2024-107 Bid Tabs.pdf

PDF 301 KB Posted

Attached to
Spacesaver Power-Assist High Density Mobile File Storage System Relocation
Solicitation number
S-24800-00012270
Issued by
Marion County, Oregon

About this file

2024-107 Bid Tabs Summary

This document is a bid tabulation sheet for the Bilquist Elementary School Sidewalks Construction project, involving multiple agencies and jurisdictions in Oregon. The project encompasses comprehensive sidewalk and drainage infrastructure improvements, including storm sewer installation, concrete work, asphalt paving, erosion control, and site restoration. The bid tab lists 72 line items with quantities ranging from fractions of a cubic yard to over 13,000 linear feet, covering work such as 12-inch and 15-inch storm sewer pipes at various depths, concrete curbs and walks, pavement markings, drainage structures, and landscape restoration. Ten contractors submitted bids for this project, with the bid opening occurring on January 8, 2025. The project includes specifications for mobilization, traffic control, environmental controls, survey work, and various utility modifications.

The engineers' estimate for the project totaled $2,401,706.00, with individual bid amounts ranging from a low of $2,143,495.00 (Turney Excavating Inc.) to a high of $2,802,828.00 (Corpac Construction Company). Pricing variation across bidders is substantial, particularly in specialized categories such as mobilization (ranging from $44,000 to $240,000), storm sewer pipe installation (unit prices from $95 to $328 per linear foot), and concrete work (unit costs varying significantly by component type). The tabulation includes average unit prices and total prices for each item across all bidders, enabling comparative analysis. One bidder (SLE Inc.) contained a documented mathematical discrepancy of $0.47 between individual line items and the stated total contract value. All bids are presented on a lump-sum basis with unit pricing for individual components, allowing for potential contingency adjustments and change order analysis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item # Spec

I t e

Unit Quantity Unit Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price LOW HIGH AVG Item Price AVG Total

1 00180 Workplace Harrassment Prevention Plan LS 1 3,000.00 3,000.00 350.00 350.00 3,000.00 3,000.00 2,500.00 2,500.00 500.00 500.00 1,180.00 1,180.00 500.00 500.00 300.00 300.00 1,000.00 1,000.00 2,000.00 2,000.00 300.00 3,000.00 1,258.89$ 1,258.89$

2 00196 Extra Work As Authorized AA 1 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00$ 100,000.00$

3 00210 Mobilization LS 1 207,000.00 207,000.00 102,000.00 102,000.00 220,000.00 220,000.00 205,125.00 205,125.00 230,525.00 230,525.00 175,000.00 175,000.00 210,080.00 210,080.00 214,856.00 214,856.00 44,000.00 44,000.00 240,000.00 240,000.00 44,000.00 240,000.00 182,398.44$ 182,398.44$

4 00221 Temporary Work Zone Traffic Control, Complete LS 1 89,000.00 89,000.00 58,650.00 58,650.00 26,000.00 26,000.00 70,000.00 70,000.00 125,000.00 125,000.00 61,400.00 61,400.00 20,000.00 20,000.00 35,000.00 35,000.00 150,000.00 150,000.00 50,000.00 50,000.00 20,000.00 150,000.00 66,227.78$ 66,227.78$

5 00223 Flaggers HR 3,120 68.00 212,160.00 88.00 274,560.00 79.00 246,480.00 78.00 243,360.00 62.50 195,000.00 77.20 240,864.00 79.00 246,480.00 98.00 305,760.00 75.00 234,000.00 77.00 240,240.00 195,000.00 305,760.00 79.30$ 247,416.00$

6 00225 Temporary Striping LF 4,500 0.65 2,925.00 0.75 3,375.00 1.00 4,500.00 0.50 2,250.00 0.63 2,835.00 0.78 3,510.00 0.65 2,925.00 0.75 3,375.00 0.70 3,150.00 1.40 6,300.00 2,250.00 6,300.00 0.80$ 3,580.00$

7 00225 Stripe Removal LF 243 0.75 182.25 3.00 729.00 3.00 729.00 2.50 607.50 2.50 607.50 6.00 1,458.00 2.50 607.50 3.00 729.00 3.00 729.00 2.75 668.25 607.50 1,458.00 3.14$ 762.75$

