2024 0607 - SMCISD Mendez ES - IFC Specifications Vol II.pdf

PDF 14 MB Posted

Attached to
SMCISD Mendez Elementary Replacement
Solicitation number
CSP-MD-2024-01
Issued by
Hays County, Texas

About this file

This document is a comprehensive project manual for the SMCISD Mendez Elementary School Replacement project, issued by San Marcos Consolidated Independent School District (SMCISD) in Texas. The project manual, dated June 7, 2024, is a two-volume set of construction specifications prepared by Perkins&Will architectural firm, covering mechanical, electrical, and plumbing systems for a new elementary school. The solicitation (CSP-MD-2024-01) is seeking competitive sealed proposals from qualified contractors, with proposals due on July 16, 2024, at 2:00 pm. Vendors must register on the BidNet Direct website to access detailed project information, and all proposals must be submitted to the SMCISD Purchasing Department at 631 Mill St., San Marcos, TX 78666.

The project specifications detail extensive requirements for mechanical, electrical, and plumbing systems, including specific guidelines for ductwork, piping, insulation, fire protection, and energy management control systems. The district reserves the right to accept or reject any proposals and will award the contract to the most qualified company. While specific budget details are not explicitly stated in the document, the comprehensive nature of the specifications suggests a significant capital investment in a modern, technologically equipped elementary school facility. Potential bidders are advised to thoroughly review the detailed technical specifications, which include requirements for everything from duct construction to kitchen exhaust systems and building automation controls.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

Issue for Construction

06 June 2024

Volume 2 of 2

Divisions 21 through 49

SMCISD MENDEZ

ELEMENTARY SCHOOL REPLACEMENT

Perkins&Will Project Number: 213030.000

NOTE: Documents are incomplete and may not be used for regulatory approval, permitting, or construction purposes.

310 Comal St, Suite 100 Austin, Texas 78702 | 512.997.5260

TITLE PAGE

00 01 01 - 1

PROJECT MANUAL

SMCISD MENDEZ ELEMENTARY SCHOOL REPLACEMENT

San Marcos, Texas

Issue for Construction 06 June 2024

Owner San Marcos CISD 631 Mill Street San Marcos, Texas 78666 Telephone: 512-757-8020 Contact: Bernie Sandoval Electronic Mail: bernie.sandoval@smcisd.net

Architect Perkins&Will 310 Comal Street, Suite 100 Austin, Texas 78702 Telephone: 512-997-5260 Contact: Kolman Uresti Electronic Mail: koleman.uresti@perkinswill.com

Structural Engineer Dunaway 5707 Southwest Parkway, Building 2, Suite 250 Austin, Texas 78735 Telephone: 512-717-6306 Contact: Sarah Willis Electronic Mail: swillis@dunaway.com

Mechanical / Electrical / Plumbing Engineer

EMA

103 S. 12th Street, Suite 202 Pflugerville, Texas 78660 Telephone: 832-680-6110 Contact: Frank Sanchez Electronic Mail: fsanchez@emaengineer.com

TITLE PAGE

00 01 01 - 2

Technology / Low Voltage Consultant True North Consulting Group 13284 Pond Springs Road, Suite 304 Austin, TX 78729 Telephone: 512-790-0517 Contact: Jeff Crabb Electronic Mail: jeff.crabb@tncg.com

Landscape Architect Coleman and Associates 9890 Silver Mountain Drive Austin, Texas 78737 Telephone: 512-476-2090 Contact: Jose Perez Electronic Mail: jose@colemanandassoc.com

Civil Engineer Gil Engineering 506 East Braker Lane Austin, Texas 78753 Telephone: 512-835-4203 Contact: Victor Gil Electronic Mail: vgil@gilengineering.com

Food Service Consultant Cosper & Associates, Inc.

13061 #3 Highway 181 San Antonio, Texas 78223 Telephone: 210-633-2020 Contact: James Cosper Electronic Mail: jcosper@cosperfsc.com

Project Numbers

PW Project Number: 213030.000

END OF DOCUMENT

PROFESSIONAL SEALS PAGE

00 01 07

SMCISD Mendez Elementary School Replacement Perkins&Will San Marcos, Texas 213030.000 Issue for Construction 07 June 2024

DOCUMENT 00 01 07

The following Specification Sections have been prepared by or under the direct supervision of the Architect:

ARCHITECT

Perkins&Will 310 Comal Street, Suite 100 Austin, Texas 78702

SPECIFICATIONS

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 Summary 01 13 00 Delegated Design Requirements 01 21 00 Allowances 01 22 00 Unit Prices 01 23 00 Alternates 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 31 06 Coordination Drawings 01 32 00 Construction Progress Documentation 01 32 33 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 43 39 Mockup Requirements 01 50 00 Temporary Facilities and Controls 01 58 13 Temporary Project Identification Sign 01 60 00 Product Requirements 01 73 00 Execution 01 73 29 Cutting and Patching 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 91 13 General Commissioning Requirements

DIVISION 03 – CONCRETE

03 15 26 Under-Slab Sheet Vapor Barrier 03 54 16 Cement-Based Underlayment

06.07.2024

SMCISD Mendez Elementary School Replacement Perkins&Will

DIVISION 04 – MASONRY

04 20 00 Unit Masonry 04 72 00 Cast Stone Masonry

DIVISION 05 – METALS

05 12 13 Architecturally Exposed Structural Steel 05 15 16 Steel Wire Rope Assemblies 05 43 00 Slotted Channel Framing 05 50 00 Metal Fabrications 05 51 13 Metal Pan Stairs 05 51 15 Decorative Metal Stairs 05 52 13 Steel Pipe and Tube Railings 05 73 00 Decorative Metal Railings

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 53 Miscellaneous Carpentry 06 16 36 Plywood Sheathing 06 16 43 Gypsum Sheathing 06 20 23 Interior Finish Carpentry 06 41 16 Plastic-Laminate-Clad Architectural Cabinets 06 41 19 Paper-Composite Countertops 06 41 23 Epoxy Countertops 06 42 19 Plastic Laminate Faced Wood Paneling 06 61 16 Solid Surfacing Countertops 06 61 17 Solid Surfacing Shower Surrounds 06 64 36 Fiberglass Reinforced Plastic Paneling

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation 07 21 19 Foamed-in-Place Insulation 07 42 10 Thermally Broken Wall Cladding Support System 07 42 13.16Metal Plate Wall Panels 07 42 93 Metal Soffit Panels 07 81 33 Mineral Fiber Fireproofing 07 84 13 Penetration Firestopping 07 84 43 Joint Firestopping 07 91 00 Preformed Joint Seals 07 92 00 Joint Sealants 07 92 19 Acoustical Joint Sealants 07 95 00 Expansion Control

