2022200082_A1_Attachment A_Switchboards.pdf

PDF 106 KB Posted

Attached to
ITB 2022200082 Provision of Electrical Components
Solicitation number
S-KE0010-00002866
Issued by
Lane County, Oregon

About this file

This document contains the specifications for Section 262413 - Switchboards related to ITB 2022200082 for the Provision of Electrical Components in Lane County and Eugene City, Oregon. The scope includes service and distribution switchboards, surge protection devices, disconnecting and overcurrent protective devices, and accessory components. The switchboards are specified for the Building 10 Service Distribution Panel (3000A, 480Y/277V, NEMA 3R), Building 18 Distribution Panels (800A and 400A, 480Y/277V and 208Y/120V, NEMA 1), and must comply with seismic requirements. The ITB also includes provisions for a service-rated automatic transfer switch to be integrated with the Building 10 switchboard.

The ITB does not include installation and will be awarded based on the products meeting the technical specifications. Pricing terms, funding sources, and other commercial details were not provided in the document. The contract term and any renewal options were also not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB 2022200082 Attachment A

SWITCHBOARDS 262413 - 1

SECTION 262413 - SWITCHBOARDS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. One Line Drawing and Switchboard Elevation Drawings.

1.2 SUMMARY

A. Section Includes:

1. Service and distribution switchboards.

2. Surge protection devices.

3. Disconnecting and overcurrent protective devices.

4. Accessory components and features.

5. Identification.

1.3 ACTION SUBMITTALS

A. Product Data: For each switchboard, overcurrent protective device, surge protection device, ground-fault protector, accessory, and component.

1. Include dimensions and manufacturers' technical data on features, performance, electrical characteristics, ratings, accessories, and finishes.

B. Shop Drawings: For each switchboard and related equipment.

1. Include dimensioned plans, elevations, sections, and details, including required clearances and service space around equipment. Show tabulations of installed devices, equipment features, and ratings.

2. Detail enclosure types for types other than NEMA 250, Type 1.

3. Detail bus configuration, current, and voltage ratings.

4. Detail short-circuit current rating of switchboards and overcurrent protective devices.

5. Include descriptive documentation of barriers specified for electrical insulation and isolation.

6. Detail utility company's metering provisions with indication of approval by utility company.

7. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices and auxiliary components.

8. Include time-current coordination curves for each type and rating of overcurrent protective device included in switchboards. Include selectable ranges for each type of overcurrent protective device.

9. Include schematic and wiring diagrams for power, signal, and control wiring.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Deliver switchboards in sections or lengths that can be moved past obstructions in delivery path.

SWITCHBOARDS 262413 - 2

B. Responsibility for receipt, storage and handling of switchgear will be assigned to the Electrical

Contractor who will be installing the switchgear. Selection of this Contractor will be made under a separate contract.

1.5 COORDINATION

A. Coordinate layout and installation of switchboards with installing Contractor.

B. Coordinate sizes and locations of concrete bases with equipment being provided.

1.6 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to repair or replace switchboard enclosures, buswork, overcurrent protective devices, accessories, and factory installed interconnection wiring that fail in materials or workmanship within specified warranty period.

1. Warranty Period: three years from date of Substantial Completion.

2. Warranty will be assigned to the installing Contractor.

B. Manufacturer's Warranty: Manufacturer's agrees to repair or replace surge protection devices that fail in materials or workmanship within specified warranty period.

1. Warranty Period: three years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Seismic Performance: Switchboards shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

2.2 SWITCHBOARDS

A. Product Selection for Restricted Space: Drawings indicate maximum dimensions for switchboards including clearances between switchboards and adjacent surfaces and other items.

Comply with indicated maximum dimensions.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. Comply with UL 891.

D. Front-Connected, Front-Accessible Switchboards:

1. Main Devices: Fixed, individually mounted.

2. Branch Devices: Panel mounted.

3. Sections front and rear aligned.

SWITCHBOARDS 262413 - 3

E. NEMA Rating Nominal System Voltage and main-Bus Continuous Amps:

1. Building 10 Service Distribution Panel: 3000 amps, 480Y/277 volts. NEMA 3R.

2. Building 18 Distribution Panel: 800 amps, 480Y/277 volts. NEMA 1.

3. Building 18 Distribution Panel: 400 amps, 208Y/120 volts. NEMA 1

F. Seismic Requirements: Fabricate and test switchboards according to IEEE 344 to withstand seismic forces defined in Section 260548.16 "Seismic Controls for Electrical Systems."

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation. Shake-table testing shall comply with ICC-

ES AC156.

a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."

G. Enclosure Finish for Indoor Units: Factory-applied finish in manufacturer's standard gray finish over a rust-inhibiting primer on treated metal surface.

H. Outdoor Enclosures: Type 3R

1. Finish: Factory-applied finish in manufacturer's standard color; undersurfaces treated with corrosion-resistant undercoating.

2. Enclosure: Downward, sloping roof; hinged doors for each section, with provisions for padlocking.

I. Insulation and isolation for main and vertical buses of feeder sections.

J. Service Entrance Rating: The Building 10 Switchboard is intended for use as service entrance equipment and shall contain service disconnecting means with overcurrent protection, a neutral bus with disconnecting link, a grounding electrode conductor terminal, and a main bonding jumper.

K. Utility Metering Compartment: Barrier compartment and section complying with EWEB requirements; hinged sealable door; buses provisioned for mounting utility company's current transformers and potential transformers or potential taps as required by utility company. If separate vertical section is required for utility metering, match and align with basic switchboard.

Provide service entrance label and necessary applicable service entrance features.

L. Bus Transition and Incoming Pull Sections at Building 10 Switchboard: Matched and aligned with basic switchboard.

M. Hinged Front Panels: Allow access to circuit breaker, metering, accessory, and blank compartments.

N. Buses and Connections: Three phase, four wire unless otherwise indicated.

1. Provide phase bus arrangement A, B, C from front to back, top to bottom, and left to right when viewed from the front of the switchboard.

SWITCHBOARDS 262413 - 4

2. Phase- and Neutral-Bus Material: Copper with copper circuit-breaker line connections.

3. Copper feeder circuit-breaker line connections.

4. Ground Bus: 1/4-by-2-inch hard-drawn copper of 98 percent conductivity, equipped with mechanical connectors for feeder and branch-circuit ground conductors.

5. Main-Phase Buses and Equipment-Ground Buses: Uniform capacity for entire length of switchboard's main and distribution sections. Provide for future extensions from both ends.

6. Disconnect Links:

a. Isolate neutral bus from incoming neutral conductors.

b. Bond neutral bus to equipment-ground bus for switchboards utilized as service equipment or separately derived systems.

7. Neutral Buses – 480 Volt Distribution Panels: 50 percent of the ampacity of phase buses unless otherwise indicated, equipped with compression connectors for outgoing circuit neutral cables. Brace bus extensions for busway feeder neutral bus.

8. Neutral Bus – 208 volt Distribution Panel: 100 percent of the ampacity of phase buses unless otherwise indicated, equipped with mechanical connectors for outgoing circuit neutral cables. Brace bus extensions for busway feeder neutral bus.

9. Isolation Barrier Access Provisions: Permit checking of bus-bolt tightness.

O. Future Devices: Equip compartments with mounting brackets, supports, bus connections, and appurtenances at full rating of circuit-breaker compartment.

2.3 SURGE PROTECTION DEVICES

A. SPDs: Comply with UL 1449, Type 1.

B. SPDs: Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 1449, Type 1.

C. Features and Accessories:

1. Internal thermal protection that disconnects the SPD before damaging internal suppressor components.

2. Indicator light display for protection status.

3. Surge counter.

D. Peak Surge Current Rating: The minimum single-pulse surge current withstand rating per phase shall not be less than 200 kA. The peak surge current rating shall be the arithmetic sum of the ratings of the individual MOVs in a given mode.

E. Protection modes and UL 1449 VPR for grounded wye circuits with 480Y/277 V, three-phase, four-wire circuits shall not exceed the following:

1. Line to Neutral: 1200 V for 480Y/277 V

2. Line to Ground: 1200 V for 480Y/277 V.

3. Line to Line: 2000 V for 480Y/277 V.

2.4 DISCONNECTING AND OVERCURRENT PROTECTIVE DEVICES

A. Molded-Case Circuit Breaker (MCCB): Comply with UL 489, with interrupting capacity to meet available fault currents.

SWITCHBOARDS 262413 - 5

1. Thermal-Magnetic Circuit Breakers: Inverse time-current element for low-level overloads and instantaneous magnetic trip element for short circuits. Adjustable magnetic trip setting for circuit-breaker frame sizes 250 A and larger.

2. Adjustable Instantaneous-Trip Circuit Breakers: Magnetic trip element with front-mounted, field-adjustable trip setting.

3. Electronic trip circuit breakers with rms sensing; field-replaceable rating plug or field-replicable electronic trip; and the following field-adjustable settings:

a. Instantaneous trip.

b. Long- and short-time pickup levels.

c. Long and short time adjustments.

4. MCCB Features and Accessories:

a. Standard frame sizes, trip ratings, and number of poles.

b. Lugs: Compression style, suitable for number, size, trip ratings, and conductor material.

c. Undervoltage Trip: Set to operate at 35 to 75 percent of rated voltage without intentional time delay.

2.5 IDENTIFICATION

A. Service Equipment Label: NRTL labeled for use as service equipment for switchboards with one or more service disconnecting and overcurrent protective devices.

2.6 AUTOMATIC TRANSFER SWITCH PROVISIONS

A. At Building 10 Swithboard include provision for service rated automatic transfer switch.

Include additional cost for factory installed transfer switch under Alternate Bid #1. Under base bid Utility section and distribution section will be connected with a 3000 amp circuit breaker.

