2024 0709 - SMCISD Mendez ES - ADD 01 - NARRATIVE.pdf
PDF 388 KB Posted
- Attached to
- SMCISD Mendez Elementary Replacement
- Solicitation number
- CSP-MD-2024-01
- Issued by
- Hays County, Texas
About this file
This document is Addendum No. 02 for the SMCISD Mendez Elementary School Replacement project for San Marcos Consolidated Independent School District (SMCISD) in Texas, issued by Perkins&Will on July 9, 2024. The addendum provides comprehensive modifications to the original Issue for Construction documents dated June 07, 2024, and includes changes to architectural specifications, drawings, and details across multiple sheets. Key modifications involve revisions to roof and deck insulation specifications, deletion of certain PVC membrane scope items, updates to code compliance plans, changes to floor plans and ceiling plans, adjustments to interior and exterior elevations, and numerous technical refinements to room configurations, door schedules, and finishing details.
The addendum does not specify pricing terms or funding sources directly, but indicates this is part of a competitive sealed proposal process with an initial proposal deadline of July 16, 2024, at 2:00 pm. The document is part of a comprehensive architectural redesign for a new elementary school, with meticulous attention to technical specifications, room layouts, fire rating requirements, and construction details. The addendum includes attachments for architectural, structural, MEP (mechanical, electrical, plumbing), technology documents, and a pre-bid RFI (Request for Information) response letter, suggesting a complex, multi-disciplinary construction project with rigorous design and documentation standards.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SMCISD Mendez Elementary School Replacement Perkins&Will San Marcos, Texas 213030.000 Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 1 of 10
Addendum No. 02 For
SMCISD Mendez Elementary School Replacement
San Marcos Consolidated ISD
JULY 9, 2024
The following items modify the plans and specifications and shall become a part of the contract documents.
07.09.2024
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 2 of 10
1.1 SCOPE
A. This Addendum is issued pursuant of Article 1.1.1 of the General Conditions of the Contract for Construction (AIA A201, 2017 Edition) in connection with the revisions of Issue for Construction documents issued June 07, 2024.
B. When construction is not under contract, all instructions contained herein shall be reflected in the Contract Sum and this Addendum will be made a part of the Contract Documents, if, as, and when a Contract is awarded.
C. This Addendum forms a part of the Contract Documents and modifies the original Issue for Construction documents dated June 07, 2024. Receipt of this Addendum must be acknowledged in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
D. This Addendum consists of 10 pages, plus attachments.
1.2 CLARIFICATIONS TO CONTRACT DOCUMENTS
A. None.
1.3 CHANGES TO THE SPECIFICATIONS
A. 07 22 00 – ROOF AND DECK INSULATION
1. Page 07 22 00 – 4: Modification of maximum board thickness to allow board thicknesses greater than 2.6 inches where 3 or more layers of insulation are present. Boards with thickness greater than 2.6” must be used as the first layer of insulation.
2. Page 07 22 00 – 6: Modification of attachment requirements to allow fastening of two layers of insulation simultaneously if 3 or more layers of insulation are present.
B. 07 54 19 – POLYVINYL-CHLORIDE (PVC) ROOFING
1. Section 1.6.E – Deletion of fleeceback PVC membrane scope items.
2. Section 2..1.B.2 – Deletion of fleeceback PVC membrane scope items.
3. Section 2.3.C.2 – Deletion of fleeceback PVC membrane scope items.
4. Section 3.4.C.1.B – Deletion of fleeceback PVC membrane scope items.
1.4 CHANGES TO THE DRAWINGS
A. 01 – GENERAL
1. SHEET G00-01 – PROJECT DATA
a. Add alternates added to sheet
2. SHEET G01-01 – CODE COMPLIANCE PLAN – LEVEL 01
a. MDF/ IDF ROOMS - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
3. SHEET G01-02 – CODE COMPLIANCE PLAN – LEVEL 02
a. Cumulative occupant load calculation chart adjusted: “Stair provided” value changed to
196”
b. MDF/ IDF ROOMS - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
4. SHEET G03-01 – PHASING DIAGRAMS
a. New Sheet.
B. 04 - ARCHITECTURAL
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 3 of 10
1. SHEET A01-01 – ARCHITECTURAL SITE PLAN
a. Removed ‘FEC’ annotations for clarity.
2. SHEET A01-02 – ENLARGED SITE PLANS AND DETAILS
a. Detail 4 – Note added for “ 7” anodized aluminum lettering with integrated backlit lighting”
b. Detail 7 – Note to ref structural added
c. Detail 7 – Note added “conduit for electrical and tech stub up”
d. Detail 9 – Egress arrows removed for clarity
e. Detail 10 – Redundant note to ref structural deleted
f. Detail 11 – Note added for 6” tall, anodized aluminum lettering with integrated backlit lighting”
g. Detail 12 – Detail notes added
3. SHEET A02-01 – ENLARGED SITE PLANS AND DETAILS
a. Detail 4 – Dimension added for wall thickness
4. SHEET A10-03 – OVERALL ROOF PLAN
a. Building expansion joints near grid line A9.9 removed
b. Reference detail added for West entry canopy (Detail 3/A31-02)
c. Note added at both entry canopies “Slope changes at edge, refer to section”
5. SHEET A11-01A – FLOOR PLAN – LEVEL 01 – AREA A
a. Moved detail tag for clarity
b. Detail 15/A52-01 reference tag placed on window A8 at reception
c. Column wrap at A1/ AJ moved
d. Detail 14/A63-50 reference tag placed on column A1/AJ
e. Detail 16/A63-50 reference tag placed on column A1/AH
f. MDF A118 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
g. Door A124.1 - Revised corridor walls to ensure continuation of the 2hr firewall and the associated expansion joint
6. SHEET A11-01B – FLOOR PLAN – LEVEL 01 – AREA B
a. Detail 14/A63-50 reference tag placed on column A1/AG
b. Detail 16/A63-50 reference tag placed on column A1/AH
c. Column wrap at A1/ AG moved
d. IDF B103 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
e. Door B111.1 - Revised corridor walls to ensure continuation of the 2hr firewall and the associated expansion joint
7. SHEET A11-01C – FLOOR PLAN – LEVEL 01 – AREA C
a. Stacks / Circ Desk C102 south view renumbered per A45-06 sheet view renumbering.
b. Interior elevations added to Office C103.
c. Dimension added from grid line CA to edge of roof canopy above
8. SHEET A11-01D – FLOOR PLAN – LEVEL 01 – AREA D
a. Revised 1st grade D128 & 129 door numbers to match their room numbers.
b. D125 - Revised partition and jambs at operable door opening to accommodate track depth.
c. D120 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
9. SHEET A11-01E – FLOOR PLAN – LEVEL 01 – AREA E
a. Added reference elevations to clarify finish scope.
b. E129 & E121: Revised millwork cubby elevation tags.