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 33 23 Overhead Coiling Doors

SMCISD Mendez Elementary School Replacement Perkins&Will

08 35 14 Accordion Fire Doors 08 35 15 Aluminum-Framed Folding Door System 08 36 13 Sectional Doors 08 38 19 Traffic Impact Doors 08 41 13 Aluminum-Framed Entrances and Storefronts 08 44 13 Glazed Aluminum Curtain Walls 08 71 00 Door Hardware 08 80 00 Glazing 08 83 00 Mirrors 08 87 00 Glazing Surface Films 08 88 13 Fire-Rated Glazing

DIVISION 09 – FINISHES

09 05 61.13 Moisture Vapor Emission Control 09 21 16.23 Gypsum Board Shaft Wall Assemblies 09 22 16 Non-Structural Metal Framing 09 22 18 Extruded Aluminum Partition Closure 09 24 00 Portland Cement Plastering 09 29 00 Gypsum Board 09 30 13 Tiling 09 51 13 Acoustical Panel Ceilings 09 54 47 Blade Acoustic Panels 09 61 16 Concrete Floor Sealing 09 64 67 Anchored Resilient Wood Stage Flooring 09 65 13 Resilient Base and Accessories 09 65 18 Resilient Sheet Rubber Flooring 09 65 19 Resilient Tile Flooring 09 65 66 Resilient Athletic Flooring 09 66 23 Resinous Matrix Terrazzo Flooring 09 67 23 Resinous Flooring 09 68 13 Tile Carpeting 09 72 00 Wall Coverings 09 72 14 Tackable Wall Covering 09 72 20 Felt Wall Covering 09 77 23 Fabric-Wrapped Panels 09 84 33 Sound-Absorbing Wall Units 09 84 33.16 Sound-Absorbing Wood-Fiber Wall Units 09 84 36 Sound-Absorbing Ceiling Units 09 84 33.16 Sound-Absorbing Wood-Fiber Ceiling Wood-Fiber Units 09 84 53 Sound Barrier Mullion Trim Cap 09 91 00 Interior Painting 09 91 03 Exterior Painting 09 96 00 High-Performance Coatings

DIVISION 10 – SPECIALTIES

10 11 16 Visual Display Units 10 11 46 Visual Display Fabrics

SMCISD Mendez Elementary School Replacement Perkins&Will

10 14 16 Plaques 10 14 19 Dimensional Letter Signage 10 14 24 Panel Signage 10 14 63 Digital Exterior Marquee Signage 10 21 13.19Plastic (HDPE) Toilet Compartments 10 21 23 Cubicle Curtains and Tracks 10 28 13 Toilet Accessories 10 41 16 Emergency Key Cabinets 10 43 13 Emergency Aid Specialties 10 44 00 Fire Protection Specialties 10 51 13 Metal Lockers 10 73 16 Manufactured Canopies 10 75 00 Flagpoles

DIVISION 11 – EQUIPMENT

11 30 00 Residential Appliances 11 51 17 Library Book Drop and Return 11 51 23 Library Shelving 11 61 43 Stage Curtains 11 66 23 Gymnasium Equipment 11 66 43 Interior Scoreboards 11 68 34 Athletic Field Equipment

DIVISION 12 – FURNISHINGS

12 24 13 Roller Window Shades 12 64 16 Banquette Seating

DIVISION 14 – CONVEYING EQUIPMENT

14 24 00 Hydraulic Elevators

END OF ARCHITECTURAL SECTIONS

SMCISD Mendez Elementary School Replacement Perkins&Will supervision of the Building Envelope Engineer:

BUILDING ENVELOPE ENGINEER

Engineered Exteriors, LLC

13740 Research Blvd., Suite C2

Austin, TX 78750

01 83 16 – Exterior Enclosure Performance Requirements

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 13 00 – Sheet Waterproofing

07 22 00 – Roof and Deck Insulation

07 27 26 – Fluid Applied Air Barriers

07 54 19 – Polyvinyl-Chloride (PVC) Membrane Roofing

07 62 00 – Sheet Metal Flashing and Trim

07 72 00 – Roof Accessories

END OF BUILDING ENVELOPE ENGINEER SECTIONS

Engineered Exteriors, LLC 6/7/24

F-12811

SMCISD Mendez Elementary School Replacement Perkins&Will supervision of the [Insert Engineer Type Here] Engineer:

FOODSERVICE CONSULTANT

Cosper & Associates, Inc.

P.O. Box 275 Elmendorf, Texas 78112

SPECIFICATIONS

DIVISION 11 – EQUIPMENT

11 40 00 Food Service Equipment

END OF FOOD SERVICE EQUIPMENT SECTIONS

SMCISD Mendez Elementary School Replacement Perkins&Will San Marcos, Texas 213030.000 Issue for Construction 07 June 2024

DOCUMENT 00 01 07

PROFESSIONAL SEALS PAGE

The following Specification Sections have been prepared by or under the direct supervision of the Landscape Architect:

LANDSCAPE ARCHITECT

Coleman & Associates 9890 Silver Mountain Dr.

Austin, Texas 78737

SPECIFICATIONS

DIVISION 12 - FURNISHINGS

12 93 00 Site Furnishings

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 14 00 Unit Paving 32 18 00 Synthetic Grass Surfacing 32 31 26 Wire Fences and Gates 32 84 00 Landscape Irrigation 32 92 00 Turf and Grasses 32 93 00 Plants

END OF LANDSCAPE ARCHITECTURE SECTIONS

SMCISD Mendez Elementary School Replacement Perkins&Will supervision of the Structural Engineer:

STRUCTURAL ENGINEER

Dunaway Associates

5707 Southwest Pkwy, Bldg 2, Ste 250

Austin, TX 78735

01 45 29 Testing Laboratory Services for Structural Tests and Special Inspections

DIVISION 03 – CONCRETE

03 10 00 Concrete Forming and Accessories

03 20 00 Concrete Reinforcing

03 30 00 Cast-in-Place Concrete

DIVISION 04 – MASONRY

04 22 00 Concrete Unit Masonry

DIVISION 05 – METALS

05 12 00 Structural Steel Framing

05 21 00 Steel Joist Framing

05 31 00 Steel Decking

05 40 00 Cold-Formed Metal Framing

DIVISION 06 – WOOD, PLASTICS, COMPOSITES

06 17 19 Cross-Laminated Timber Panels

06 18 00 Glued-Laminated Structural Units

DIVISION 31 – EARTHWORK

31 00 00 Earthwork Under Bldg Pad

31 63 29 Drilled Concrete Piers

END OF STRUCTURAL SECTIONS

SMCISD Mendez Elementary School Replacement Perkins&Will supervision of the Technology Engineer:

TECHNOLOGY ENGINEER

True North Consulting Group 13284 Pond Springs Road, Suite 304 Austin, TX 78729

DIVISION 27 – COMMUNICATIONS

27 00 00 General Technology Requirements 27 05 23 Pathways for Technology Systems 27 10 00 Communications Cabling General Requirements 27 10 05 Grounding and Bonding for Technology Systems 27 11 00 Communications Equipment Rooms 27 13 00 Communications Backbone Cabling 27 15 00 Communications Horizontal Cabling 27 16 00 Communications Connecting Cords 27 18 00 Communications Labeling and Identification 27 40 00 AV/Multimedia General Requirements 27 41 00 Audio Visual Systems 27 51 00 Distributed Communication Systems 27 60 00 Physical Security General Requirements 27 62 00 Video Surveillance System 27 64 00 Electronic Access Control System 27 66 00 Intrusion Detection System

END OF TECHNOLOGY SECTIONS

SMCISD Mendez Elementary School Replacement Perkins&Will supervision of the [Insert Engineer Type Here] Engineer:

EMA Engineering & Consulting 328 South Broadway Ave.

Tyler, Texas 75702 903.581.2677

01 91 00 Building Systems Commissioning

DIVISION 21 – FIRE PROTECTION

21 00 10 Basic Fire Protection System Requirements 21 00 90 Fire Protection System Submittal Procedures 21 13 14 Fire Protection System

DIVISION 22 – PLUMBING

22 00 10 Basic Plumbing Requirements 22 00 90 Plumbing Submittal Procedures 22 05 20 Gauges, Meters, and Thermometers 22 05 24 Valves - General 22 05 30 Pipe and Pipe Fittings - General 22 05 34 Isolation Devices 22 05 54 Plumbing Identification 22 07 20 Piping Insulation 22 08 00 Commissioning of Plumbing 22 11 17 Domestic Water Piping and Appurtenances 22 13 17 Soil, Waste and Sanitary Drain Piping, Vent Piping and Appurtenances 22 13 18 Condensate Piping 22 13 19 Interceptors 22 14 01 Roof Drainage and Appurtenances 22 14 29 Sump Pumps 22 16 01 Natural Gas Piping and Appurtenances 22 33 34 Access Doors 22 40 01 Plumbing Fixtures and Fixture Carriers

06-03-2024

SMCISD Mendez Elementary School Replacement Perkins&Will

DIVISION 23 – HVAC

23 00 00 Basic Mechanical Requirements 23 00 90 HVAC Submittal Procedures 23 05 19 Meters and Gauges for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 32 Roof Curbs 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, And Balancing for HVAC 23 07 13 Duct and Grille Insulation 23 07 21 Refrigerant Piping Insulation 23 08 00 Commissioning of Heating, Ventilating and Air Conditioning (HVAC) 23 09 23 Energy Management Control System (EMCS) BACNET 23 09 23A Sequence of Operations General 23 09 23E Sequence of Operations Kitchen Sequences 23 09 23G Sequence of Operations Rooftop Unit Sequences 23 23 00 Refrigerant Piping 23 31 13 Metal Ductwork 23 33 33 Access Doors 23 34 16 HVAC Fans 23 37 13 Diffusers, Registers, And Grilles 23 38 13 Commercial Kitchen Hoods 23 43 23 Bipolar Ionization Air Purification System 23 51 13 Stage Vents 23 74 23A Kitchen Makeup Air Systems (Direct Hood) 23 81 19 Packaged HVAC Units 23 81 27 Small Capacity Split System Units 23 82 39 Electric Unit Heaters

SMCISD Mendez Elementary School Replacement Perkins&Will

DIVISION 26 – ELECTRICAL

26 00 00 Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73 Power System Studies 26 08 00 Commissioning of Electrical Systems 26 09 13 Electrical Power Monitoring 26 09 23 Lighting Control Devices 26 20 00 Low Voltage Electrical Distribution 26 27 26 Wiring Devices 26 31 13 Solar Photovoltaic System 26 43 00 Surge Protective Devices (SPDS) 26 50 00 Lighting 26 55 61 Theatrical Lighting

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 46 21 Fire Detection and Alarm System

06-03-2024

SMCISD Mendez Elementary School Replacement Perkins&Will

- TABLE OF CONTENTS OF THE CONSTRUCTION DOCUMENTS – PROJECT MANUAL

©2017 Gil Engineering Associates, Inc. Engineers ◦ Planners ◦ Surveyors

DIVISION 01 GENERAL REQUIRMENTS

SECTION 01 57 15 – DUST CONTROL

DIVISION 02 – EXISTING CONDITIONS:

SECTION 02 41 13 – SELECTIVE SITE DEMOLITION

DIVISION 31 – EARTHWORK:

SECTION 31 05 21 – GEOGRID SOIL REINFORCEMENT

SECTION 31 11 00 – CLEARING AND GRUBBING

SECTION 31 11 01 – SITE PREPARATION

SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING

Texas Registered Firm Number F1186

SECTION 31 22 13 - ROUGH GRADING

SECTION 31 22 19 - FINISH GRADING

SECTION 31 23 13 - SUBGRADE PREPARATION

SECTION 31 23 33 - TRENCHING AND BACKFILLING

SECTION 31 25 00 - EROSION AND SEDIMENTATION CONTROLS

SECTION 31 36 00 – GABIONS

SECTION 31 41 33 - TRENCH SHIELDING

DIVISION 32 – EXTERIOR IMPROVEMENTS:

SECTION 32 11 13 – LIME TREATED SUBGRADES

SECTION 32 11 23 - AGGREGATE BASE COURSE

SECTION 32 12 16 - ASPHALT PAVING

SECTION 32 13 13 - CONCRETE PAVING

SECTION 32 13 73 - CONCRETE PAVING JOINT SEALANTS

SECTION 32 16 21 - CONCRETE CURBS GUTTERS AND WALKS

SECTION 32 17 13 - PARKING BUMPERS

SECTION 32 17 23 - PAVEMENT MARKINGS

SECTION 32 17 23.33 – THERMOPLASTIC PAVEMENT MARKINGS

SECTION 32 17 26 – TACTILE WARNING SURFACING

SECTION 32 31 13 – CHAIN LINK FENCES AND GATES

SECTION 32 91 19.13 – SPREADING AND GRADING TOPSOIL

SECTION 32 92 02 – SODDING

- TABLE OF CONTENTS OF THE CONSTRUCTION DOCUMENTS – PROJECT MANUAL

©2017 Gil Engineering Associates, Inc. Engineers ◦ Planners ◦ Surveyors

SECTION 32 92 19.16 – HYDRAULIC SEEDING

DIVISION 33 – UTILITIES:

SECTION 33 01 30 – TESTING OF GRAVITY SEWER SYSTEMS

SECTION 33 05 16 – UTILITY STRUCTURES

SECTION 33 11 00 – WATER UTILITY DISTRIBUTION PIPING

SECTION 33 11 00.17 - POLYETHYLENE WRAP

SECTION 33 13 00 – DISINFECTION OF WATER DISTRIBUTION SYSTEMS

SECTION 33 31 00 – SANITARY UTILITY SEWERAGE PIPING

SECTION 33 39 13-SANITARY UTILITY MANHOLES FRAMES AND COVERS

SECTION 33 41 00 – STORM UTILITY DRAINAGE PIPING

SECTION 33 49 13 – STORM DRAINAGE MANHOLES FRAMES AND COVERS

SECTION 33 51 13 – NATURAL GAS DISTRIBUTION

TABLE OF CONTENTS

00 01 10 - 1

DOCUMENT 00 01 10

TABLE OF CONTENTS

INDEX OF ISSUES

Issue for Construction ......................................................................... 07 June 2024 Issue for Bid and Permit ....................................................................... 28 May 2024 Design Development ......................................................................... 01 March 2024 Schematic Design ........................................................................... 05 January 2024

INDEX OF DISCIPLINES

A (Architectural) FP (Fire Protection) O (Owner) BE(Building Envelope) FS (Food Service) P (Plumbing) C (Civil) L (Landscape) S (Structural) D (Door Hardware) M (Mechanical) T (Technology/LV) E (Electrical)

SECTION SECION

DISC NUMBER TITLE ISSUE DATE

VOLUME 1 OF 2

INTRODUCTORY INFORMATION

A 00 01 01 Title Page ........................................................... 07 June 2024 A 00 01 10 Table of Contents ................................................. 07 June 2024

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

PROCUREMENT REQUIREMENTS

O 00 11 16 Invitation to Proposers .......................................... 07 June 2024 O 00 21 13 Instructions to Proposers ...................................... 07 June 2024 A 00 26 00 Procurement Substitution Procedures ..................... 07 June 2024 Substitution Request Form O 00 31 32 Geotechnical Data .................................................. 15 Mar 2024 Geotechnical Report

CONTRACTING REQUIREMENTS

A 00 41 00 Bid Proposal Form ................................................ 07 June 2024 Prevailing Wage Rates Exhibit A – Prevailing Wage Rates A 00 52 34 Owner Contractor Agreement ................................ 07 June 2024 AIA Document A101 – 2017 AIA Document A201 – 2017

Issue for Bid and Permit 07 June 2024

SECTION SECION

DISC NUMBER TITLE ISSUE DATE

00 01 10 - 2

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 – GENERAL REQUIREMENTS

A 01 10 00 Summary ............................................................ 07 June 2024 A 01 13 00 Delegated Design Requirements ............................. 07 June 2024 A 01 21 00 Allowances .......................................................... 07 June 2024 Allowance Expenditure Authorization Form A 01 22 00 Unit Prices ........................................................... 07 June 2024 A 01 23 00 Alternates ........................................................... 07 June 2024 A 01 25 00 Substitution Procedures ........................................ 07 June 2024 Substitution Request Form A 01 26 00 Contract Modification Procedures ............................ 07 June 2024 A 01 29 00 Payment Procedures ............................................. 07 June 2024 A 01 31 00 Project Management and Coordination .................... 07 June 2024 A 01 31 06 Coordination Drawings .......................................... 07 June 2024 A 01 32 00 Construction Progress Documentation ..................... 07 June 2024 A 01 32 33 Photographic Documentation ................................. 07 June 2024 A 01 33 00 Submittal Procedures ............................................ 07 June 2024 Electronic File Transfer Agreement Form (BIM) A 01 40 00 Quality Requirements ........................................... 07 June 2024 O 01 42 00 References .......................................................... 07 June 2024 A 01 43 39 Mockup Requirements ........................................... 07 June 2024 S 01 45 29 Testing Laboratory Services for Structural Tests and Special Inspections .................................. 07 June 2024 A 01 50 00 Temporary Facilities and Controls ........................... 07 June 2024 C 01 57 15 Dust Control ........................................................ 07 June 2024 A 01 58 13 Temporary Project Identification Sign ..................... 07 June 2024 A 01 60 00 Product Requirements ........................................... 07 June 2024 A 01 73 00 Execution ............................................................ 07 June 2024 A 01 73 29 Cutting and Patching ............................................ 07 June 2024 A 01 77 00 Closeout Procedures ............................................. 07 June 2024 A 01 78 23 Operation and Maintenance Data ............................ 07 June 2024 A 01 78 39 Project Record Documents ..................................... 07 June 2024 A 01 79 00 Demonstration and Training .................................. 07 June 2024 BE 01 83 16 Building Enclosure Performance Requirements ......... 07 June 2024 M 01 91 00 Building Systems Commissioning ........................... 07 June 2024 A 01 91 13 General Commissioning Requirements .................... 07 June 2024

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITIONS

C 02 41 13 Selective Site Demolition ....................................... 07 June 2024

00 01 10 - 3

DIVISION 03 – CONCRETE

S 03 10 00 Concrete Forming and Accessories.......................... 07 June 2024 A 03 15 26 Under-Slab Sheet Vapor Barrier ............................. 07 June 2024 S 03 20 00 Concrete Reinforcing ............................................ 07 June 2024 S 03 30 00 Cast-in-Place Concrete .......................................... 07 June 2024 A 03 54 16 Cement-Based Underlayment ................................ 07 June 2024

DIVISION 04 – MASONRY

A 04 20 00 Unit Masonry ....................................................... 07 June 2024 S 04 22 00 Concrete Unit Masonry .......................................... 07 June 2024 A 04 72 00 Cast Stone Masonry .............................................. 07 June 2024