Under alternate bid the main circuit breaker is replaced with a 3000 amp molded case transfer switch.

B. Transfer switch shall Comply with NFPA 110.

C. Service-Rated Transfer Switch:

1. Comply with UL 869A and UL 489.

2. Provide terminals for bonding the grounding electrode conductor to the grounded service conductor.

3. In systems with a neutral, the bonding connection shall be on the neutral bus.

4. Provide removable link for temporary separation of the service and load grounded conductors.

5. Ground-Fault Protection: Comply with UL 1008 for normal and alternative buses.

6. Service Disconnecting Means: Externally operated, manual mechanically actuated.

D. Factory Wiring: Train and bundle factory wiring and label, consistent with Shop Drawings, by color-code or by numbered or lettered wire and cable with printed tape markers at terminations.

Color-coding and wire and cable markers are specified in Section 260553 "Identification for

Electrical Systems."

1. Designated Terminals: Pressure type, suitable for types and sizes of field wiring indicated.

2. Power-Terminal Arrangement and Field-Wiring Space: Suitable for top, side, or bottom entrance of feeder conductors as indicated.

SWITCHBOARDS 262413 - 6

3. Control Wiring: Equipped with lugs suitable for connection to terminal strips.

4. Accessible via front access.

E. Enclosures: Transfer switch will be housed in NEMA3R integrated switchgear enclosure.

2.7 MOLDED-CASE-TYPE AUTOMATIC TRANSFER SWITCHES

A. Comply with Level 1 equipment according to NFPA 110.

B. Switch Characteristics: Designed for continuous-duty repetitive transfer of full-rated current between active power sources.

1. Limitation: Switches using contactor-based components are unacceptable.

2. Switch Action: Double throw; mechanically held in both directions.

3. Contacts: Silver composition or silver alloy for load-current switching.

4. Conductor Connectors: Suitable for use with conductor material and sizes.

5. Material: Copper.

6. Main and Neutral Lugs: Compression type.

7. Ground bar.

8. Connectors shall be marked for conductor size and type according to UL 1008.

C. Automatic Delayed-Transition Transfer Switches: Pauses or stops in intermediate position to momentarily disconnect both sources, with transition controlled by programming in the automatic transfer-switch controller. Interlocked to prevent the load from being closed on both sources at the same time.

1. Adjustable Time Delay: For override of normal-source voltage sensing to delay transfer and engine start signals for alternative source. Adjustable from zero to six seconds, and factory set for one second.

2. Sources shall be mechanically and electrically interlocked to prevent closing both sources on the load at the same time.

D. Manual Switch Operation: Under load, with door closed and with either or both sources energized. Transfer time is same as for electrical operation. Control circuit automatically disconnects from electrical operator during manual operation.

E. Manual Switch Operation: Unloaded. Control circuit automatically disconnects from electrical operator during manual operation.

F. Electric Switch Operation: Electrically actuated by push buttons designated "Normal Source" and "Alternative Source." Switch shall be capable of transferring load in either direction with either or both sources energized.

G. Transfer Switches Based on Molded-Case-Switch Components: Comply with UL 489 and

UL 869A.

H. Automatic Transfer-Switch Controller Features:

1. Controller operates through a period of loss of control power.

2. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator. Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at

SWITCHBOARDS 262413 - 7

90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal.

Factory set for pickup at 95 percent.

3. Time Delay for Retransfer to Normal Source: Adjustable from zero to 30 minutes, and factory set for 10 minutes. Override shall automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.

4. Test Switch: Simulate normal-source failure.

5. Switch-Position Pilot Lights: Indicate source to which load is connected.

6. Source-Available Indicating Lights: Supervise sources via transfer-switch normal- and emergency-source sensing circuits.

a. Normal Power Supervision: Green light with nameplate engraved "Normal Source

Available."

b. Emergency Power Supervision: Red light with nameplate engraved "Emergency

Source Available."

7. Unassigned Auxiliary Contacts: Two normally open, single-pole, double-throw contacts for each switch position, rated 10 A at 240-V ac.

8. Transfer Override Switch: Overrides automatic retransfer control so automatic transfer switch will remain connected to emergency power source regardless of condition of normal source. Pilot light indicates override status.

9. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum.

10. Engine Shutdown Contacts: Time delay adjustable from zero to five minutes, and factory set for five minutes. Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source.

11. Engine-Generator Exerciser: Solid-state, programmable-time switch starts engine generator and transfers load to it from normal source for a preset time, then retransfers and shuts down engine after a preset cool-down period. Initiates exercise cycle at preset intervals adjustable from 7 to 30 days. Factory settings shall be for 7-day exercise cycle, 20-minute running period, and 5-minute cool-down period. Exerciser features include the following:

a. Exerciser Transfer Selector Switch: Permits selection of exercise with and without load transfer.

b. Push-button programming control with digital display of settings.

END OF SECTION 262413

File details come from the government source that posted it. Updated .