8 00280 Erosion Control LS 1 5,000.00 5,000.00 7,000.00 7,000.00 12,000.00 12,000.00 12,000.00 12,000.00 35,000.00 35,000.00 8,000.00 8,000.00 32,200.00 32,200.00 25,000.00 25,000.00 1,500.00 1,500.00 8,000.00 8,000.00 1,500.00 35,000.00 15,633.33$ 15,633.33$

9 00280 Check Dam, Type 6 EA 3 195.00 585.00 400.00 1,200.00 300.00 900.00 185.00 555.00 175.00 525.00 200.00 600.00 260.00 780.00 170.00 510.00 100.00 300.00 250.00 750.00 300.00 1,200.00 226.67$ 680.00$

10 00280 Sediment Barrier, Type 8 LF 2,487 8.50 21,139.50 4.25 10,569.75 6.00 14,922.00 7.50 18,652.50 5.50 13,678.50 12.50 31,087.50 6.50 16,165.50 9.00 22,383.00 4.00 9,948.00 6.25 15,543.75 9,948.00 31,087.50 6.83$ 16,994.50$

11 00280 Inlet Protection, Type 3 EA 20 100.00 2,000.00 170.00 3,400.00 100.00 2,000.00 100.00 2,000.00 78.00 1,560.00 70.00 1,400.00 100.00 2,000.00 100.00 2,000.00 115.00 2,300.00 125.00 2,500.00 1,400.00 3,400.00 106.44$ 2,128.89$

12 00280 Pollution Control Plan LS 1 1,000.00 1,000.00 350.00 350.00 500.00 500.00 500.00 500.00 1,500.00 1,500.00 300.00 300.00 500.00 500.00 400.00 400.00 2,000.00 2,000.00 2,000.00 2,000.00 300.00 2,000.00 894.44$ 894.44$

13 00305 Construction Survey Work LS 1 43,000.00 43,000.00 61,900.00 61,900.00 34,000.00 34,000.00 30,000.00 30,000.00 33,000.00 33,000.00 36,225.00 36,225.00 34,265.00 34,265.00 36,750.00 36,750.00 34,650.00 34,650.00 40,000.00 40,000.00 30,000.00 61,900.00 37,865.56$ 37,865.56$

14 00310 Removal of Structures and Obstructions LS 1 25,000.00 25,000.00 53,000.00 53,000.00 100,000.00 100,000.00 30,000.00 30,000.00 55,000.00 55,000.00 38,550.50 38,550.50 81,000.00 81,000.00 22,000.00 22,000.00 43,000.00 43,000.00 85,000.00 85,000.00 22,000.00 100,000.00 56,394.50$ 56,394.50$

15 00310 Removal of Pipes LF 386 65.00 25,090.00 70.00 27,020.00 100.00 38,600.00 8.00 3,088.00 35.00 13,510.00 14.50 5,597.00 20.00 7,720.00 75.00 28,950.00 6.50 2,509.00 45.00 17,370.00 2,509.00 38,600.00 41.56$ 16,040.44$

16 00310 Removal of Inlets EA 7 750.00 5,250.00 800.00 5,600.00 1,000.00 7,000.00 500.00 3,500.00 750.00 5,250.00 705.00 4,935.00 870.00 6,090.00 1,200.00 8,400.00 1,000.00 7,000.00 700.00 4,900.00 3,500.00 8,400.00 836.11$ 5,852.78$

17 00320 Clearing and Grubbing LS 1 33,000.00 33,000.00 55,250.00 55,250.00 24,000.00 24,000.00 45,000.00 45,000.00 35,000.00 35,000.00 46,940.00 46,940.00 19,500.00 19,500.00 35,000.00 35,000.00 17,250.00 17,250.00 65,000.00 65,000.00 17,250.00 65,000.00 38,104.44$ 38,104.44$

18 00330 General Excavation CY 1,113 55.00 61,215.00 81.00 90,153.00 60.00 66,780.00 70.00 77,910.00 60.00 66,780.00 93.00 103,509.00 78.00 86,814.00 82.00 91,266.00 66.00 73,458.00 125.00 139,125.00 66,780.00 139,125.00 79.44$ 88,421.67$

19 00350 Subgrade Geotextile SY 1,453 2.25 3,269.25 1.50 2,179.50 3.00 4,359.00 1.50 2,179.50 1.50 2,179.50 2.00 2,906.00 2.00 2,906.00 2.00 2,906.00 2.00 2,906.00 1.50 2,179.50 2,179.50 4,359.00 1.89$ 2,744.56$

20 00445 12 Inch Storm Sewer Pipe, 5ft Depth LF 460 165.00 75,900.00 125.00 57,500.00 130.00 59,800.00 100.00 46,000.00 130.00 59,800.00 205.00 94,300.00 95.00 43,700.00 140.00 64,400.00 123.25 56,695.00 265.00 121,900.00 43,700.00 121,900.00 145.92$ 67,121.67$

21 00445 12 Inch Storm Sewer Pipe, 10ft Depth LF 904 175.00 158,200.00 100.00 90,400.00 190.00 171,760.00 130.00 117,520.00 140.00 126,560.00 267.00 241,368.00 125.00 113,000.00 160.00 144,640.00 143.50 129,724.00 210.00 189,840.00 90,400.00 241,368.00 162.83$ 147,201.33$

22 00445 15 Inch Storm Sewer Pipe, 10ft Depth LF 154 185.00 28,490.00 144.00 22,176.00 230.00 35,420.00 180.00 27,720.00 210.00 32,340.00 328.00 50,512.00 155.00 23,870.00 198.00 30,492.00 213.00 32,802.00 290.00 44,660.00 22,176.00 50,512.00 216.44$ 33,332.44$

23 00470 Concrete Storm Sewer Manholes EA 10 8,600.00 86,000.00 7,250.00 72,500.00 6,000.00 60,000.00 5,500.00 55,000.00 8,500.00 85,000.00 7,800.00 78,000.00 4,700.00 47,000.00 9,500.00 95,000.00 8,358.00 83,580.00 8,500.00 85,000.00 47,000.00 95,000.00 7,345.33$ 73,453.33$

24 00470 Concrete Inlets, Type WES Standard GB-2 EA 16 5,800.00 92,800.00 3,750.00 60,000.00 3,300.00 52,800.00 3,800.00 60,800.00 3,500.00 56,000.00 4,200.00 67,200.00 4,000.00 64,000.00 6,000.00 96,000.00 4,480.00 71,680.00 4,000.00 64,000.00 52,800.00 96,000.00 4,114.44$ 65,831.11$

25 SP0470 Storage Pond, Infiltration Trench 1 LS 1 33,600.00 33,600.00 26,700.00 26,700.00 13,000.00 13,000.00 20,000.00 20,000.00 44,100.00 44,100.00 33,760.00 33,760.00 42,500.00 42,500.00 35,000.00 35,000.00 18,648.00 18,648.00 50,000.00 50,000.00 13,000.00 50,000.00 31,523.11$ 31,523.11$

26 SP0470A Precast 48" Water Quality Manhole EA 1 19,700.00 19,700.00 23,500.00 23,500.00 21,000.00 21,000.00 19,000.00 19,000.00 15,200.00 15,200.00 25,000.00 25,000.00 21,000.00 21,000.00 24,500.00 24,500.00 22,515.00 22,515.00 30,000.00 30,000.00 15,200.00 30,000.00 22,412.78$ 22,412.78$

27 SP0470B Galvanized Steel Curb Hatch EA 2 11,000.00 22,000.00 9,400.00 18,800.00 6,000.00 12,000.00 4,500.00 9,000.00 8,750.00 17,500.00 7,630.00 15,260.00 5,500.00 11,000.00 5,000.00 10,000.00 6,937.50 13,875.00 6,000.00 12,000.00 9,000.00 18,800.00 6,635.28$ 13,270.56$

28 00490 Extra For Manholes Over Existing Sewers EA 2 3,000.00 6,000.00 4,500.00 9,000.00 2,000.00 4,000.00 2,500.00 5,000.00 1,250.00 2,500.00 3,275.00 6,550.00 1,750.00 3,500.00 10,500.00 21,000.00 10,933.00 21,866.00 5,000.00 10,000.00 2,500.00 21,866.00 4,634.22$ 9,268.44$

29 00490 Filling Abandoned Structures EA 7 3,500.00 24,500.00 1,000.00 7,000.00 2,000.00 14,000.00 350.00 2,450.00 500.00 3,500.00 1,700.00 11,900.00 540.00 3,780.00 1,000.00 7,000.00 500.00 3,500.00 1,750.00 12,250.00 2,450.00 14,000.00 1,037.78$ 7,264.44$

30 00490 Adjusting Boxes EA 34 477.00 16,218.00 200.00 6,800.00 300.00 10,200.00 250.00 8,500.00 175.00 5,950.00 300.00 10,200.00 800.00 27,200.00 575.00 19,550.00 500.00 17,000.00 275.00 9,350.00 5,950.00 27,200.00 375.00$ 12,750.00$

31 00490 Major Adjustment of Manholes EA 2 3,500.00 7,000.00 3,300.00 6,600.00 1,800.00 3,600.00 2,000.00 4,000.00 1,250.00 2,500.00 4,000.00 8,000.00 2,400.00 4,800.00 3,000.00 6,000.00 1,500.00 3,000.00 5,000.00 10,000.00 2,500.00 10,000.00 2,694.44$ 5,388.89$

32 00490 Minor Adjustment of Manholes EA 5 2,000.00 10,000.00 1,800.00 9,000.00 900.00 4,500.00 1,400.00 7,000.00 150.00 750.00 2,000.00 10,000.00 1,200.00 6,000.00 1,350.00 6,750.00 1,000.00 5,000.00 1,500.00 7,500.00 750.00 10,000.00 1,255.56$ 6,277.78$

33 00490 Connection to Existing Structures EA 3 3,000.00 9,000.00 2,675.00 8,025.00 2,000.00 6,000.00 3,000.00 9,000.00 2,500.00 7,500.00 2,630.00 7,890.00 3,000.00 9,000.00 3,500.00 10,500.00 1,450.00 4,350.00 2,750.00 8,250.00 4,350.00 10,500.00 2,611.67$ 7,835.00$

34 00495 Trench Resurfacing SY 468 75.00 35,100.00 146.00 68,328.00 90.00 42,120.00 100.00 46,800.00 70.00 32,760.00 66.50 31,122.00 50.00 23,400.00 208.00 97,344.00 64.50 30,186.00 140.00 65,520.00 23,400.00 97,344.00 103.89$ 48,620.00$

35 00620 Cold Plane Pavement Removal, 0 - 2 Inches Deep SY 5,302 4.50 23,859.00 6.75 35,788.50 7.00 37,114.00 6.00 31,812.00 6.50 34,463.00 5.50 29,161.00 5.00 26,510.00 10.00 53,020.00 6.60 34,993.20 6.75 35,788.50 26,510.00 53,020.00 6.68$ 35,405.58$

36 00641 Aggregate Base TON 1,521 50.00 76,050.00 59.00 89,739.00 60.00 91,260.00 50.00 76,050.00 45.00 68,445.00 56.50 85,936.50 67.00 101,907.00 60.00 91,260.00 73.00 111,033.00 75.00 114,075.00 68,445.00 114,075.00 60.61$ 92,189.50$

37 00744 Level 3, 1/2" ACP Mixture TON 1,594 125.00 199,250.00 173.25 276,160.50 170.00 270,980.00 165.00 263,010.00 145.00 231,130.00 175.00 278,950.00 170.00 270,980.00 168.00 267,792.00 156.50 249,461.00 155.00 247,070.00 231,130.00 278,950.00 164.19$ 261,725.94$

38 00749 Extra for Asphalt Approaches EA 17 1,200.00 20,400.00 1,175.00 19,975.00 1,300.00 22,100.00 1,500.00 25,500.00 1,000.00 17,000.00 2,400.00 40,800.00 1,800.00 30,600.00 3,750.00 63,750.00 1,280.29 21,764.93 1,400.00 23,800.00 17,000.00 63,750.00 1,733.92$ 29,476.66$

39 00759 Concrete Curbs, Standard Curb LF 496 40.00 19,840.00 36.75 18,228.00 30.00 14,880.00 35.00 17,360.00 28.00 13,888.00 35.00 17,360.00 25.50 12,648.00 50.00 24,800.00 40.00 19,840.00 38.00 18,848.00 12,648.00 24,800.00 35.36$ 17,539.11$

40 00759 Concrete Curbs, Curb & Gutter LF 2,634 40.00 105,360.00 39.00 102,726.00 23.00 60,582.00 36.00 94,824.00 38.00 100,092.00 37.00 97,458.00 28.00 73,752.00 42.00 110,628.00 45.00 118,530.00 40.00 105,360.00 60,582.00 118,530.00 36.44$ 95,994.67$

41 00759 Concrete Islands SF 273 33.00 9,009.00 26.25 7,166.25 18.00 4,914.00 27.00 7,371.00 28.00 7,644.00 29.00 7,917.00 19.00 5,187.00 28.00 7,644.00 28.00 7,644.00 23.00 6,279.00 4,914.00 7,917.00 25.14$ 6,862.92$

42 0759 Concrete Walks SF 11,913 11.00 131,043.00 9.50 113,173.50 6.00 71,478.00 10.00 119,130.00 11.00 131,043.00 10.40 123,895.20 6.50 77,434.50 13.00 154,869.00 8.60 102,451.80 9.50 113,173.50 71,478.00 154,869.00 9.39$ 111,849.83$

43 SP0759 Extra for Thickened Edge Sidewalk LF 160 36.00 5,760.00 106.50 17,040.00 50.00 8,000.00 91.00 14,560.00 60.00 9,600.00 89.13 14,260.80 70.00 11,200.00 83.00 13,280.00 26.40 4,224.00 85.00 13,600.00 4,224.00 17,040.00 73.45$ 11,751.64$

44 0759 Concrete Driveways SF 5,988 16.00 95,808.00 13.50 80,838.00 12.00 71,856.00 15.00 89,820.00 16.00 95,808.00 17.25 103,293.00 9.00 53,892.00 30.00 179,640.00 9.00 53,892.00 17.00 101,796.00 53,892.00 179,640.00 15.42$ 92,315.00$

45 0759 Concrete Driveways, Reinforced SF 650 28.00 18,200.00 16.00 10,400.00 14.00 9,100.00 19.00 12,350.00 23.00 14,950.00 19.76 12,844.00 11.50 7,475.00 30.50 19,825.00 16.06 10,439.00 20.00 13,000.00 7,475.00 19,825.00 18.87$ 12,264.78$

46 0759 Truncated Domes On New Surfaces SF 301 45.00 13,545.00 37.00 11,137.00 40.00 12,040.00 33.00 9,933.00 60.00 18,060.00 36.00 10,836.00 30.00 9,030.00 36.00 10,836.00 35.00 10,535.00 32.00 9,632.00 9,030.00 18,060.00 37.67$ 11,337.67$

47 0759 Extra For New Curb Ramps EA 24 2,200.00 52,800.00 1,780.00 42,720.00 1,600.00 38,400.00 1,500.00 36,000.00 1,300.00 31,200.00 2,100.00 50,400.00 1,040.00 24,960.00 1,850.00 44,400.00 1,292.50 31,020.00 1,600.00 38,400.00 24,960.00 50,400.00 1,562.50$ 37,500.00$

48 0855 Bi-Directional Yellow Type I Markers EA 8 30.00 240.00 68.00 544.00 60.00 480.00 61.00 488.00 55.00 440.00 24.00 192.00 55.00 440.00 80.00 640.00 64.25 514.00 60.00 480.00 192.00 640.00 58.58$ 468.67$

49 0855 Bi-Directional Blue Type IAR Markers, Recessed EA 2 30.00 60.00 290.00 580.00 250.00 500.00 250.00 500.00 235.00 470.00 1,100.00 2,200.00 235.00 470.00 350.00 700.00 273.50 547.00 250.00 500.00 470.00 2,200.00 359.28$ 718.56$

50 0865 Thermoplastic, Extruded, Surface, Non-profiled LF 13,663 1.33 18,171.79 1.75 23,910.25 1.50 20,494.50 1.50 20,494.50 1.50 20,494.50 2.00 27,326.00 1.50 20,494.50 2.00 27,326.00 1.50 20,494.50 1.60 21,860.80 20,494.50 27,326.00 1.65$ 22,543.95$

51 0867 Pavement Legend, Type AB: Arrows EA 6 350.00 2,100.00 380.00 2,280.00 350.00 2,100.00 350.00 2,100.00 310.00 1,860.00 455.00 2,730.00 300.00 1,800.00 385.00 2,310.00 346.00 2,076.00 325.00 1,950.00 1,800.00 2,730.00 355.67$ 2,134.00$

52 0867 Pavement Legend, Type B-HS: Bike Lane Stencil EA 10 340.00 3,400.00 420.00 4,200.00 400.00 4,000.00 400.00 4,000.00 350.00 3,500.00 455.00 4,550.00 350.00 3,500.00 410.00 4,100.00 376.00 3,760.00 350.00 3,500.00 3,500.00 4,550.00 390.11$ 3,901.11$

53 0867 Pavement Bar, Type B-HS SF 105 13.00 1,365.00 14.50 1,522.50 14.00 1,470.00 13.00 1,365.00 12.00 1,260.00 23.00 2,415.00 12.00 1,260.00 15.00 1,575.00 13.00 1,365.00 12.50 1,312.50 1,260.00 2,415.00 14.33$ 1,505.00$

54 0868 Green Bicycle Lane, Preformed Thermoplastic Film SF 110 12.60 1,386.00 17.00 1,870.00 18.00 1,980.00 15.00 1,650.00 14.00 1,540.00 37.00 4,070.00 14.00 1,540.00 17.50 1,925.00 15.50 1,705.00 15.00 1,650.00 1,540.00 4,070.00 18.11$ 1,992.22$

55 0869 Curb Marking, Paint LF 20 6.50 130.00 8.00 160.00 8.00 160.00 7.00 140.00 7.00 140.00 10.00 200.00 7.00 140.00 15.00 300.00 8.65 173.00 7.00 140.00 140.00 300.00 8.63$ 172.56$

56 0902 Crosswalk Closure Supports EA 4 1,300.00 5,200.00 1,700.00 6,800.00 1,200.00 4,800.00 1,300.00 5,200.00 1,200.00 4,800.00 1,670.00 6,680.00 1,200.00 4,800.00 1,350.00 5,400.00 1,812.50 7,250.00 1,200.00 4,800.00 4,800.00 7,250.00 1,403.61$ 5,614.44$

57 0905 Remove Existing Signs LS 1 4,350.00 4,350.00 370.00 370.00 2,000.00 2,000.00 2,200.00 2,200.00 1,500.00 1,500.00 370.00 370.00 2,000.00 2,000.00 2,350.00 2,350.00 5,000.00 5,000.00 3,000.00 3,000.00 370.00 5,000.00 2,087.78$ 2,087.78$

58 0905 Remove and Reinstall Existing Signs LS 1 3,500.00 3,500.00 5,600.00 5,600.00 4,500.00 4,500.00 5,000.00 5,000.00 4,550.00 4,550.00 5,480.00 5,480.00 4,580.00 4,580.00 5,500.00 5,500.00 5,000.00 5,000.00 5,000.00 5,000.00 4,500.00 5,600.00 5,023.33$ 5,023.33$

59 0920 Sign Support Footings CY 2.6 4,000.00 10,400.00 11,500.00 29,900.00 1,000.00 2,600.00 2,400.00 6,240.00 2,100.00 5,460.00 11,640.00 30,264.00 2,100.00 5,460.00 2,450.00 6,370.00 884.62 2,300.01 2,400.00 6,240.00 2,300.01 30,264.00 4,052.74$ 10,537.11$

60 0930 Perforated Steel Square Tube Anchor Sign Supports LS 1 7,726.46 7,726.46 24,400.00 24,400.00 7,000.00 7,000.00 7,500.00 7,500.00 7,000.00 7,000.00 23,878.00 23,878.00 6,900.00 6,900.00 8,000.00 8,000.00 7,650.00 7,650.00 8,000.00 8,000.00 6,900.00 24,400.00 11,147.56$ 11,147.56$

61 0940 Signs, Standard Sheeting, Extruded Aluminum SF 239 44.00 10,516.00 48.25 11,531.75 32.00 7,648.00 35.00 8,365.00 32.00 7,648.00 47.00 11,233.00 32.00 7,648.00 37.00 8,843.00 36.00 8,604.00 35.00 8,365.00 7,648.00 11,531.75 37.14$ 8,876.19$

62 0970 Pole Foundations LS 1 3,000.00 3,000.00 2,725.00 2,725.00 4,000.00 4,000.00 2,500.00 2,500.00 4,400.00 4,400.00 2,675.00 2,675.00 2,500.00 2,500.00 4,750.00 4,750.00 5,545.00 5,545.00 2,500.00 2,500.00 2,500.00 5,545.00 3,510.56$ 3,510.56$

63 0970 Switching, Conduit, And Wiring LS 1 15,000.00 15,000.00 13,600.00 13,600.00 30,000.00 30,000.00 13,000.00 13,000.00 11,000.00 11,000.00 13,285.00 13,285.00 11,000.00 11,000.00 16,500.00 16,500.00 12,100.00 12,100.00 16,000.00 16,000.00 11,000.00 30,000.00 15,165.00$ 15,165.00$

64 0990 Flashing Beacon Installation, SE Webster Rd & SE Bixel

Way LS 1 10,000.00 10,000.00 9,900.00 9,900.00 17,000.00 17,000.00 8,000.00 8,000.00 8,000.00 8,000.00 9,660.00 9,660.00 8,500.00 8,500.00 11,000.00 11,000.00 8,800.00 8,800.00 10,000.00 10,000.00 8,000.00 17,000.00 10,095.56$ 10,095.56$

65 0990 Flashing Beacon Installation, SE Webster Rd & SE Webster

Lane LS 1 10,000.00 10,000.00 9,900.00 9,900.00 17,000.00 17,000.00 9,000.00 9,000.00 8,000.00 8,000.00 9,660.00 9,660.00 7,500.00 7,500.00 11,000.00 11,000.00 8,800.00 8,800.00 10,000.00 10,000.00 7,500.00 17,000.00 10,095.56$ 10,095.56$

66 1030 Permanent Seeding AC 0 18,500.00 3,330.00 10,500.00 1,890.00 12,000.00 2,160.00 10,000.00 1,800.00 8,500.00 1,530.00 12,075.00 2,173.50 10,000.00 1,800.00 10,000.00 1,800.00 16,800.00 3,024.00 10,250.00 1,845.00 1,530.00 3,024.00 11,125.00$ 2,002.50$

67 1040 Topsoil CY 95 85.00 8,075.00 95.25 9,048.75 90.00 8,550.00 86.00 8,170.00 80.00 7,600.00 85.00 8,075.00 72.00 6,840.00 90.00 8,550.00 51.00 4,845.00 75.00 7,125.00 4,845.00 9,048.75 80.47$ 7,644.86$

68 1040 Bark Mulch CY 23 85.00 1,955.00 112.00 2,576.00 90.00 2,070.00 100.00 2,300.00 95.00 2,185.00 85.00 1,955.00 68.00 1,564.00 108.00 2,484.00 68.00 1,564.00 75.00 1,725.00 1,564.00 2,576.00 89.00$ 2,047.00$

69 1070 Single Mailbox Supports EA 13 850.00 11,050.00 1,200.00 15,600.00 600.00 7,800.00 750.00 9,750.00 660.00 8,580.00 1,175.00 15,275.00 700.00 9,100.00 775.00 10,075.00 203.00 2,639.00 700.00 9,100.00 2,639.00 15,600.00 751.44$ 9,768.78$

70 1070 Multiple Mailbox Supports EA 2 1,200.00 2,400.00 2,135.00 4,270.00 1,200.00 2,400.00 1,500.00 3,000.00 1,355.00 2,710.00 2,060.00 4,120.00 1,400.00 2,800.00 1,600.00 3,200.00 1,162.50 2,325.00 1,450.00 2,900.00 2,325.00 4,270.00 1,540.28$ 3,080.56$

71 1070 Mailbox Concrete Collars EA 15 500.00 7,500.00 185.00 2,775.00 60.00 900.00 500.00 7,500.00 400.00 6,000.00 180.00 2,700.00 400.00 6,000.00 475.00 7,125.00 200.00 3,000.00 425.00 6,375.00 900.00 7,500.00 313.89$ 4,708.33$

72 01150 2.5 Inch Backflow Prevention Assembly EA 1 1,500.00 1,500.00 3,300.00 3,300.00 13,000.00 13,000.00 5,000.00 5,000.00 1,850.00 1,850.00 4,430.00 4,430.00 5,000.00 5,000.00 5,500.00 5,500.00 7,235.00 7,235.00 6,000.00 6,000.00 1,850.00 13,000.00 5,701.67$ 5,701.67$

$2,377,603.25 $2,357,960.25 $2,293,286.50 $2,220,000.00 $2,305,251.00 $2,623,232.00 $2,143,495.00 $2,802,828.00 * $2,146,264.44 $2,723,036.80 2,143,495.00 2,802,828.00 $2,401,706.00

Kerr Contractors Oregon, LLC The Saunders Co., Inc. Moore Excavation Inc.SLE Inc.

BILQUIST ELEMENTARY SCHOOL SIDEWALKS CONSTRUCTION

Dirt & Aggregate Interchange Inc.D&D Concrete

Bid Opening January 8, 2025

Engineers Estimate Turney Excavating Inc. Pacific Excavation Inc. Corpac Construction Company

* SLE's bid had $0.47 math error between Total Contract

Value and total bid schedule values

File details come from the government source that posted it. Updated .