DIVISION 05 – METALS

S 05 12 00 Structural Steel Framing ....................................... 07 June 2024 A 05 12 13 Architecturally Exposed Structural Steel .................. 07 June 2024 A 05 15 16 Steel Wire Rope Assemblies ................................... 07 June 2024 S 05 21 00 Steel Joist Framing ............................................... 07 June 2024 S 05 31 00 Steel Decking ...................................................... 07 June 2024 S 05 40 00 Cold-Formed Metal Framing ................................... 07 June 2024 A 05 43 00 Slotted Channel Framing ....................................... 07 June 2024 A 05 50 00 Metal Fabrications ................................................ 07 June 2024 A 05 51 13 Metal Pan Stairs ................................................... 07 June 2024 A 05 51 15 Decorative Metal Stairs ......................................... 07 June 2024 A 05 52 13 Steel Pipe and Tube Railings .................................. 07 June 2024 A 05 73 00 Decorative Metal Railings ...................................... 07 June 2024

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

A 06 10 53 Miscellaneous Carpentry........................................ 07 June 2024 A 06 16 36 Plywood Sheathing ............................................... 07 June 2024 A 06 16 43 Gypsum Sheathing ............................................... 07 June 2024 S 06 17 19 Cross-Laminated Timber Panels ............................. 07 June 2024 S 06 18 00 Structural Glued Laminated Units ........................... 07 June 2024 A 06 20 23 Interior Finish Carpentry ....................................... 07 June 2024 A 06 41 16 Plastic-Laminate-Clad Architectural Cabinets ........... 07 June 2024 A 06 41 19 Paper-Composite Countertops ................................ 07 June 2024 A 06 41 23 Epoxy Countertops ............................................... 07 June 2024 A 06 42 19 Plastic Laminate Faced Wood Paneling .................... 07 June 2024 A 06 61 16 Solid Surfacing Countertops .................................. 07 June 2024 A 06 61 17 Solid Surfacing Shower Surrounds .......................... 07 June 2024 A 06 64 36 Fiberglass Reinforced Plastic Paneling ..................... 07 June 2024

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

BE 07 13 00 Sheet Waterproofing ............................................. 07 June 2024 A 07 21 00 Thermal Insulation ............................................... 07 June 2024 A 07 21 19 Foamed-in-Place Insulation ................................... 07 June 2024 BE 07 22 00 Roof and Deck Insulation ...................................... 07 June 2024

00 01 10 - 4

BE 07 27 26 Fluid Applied Air Barriers ....................................... 07 June 2024 A 07 42 10 Thermally Broken Wall Cladding Support System ..... 07 June 2024 A 07 42 13.16 Metal Plate Wall Panels ......................................... 07 June 2024 A 07 42 93 Metal Soffit Panels ................................................ 07 June 2024 BE 07 54 19 Polyvinyl-Chloride (PVC) Membrane Roofing ............ 07 June 2024 BE 07 62 00 Sheet Metal Flashing and Trim ............................... 07 June 2024 BE 07 7200 Roof Accessories .................................................. 07 June 2024 A 07 81 33 Mineral Fiber Fireproofing ...................................... 07 June 2024 A 07 84 13 Penetration Firestopping ....................................... 07 June 2024 A 07 84 43 Joint Firestopping ................................................. 07 June 2024 A 07 91 00 Preformed Joint Seals ........................................... 07 June 2024 A 07 92 00 Joint Sealants ...................................................... 07 June 2024 A 07 92 19 Acoustical Joint Sealants ....................................... 07 June 2024 A 07 95 00 Expansion Control ................................................ 07 June 2024

DIVISION 08 – OPENINGS

A 08 11 13 Hollow Metal Doors and Frames ............................. 07 June 2024 A 08 14 16 Flush Wood Doors ................................................ 07 June 2024 A 08 31 13 Access Doors and Frames ...................................... 07 June 2024 A 08 33 23 Overhead Coiling Doors ......................................... 07 June 2024 A 08 35 14 Accordion Fire Doors ............................................. 07 June 2024 A 08 35 15 Aluminum-Framed Folding Door System .................. 07 June 2024 A 08 41 13 Aluminum-Framed Entrances and Storefronts .......... 07 June 2024 A 08 44 13 Glazed Aluminum Curtain Walls ............................. 07 June 2024 D 08 71 00 Finish Hardware ................................................... 07 June 2024 A 08 80 00 Glazing ............................................................... 07 June 2024 A 08 83 00 Mirrors ................................................................ 07 June 2024 A 08 87 00 Glazing Surface Films ........................................... 07 June 2024 A 08 88 13 Fire-Rated Glazing ................................................ 07 June 2024

DIVISION 09 – FINISHES

A 09 05 61.13 Moisture Vapor Emission Control ............................ 07 June 2024 A 09 21 16.23 Gypsum Board Shaft Wall Assemblies ..................... 07 June 2024 A 09 22 16 Non-Structural Metal Framing ................................ 07 June 2024 A 09 22 18 Extruded Aluminum Partition Closure ...................... 07 June 2024 A 09 24 00 Portland Cement Plastering ................................... 07 June 2024 A 09 29 00 Gypsum Board ..................................................... 07 June 2024 A 09 30 13 Tiling .................................................................. 07 June 2024 A 09 51 13 Acoustical Panel Ceilings ....................................... 07 June 2024 A 09 54 47 Blade Acoustic Panels ........................................... 07 June 2024 A 09 61 16 Concrete Floor Sealing .......................................... 07 June 2024 A 09 64 67 Anchored Resilient Wood Stage Flooring .................. 07 June 2024 A 09 65 13 Resilient Base and Accessories ............................... 07 June 2024 A 09 65 18 Resilient Sheet Rubber Flooring .............................. 07 June 2024 A 09 65 19 Resilient Tile Flooring ............................................ 07 June 2024 A 09 65 66 Resilient Athletic Flooring ...................................... 07 June 2024 A 09 66 23 Resinous Matrix Terrazzo Flooring .......................... 07 June 2024

00 01 10 - 5

A 09 67 23 Resinous Flooring ................................................. 07 June 2024 A 09 68 13 Tile Carpeting ...................................................... 07 June 2024 A 09 72 00 Wall Coverings ..................................................... 07 June 2024 A 09 72 14 Tackable Wall Covering ......................................... 07 June 2024 A 09 72 20 Felt Wall Covering ................................................ 07 June 2024 A 09 77 23 Fabric-Wrapped Panels ......................................... 07 June 2024 A 09 84 33 Sound-Absorbing Wall Units .................................. 07 June 2024 A 09 84 33.16 Sound-Absorbing Wood-Fiber Wall Units ................. 07 June 2024 A 09 84 33.16 Sound-Absorbing Wood-Fiber Ceiling Wood-Fiber Units ........................................... 07 June 2024 A 09 84 53 Sound Barrier Mullion Trim Cap .............................. 07 June 2024 A 09 91 00 Interior Painting ................................................... 07 June 2024 A 09 91 03 Exterior Painting .................................................. 07 June 2024 A 09 96 00 High-Performance Coatings ................................... 07 June 2024

