Addendum No. 2 for RFB 2024-009 is issued by the City of Manitou Springs for the Manitou Overlook Park-Higginbotham Flats Master Plan project. The addendum provides clarifications and responses to potential bidders' questions regarding the design project. Key details include a $50,000 budget for Phase 1 design, with a requirement to complete a first draft of the design prior to October 2024 for presentation at a City Council meeting. The project involves designing a park on a property previously used as a community garden, with the goal of creating a lasting use space for residents and visitors.

The addendum indicates no construction budget has been identified at this time, and no site survey or environmental study has been conducted. The city expects collaboration with the artist of the Seven Rock Cairn sculpture and plans to share a site survey with the selected contractor. Bidders are asked to provide design fees for Phase 1, with the ultimate vision being a sustainable park featuring native pollinator gardens, seating areas with mountain views, and elements that honor the region's Indigenous tribes and plants. The project emphasizes low maintenance, native plantings, and natural materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB 2024-009 Addendum 2 City of Manitou Springs Manitou Overlook Park-Higginbotham Flats Master Plan

CITY OF MANITOU SPRINGS ADDENDUM FORM

NUMBER: __2__ DATE: __JUNE 05, 2024__

1.01 GENERAL

The following changes, additions, and/or deletions are, by issuance of the Addendum, made a part of the Project Manual for the Manitou Overlook Park- Higginbotham Flats Master Plan as if originally contained therein. Execution of the acknowledgement of receipt shall be the bidder’s acceptance of the conditions herein set forth. This Addendum shall be signed and submitted with and attached to the submitted Bid Form. Failure to do so may result in the rejection of the Bid.

1.02 RFI’s & Answers

1. Is there a total project budget for construction already identified for this project? No, there is no construction budget identified for the project at this time.

2. Is there a range of fees already defined for phase one of design? Yes, $50,000.

3. Is there a timeline or duration already identified for Phase 1 design? Or is there a maximum time you would wish for the design team to accommodate for? We would like a first draft of the design to be completed prior to October 2024, in order to present the design at an October City Council meeting.

4. On page 6, "5. Cost Schedule, b. Total project costs": To confirm, are you asking for our design fees for Phase 1 design? Yes, that is correct.

5. Are there specific site characteristics that inform the selection of this site / land in relation to the program? No, there are none. This property was bought several years ago and has been used for a variety of things in the past, most recently used as a community garden. It is a desire of the PARAB board, the community and the City to see the land have a designated lasting use that is open for use by its residents and visitors alike.

6. Should we assume collaboration to be had with the artist of the Seven Rock Cairn sculpture? Or none? Yes, assume collaboration with the artist.

7. Would you provide access to the meeting notes from the initial Pre-Proposal Site Visit?

We had a conflict of schedule and could unfortunately not attend the meeting that day. Yes, these are already available in Addendum No 1.

RFB 2024-009 Addendum 2 City of Manitou Springs Manitou Overlook Park-Higginbotham Flats Master Plan

8. Is there a site survey available for us to review so that we may assess the levels of setbacks or land restrictions for these parcels? Not at this time. The City of Manitou Springs will share a site survey with the selected contractor once available.

9. Was there an environmental study already conducted for this site? No there has not been a study for this site.

1.03 ACKNOWLEDGEMENT OF RECEIPT