This is Addendum No. 2 to the original contract documents for the GISD JROTC Fieldhouse Phase 2 project involving the Genesee Intermediate School District located at 2413 W. Maple Ave., Flint, Michigan. The project involves construction of a JROTC fieldhouse facility at 5081 Torrey Road, Flint, Michigan, with DCC Construction serving as the Construction Manager, MAYOTTEgroup Architects as the Architect, and Clark Trombley Randers as the MEP Engineer. The addendum was issued on May 22, 2020, to amplify, clarify, and modify the original contract documents and includes a pre-bid meeting sign-in sheet as an attachment. The addendum specifies that ASI is an acceptable manufacturer for toilet, bath, and laundry accessories per Section 102800 and establishes Siemens as the basis of design for the fire detection and alarm system per Section 284600, while permitting other manufacturers to bid provided they fully integrate with the campus master system.

The addendum contains electrical modifications detailed on Sheet E701, reducing the house panel from a 400-amp to a 200-amp panel, adjusting the breaker size serving the stepdown transformer and related panel from 125-amp to 90-amp, and revising the corresponding panel schedules to reflect these changes. No pricing terms, set asides, funding sources, or contract award information are contained in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 2 2019-046 – GISD JROTC Fieldhouse Phase 2 mjm

ADDENDUM TO THE CONTRACT DOCUMENTS FOR:

CLIENT:

Genesee Intermediate School District

2413 W. Maple Ave.

Flint, MI. 48507

PROJECT:

GISD JROTC Fieldhouse - Phase 2

5081 Torrey Road

Flint, MI. 48507

CONSTRUCTION MANAGER:

DCC Construction

9100 Lapeer Road, Suite #A

Davison, MI 48423

ARCHITECT:

MAYOTTEgroup Architects

6240 W. Mt. Hope

Lansing, MI 48917

MEP ENGINEER:

Clark Trombley Randers

504 S. Creyts Rd., Suite B

Lansing, MI 48917

PURPOSE: This addendum is issued to amplify, clarify, and modify the original contract documents and shall take precedence over them.

DATE ISSUED: May 22, 2020

ATTACHMENTS: Pre-Bid Meeting Sign-In Sheet

Drawing E701

To All Bidders

GENERAL

Item 1 The pre-bid meeting sign-in sheet is attached for reference.

SPECIFICATIONS

Item 2 Reference Section 102800 “Toilet, Bath and Laundry Accessories”.

A. ASI is an acceptable manufacturer.

Item 3 Reference Section 284600 “Fire Detection and Alarm.

A. Revise section to add a Manufacturers section noting the basis of design to be

Siemens. The existing campus system is Siemens.

B. Other manufacturers are permitted to bid as long as they fully integrate into the campus master system.

ELECTRICAL

Item 4 Reference Sheet E701 (Reissued).

A. Revised one-line diagram reducing the house panel ‘HP’ from a 400A panel to a 200A panel.

B. Adjusted breaker size located in panel ‘HP’ that serves stepdown transformer and panel ‘RP’ from a 125A-3P to a 90A-3P.

C. Revised panel schedule ‘HP’ to reflect change to main breaker size.

D. Modified panel schedule ‘HP’ to reflect breaker size change serving panel ‘RP’ and associated stepdown transformer.

END OF ADDENDUM NO.