DIVISION 10 – SPECIALTIES

A 10 11 16 Visual Display Units .............................................. 07 June 2024 A 10 11 46 Visual Display Fabrics ........................................... 07 June 2024 A 10 14 16 Plaques ............................................................... 07 June 2024 A 10 14 19 Dimensional Letter Signage ................................... 07 June 2024 A 10 14 24 Panel Signage ...................................................... 07 June 2024 A 10 14 63 Digital Exterior Marquee Signage............................ 07 June 2024 A 10 21 13.19 Plastic (HDPE) Toilet Compartments ....................... 07 June 2024 A 10 21 23 Cubicle Curtains and Tracks ................................... 07 June 2024 A 10 28 13 Toilet Accessories ................................................. 07 June 2024 A 10 41 16 Emergency Key Cabinets ....................................... 07 June 2024 A 10 43 13 Emergency Aid Specialties ..................................... 07 June 2024 A 10 44 00 Fire Protection Specialties ..................................... 07 June 2024 A 10 51 13 Metal Lockers ...................................................... 07 June 2024 A 10 73 16 Manufactured Canopies ......................................... 07 June 2024 A 10 75 00 Flagpoles ............................................................ 07 June 2024

DIVISION 11 – EQUIPMENT

A 11 30 00 Residential Appliances .......................................... 07 June 2024 FS 11 40 00 Foodservice Equipment ......................................... 07 June 2024 A 11 51 17 Library Book Drop and Return ................................ 07 June 2024 A 11 51 23 Library Shelving ................................................... 07 June 2024 A 11 61 43 Stage Curtains ..................................................... 07 June 2024 A 11 66 23 Gymnasium Equipment ......................................... 07 June 2024 A 11 66 43 Interior Scoreboards ............................................. 07 June 2024 A 11 68 34 Athletic Field Equipment ........................................ 07 June 2024

DIVISION 12 – FURNISHINGS

A 12 24 13 Roller Window Shades .......................................... 07 June 2024 A 12 64 16 Banquette Seating ................................................ 07 June 2024 L 12 93 00 Site Furnishings ................................................... 07 June 2024

00 01 10 - 6

DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED

DIVISION 14 – CONVEYING SYSTEMS

A 14 24 00 Hydraulic Elevators ............................................... 07 June 2024

DIVISIONS 15 – 19 – NOT USED

VOLUME 2 OF 2

INTRODUCTORY INFORMATION

A 00 01 01 Title Page ........................................................... 07 June 2024 A 00 01 10 Table of Contents ................................................. 07 June 2024

FACILITY SERVICES SUBGROUP

DIVISION 20 – NOT USED

DIVISION 21 – FIRE PROTECTION

FP 21 00 10 Basic Fire Protection System Requirements ............. 07 June 2024 FP 21 00 90 Fire Protection System Submittal Procedures ........... 07 June 2024 FP 21 13 14 Fire Protection System .......................................... 07 June 2024

DIVISION 22 - PLUMBING

P 22 00 10 Basic Plumbing Requirements ................................ 07 June 2024 P 22 00 90 Plumbing Submittal Procedures .............................. 07 June 2024 P 22 05 20 Gauges, Meters, and Thermometers ....................... 07 June 2024 P 22 05 24 Valves – General .................................................. 07 June 2024 P 22 05 30 Pipe and Pipe Fittings – General ............................. 07 June 2024 P 22 05 34 Isolation Devices .................................................. 07 June 2024 P 22 05 54 Plumbing Identification ......................................... 07 June 2024 P 22 07 20 Piping Insulation .................................................. 07 June 2024 P 22 08 00 Commissioning of Plumbing ................................... 07 June 2024 P 22 11 17 Domestic Water Piping and Appurtenances Copper ... 07 June 2024 P 22 13 17 Soil, Waste and Sanitary Drain Piping, Vent Piping, and Appurtenances .............................. 07 June 2024 P 22 13 18 Condensate Piping ................................................ 07 June 2024 P 22 13 19 Interceptors ........................................................ 07 June 2024 P 22 14 01 Roof Drainage and Appurtenances .......................... 07 June 2024 P 22 14 29 Sump Pumps ....................................................... 07 June 2024 P 22 16 01 Natural Gas Piping and Appurtenances .................... 07 June 2024 P 22 33 34 Access Doors ....................................................... 07 June 2024 P 22 40 01 Plumbing Fixtures and Fixture Carriers .................... 07 June 2024

00 01 10 - 7

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

M 23 00 00 Basic Mechanical Requirements .............................. 07 June 2024 M 23 00 90 HVAC Submittal Procedures ................................... 07 June 2024 M 23 05 19 Meters and Gauges for HVAC Piping ........................ 07 June 2024 M 23 05 29 Hangers and Supports for HVAC Piping and Equipment .................................................... 07 June 2024 M 23 05 32 Roof Curbs .......................................................... 07 June 2024 M 23 05 53 Identification for HVAC Piping and Equipment .......... 07 June 2024 M 23 05 93 Testing, Adjusting, and Balancing for HVAC ............. 07 June 2024 M 23 07 13 Duct and Grille Insulation ...................................... 07 June 2024 M 23 07 21 Refrigerant Piping Insulation .................................. 07 June 2024 M 23 08 00 Commissioning of Heating, Ventilating and Air Conditioning (HVAC) .................................. 07 June 2024 M 23 09 23 Energy Management Control System (BACNET) ....... 07 June 2024 M 23 09 23E Sequence of Operations Kitchen Sequences ............. 07 June 2024 M 23 0923G Sequence of Operations Rooftop Unit Sequences ...... 07 June 2024 M 23 23 00 Refrigerant Piping................................................. 07 June 2024 M 23 31 13 Metal Ductwork .................................................... 07 June 2024 M 23 33 33 Access Doors ....................................................... 07 June 2024 M 23 34 16 HVAC Fans .......................................................... 07 June 2024 M 23 37 13 Diffusers, Registers, and Grilles ............................. 07 June 2024 M 23 38 13 Commercial Kitchen Hoods .................................... 07 June 2024 M 23 43 23 Bipolar Ionization Air Purification System ................ 07 June 2024 M 23 51 13 Stage Vents ......................................................... 07 June 2024 M 23 74 23A Kitchen Makeup Air Systems (Direct Hood) .............. 07 June 2024 M 23 81 19 Packaged HVAC Units ........................................... 07 June 2024 M 23 81 27 Small Capacity Split System Units .......................... 07 June 2024 M 23 82 39 Electric Unit Heaters ............................................. 07 June 2024

