This document contains a combined synopsis and solicitation requesting quotes for exciters and automatic voltage regulators. Key details include a solicitation number of 20235201003 issued by the International Boundary and Water Commission as a 100% small business set-aside. Quotes are due by 3:00 PM Mountain time on April 14, 2023 and shall be emailed to the address provided. Site visits to assess requirements are encouraged by April 5. The solicitation seeks exciters and automatic voltage regulators per the attached CLIN structure and scope of work. Award will be made to the responsible offeror with the lowest price technically acceptable proposal as determined by technical approach, expertise, personnel qualifications, and past performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Generator Operation Curves and Data Plates.pdf | ||
| QnA 5-10-23.docx | DOCX document | |
| QnA M007.docx | DOCX document | |
| Drawings Main Boards.pdf | ||
| FALCON EXCITER INFORMATION.pdf | ||
| QnAs 4-28-23.docx | DOCX document | |
| Main Floor.pdf | ||
| Falcon General Arrangement.pdf | ||
| Falcon Electrical Diagram.pdf | ||
| Generators Floor.pdf | ||
| AVR_Exciters Control System Drawings.pdf | ||
| Exciter and AVR Data Plates.pdf | ||
| PWS- Falcon Plant Exciters and Automatic Voltage Regulator rev4 ED 03_22.pdf | ||
| 1 Updated PWS- Falcon Plant Exciters and Automatic Voltage Regulator rev4 ED 03_22.pdf | ||
| Updated CLIN Structure.docx | DOCX document | |
| Pics Exciter and AVR Data Plates.pdf | ||
| CLIN Structure.docx | DOCX document | |
| AVR Pictures.pdf | ||
| WAGE Determination.pdf | ||
| Exciter Drawing.pdf | ||
| PWS Falcon Plant Exciters and Automatic Voltage Regulat.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&As 4/23/23
1. The existing excitation system seems to have a rotating DC exciter that provides a field current to the generator field. The excitation supply is provided by an Amplidyne, which is controlled by a Rheostate and AVR buck/boost control. Please confirm if my understanding is correct.
That is correct, our current generators excitation has a rotating DC exciter system.
2. In similar projects, Reivax has delivered and installed a static excitation system with an excitation transformer (PPT). The feed to the PPT has been from the generator terminals (13.8kV etc.). The rotating DC exciter has been left on the shaft, but disconnected electrically. For AC feeder connection, we have used 15kV 2/0 cable most of the time and DLO cable for connection to the generator collector rings. Would Falcon Dam have a similar retrofit.
Regards the static excitation system. I spoke with our Falcon Power Superintendent, and we concur the static excitation would be the more appropriate upgrade for our current excitation system.
3. As for control room interface, we are not familiar with PLC Indusoft software, but we could get a 3rd party to perform that work.
Regards the PLC programming, we can provide information about the vendor who install and program our existing PLC, only if you’re selected to perform this project and vendor approved to release the information.
4. In addition to the PLC connection, we would also recommend one (1) remote 15” HMI screen which can view and control all three (3) units from a single point. The remote screen would have the same look as teh local HMI screen for each exciter line-up.
15 HMI screen would be great to have it in the proposal.
5. As for the hazardous material, is there a hazardous material inspection report available for the plant where IBWC hired a 3rd party to conduct such an investigation? This is typically how USACE works.
Regards the hazardous material. Please include the cost to perform the inspection and removal of these materials.