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 4 of 10
c. Clarified height of partial height partition in E109.
d. Pantry E100A: Provided millwork elevation.
e. E106 & E108: Revised millwork and provided millwork elevations.
f. E125: Revised partition and jambs at operable door opening to accommodate track depth.
10. SHEET A11-02C – FLOOR PLAN – LEVEL 02 – AREA C
a. Grid bubble AM moved for clarity
11. SHEET A11-02D – FLOOR PLAN – LEVEL 02 – AREA D
a. Dimension added for courtyard glazing locations
b. Clarified depth of typical column furr out along exterior walls.
c. D200: Updated millwork and elevations to accommodate mechanical chase.
d. D202: Revised millwork cubby elevation tags.
e. D222: Revised location of teacher cabinet millwork.
f. Added reference elevations to clarify finish scope.
g. Door D200A.1 changed from glazing type 17 to type 1
h. Door D200A.2 changed from glazing type 16 to type 3
i. Dimensions added in room D210
j. D206 & D225: Revised partition and jambs at operable door opening to accommodate track depth.
k. IDF D230 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements.
12. SHEET A11-02E – FLOOR PLAN – LEVEL 02 – AREA E
a. Clarified depth of typical column furr out along exterior walls.
b. Added reference elevations to clarify finish scope.
c. Door E200A.1 changed from glazing type 16 to type 1
d. Door E200A.2 changed from glazing type 17 to type 3
e. E206 & E225: Revised partition and jambs at operable door opening to accommodate track depth.
13. SHEET A12-01D – RELFECTED CEILING PLAN – LEVEL 01 – AREA D
a. D125: Revised ceiling transition at operable partition to accommodate track depth.
b. D105: Revised keynote.
14. SHEET A12-01E – RELFECTED CEILING PLAN – LEVEL 01 – AREA E
a. Clarified typical interior & exterior window treatment details.
b. E125: Revised ceiling transition at operable partition to accommodate track depth.
15. SHEET A12-02D– RELFECTED CEILING PLAN – LEVEL 02 – AREA D
a. Updated gyp bd soffit/sloped ceilings to align with column fur outs, typical in all classrooms.
b. Corridor D231 – Revised security flat panel locations per Technology.
c. Clarified typical interior & exterior window treatment details.
d. Revised ceiling height in niche in Corridor D233.
e. D205 & D225: Revised ceiling transition at operable partition to accommodate track depth.
16. SHEET A12-02E - – RELFECTED CEILING PLAN – LEVEL 02 – AREA E
a. Updated gyp bd soffit/sloped ceilings to align with column furr outs, typical in all classrooms.
b. Corridor E235 – Revised security flat panel locations per Technology.
c. Clarified typical interior & exterior window treatment details.
d. Revised ceiling height in niche in Corridor E237.
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 5 of 10
e. E205 & E225: Revised ceiling transition at operable partition to accommodate track depth.
17. SHEET A13-01A – INTERIOR FINISH PLAN – LEVEL 01 – AREA A
a. Revised finishes at Cafeteria south wall per interior elevations.
b. Finish plan note arrow head adjusted on courtyard wall
18. SHEET A13-01B – INTERIOR FINISH PLAN – LEVEL 01 – AREA B
a. Revised equipment tag in Cafeteria to meet A64-01 Equipment Schedule.
b. Lines for menu boards changed from dashed to solid to show contractor responsibility.
Reference technology for responsibility of all flat panel displays.
c. Revised finishes at Cafeteria south wall per interior elevations.
d. Finish plan note arrow head adjusted on courtyard wall
19. SHEET A13-01D – INTERIOR FINISH PLAN – LEVEL 01 – AREA D
a. Clarified stair finishes at Stair 2.
20. SHEET A13-01E – INTERIOR FINISH PLAN – LEVEL 01 – AREA E
a. Added missing room name and room finish tag to ACL 2 E106.
b. E122, E121 – updated seat cushion locations per updated cubby millwork.
c. C101, E105, E109, & E110: Clarified interior and exterior window treatment with keynotes.
d. Clarified stair and plinth finishes and finish transitions at Stair 1 and Elevator Lobby E131.
e. E108A, E108B, E108C, Corridor E132: Revised finishes.
f. Noted corner guard locations.
g. Updated room number in keynote FN22 to match plan.
h. C101: Updated finishes to match interior elevations.
21. SHEET A13-02D – INTERIOR FINISH PLAN – LEVEL 02 – AREA D
a. General: Moved equipment tags from floor plan series to finish plan series.
b. SG D221A: Revised ceiling finish to match RCP. Clarified height of visual display wall covering with keynote. (Clarified visual display height only at D214.)
c. Stair 2: Revised finish tag to match room finish tag.
d. Conference E232: Updated finishes and equipment to match other conference rooms.
e. Clarified finish extents and revised wall tile at Collab millwork.
f. Corridor D231 & D234 – Revised security flat panel locations per Technology.
g. Added missing room name and finish tag to Corridor D233.
h. Corridor D231: Clarified extents of wall finishes with keynote FN19.
i. D210 & D230: Adjusted finishes to match other typical interior classrooms on Level 01 and to match RCP.
j. D200A, D203A, D207, D209A, D223A, D224, D229A: Provided missing keynotes noting other rooms to reference for finishes.
k. D214, D212, D211, D214A, D220, D233 water fountain: Revised finishes.
l. D200, D202, D203, D206, D208, D209, D210, D214, D221, D222, D223, D225, D228, D229, & D230: Clarified interior and exterior window treatment with keynotes and finish tags.
m. D201, D205, D206, D225, D231, D232, D234: Updated finishes to match RCP, finish plan keynotes & finish tags, elevations, and finish schedule comments.
22. SHEET A13-02E – INTERIOR FINISH PLAN – LEVEL 02 – AREA E
a. General: Moved equipment tags from floor plan series to finish plan series.
b. Updated room numbers in keynotes FN29 & FN30.
c. SG E223A: Revised ceiling finish to match RCP. Clarified height of visual display wall covering with keynote. (Clarified visual display height only at E214.)
d. Stair 1: Revised finish tag to match room finish tag.
e. Clarified height of FRP in E220.
f. Clarified finish extents and revised wall tile at Collab millwork.
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 6 of 10
g. Added missing room name and finish tags to Corridor E238 & E239
h. Corridor E235: Clarified extents of wall finishes with keynote FN19.
i. E210 & E230: Adjusted finishes to match other typical interior classrooms on Level 01 and to match RCP.
j. E211, E212, E213, E237 waterfountain: Revised finishes.
k. E200, E202, E203, E206, E208, E209, E210, E214, E221, E222, E223, E225, E228, E229, E230, : Clarified interior and exterior window treatment with keynotes and finish tags.
l. E201, E205, E206, E225, E226, E234, E235, E236, E237: Updated finishes to match RCP, finish plan keynotes & finish tags, elevations, and finish schedule comments.
23. SHEET A20-01 – EXTERIOR ELEVATIONS
a. Exterior elevation legend – Wall type 1, 1A, and 4, labels adjusted
b. Exterior elevation legend – Type 3 removed, Type 2 changed from “storefront system” to
“exterior glazing system”
c. Detail 1 – “typ” removed from wall type label
d. Detail 2 – Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
e. Detail 3 - Wall type label changed from “Type 2 TYP” to “Type 5 TYP” and Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
f. Detail 5 - Grid lines AM AP AQ AR AS removed for clarity
g. Detail 6 – Dimensional letter signage removed at this location
h. Detail 6 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
24. SHEET A20-02 – EXTERIOR ELEVATIONS - COURTYARDS
a. Exterior elevation legend – Wall type 1, 1A, and 4, labels adjusted
b. Detail 2 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
c. Detail 3 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
d. Detail 4 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
e. Detail 8 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP”
25. SHEET A31-04 – EXTERIOR WALL SECTIONS
a. Wall section 2 - Revised section per revisions to detail 5/A32-10
26. SHEET A32-04 – BUILDING ENCLOSURE DETAILS
a. Detail 2 – Metal stud, batt insulation, spray applied insulation removed near grid line DQ.
b. Gray hatch added above metal deck and note added for “insulation board with staggered joints. Ref specs and manufacturer recommendations.”
c. Steel angle shown to match structural drawings. Some spray foam insulation in this area removed.
d. Cold form steel studs added for mounting exterior sheathing in soffit
e. 2” rigid insulation added to edge of canopy
27. SHEET A32-10 – BUILDING ENCLOSURE DETAILS
a. Detail 5 – Revised to show the correct envelope detailing required at this location.
28. SHEET A32-11 – BUILDING ENCLOSURE DETAILS
a. Detail 2 – Expansion joint removed. Detail made to reflect roofing details – ref A32-50 series
29. SHEET A32-20 – BUILDING ENCLOSURE DETAILS
a. Detail 13 – Joint added along CMU wall er structural requirements. Backer rod and sealant note added
30. SHEET A32-21 – BUILDING ENCLOSURE DETAILS
a. Detail 1 – Expansion joint and gyp adjusted graphically. Building expansion joint adjacent to accordion fire door removed.
b. Detail 4 – Note added “wall type varies ref floor plans”
c. Detail 4 – Backer rod and sealant added at interior corner near grid lines A10/ CJ
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 7 of 10
d. Detail 5 – Overlapping notes moved for clarity
31. SHEET A32-22 – BUILDING ENCLOSURE DETAILS
a. Detail 2 - Hat channel and double gyp layer added to match X81 wall type on interior
b. Detail 5 – Detail added
c. Detail 6 - Detail added
32. SHEET A32-23 – BUILDING ENCLOSURE DETAILS
a. Detail 1 – Location of expansion joint moved
b. Detail 2 – Masonry wall ties moved for accuracy
33. SHEET A32-55: TYPICAL ROOFING DETAILS
a. Addition of detail 3 to sheet.
34. SHEET A33-02 – EXTERIOR GLAZING SCHEDULE
a. Glazing elevation B5 – Upper glazing removed for redundancy. Shown in glazing elevation B5A
35. SHEET A33-51 – EXTERIOR GLAZING DETAILS
a. Detail 5 – mullion depth changed from 7.5” to 6”
36. SHEET A33-53 – EXTERIOR GLAZING DETAILS
a. Detail 3 – Interior wall condition changed to reflect changes in detail 1/A32-23
37. SHEET A41-01 – ENLARGED STAIR PLANS & SECTIONS
a. Revised enlarged plans and sections on sheet.
38. SHEET A41-02 – ENLARGED STAGE STAIR PLANS, SECTIONS, & ELEVATIONS
a. Revised details to include more information.
b. Removed details not used.
39. Sheet A41-50 – STAIR DETAILS
a. Revised sheet to add new details and remove unused details.
b. Revised general notes.
40. SHEET A44-01 - MISCELLANEOUS ENLARGED PLANS, ENLARGED RCPS
a. Views 5, 6, 7, 11, & 12: Clarified roller shade condition with reference detail at exterior windows and noted light fixture suspension height.
b. Views 8, 13 & 14: Revised ceiling transition at operable partition to accommodate track depth.
41. SHEET A44-02 - MISCELLANEOUS ENLARGED PLANS, ENLARGED RCPS
a. Revised technology and electrical conduit notch depth keynotes FP31 & 32 at low roof per coordination with structural.
b. Revised general note 3.
42. SHEET A45-01 – INTERIOR ELEVATIONS
a. General: Updated view names to match room numbers on floor plans.
b. View 4, 5, & 7: Updated wall finish dimensions and added keynote & section detail references, per detail revision.
c. View 11: Updated reference section detail.
d. Equipment responsibility graphics added to interior elevation legend
43. SHEET A45-02 – INTERIOR ELEVATIONS
a. General: Updated view names to match room numbers on floor plans.
b. Views 12: Clarified map rail dimension and extents with keynote IE9.
c. Added view 16 & 17.
d. Detail 7 – washer and dryer outlines changed to reflect CFCI
e. Equipment responsibility graphics added to interior elevation legend
44. SHEET A45-03 – INTERIOR ELEVATIONS
a. General: Added reference sections to clarify finish details.
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 8 of 10
b. View 04 & 05: Revised CWF panel dimensions at door to accommodate vertical wood trim.
c. View 6: Clarified graphic letter font.
d. View 09: Revised finish per finish schedule comments. Added detail reference and material trim and cut-out comments to match similar views 06 & 07. Added graphic number font.
e. View 12: Revised millwork widths to accommodate tv niche.
f. View 13: Revised base cabinet at non-ADA sinks.
g. Equipment responsibility graphics added to interior elevation legend
45. SHEET A45-04 – INTERIOR ELEVATIONS
a. General: Updated view names to match room numbers on floor plans.
b. Added views 16 & 17.
c. View 7: Clarified dimensions, alignments, and reference details.
d. View 8, 11, 13, & 14: Clarified finishes and graphic number extent. Provided comments and detail reference per similar views 06 & 07/A45-03.
e. View 13: Adjusted view to show full extent of finishes per A13-02D.
f. Equipment responsibility graphics added to interior elevation legend
46. SHEET A45-05 – INTERIOR ELEVATIONS
a. View 1: Clarified finishes and graphic number extent. Provided comments and detail reference per similar views 06 & 07/A45-03.
b. Views 7, 10, 11, 12, 13, & 14: Added millwork tags, dimensions, and keynotes.
c. Views 8, 9: Adjusted millwork layout to accommodate window placement. Updated and/or added millwork tags, dimensions, and keynotes.
d. Equipment responsibility graphics added to interior elevation legend
47. SHEET A45-06 – INTERIOR ELEVATIONS
a. General: Renumbered views into numerical order.
b. General: Updated view names to match room numbers on floor plans.
c. Added views 14, 15, 16, 17, & 18.
d. View 01: Adjusted layout to accommodate teacher cabinet and column furr out.
e. Views 04, 06, 07, 08, 09, 10: Adjusted layout to accommodate window placement and column furr out. Added millwork tags, dimensions, and keynotes.
f. Views 02, 03, 05, 11, 12: Added millwork tags, dimensions, and keynotes.
g. Equipment responsibility graphics added to interior elevation legend
48. SHEET A45-07 – INTERIOR ELEVATIONS
a. Equipment responsibility graphics added to interior elevation legend
49. SHEET A45-08 – INTERIOR ELEVATIONS
a. New Sheet
50. SHEET A50-00 – CASEWORK ELEVATIONS
a. Detail B80 – Clarified sheet cushion depth
b. Detail F12 – Noted atypical glass door condition to match note on A45-03 elevation.
c. Added missing details B40, F22, F23, & W24.
d. Updated section call-out references.
e. Removed unused millwork types.
51. SHEET A50-01 – INTERIOR CASEWORK DETAILS
a. Detail 4 – Updated detail and added dimensions per ADA/TAS requirements.
b. Details 14 & 15 – Updated depth to match detail 13. Removed overall height dimensions.
Ref A50-00 for heights.
52. SHEET A50-02 – ENLARGED CASEWORK DETAILS
a. Added keynote legend to sheet.
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 9 of 10
53. SHEET A50-03 – ENLARGED CASEWORK DETAILS
a. Views 1, 2, 3, 4, 7, 8, & 12: revised circulation desk to accommodate specified book drop.
54. SHEET A50-04 – ENLARGED CASEWORK DETAILS
a. View 2 – revised base cabinet at non-ADA sinks.
55. SHEET A50-05 – ENLARGED CASEWORK DETAILS
a. Removed unused view 9.
b. Added views 11, 12, & 13.
c. Updated details 6 & 10.
56. SHEET A50-06 – ENLARGED CASEWORK DETAILS
a. Revised glass door system to accommodate shelf depth. Adjusted wall finish, height of doors, thickness of glazing, quantity and spacing of wall brackets per glazing door system revision.
57. SHEET A51-02 – CEILING DETAILS
a. Views 09, 10, & 11: Added details, dimensions, and annotations to views.
58. SHEET A52-01 – MISC INTERIOR DETAILS
a. Added view 15.
b. General: Renumbered views 2,5, & 6 & reordered views into numerical order.
c. Removed views 7, 9, & 10.
d. Views 02, 03, 04, 05, 11, 12, & 13: Added details, dimensions, and annotations to views.
e. View 06: Cleaned up graphics.
59. SHEET A61-01 – INTERIOR PARTITION TYPE CHARTS
a. Partition type chart “K” added
60. SHEET A62-01 – DOOR SCHEDULE
a. 1st Grade D128 & D129 door numbers revised from (D127 & D128) to match their room numbers.
b. E127, D207, D227, E205, & E227: Revised door type to hollow metal and updated door and frame finish.
c. Door D200A.1 changed from glazing type 17 to type 1
d. Door D200A.2 changed from glazing type 16 to type 3
e. Door E200A.1 changed from glazing type 16 to type 1
f. Door E200A.2 changed from glazing type 17 to type 3
61. SHEET A62-53 – OPERABLE DOOR/ WALL DETAILS
a. Detail 2 – Ceiling fur down widened to accommodate structural steel width
b. Detail 7 – expansion joint adjacent to accordion fire door removed
62. SHEET A63-50 – INTERIOR GLAZING DETAILS
a. Detail 13 – Detail renamed
b. Detail 14 – Detail added
c. Detail 15 – Detail added
d. Detail 16 – Detail added
63. SHEET A64-01 – INTERIOR FINISH LEGEND & EQUIPMENT SCHEDULE
a. WDT2: Revised size to reference detail.
b. EQ14 comments changed to reflect 43” and 55” displays respectively
c. Responsibility column removed from schedule
64. SHEET A64-10 – INTERIOR ROOM SIGNAGE SCHEDULE
a. New sheet
1.5 ATTACHMENTS
A. ATTACHMENT 1 – ARCHITECTURAL
Issue For Construction 07 June 2024 Addendum 02 09 July 2024
Addendum No.
02 Page 10 of 10
B. ATTACHMENT 2 – STRUCTURAL
C. ATTACHMENT 3 – MEP
D. ATTACHMENT 4 - TECHNOLOGY
E. ATTACHMENT 5 - Pre-Bid RFI Response Letter
END OF DOCUMENT
| 1.1 SCOPE |
| A. This Addendum is issued pursuant of Article 1.1.1 of the General Conditions of the Contract for Construction (AIA A201, 2017 Edition) in connection with the revisions of Issue for Construction documents issued June 07, 2024. |
| B. When construction is not under contract, all instructions contained herein shall be reflected in the Contract Sum and this Addendum will be made a part of the Contract Documents, if, as, and when a Contract is awarded. |
| C. This Addendum forms a part of the Contract Documents and modifies the original Issue for Construction documents dated June 07, 2024. Receipt of this Addendum must be acknowledged in the space provided on the Bid Form. Failure to do so may subject t... |
| D. This Addendum consists of 10 pages, plus attachments. |
| 1.2 CLARIFICATIONS TO CONTRACT DOCUMENTS |
| A. None. |
| 1.3 CHANGES TO THE SPECIFICATIONS |
| A. 07 22 00 – ROOF AND DECK INSULATION |
| 1. Page 07 22 00 – 4: Modification of maximum board thickness to allow board thicknesses greater than 2.6 inches where 3 or more layers of insulation are present. Boards with thickness greater than 2.6” must be used as the first layer of insulation. |
| 2. Page 07 22 00 – 6: Modification of attachment requirements to allow fastening of two layers of insulation simultaneously if 3 or more layers of insulation are present. |
| B. 07 54 19 – POLYVINYL-CHLORIDE (PVC) ROOFING |
| 1. Section 1.6.E – Deletion of fleeceback PVC membrane scope items. |
| 2. Section 2..1.B.2 – Deletion of fleeceback PVC membrane scope items. |
| 3. Section 2.3.C.2 – Deletion of fleeceback PVC membrane scope items. |
| 4. Section 3.4.C.1.B – Deletion of fleeceback PVC membrane scope items. |
| 1.4 CHANGES TO THE DRAWINGS |
| A. 01 – GENERAL |
| 1. SHEET G00-01 – PROJECT DATA |
| a. Add alternates added to sheet |
| 2. SHEET G01-01 – CODE COMPLIANCE PLAN – LEVEL 01 |
| a. MDF/ IDF ROOMS - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| 3. SHEET G01-02 – CODE COMPLIANCE PLAN – LEVEL 02 |
| a. Cumulative occupant load calculation chart adjusted: “Stair provided” value changed to 196” |
| b. MDF/ IDF ROOMS - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| 4. SHEET G03-01 – PHASING DIAGRAMS |
| a. New Sheet. |
| B. 04 - ARCHITECTURAL |
| 1. SHEET A01-01 – ARCHITECTURAL SITE PLAN |
| a. Removed ‘FEC’ annotations for clarity. |
| 2. SHEET A01-02 – ENLARGED SITE PLANS AND DETAILS |
| a. Detail 4 – Note added for “ 7” anodized aluminum lettering with integrated backlit lighting” |
| b. Detail 7 – Note to ref structural added |
| c. Detail 7 – Note added “conduit for electrical and tech stub up” |
| d. Detail 9 – Egress arrows removed for clarity |
| e. Detail 10 – Redundant note to ref structural deleted |
| f. Detail 11 – Note added for 6” tall, anodized aluminum lettering with integrated backlit lighting” |
| g. Detail 12 – Detail notes added |
| 3. SHEET A02-01 – ENLARGED SITE PLANS AND DETAILS |
| a. Detail 4 – Dimension added for wall thickness |
| 4. SHEET A10-03 – OVERALL ROOF PLAN |
| a. Building expansion joints near grid line A9.9 removed |
| b. Reference detail added for West entry canopy (Detail 3/A31-02) |
| c. Note added at both entry canopies “Slope changes at edge, refer to section” |
| 5. SHEET A11-01A – FLOOR PLAN – LEVEL 01 – AREA A |
| a. Moved detail tag for clarity |
| b. Detail 15/A52-01 reference tag placed on window A8 at reception |
| c. Column wrap at A1/ AJ moved |
| d. Detail 14/A63-50 reference tag placed on column A1/AJ |
| e. Detail 16/A63-50 reference tag placed on column A1/AH |
| f. MDF A118 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| g. Door A124.1 - Revised corridor walls to ensure continuation of the 2hr firewall and the associated expansion joint |
| 6. SHEET A11-01B – FLOOR PLAN – LEVEL 01 – AREA B |
| a. Detail 14/A63-50 reference tag placed on column A1/AG |
| b. Detail 16/A63-50 reference tag placed on column A1/AH |
| c. Column wrap at A1/ AG moved |
| d. IDF B103 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| e. Door B111.1 - Revised corridor walls to ensure continuation of the 2hr firewall and the associated expansion joint |
| 7. SHEET A11-01C – FLOOR PLAN – LEVEL 01 – AREA C |
| a. Stacks / Circ Desk C102 south view renumbered per A45-06 sheet view renumbering. |
| b. Interior elevations added to Office C103. |
| c. Dimension added from grid line CA to edge of roof canopy above |
| 8. SHEET A11-01D – FLOOR PLAN – LEVEL 01 – AREA D |
| a. Revised 1st grade D128 & 129 door numbers to match their room numbers. |
| b. D125 - Revised partition and jambs at operable door opening to accommodate track depth. |
| c. D120 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| 9. SHEET A11-01E – FLOOR PLAN – LEVEL 01 – AREA E |
| a. Added reference elevations to clarify finish scope. |
| b. E129 & E121: Revised millwork cubby elevation tags. |
| c. Clarified height of partial height partition in E109. |
| d. Pantry E100A: Provided millwork elevation. |
| e. E106 & E108: Revised millwork and provided millwork elevations. |
| f. E125: Revised partition and jambs at operable door opening to accommodate track depth. |
| 10. SHEET A11-02C – FLOOR PLAN – LEVEL 02 – AREA C |
| a. Grid bubble AM moved for clarity |
| 11. SHEET A11-02D – FLOOR PLAN – LEVEL 02 – AREA D |
| a. Dimension added for courtyard glazing locations |
| b. Clarified depth of typical column furr out along exterior walls. |
| c. D200: Updated millwork and elevations to accommodate mechanical chase. |
| d. D202: Revised millwork cubby elevation tags. |
| e. D222: Revised location of teacher cabinet millwork. |
| f. Added reference elevations to clarify finish scope. |
| g. Door D200A.1 changed from glazing type 17 to type 1 |
| h. Door D200A.2 changed from glazing type 16 to type 3 |
| i. Dimensions added in room D210 |
| j. D206 & D225: Revised partition and jambs at operable door opening to accommodate track depth. |
| k. IDF D230 - Revised surrounding walls to be 2HR rate partition (C) to comply with network closet fire rating requirements. |
| 12. SHEET A11-02E – FLOOR PLAN – LEVEL 02 – AREA E |
| a. Clarified depth of typical column furr out along exterior walls. |
| b. Added reference elevations to clarify finish scope. |
| c. Door E200A.1 changed from glazing type 16 to type 1 |
| d. Door E200A.2 changed from glazing type 17 to type 3 |
| e. E206 & E225: Revised partition and jambs at operable door opening to accommodate track depth. |
| 13. SHEET A12-01D – RELFECTED CEILING PLAN – LEVEL 01 – AREA D |
| a. D125: Revised ceiling transition at operable partition to accommodate track depth. |
| b. D105: Revised keynote. |
| 14. SHEET A12-01E – RELFECTED CEILING PLAN – LEVEL 01 – AREA E |
| a. Clarified typical interior & exterior window treatment details. |
| b. E125: Revised ceiling transition at operable partition to accommodate track depth. |
| 15. SHEET A12-02D– RELFECTED CEILING PLAN – LEVEL 02 – AREA D |
| a. Updated gyp bd soffit/sloped ceilings to align with column fur outs, typical in all classrooms. |
| b. Corridor D231 – Revised security flat panel locations per Technology. |
| c. Clarified typical interior & exterior window treatment details. |
| d. Revised ceiling height in niche in Corridor D233. |
| e. D205 & D225: Revised ceiling transition at operable partition to accommodate track depth. |
| 16. SHEET A12-02E - – RELFECTED CEILING PLAN – LEVEL 02 – AREA E |
| a. Updated gyp bd soffit/sloped ceilings to align with column furr outs, typical in all classrooms. |
| b. Corridor E235 – Revised security flat panel locations per Technology. |
| c. Clarified typical interior & exterior window treatment details. |
| d. Revised ceiling height in niche in Corridor E237. |
| e. E205 & E225: Revised ceiling transition at operable partition to accommodate track depth. |
| 17. SHEET A13-01A – INTERIOR FINISH PLAN – LEVEL 01 – AREA A |
| a. Revised finishes at Cafeteria south wall per interior elevations. |
| b. Finish plan note arrow head adjusted on courtyard wall |
| 18. SHEET A13-01B – INTERIOR FINISH PLAN – LEVEL 01 – AREA B |
| a. Revised equipment tag in Cafeteria to meet A64-01 Equipment Schedule. |
| b. Lines for menu boards changed from dashed to solid to show contractor responsibility. Reference technology for responsibility of all flat panel displays. |
| c. Revised finishes at Cafeteria south wall per interior elevations. |
| d. Finish plan note arrow head adjusted on courtyard wall |
| 19. SHEET A13-01D – INTERIOR FINISH PLAN – LEVEL 01 – AREA D |
| a. Clarified stair finishes at Stair 2. |
| 20. SHEET A13-01E – INTERIOR FINISH PLAN – LEVEL 01 – AREA E |
| a. Added missing room name and room finish tag to ACL 2 E106. |
| b. E122, E121 – updated seat cushion locations per updated cubby millwork. |
| c. C101, E105, E109, & E110: Clarified interior and exterior window treatment with keynotes. |
| d. Clarified stair and plinth finishes and finish transitions at Stair 1 and Elevator Lobby E131. |
| e. E108A, E108B, E108C, Corridor E132: Revised finishes. |
| f. Noted corner guard locations. |
| g. Updated room number in keynote FN22 to match plan. |
| h. C101: Updated finishes to match interior elevations. |
| 21. SHEET A13-02D – INTERIOR FINISH PLAN – LEVEL 02 – AREA D |
| a. General: Moved equipment tags from floor plan series to finish plan series. |
| b. SG D221A: Revised ceiling finish to match RCP. Clarified height of visual display wall covering with keynote. (Clarified visual display height only at D214.) |
| c. Stair 2: Revised finish tag to match room finish tag. |
| d. Conference E232: Updated finishes and equipment to match other conference rooms. |
| e. Clarified finish extents and revised wall tile at Collab millwork. |
| f. Corridor D231 & D234 – Revised security flat panel locations per Technology. |
| g. Added missing room name and finish tag to Corridor D233. |
| h. Corridor D231: Clarified extents of wall finishes with keynote FN19. |
| i. D210 & D230: Adjusted finishes to match other typical interior classrooms on Level 01 and to match RCP. |
| j. D200A, D203A, D207, D209A, D223A, D224, D229A: Provided missing keynotes noting other rooms to reference for finishes. |
| k. D214, D212, D211, D214A, D220, D233 water fountain: Revised finishes. |
| l. D200, D202, D203, D206, D208, D209, D210, D214, D221, D222, D223, D225, D228, D229, & D230: Clarified interior and exterior window treatment with keynotes and finish tags. |
| m. D201, D205, D206, D225, D231, D232, D234: Updated finishes to match RCP, finish plan keynotes & finish tags, elevations, and finish schedule comments. |
| 22. SHEET A13-02E – INTERIOR FINISH PLAN – LEVEL 02 – AREA E |
| a. General: Moved equipment tags from floor plan series to finish plan series. |
| b. Updated room numbers in keynotes FN29 & FN30. |
| c. SG E223A: Revised ceiling finish to match RCP. Clarified height of visual display wall covering with keynote. (Clarified visual display height only at E214.) |
| d. Stair 1: Revised finish tag to match room finish tag. |
| e. Clarified height of FRP in E220. |
| f. Clarified finish extents and revised wall tile at Collab millwork. |
| g. Added missing room name and finish tags to Corridor E238 & E239 |
| h. Corridor E235: Clarified extents of wall finishes with keynote FN19. |
| i. E210 & E230: Adjusted finishes to match other typical interior classrooms on Level 01 and to match RCP. |
| j. E211, E212, E213, E237 waterfountain: Revised finishes. |
| k. E200, E202, E203, E206, E208, E209, E210, E214, E221, E222, E223, E225, E228, E229, E230, : Clarified interior and exterior window treatment with keynotes and finish tags. |
| l. E201, E205, E206, E225, E226, E234, E235, E236, E237: Updated finishes to match RCP, finish plan keynotes & finish tags, elevations, and finish schedule comments. |
| 23. SHEET A20-01 – EXTERIOR ELEVATIONS |
| a. Exterior elevation legend – Wall type 1, 1A, and 4, labels adjusted |
| b. Exterior elevation legend – Type 3 removed, Type 2 changed from “storefront system” to “exterior glazing system” |
| c. Detail 1 – “typ” removed from wall type label |
| d. Detail 2 – Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| e. Detail 3 - Wall type label changed from “Type 2 TYP” to “Type 5 TYP” and Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| f. Detail 5 - Grid lines AM AP AQ AR AS removed for clarity |
| g. Detail 6 – Dimensional letter signage removed at this location |
| h. Detail 6 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| 24. SHEET A20-02 – EXTERIOR ELEVATIONS - COURTYARDS |
| a. Exterior elevation legend – Wall type 1, 1A, and 4, labels adjusted |
| b. Detail 2 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| c. Detail 3 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| d. Detail 4 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| e. Detail 8 - Wall type label changed from “Type 3 TYP” to “Type 2 TYP” |
| 25. SHEET A31-04 – EXTERIOR WALL SECTIONS |
| a. Wall section 2 - Revised section per revisions to detail 5/A32-10 |
| 26. SHEET A32-04 – BUILDING ENCLOSURE DETAILS |
| a. Detail 2 – Metal stud, batt insulation, spray applied insulation removed near grid line DQ. |
| b. Gray hatch added above metal deck and note added for “insulation board with staggered joints. Ref specs and manufacturer recommendations.” |
| c. Steel angle shown to match structural drawings. Some spray foam insulation in this area removed. |
| d. Cold form steel studs added for mounting exterior sheathing in soffit |
| e. 2” rigid insulation added to edge of canopy |
| 27. SHEET A32-10 – BUILDING ENCLOSURE DETAILS |
| a. Detail 5 – Revised to show the correct envelope detailing required at this location. |
| 28. SHEET A32-11 – BUILDING ENCLOSURE DETAILS |
| a. Detail 2 – Expansion joint removed. Detail made to reflect roofing details – ref A32-50 series |
| 29. SHEET A32-20 – BUILDING ENCLOSURE DETAILS |
| a. Detail 13 – Joint added along CMU wall er structural requirements. Backer rod and sealant note added |
| 30. SHEET A32-21 – BUILDING ENCLOSURE DETAILS |
| a. Detail 1 – Expansion joint and gyp adjusted graphically. Building expansion joint adjacent to accordion fire door removed. |
| b. Detail 4 – Note added “wall type varies ref floor plans” |
| c. Detail 4 – Backer rod and sealant added at interior corner near grid lines A10/ CJ |
| d. Detail 5 – Overlapping notes moved for clarity |
| 31. SHEET A32-22 – BUILDING ENCLOSURE DETAILS |
| a. Detail 2 - Hat channel and double gyp layer added to match X81 wall type on interior |
| b. Detail 5 – Detail added |
| c. Detail 6 - Detail added |
| 32. SHEET A32-23 – BUILDING ENCLOSURE DETAILS |
| a. Detail 1 – Location of expansion joint moved |
| b. Detail 2 – Masonry wall ties moved for accuracy |
| 33. SHEET A32-55: TYPICAL ROOFING DETAILS |
| a. Addition of detail 3 to sheet. |
| 34. SHEET A33-02 – EXTERIOR GLAZING SCHEDULE |
| a. Glazing elevation B5 – Upper glazing removed for redundancy. Shown in glazing elevation B5A |
| 35. SHEET A33-51 – EXTERIOR GLAZING DETAILS |
| a. Detail 5 – mullion depth changed from 7.5” to 6” |
| 36. SHEET A33-53 – EXTERIOR GLAZING DETAILS |
| a. Detail 3 – Interior wall condition changed to reflect changes in detail 1/A32-23 |
| 37. SHEET A41-01 – ENLARGED STAIR PLANS & SECTIONS |
| a. Revised enlarged plans and sections on sheet. |
| 38. SHEET A41-02 – ENLARGED STAGE STAIR PLANS, SECTIONS, & ELEVATIONS |
| a. Revised details to include more information. |
| b. Removed details not used. |
| 39. Sheet A41-50 – STAIR DETAILS |
| a. Revised sheet to add new details and remove unused details. |
| b. Revised general notes. |
| 40. SHEET A44-01 - MISCELLANEOUS ENLARGED PLANS, ENLARGED RCPS |
| a. Views 5, 6, 7, 11, & 12: Clarified roller shade condition with reference detail at exterior windows and noted light fixture suspension height. |
| b. Views 8, 13 & 14: Revised ceiling transition at operable partition to accommodate track depth. |
| 41. SHEET A44-02 - MISCELLANEOUS ENLARGED PLANS, ENLARGED RCPS |
| a. Revised technology and electrical conduit notch depth keynotes FP31 & 32 at low roof per coordination with structural. |
| b. Revised general note 3. |
| 42. SHEET A45-01 – INTERIOR ELEVATIONS |
| a. General: Updated view names to match room numbers on floor plans. |
| b. View 4, 5, & 7: Updated wall finish dimensions and added keynote & section detail references, per detail revision. |
| c. View 11: Updated reference section detail. |
| d. Equipment responsibility graphics added to interior elevation legend |
| 43. SHEET A45-02 – INTERIOR ELEVATIONS |
| a. General: Updated view names to match room numbers on floor plans. |
| b. Views 12: Clarified map rail dimension and extents with keynote IE9. |
| c. Added view 16 & 17. |
| d. Detail 7 – washer and dryer outlines changed to reflect CFCI |
| e. Equipment responsibility graphics added to interior elevation legend |
| 44. SHEET A45-03 – INTERIOR ELEVATIONS |
| a. General: Added reference sections to clarify finish details. |
| b. View 04 & 05: Revised CWF panel dimensions at door to accommodate vertical wood trim. |
| c. View 6: Clarified graphic letter font. |
| d. View 09: Revised finish per finish schedule comments. Added detail reference and material trim and cut-out comments to match similar views 06 & 07. Added graphic number font. |
| e. View 12: Revised millwork widths to accommodate tv niche. |
| f. View 13: Revised base cabinet at non-ADA sinks. |
| g. Equipment responsibility graphics added to interior elevation legend |
| 45. SHEET A45-04 – INTERIOR ELEVATIONS |
| a. General: Updated view names to match room numbers on floor plans. |
| b. Added views 16 & 17. |
| c. View 7: Clarified dimensions, alignments, and reference details. |
| d. View 8, 11, 13, & 14: Clarified finishes and graphic number extent. Provided comments and detail reference per similar views 06 & 07/A45-03. |
| e. View 13: Adjusted view to show full extent of finishes per A13-02D. |
| f. Equipment responsibility graphics added to interior elevation legend |
| 46. SHEET A45-05 – INTERIOR ELEVATIONS |
| a. View 1: Clarified finishes and graphic number extent. Provided comments and detail reference per similar views 06 & 07/A45-03. |
| b. Views 7, 10, 11, 12, 13, & 14: Added millwork tags, dimensions, and keynotes. |
| c. Views 8, 9: Adjusted millwork layout to accommodate window placement. Updated and/or added millwork tags, dimensions, and keynotes. |
| d. Equipment responsibility graphics added to interior elevation legend |
| 47. SHEET A45-06 – INTERIOR ELEVATIONS |
| a. General: Renumbered views into numerical order. |
| b. General: Updated view names to match room numbers on floor plans. |
| c. Added views 14, 15, 16, 17, & 18. |
| d. View 01: Adjusted layout to accommodate teacher cabinet and column furr out. |
| e. Views 04, 06, 07, 08, 09, 10: Adjusted layout to accommodate window placement and column furr out. Added millwork tags, dimensions, and keynotes. |
| f. Views 02, 03, 05, 11, 12: Added millwork tags, dimensions, and keynotes. |
| g. Equipment responsibility graphics added to interior elevation legend |
| 48. SHEET A45-07 – INTERIOR ELEVATIONS |
| a. Equipment responsibility graphics added to interior elevation legend |
| 49. SHEET A45-08 – INTERIOR ELEVATIONS |
| a. New Sheet |
| 50. SHEET A50-00 – CASEWORK ELEVATIONS |
| a. Detail B80 – Clarified sheet cushion depth |
| b. Detail F12 – Noted atypical glass door condition to match note on A45-03 elevation. |
| c. Added missing details B40, F22, F23, & W24. |
| d. Updated section call-out references. |
| e. Removed unused millwork types. |
| 51. SHEET A50-01 – INTERIOR CASEWORK DETAILS |
| a. Detail 4 – Updated detail and added dimensions per ADA/TAS requirements. |
| b. Details 14 & 15 – Updated depth to match detail 13. Removed overall height dimensions. Ref A50-00 for heights. |
| 52. SHEET A50-02 – ENLARGED CASEWORK DETAILS |
| a. Added keynote legend to sheet. |
| 53. SHEET A50-03 – ENLARGED CASEWORK DETAILS |
| a. Views 1, 2, 3, 4, 7, 8, & 12: revised circulation desk to accommodate specified book drop. |
| 54. SHEET A50-04 – ENLARGED CASEWORK DETAILS |
| a. View 2 – revised base cabinet at non-ADA sinks. |
| 55. SHEET A50-05 – ENLARGED CASEWORK DETAILS |
| a. Removed unused view 9. |
| b. Added views 11, 12, & 13. |
| c. Updated details 6 & 10. |
| 56. SHEET A50-06 – ENLARGED CASEWORK DETAILS |
| a. Revised glass door system to accommodate shelf depth. Adjusted wall finish, height of doors, thickness of glazing, quantity and spacing of wall brackets per glazing door system revision. |
| 57. SHEET A51-02 – CEILING DETAILS |
| a. Views 09, 10, & 11: Added details, dimensions, and annotations to views. |
| 58. SHEET A52-01 – MISC INTERIOR DETAILS |
| a. Added view 15. |
| b. General: Renumbered views 2,5, & 6 & reordered views into numerical order. |
| c. Removed views 7, 9, & 10. |
| d. Views 02, 03, 04, 05, 11, 12, & 13: Added details, dimensions, and annotations to views. |
| e. View 06: Cleaned up graphics. |
| 59. SHEET A61-01 – INTERIOR PARTITION TYPE CHARTS |
| a. Partition type chart “K” added |
| 60. SHEET A62-01 – DOOR SCHEDULE |
| a. 1st Grade D128 & D129 door numbers revised from (D127 & D128) to match their room numbers. |
| b. E127, D207, D227, E205, & E227: Revised door type to hollow metal and updated door and frame finish. |
| c. Door D200A.1 changed from glazing type 17 to type 1 |
| d. Door D200A.2 changed from glazing type 16 to type 3 |
| e. Door E200A.1 changed from glazing type 16 to type 1 |
| f. Door E200A.2 changed from glazing type 17 to type 3 |
| 61. SHEET A62-53 – OPERABLE DOOR/ WALL DETAILS |
| a. Detail 2 – Ceiling fur down widened to accommodate structural steel width |
| b. Detail 7 – expansion joint adjacent to accordion fire door removed |
| 62. SHEET A63-50 – INTERIOR GLAZING DETAILS |
| a. Detail 13 – Detail renamed |
| b. Detail 14 – Detail added |
| c. Detail 15 – Detail added |
| d. Detail 16 – Detail added |
| 63. SHEET A64-01 – INTERIOR FINISH LEGEND & EQUIPMENT SCHEDULE |
| a. WDT2: Revised size to reference detail. |
| b. EQ14 comments changed to reflect 43” and 55” displays respectively |
| c. Responsibility column removed from schedule |
| 64. SHEET A64-10 – INTERIOR ROOM SIGNAGE SCHEDULE |
| a. New sheet |
| 1.5 ATTACHMENTS |
| A. ATTACHMENT 1 – ARCHITECTURAL |
| B. ATTACHMENT 2 – STRUCTURAL |
| C. ATTACHMENT 3 – MEP |
| D. ATTACHMENT 4 - TECHNOLOGY |
| E. ATTACHMENT 5 - Pre-Bid RFI Response Letter |
File details come from the government source that posted it. Updated .