DIVISIONS 24 – 25 – NOT USED

DIVISION 26 – ELECTRICAL

E 26 00 00 Electrical ............................................................. 07 June 2024 E 26 05 19 Low Voltage Electrical Power Conductors and Cables ................................................... 07 June 2024 E 26 05 26 Grounding and Bonding for Electrical Systems ......... 07 June 2024 E 26 05 33 Raceways and Boxes for Electrical Systems ............. 07 June 2024 E 26 05 53 Identification for Electrical Systems ........................ 07 June 2024 E 26 05 73 Power System Studies .......................................... 07 June 2024 E 26 08 00 Commissioning of Electrical Systems ...................... 07 June 2024 E 26 09 13 Electrical Power Monitoring .................................... 07 June 2024 E 26 09 23 Lighting Control Devices ........................................ 07 June 2024 E 26 20 00 Low Voltage Electrical Distribution .......................... 07 June 2024 E 26 27 26 Wiring Devices ..................................................... 07 June 2024 E 26 31 13 Solar Photovoltaic System ..................................... 07 June 2024 E 26 43 00 Surge Protective Devices ....................................... 07 June 2024

00 01 10 - 8

E 26 50 00 Lighting .............................................................. 07 June 2024 E 26 55 61 Theatrical Lighting ................................................ 07 June 2024

DIVISION 27 – COMMUNICATIONS

T 27 00 00 General Technology Requirements .......................... 07 June 2024 T 27 05 23 Pathways for Technology Systems .......................... 07 June 2024 T 27 10 00 Communications Cabling General Requirements ....... 07 June 2024 T 27 10 05 Grounding and Bonding for Technology Systems ...... 07 June 2024 T 27 11 00 Communications Equipment Rooms ........................ 07 June 2024 T 27 13 00 Communications Backbone Cabling ......................... 07 June 2024 T 27 15 00 Communications Horizontal Cabling ........................ 07 June 2024 T 27 16 00 Communications Connecting Cords ......................... 07 June 2024 T 27 18 00 Communications Labeling and Identification ............ 07 June 2024 T 27 40 00 AV/Multimedia General Requirements ..................... 07 June 2024 T 27 41 00 Audio Visual Systems ............................................ 07 June 2024 T 27 51 00 Distributed Communication Systems ....................... 07 June 2024 T 27 60 00 Physical Security General Requirements .................. 07 June 2024 T 27 62 00 Video Surveillance System .................................... 07 June 2024 T 27 64 00 Electronic Access Control System ........................... 07 June 2024 T 27 66 00 Intrusion Detection System ................................... 07 June 2024

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

E 28 46 21 Fire Detection and Alarm System ........................... 07 June 2024

DIVISION 29 – NOT USED

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 30 – NOT USED

DIVISION 31 – EARTHWORK

S 31 00 00 Earthwork Under Building Pad ................................ 07 June 2024 C 31 05 21 Geo Grid Reinforcement ........................................ 07 June 2024 C 31 11 00 Clearing and Grubbing .......................................... 07 June 2024 C 31 11 01 Site Preparation ................................................... 07 June 2024 C 31 14 13.23 Topsoil Stripping and Stockpiling ............................ 07 June 2024 C 31 22 13 Rough Grading ..................................................... 07 June 2024 C 31 22 19 Finish Grading ..................................................... 07 June 2024 C 31 23 13 Subgrade Preparation ........................................... 07 June 2024 C 31 23 33 Trenching and Backfilling ...................................... 07 June 2024 C 31 25 00 Erosion and Sedimentation Controls ....................... 07 June 2024 A 31 31 16 Termite Control .................................................... 07 June 2024 C 31 36 00 Gabions .............................................................. 07 June 2024 C 31 41 33 Trench Shielding .................................................. 07 June 2024 S 31 63 29 Drilled Concrete Piers ........................................... 07 June 2024

00 01 10 - 9

DIVISION 32 – EXTERIOR IMPROVEMENTS

C 32 11 13.13 Lime-Treated Subgrades ....................................... 07 June 2024 C 32 11 23 Aggregate Base Course ......................................... 07 June 2024 C 32 12 16 Asphalt Paving ..................................................... 07 June 2024 C 32 13 13 Concrete Paving ................................................... 07 June 2024 C 32 13 73 Concrete Paving Joint Sealants .............................. 07 June 2024 C 32 14 00 Unit Paving .......................................................... 07 June 2024 C 32 16 21 Concrete Curbs, Gutters, and Walks ....................... 07 June 2024 C 32 17 13 Parking Bumpers .................................................. 07 June 2024 C 32 17 23 Pavement Markings .............................................. 07 June 2024 C 32 17 23.33 Thermoplastic Pavement Markings .......................... 07 June 2024 C 32 17 26 Tactile Warning Surfacing ...................................... 07 June 2024 L 32 18 00 Synthetic Grass Surfacing ..................................... 07 June 2024 C 32 31 13 Chain Link Fences and Gates ................................. 07 June 2024 L 32 31 26 Wire Fences and Gates.......................................... 07 June 2024 L 32 84 00 Landscape Irrigation ............................................. 07 June 2024 C 32 91 19.13 Spreading and Grading Topsoil............................... 07 June 2024 L 32 92 00 Turf and Grasses .................................................. 07 June 2024 C 32 92 02 Sodding .............................................................. 07 June 2024 C 32 92 19.16 Hydraulic Seeding ................................................ 07 June 2024 L 32 93 00 Plants ................................................................. 07 June 2024

DIVISION 33 – UTILITIES

C 33 01 30 Testing of Gravity Sewer Systems .......................... 07 June 2024 C 33 11 00 Water Utility Distribution Piping ............................. 07 June 2024 C 33 11 00.17 Polyethylene Wrap ............................................... 07 June 2024 C 33 13 00 Disinfection of Water Distribution Systems .............. 07 June 2024 C 33 31 00 Sanitary Utility Sewerage Piping ............................. 07 June 2024 C 33 39 13 Sanitary Utility Sewerage Manholes, Frames, and Covers .................................................... 07 June 2024 C 33 41 00 Storm Utility Drainage Piping ................................. 07 June 2024 C 33 49 13 Storm Drainage Manholes, Frames and Covers ........ 07 June 2024 C 33 51 13 Natural Gas Distribution ........................................ 07 June 2024

PROCESS EQUIPMENT SUBGROUP

DIVISIONS 40 – 48 – NOT USED

END OF TABLE OF CONTENTS

Issue for Construction 07 June 2024

BASIC FIRE PROTECTION SYSTEM REQUIREMENTS

21 00 10 - 1

EMA Engineering & Consulting

SECTION 21 00 10

BASIC FIRE PROTECTION SYSTEM REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions, Division 1 Specifications, and Section 21, apply to this Section.

1.2 SECTION INCLUDES

A. Basic fire protection requirements necessary to provide complete installation of all Division 21 work.

1.3 WORK INCLUDED

A. This section of work comprises furnishing of all materials, equipment, tools, scaffolding, rigging, hoisting, labor, and transportation necessary for the complete installation of the fire protection system as shown on the plans and as specified herein.

B. Bidders shall determine the contents of a complete set of drawings and specifications and be aware that they may be bidding from a partial set of drawings, applicable only to the various separate contracts, subcontracts, or trades as may be issued for bidding purposes only. The contract documents and the complete scope of work for the project are illustrated on the combined Architectural, Structural, Plumbing, Heating, Ventilating, Air Conditioning and Electrical, and each Bidder shall thoroughly acquaint himself with all the details of the complete set of drawings and specifications before submitting his bid. All drawings and specifications form a part of the contract documents for each separate contract and shall be considered as bound therewith in the event partial sets of plans and specifications are issued for bidding only. The submission of bids shall be deemed evidence of the review and examination of all drawings, specifications, and addenda issued for this project as no allowances will be made because of unfamiliarity with any portion of the complete set of documents.

1.4 RELATED SECTIONS

A. The conditions of the Division 1 requirements and the contract requirements which include the General Conditions and the Supplementary Conditions apply to the work of this division.

1.5 CODES & REFERENCE STANDARDS

A. General:

1. Perform all Division 21 work in strict accordance with the requirements and recommendations stated in the codes and standards except when

Issue for Construction 07 June 2024

BASIC FIRE PROTECTION SYSTEM REQUIREMENTS

21 00 10 - 2

EMA Engineering & Consulting requirements are modified by the contract documents.

2. Nothing in the Contract Documents shall be construed to permit work not conforming to these codes.

3. When two or more codes or standards are applicable to the same work, then the stricter code or standard shall govern.

4. The date of the code or standard that is in effect on the date of issue of the contract documents except when a particular publication date is specified.

5. The Contractor shall be held responsible for verifying all local codes and ordinances that may alter any part of the plans or specifications. The Contractor shall bear all costs for correcting the deficiencies.

6. Where local codes and ordinances are not in writing or on record, but a local precedence has been set, the Owner shall pay for any additional cost incurred.

B. Applicable Codes and Standards for All Division 21 Work:

1. International Building Code

2. International Gas Code

3. International Plumbing Code

4. International Mechanical Code

5. International Energy Conservation Code

C. National Electrical Code

D. Occupational Safety and Health Administration Standards:

1. OSHA Standard 2207 - Construction Industry Standards

2. OSHA 29 CFR Part 1926 - Regulation of Excavation

3. Texas Underground Facility Damage Prevention Act (H.B. 2295)

4. All other applicable standards

E. National Fire Protection Association

F. Fire Sprinkler System:

1. NFPA 13

2. NFPA 14

3. NFPA 101 Section 8-3

4. All other applicable codes

G. National Appliance Energy Conservation Act of 1987

H. Texas State Board of Insurance Standards

I. Clean Air Act and Clean Air Act Amendments of 1990

J. Safety Code for Elevators and Escalators

K. State Codes:

1. Texas Department of Labor Boiler Rules and Regulations

2. All other applicable codes

L. Local Municipal Codes and Ordinances

Issue for Construction 07 June 2024

BASIC FIRE PROTECTION SYSTEM REQUIREMENTS

21 00 10 - 3

EMA Engineering & Consulting

1.6 SCHEDULE OF ABBREVIATIONS

A. Reference Standards are listed in Section 21 using abbreviations listed below:

1. AABC (NSTSB) - Associated Air Balance Council

2. AASHTO - American Association of State Highway and Transportation Officials

3. ADA - Americans with Disabilities Act

4. ADC - Air Diffusion Council

5. AGA - American Gas Association

6. AMCA - Air Moving and Conditioning Association

7. ANSI - American National Standards Institute

8. ARI - Air-Conditioning and Refrigeration Institute

9. ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning

Engineers

10. ASME - American Society of Mechanical Engineers

11. ASPE - American Society of Plumbing Engineers

12. ASTM - American Society for Testing and Materials

13. AWE - American Welding Society

14. AWWA - American Water Works Association

15. CGA - Compressed Gas Association

16. CISPI - Cast Iron Soil Pipe Institute

17. CS - Commercial Standard

18. CSA - Canadian Standards Association

19. DIPRA - Ductile Iron Pipe Research Association

20. DOT - Department of Transportation

21. DOC - Department of Commerce

22. FCC - Federal Communications Commission

23. FM - Factory Mutual

24. FS - Federal Specification

25. IBC - International Building Code

26. ITL - Independent Testing Laboratories

27. NEC - National Electric Code

28. NFPA - National Fire Protection Association

29. NSF - National Sanitation Foundation

30. OSHA - Occupational Safety and Health Administration

31. PDI - Plumbing and Drainage Institute

32. SMACNA - Sheet Metal and Air Conditioning National Association

33. TCEQ - Texas Commission on Environmental Quality

34. TDH - Texas Department of Health

35. TWC - Texas Water Commission

36. UL - Underwriters Laboratories

1.7 QUALITY ASSURANCE

A. Provide complete installations of all systems.

B. Furnish all items of equipment, material, and labor to complete the Contract even though each and every item necessary is not specifically mentioned or shown.

C. In case of any conflict between the specifications, plans, and ordinances, the ordinances shall govern.

Issue for Construction 07 June 2024

BASIC FIRE PROTECTION SYSTEM REQUIREMENTS

21 00 10 - 4

EMA Engineering & Consulting

D. All materials furnished under this Contract shall be new, free from defects of any kind, of the quality and design hereinafter specified, and shall conform to the standards of Underwriter`s Laboratories Inc., except for equipment which UL does not list or provide label service.

E. All fire sprinkler equipment and sprinkler heads shall be the same brand.

F. Contractor`s Responsibility

1. Erect barricades, protective fencing, and signs to prevent injury to personnel on-site.

2. Make permanent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .