This is Addendum #1 to a bid solicitation issued by the County of Kenosha, Wisconsin, for the Victim Witness, Juvenile Intake, and District Attorney Relocation and Partial Remodel Project. The project encompasses interior remodeling across three areas: Phase 1 involves a 300-square-foot conference room and vestibule conversion in the Courthouse basement; Phase 2 consists of 1,600 square feet of office space remodeling in the Courthouse basement; Phase 3 covers 2,200 square feet in the Molinaro Building first floor. Work includes new partition walls, flooring, painting, ceilings, millwork, reception areas, and kitchenette installations. The addendum clarifies specifications for bullet-resistant construction in Area 03 only, approved manufacturers for specialized windows and doors, television and data infrastructure requirements, HVAC modifications, and door and glazing specifications across all areas. Bids were due on Thursday, May 28, 2020, by 3:00 PM local time to the Kenosha County Clerk of the Courts. The desired project start was June 2020 with substantial completion targeted for September 15, 2020. Building access is restricted to 6:00 AM to 5:00 PM, with all loud work required before 8:00 AM to avoid interference with county court operations.
The addendum contains 28 questions and answers addressing design clarifications, material specifications, phasing coordination, and construction logistics. Approved manufacturers include Chicago Bullet Proof Window Systems for bullet-resistant windows and doors in Area 03, and Armortex for additional Level III bullet-resistant components. All non-bullet-resistant glazing must be clear tempered unless otherwise specified. General contractors and subcontractors are responsible for all required city permit fees. The dumpster and construction staging area will be located on the north side of the Molinaro Building parking lot, to be coordinated with the County. The addendum includes a pre-bid sign-in sheet showing attendance from nine construction firms representing general contracting, HVAC, and electrical divisions. No pricing information, set-asides, or funding sources are specified in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2008 KCJIDA_Bid Specs - 2020.04.24.pdf | ||
| 2008 KCJIDA_Bid Drawings - 2020.04.24.pdf | ||
| 2008 Bid Documents.pdf | ||
| 2008 Addendum 3.pdf | ||
| 2008 Addendum 2.pdf | ||
| Vendor Responsibility Form Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-1-
May 19, 2020
Bid #2008 Kenosha County Victim Witness, Juvenile Intake, and District Attorney Relocation and Partial Remodel Project
ADDENDUM #1
BIDS DUE: THURSDAY, MAY 28, 2020 BY 3:00PM Local Time to: County of Kenosha Clerk of the Courts - Attn: Rebecca Matoska-Menting located at the Kenosha County Courthouse, Room 204 912 56th Street Kenosha, WI 53140. At that time Bids will be opened publicly for consideration by the Owner.
To all Contract Bidders of record.
This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents. Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum consists of (5) written pages, (1) sign in sheets, and (8) Attachments
APPROVED MANUFACTURERS
All the following Acceptable Manufacturer's products below must meet or exceed written specifications:
1. SECTION – 08 56 71 – BULLET RESISTANT HOLLOW METAL WINDOWS
a. Chicago Bullet Proof Window Systems, Inc.
- CBP Model STW BR HM window with Speak-Thru and Non- Ricochet Dip Tray
2. SECTION – 08 14 29 – WOOD DOORS (PRE-FINISHED)
a. Chicago Bullet Proof Window Systems, Inc.
- CBP Model WH BR Wood Haven Door and Frame.
QUESTIONS AND ANSWERS
1. How many phases are necessary to complete this project?
a. There are (4) phases to the project in (3) different areas. Phase 1 is the remodeling of the small conference room in the Courthouse basement. Phase 2 is the new Juvenile Intake office remodel in the Courthouse basement. Phase 3 will be the DA remodel area on the first floor of the Molinaro Building and Phase 4 will be the enclosure of the existing relocated reception on the first floor of the Molinaro Building. All areas are indicated on sheet A001. The GC will be responsible for coordinating the schedule of moving in/out of these areas in accordance with the indicated phases.
2. Where will the dumpster and construction staging area be located for the project?
a. The dumpster will be located on the northside of the Molinaro Building parking lot for all phases of the project. Coordinate location with County.
3. Per sheet 2IT200, will there be a TV location indicated in conference 2111?
a. There is to be a TV location rough-in included for a future TV location on the East wall.
Rough in will include blocking in the wall for a wall mount TV, (1) duplex outlet, and an HDMI run to the base of the wall. In addition, all TV locations are to receive (2) CAT 6 cables. All headend equipment will be provided by the owner. All final TV locations to be coordinated with the Architect before installation.
-2-
4. Per sheet 1IT200, will there be a TV location indicated in conference 1101?
a. There is to be a TV location rough-in included for a TV on the North wall. Rough in will include (1) duplex outlet, (1) Coax. In addition, all TV locations are to receive (2) CAT 6 cables. All headend equipment will be provided by the owner. All final TV locations to be coordinated with the Architect before installation. Coax cable for area 01 to be reused from Area 02. General contractor to be responsible for the cable function during the relocation process.
5. Drawing on sheet A002 only shows door Types LNL with Glass, However, page 1A201 notes type FG Door on the Door Schedule. Does this door have glass? If so, will it be ¼” Clear Tempered?
a. Door 1101A will be a FG style door. Please see attached sheet A002 for FG door style standards. Per Glazing specifications (08 80 00) the glazing will be ¼” clear tempered for door 1101A.
6. Sheet 2A201 notes a Type HG Door on Door Schedule. Is this door Half Glass? It also has a X on glass. Is this ¼” Clear Tempered?
a. Yes, this door will be half glass. See updated sheet A002 for HG door standards. In addition, see attached sheet 2A201 for updated door schedule.
7. I am confused on finding the specifications for the new ductwork to be added. Where are the requirements?
a. There will be no specification included with the project for HVAC. The scope of work is shown on sheets 2M200 for area 02 and attached sheet 3M200 for Area 03. See the General Mechanical Notes on Sheet 2M200 & 3M200.
8. Do you have an estimated start and completion date?
a. The desired start and completion dates are listed on the Bid Offer Form. Per the Bid offer, desired start will be June 2020 and substantial completion on September 15th, 2020. If these dates cannot be met, please fill out your possible completion schedule per the form request.
9. Drawing Page A002 calls for Type B Frame to have a sidelite. I don’t see this frame called out on any of the door schedules. Should this be excluded?
a. All sidelites have been eliminated from the project. Please see attached updates sheet
A002 - WALL TYPES & TYPICAL DETAILS.
10. Drawing sheet 3A201 – Door Schedule for type 3100A calls for type F door (which has no glass on page A002) but in the remarks states to be bullet proof glazing. Please confirm.
a. Door 3100A is to be solid door with no glazing. Remark for door 3100A should read, “Solid core construction wood veneer faces, bullet-resistant composite core and solid 3/8 inch thick wood stile and rail edges of same species as veneer”.
11. Drawing Page 2A201, on the Room Schedule, 2100 West and 2101 East list GL-3.
Please confirm what is GL-3?
a. GL-3 refers to bullet resistant glazing, Level III. However, all bullet resistant glazing and wall panel is to be removed from Area 02. There is no bullet proofing in Areas 01 & 02.
Area 03 is the only area to receive Level III bullet resistant construction.
12. Drawing Page 2A201, the Room Schedule also states GL-1 on some rooms. Please confirm what that is?
a. GL-1 refers to 1/4” Tempered Glass. See the Material Key on sheet A002 – WALL
TYPES AND TYPICAL DETAILS. The only rooms with GL-1 in Area 02, will be the west wall of Waiting 2100 and the East wall of Reception 2101. All GL-1 referenced in Office
-3-
2107, Multi-purpose Office 2108, Office 2109, Office 2110, and Conference 2111 to be excluded from the project.
13. Drawing Spec Section 088000 – Glazing – notes several different types of glass. Under
Part 2 – Products & 2.3 – Fabrication - it notes 3/8” clear or gray? Is this included?
Tinted Glass?
a. There will be no 3/8” thick glass required for this project. All non Bullet-Resistant glass to be ¼” Clear tempered unless noted otherwise. Per sheet 2A201 frosted glass will be required at door 2100A. See updated sheet 2A201.
14. On Sheet 2A300 for Area 02 at detail 05, the reception (2) hollow metal frames they are wanting just ¼” clear tempered and not Level 3 bullet resistant. Is that correct? Also, I cannot find in the specs what is the type of speak hole cover they require?
a. The glazing in this area will be GL-1, 1/4” clear tempered glass. Area 02 will have no
Bullet Resistant construction. The speak hole in this area will be just a 4” diameter hole cut in the glass with a speak hole frame. Basis of design for the speak hole frame: CRL Aluminum Plastic Speak-Thru Hole Frame. Center of speak hole to be cut at 2’-0” off counter height as shown on sheet 2A300 detail 04. All holes in glazing even capped punctures to be polished finish.
15. Sheet 2A300 details 04 & 05 list a Voice Port and refers to specification section 08 80
00. Nothing is listed in the spec for this item.
a. For the voice port in Area 02, refer to question #13 for basis of design.
16. Sheet 2A300 details 04 & 05 list a Pass Thru Tray and refers to specification section
08 80 00. Nothing is listed in the spec for this item.
a. The pass thru tray in this area per elevations 04 & 05 will be an open section of the glass window. Hollow metal frame trim around the opening is to be provided. Minimum opening dimension to be 4”(H) x 14”(W).
17. Sheet 3A300 details 02 & 03 list a Voice Port, Level III rated, spec section 08 56 71.
Nothing listed in the spec for this item.
a. The basis of design for the voice port in Area 03 is the Armortex ANVS6 cast stainless steel speaker. Description reads; “Natural voice Speak Thru provide voice transmission along with security. SSBRS models will fit into 4″ to 6″ diameter hole. 7″ Stainless Steel face plates are secured form the safe side to avoid tampering from the exterior. For ballistic levels 1 thru 3 UL listed laminated polycarbonate offsets face plates”.
Specification section 08 56 71 is a performance-based specification and equal manufacturers meeting the UL level and design intent will be accepted after review by the architect.
18. Sheet 3A300 details 02 & 03 list a Pass Thru Tray, Level III rated, specification section
08 56 71. Nothing listed in the spec for this item.
a. The basis of design for the voice port in Area 03 is the Armortex Deal Tray Non-Ricochet
RMDT-1016. Description reads; Transaction Deal Trays are rolled and formed from 16ga stainless steel with a #3 satin brushed finish and can be lined with HI-Hard ballistic steel to meet ballistic protection requirements. Recessed trays “RMDT” are designed to install into a cut out of 2″ high counters with a capped glazing cap running across top middle”.
Counter top is provided by 06 61 00 and coordinated with recessed deal tray. Deal tray total dimension to be 10” x 16”. Specification section 08 56 71 is a performance-based specification and equal manufacturers meeting the UL level and design intent will be accepted after review by the architect.
-4-
19. Sheet 3A300 details 02 & 03 list Armortex Bullet Resistant Hollow Metal Window System UL Rated Level III rated spec section 08 56 71. Nothing listed in the spec for this item.
a. Specification section 08 56 71 – BULLET RESISTANT HOLLOW METAL WINDOWS
Parts 2 – PRODUCTS provides the intent of design for the Bullet Resistant Hollow Metal Windows. Specification section 08 56 71 is a performance-based specification and equal manufacturers meeting the UL level and design intent will be accepted after review by the architect. See plans and elevations for window sizes.
20. What is the deck height for each area of work?
a. The deck height for Areas 01 & 02 is approximately 10’-2”. The deck height in Area 03 is approximately 9’-10” to the bottom of the concrete tee and 10’-10” at the top of the concrete tee. General Contractor to field verify all existing deck heights.
21. What are the available work hours for this project?
a. Building access will be available form 6AM – 5PM. 5PM the building closes and all work must be completed by this time. All loud work that could potentially interfere with the county court must be done prior to 8AM.
22. Who will be responsible for permit fees?
a. General contractors and sub-contractors will be responsible for all required city permit fees.
23. The drawings call for data to the TV locations, so just one data jack, no coax?
a. TV location in Area 01 to include (1) duplex outlet, (1) Coax. TV locations in Area 02 & 03 to include (1) duplex outlet, (1) HDMI. In addition, all TV locations are to receive (2) CAT 6 cables. All headend equipment will be provided by the owner.
24. Will the Card Reader at door 2100A remain or be removed?
a. Existing Card Reader at door 2100A is to be relocated to door 2100B. There will be no card reader at door 2100A. General Contractor responsible for the relocation of the existing card reader.
25. Who is responsible for the removal of the existing cubicles in Area 03?
a. The General Contractor will not be responsible for cubicle removal. Cubicle removal by owner. General contractor responsible to coordinate with moving schedule.
26. Per sheet 3IT200, will there be a TV location indicated in conference 3112?
a. There is to be rough included for a future TV location on the East wall. Rough in will include blocking in wall for wall mount TV, (1) duplex outlet, (1) Coax and an HDMI run to the base of the wall. In addition, all TV locations are to receive (2) CAT 6 cables. All headend equipment will be provided by the owner. All final TV locations to be coordinated with the Architect before installation.
27. Per sheet 2IT200, there is a dedicated 20 amp outlet and (2) cat 6 lines shown for a copy print area, will this be required in Area 03 as well? If so, what is the location?
a. There will be a copy print station on the West wall, North of Existing Conference 3112.
This location will include a 20 amp dedicated outlet and (2) cat 6 lines for a copy/print area. Final location to be coordinated with the Architect before installation.
28. There are some C2 locations on the print but no description in the Keynote Legend of what they get, one voice and one data?
a. The type of line in this case doesn’t matter. Each C2 location is indicating (2) cat 6 lines.
-5-
REVISED DRAWINGS
• 01 - TITLE SHEET
• A002 – WALL TYPES & TYPICAL DETAILS
• 2A201 – AREA 02 – PROPOSED FLOOR PLAN
• 2IT200 - AREA 02 – TECHNOLOGY AND ELECTRICAL PLANS
• 3A300 – SECTIONS AND DETAILS
• 3A400 – AREA 03 – CEILING PLANS
• 3IT200 – AREA 03 – TECHNOLOGY AND ELECTRICAL PLANS
• 3M200 – AREA 03 – HVAC PLAN
01KUENY ARCHITECTS, LLC
10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103
SITE MAP GENERAL NOTES
1. All concrete to test 4000 psi in 28 days.
2. Verify all dimensions, access, utilities and working conditions in the field.
3. Conform to all applicable codes, ordinances and safety standards.
4. Obtain and pay for all required permits and fees.
5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the
Specifications.
6. No concrete to be poured without Architect's prior review.
7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.
8. Leave site clean, neat and free of debris at all times.
9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.
10. Guard against interfering with Owner's operations.
11. These Drawings contain no provisions or procedures for on-site safety. Each Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.
12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
MATERIAL INDICATIONS DRAWING LEGEND
New or Required Point Elevation
Existing Point Elevation
Existing Contours
New or Required Contours
A Grid Lines
3.1
Building Section
Wall Section
Room/Space Number
Door Number
SHEET INDEX
Earth Backfill
Rigid Insulation
Concrete Block
Aluminum
Lumber (Rough)
Steel
Sand Fill
Concrete
Finished Wood
Stone Fill
Plywoo d Batt Insulation
4.1
Room Name
101A Interior Elevation
Detail Section1 5.1
7.1
5.1
Detail Number Page Number
Exterior Elevation
2.1
# Wall Tag
+ 100.0
+ 100.0
+ 100.0
+ 100.0
CONSULTANTS
OH Door NumberOH 101A
Kenosha County
Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
912 56th St, Kenosha, WI 53140
April 24, 2020
Kenosha County Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
TITLE SHEET
01 Title Sheet
GENERAL ARCHITECTURE
A001 Work Area and Phasing Key Plan A002 Wall Types & Typical Details
ARCHITECTURAL
1A200 Area 01 - Existing and Demo 1A201 Area 01 - Plans and Details 1A202 Area 01 - Ceiling & Finish Plans 1IT200 Area 01 - Technology & Electrical Plan 2A200 Area 02 - Existing and Demo Plans 2A201 Area 02 - Proposed Floor Plan 2A202 Area 02 - Finish Plans 2A300 Area 02 - Sections and Details 2A400 Area 02 - Ceiling Plans 2IT200 Area 02 - Technology & Electrical Plans 2M200 Area 02 - HVAC Plan 3A200 Area 03 - Existing and Demo Plan 3A201 Area 03 - Proposed Plan 3A202 Area 03 - Finish Plans 3A300 Area 03 - Sections and Details 3A400 Area 03 - Ceiling Plans 3IT200 Area 03 - Technology & Electrical Plans 3M200 Area 03 - HVAC Plan
ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100
(262) 857-8101 Pleasant Prairie, Wisconsin
53158 Architect of Record - Jon P. Wallenkamp Project Contact - Lee Anderson (262) 945-7709
PROJECT
LOCATION
BID SET DRAWINGS
WALL BASE PER ROOM FINISH SCHEDULE
FLOOR FINISH PER SCHEDULES AND
DETAILS
CONTINUOUS STEEL STUD
RUNNER; ANCHOR TO FLOOR STRUCTURE
5/8" GYPSUM BOARD; EACH SIDE
ACOUSTICAL BATT INSULATION; TYPICAL
AT ACOUSTICAL PARTITIONS
FINISH CEILING PER SCHEDULES AND
WALL SECTIONS
UNDERSIDE OF STRUCTURE
EXTEND TO UNDERSIDE OF STRUCTURE
AND SEAL PER SCHEDULES AND DETAILS
W
AL
L
HE
IG
HT
P
ER
S
CH
ED
UL
ES
WALL EXTENDED PAST FINISH CEILING;
SEE BRACING DETAIL
A STEEL STUD PARTITION
A1 3-5/8" STEEL STUD; 16" 0.C. / WALL EXTENSION 6" PAST FINISH CEILING
A2 3-5/8" STEEL STUD; 16" 0.C. / WALL EXTENSION TO STRUCTURE
WALL BASE PER ROOM FINISH SCHEDULE
FLOOR FINISH PER SCHEDULES AND
DETAILS
CONTINUOUS STEEL STUD
RUNNER; ANCHOR TO FLOOR STRUCTURE
5/8" GYPSUM BOARD; ONE SIDE
ACOUSTICAL BATT INSULATION; TYPICAL
AT ACOUSTICAL PARTITIONS
FINISH CEILING PER SCHEDULES AND
WALL SECTIONS
UNDERSIDE OF STRUCTURE
EXTEND TO UNDERSIDE OF STRUCTURE
AND SEAL PER SCHEDULES AND DETAILS
W
AL
L
HE
IG
HT
P
ER
S
CH
ED
UL
ES
WALL EXTENDED PAST FINISH CEILING;
SEE BRACING DETAIL
B STEEL STUD PARTITION
B1 3-5/8" STEEL STUD; 16" 0.C. / WALL EXTENSION 6" PAST FINISH CEILING
B2 3-5/8" STEEL STUD; 16" 0.C. / WALL EXTENSION TO STRUCTURE
B3 2-1/2" STEEL STUD; 16" 0.C. / WALL EXTENSION 6" PAST FINISH CEILING
B4 2-1/2" STEEL STUD; 16" 0.C. / WALL EXTENSION TO STRUCTURE
FINISHED CEILING PER SCHEDULES
AND DETAILS
METAL STUD KICKERS @ 36" O.C.
TO STRUCTURE; SAME GA AS
WALL
WALL TYPE PER SCHEDULES AND
FLOOR PLANS
WALL PER PLAN; SEE FLOOR
PLAN FOR WALL TYPE
SEAL EDGE WITH CLEAR
SILICON
1/4" CLEAR TEMPERED GLASS;
OFFSET GLAZING TO ONE SIDE
OF WALL
EXTERIOR GLAZING PER PLANS
AND SCHEDULES
WINDOW BLINDS PER PLANS
ALUMINUM CAP; SEE PLAN
FOR WALL THICKNESS
LEVEL PER PLANS
0'-0"
CE
IL
IN
G
H
EI
G
HT
P
ER
P
LA
NS
HE
IG
HT
P
ER
P
LA
NS
4"
WIDTH PER PLANS 1"
M
IN
I M
UM
1' -8
HE
IG
HT
P
ER
P
LA
NS
WALL BASE PER
ROOM
PVC EDGING TYPICAL ON ALL
DOORS AND DRAWERS
ADJUSTABLE SHELVES; SEMI
EXPOSED SURFACES TO BE
MELAMINE
DRAWER PER ELEVATIONS
COUNTER TOP MATERIAL
PER INTERIOR ELEVATIONS
WOOD BLOCKING AS NEEDED
WALL CABINETS IF APPLICABLE
TO PROJECT PER INTERIOR
ELEVATIONS
CONSTRUCTION SIMILAR
TO BASE CABINETS
CEILING PER PLANS AND
SCHEDULES
STUD WALL PER
WIDTH
PER PLANS
3-5/8" METAL STUD
RUNNER WRAPPED
DOUBLE
METAL STUD; STUD TYPICAL
MINERAL WOOL INSULATION;
FULL FRAME WIDTH AND
HOLLOW METAL DOOR
FRAME;
5/8" GYPSUM BOARD PER
WALL TYPE SCHEDULE
WOOD OR HOLLOW METAL
DOOR;
3-5/8" METAL STUD
DOUBLE METAL STUDS; SAME
AS WALL CONSTRUCTION
MINERAL WOOL INSULATION;
FULL FRAME WIDTH AND
HOLLOW METAL DOOR
FRAME;
5/8" GYPSUM BOARD PER
WALL TYPE SCHEDULE
WOOD OR HOLLOW METAL
DOOR;
ANCHOR METAL STUD WALL
TO ACOUSTICAL CEILING TILE
SYSTEM
METAL STUD WALL;
THICKNESS
ACOUSTICAL CEILING SYSTEM;
SEE ROOM FINISH SCHEDULE
AND CEILING PLANS
PAINT WALL PER FINISH
SCHEDULES
(TYPICAL PER REMODEL AREA 01 ONLY)
LEVER STOREROOM LOCK
Outside lever fixed, unlocked by key. Inside lever always unlocked.
LEVER CLASSROOM LOCK
Outside lever locked and unlocked by key. Inside lever always unlocked.
SINGLE CYLINDER CLASSROOM LOCK
Deadbolt locked or unlocked by key from outside. Deadbolt unlocked by thumbturn only from inside.
LEVER OFFICE LOCK
Push-button locking. Pushing button locks outside lever until unlocked by key outside or by turning inside lever.
LEVER ENTRANCE LOCK
Turn/Push-button locking. Pushing and turning button locks outside lever requiring use of key until button in manually unlocked.
Push-button locking. Push button locks outside lever until locked by outside key or by turning inside lever.
DOOR WIDTH
DO
O
R
HE
IG
HT
DOOR WIDTH
DO
O
R
HE
IG
HT
F LNL
6" 1'
-6
2'-0" 6"
FG
6" 2'-0" 6"
DOOR WIDTH
5' -8
6"
6" 2'-0" 6"
DOOR WIDTH
3' -1
0" 2'
-8
6"
HG
DO
O
R
HE
IG
HT
DO
O
R
HE
IG
HT
7' -0
2"
3'-0"
A
WALL BASE PER ROOM FINISH SCHEDULE
FLOOR FINISH PER SCHEDULES AND
DETAILS
CONTINUOUS STEEL STUD
RUNNER; ANCHOR TO FLOOR STRUCTURE
5/8" GYPSUM BOARD; BOTH SIDES
ACOUSTICAL BATT INSULATION; TYPICAL
AT ACOUSTICAL PARTITIONS
FINISH CEILING PER SCHEDULES AND
WALL SECTIONS
UNDERSIDE OF STRUCTURE
EXTEND TO UNDERSIDE OF STRUCTURE
AND SEAL PER SCHEDULES AND DETAILS
W
AL
L
HE
IG
HT
P
ER
S
CH
ED
UL
ES
WALL EXTENDED PAST FINISH CEILING;
SEE BRACING DETAIL
U UL RATED - BULLET RES.
U1 3-5/8" STEEL STUD; UL LEVEL III RATING / WALL TO STRUCTURE
BULLET RESISTANT FIBERGLASS PANEL;
UL RATING PER PLANS AND SPECS; PANEL
AT SECURE SIDE OF CONSTRUCTION
4" WIDE BATTEN STRIP AT EACH PANEL
SEAM; SEE SPECIFICATIONS
*ALL INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH
MANUFACTURER'S SPECIFICATIONS
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved SCALE: As indicated
A002Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Wall Types & Typical Details
912 56th St, Kenosha, WI 53140
3" = 1'-0"2 Typical Kicker Detail
3" = 1'-0"5 Typical Sound Stop
1/2" = 1'-0"6 Typical Millwork Section
3" = 1'-0"4 3-5/8" Metal Stud Head 3" = 1'-0"3 3-5/8" Metal Stud Jamb
3" = 1'-0"1 Partition Wall @ Ceiling
MATERIAL KEY
CODE DESCRIPTION
CEILING TYPE
ACT-1 2x2 Acoustical Ceiling Panels
FLOOR TYPE
CPT-1 2x2 Carpet Tile VB 4" Vinyl Base
PAINT SCHEDULE KEY
EPOXY Epoxy Paint LATEX-E Latex Wall Paint - Enamel LATEX-S Latex Wall Paint - Satin Finish
WALL TYPE
GL-1 1/4" Tempered Glass GL-2 1" Insulated Glass GL-3 Bullet Resisitant Glazing - Level III GWB1 5/8" G.W.B. Taped and Finished on Stud Framing per Wall Type GWB2 5/8" Moisture & Mold Resistant Gypsum Wallboard
Taped & Finished on Stud Framing per Wall Type
LOCKSET TYPESDOOR PANEL TYPES DOOR FRAME
CR
existing IT office conference waiting 2100reception clst.
existing RR
ex. chase office 01 existing file storage room
7' -1
7/
8" 9'
-7
8' -1
5/ multi purpose office
FI
EL
D
VE
RI
F Y
D
IM
EN
SI
O
NS
'-4
/1
6"
'-8
8'-9 1/2"
20'-0"
'-0
'-9
/8
'-1
7/
8"
'-9
7' -5 office 03
3' -3
/2
6'
-0
2A300 5
2A300
B
2101A
4"
2107A
2108A
2111A
2109A
2110A
'-1
'-6
E2103 clst.
A
2A300 7
02 05 00.C5 hall
7'-9 5/8" 8'-0"
15'-9 5/8"
14'-8 5/8"
6'-6 5/8"
9'-7"
2A300
4' -3
/8
2A300
1'-4"
2A3006
5' -3
/8
E2106
E2105
E2104
A1 A1
A1 A002
Sim
A002
Sim
B1
B1
B3
B3
B3
A1 A1
A1
A1
A1 existing hall
A1
A1
A1
A1
A1
2A3004
02 05 00.C6
2A300
1. REMOVE LOOSE PAINT AND
MISCELLANEOUS HANGING OBJECTS
FROM WALLS AND CEILINGS AT ALL
AREAS TO RECEIVE NEW FINISHES.
2. PATCH AND REPAIR ALL EXISTING
FLOOR SLABS AND WALL SURFACES
DAMAGED FROM DEMOLITION OR
PRIOR USE.
3. PATCH ALL AREAS OF ELECTRICAL
AND MECHANICAL DEMOLITION THAT
WILL NOT BE REUSED.
4. CONTRACTOR TO FIELD VERIFY ALL
EXISTING DIMENSIONS AND
CONDITIONS. IN THE EVENT OF A
DISCREPANCY BETWEEN THE
DRAWINGS AND THE EXISTING
CONDITIONS, NOTIFY THE ARCHITECT
BEFORE PROCEEDING.
5. DO NOT REMOVE ANY ITEMS WHICH
JEOPARDIZE THE STRUCTURAL
INTEGRITY OF THE BUILDING. IF
HIDDEN ELEMENTS OR DETERIORATED
ELEMENTS ARE ENCOUNTERED,
NOTIFY THE ARCHITECT IMMEDIATELY.
6. PROTECT ALL ADJACENT AREAS AND
ITEMS "TO REMAIN" DURING
DEMOLITION/CONSTRUCTION.
REPAIR/REPLACE ALL ITEMS DAMAGED
DURING CONSTRUCTION.
7. EXISTING BUILDING CONDITIONS
SHOWN ON THESE DRAWINGS ARE
DERIVED FROM DRAWINGS OF THE
ORIGINAL BUILDING AND FROM LIMITED
FIELD OBSERVATION.
8. THE CONTRACTOR SHALL PROVIDE
AND MAINTAIN ADDITIONAL MEANS OF
EGRESS AS NEEDED AS A RESULT OF
CONSTRUCTION SEQUENCING AND/OR
REGULATORY REQUIREMENTS.
GENERAL PROJECT NOTES
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
KEYNOTE LEGEND
SCALE: As indicated
2A201Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 02 - Proposed Floor Plan
912 56th St, Kenosha, WI 53140
Spec. # Description
02 05 00.C5 EXISTING CONCRETE COLUMN TO REMAIN; FIELD VERIFY
LOCATION
02 05 00.C6 EXISTING STEEL COLUMN TO REMAIN; PAINT PER ROOM
FINISH SCHEDULE
ROOM SCHEDULE - AREA 02
NUMBER NAME FLOOR TYPE BASE
WALL FINISH CEILING
REMARKSNORTH SOUTH EAST WEST TYPE HEIGHT
2100 waiting CPT-1 TL-1 GWB1 Existing Existing GWB1/GL-1 ACT-1 7'-11" 2101 reception CPT-1 VB Existing Existing GWB1/GL-1 Existing ACT-1 7'-11" 2102 hall CPT-1 VB Existing GWB1 Existing/GWB1 Existing/GWB1 ACT-1 7'-11" 2103 existing RR Existing Existing Existing Existing Existing Existing ACT-1 Existing 2104 ex. chase Existing Existing Existing Existing Existing Existing Existing Existing 2105 clst. CPT-1 Existing Existing Existing Existing Existing Existing Existing 2106 clst. CPT-1 Existing Existing Existing Existing Existing Existing Existing 2107 office 01 CPT-1 VB GWB1 Existing/GWB1 Existing GWB1 ACT-1 7'-11" 2108 multi purpose office 02 CPT-1 VB GWB1 GWB1 Existing/GWB1 GWB1 ACT-1 7'-11" 2109 office 03 CPT-1 VB Existing/GWB1 GWB1 Existing/GWB1 GWB1 ACT-1 7'-11" 2110 office CPT-1 VB Existing/GWB1 GWB1 Existing/GWB1 Existing ACT-1 7'-11" 2111 conference CPT-1 VB GWB1 Existing/GWB1 GWB1 Existing/GWB1 ACT-1 7'-11" 2112 existing IT Existing Existing Existing Existing Existing Existing Existing Existing
DOOR SCHEDULE - AREA 02
MARK
FROM ROOM TO ROOM
LABEL
DOOR FRAME
REMARKSNUM NAME NUM NAME TYPE MATERIAL SWING WIDTH HEIGHT THICKNESS LOUVER GLASS TYPE MATERIAL GLASS 2100A - existing hall 2100 waiting - HG Wood RH 3' - 0" 7' - 0" 1 3/4" - X A HM - Door glazing to be 1/4" tempered frosted glass 2100B 2100 waiting 2102 hall - LNL Wood LHR 3' - 0" 7' - 0" 1 3/4" - X A HM - Contractor to provide door frame acceptable for new card reader and electric strike 2101A 2102 hall 2101 reception - HG Wood RH 3' - 0" 7' - 0" 1 3/4" - X A HM - Contractor to provide door frame acceptable for new card reader and electric strike 2107A 2102 hall 2107 office 01 - LNL Wood LH 3' - 0" 7' - 0" 1 3/4" - X A HM - - 2108A 2102 hall 2108 multi purpose office 02 - LNL Wood RH 3' - 0" 7' - 0" 1 3/4" - X A HM - - 2109A 2102 hall 2109 office 03 - LNL Wood RH 3' - 0" 7' - 0" 1 3/4" - X A HM - - 2110A 2102 hall 2110 office - LNL Wood LH 3' - 0" 7' - 0" 1 3/4" - X A HM - - 2111A 2102 hall 2111 conference - HG Wood LH 3' - 0" 7' - 0" 1 3/4" - X A HM - -
HARDWARE SCHEDULE
MARK LOCKSET PUSH-PULL HOLD OPEN CLOSER HINGE DOOR STOP THRESHOLD WEATHERSTRIP KICKPLATE SOUNDSTOP NAMEPLATE NOTES 2100A By Owner - - X X - X - - X - Lockset Provided by Owner; Installed by G.C.
2100B By Owner - - X X X - - - X - Lockset Provided by Owner; Installed by G.C.
2101A By Owner - - X X X - - - X - Lockset Provided by Owner; Installed by G.C.
2107A By Owner - - - X X - - - X - Lockset Provided by Owner; Installed by G.C.
2108A By Owner - - - X X - - - X - Lockset Provided by Owner; Installed by G.C.
2109A By Owner - - - X X - - - X - Lockset Provided by Owner; Installed by G.C.
2110A By Owner - - - X X - - - X - Lockset Provided by Owner; Installed by G.C.
2111A By Owner - - - X X - - - X - Lockset Provided by Owner; Installed by G.C.
PAINT SCHEDULE
ROOM
FLOOR
WALLS
CEILING METAL WOOD REMARKSNUM NAME NORTH SOUTH EAST WEST
2100 waiting - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2101 reception - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2102 hall - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2103 existing RR - - - - - - - - 2104 ex. chase - - - - - - - - 2105 clst. - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2106 clst. - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2107 office 01 - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2108 multi purpose office 02 - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2109 office 03 - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2110 office - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2111 conference - Latex-S Latex-S Latex-S Latex-S - Enamel Varnish 2112 existing IT - - - - - - - -
C4
C4
C4
C4
CR
CR
existing IT office conference waiting reception clst.
existing RR
ex. chase office 01 existing file storage room multi purpose office office 03 clst.
hall
26 05 00.01
DEDICATED
20A
26 05 00.0326 05 00.03
26 05 00.0326 05 00.03
3'-4" A.F.F
MICROWAVE
FRIDGE
26 05 00.05
C2
C
C
C
27 00 00.01
27 00 00.02
3'-4" A.F.F
26 05 00.08
27 00 00.06
C2
C
TV
06 10 00.B1
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
KEYNOTE LEGEND
SCALE: As indicated
2IT200Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 02 - Technology & Electrical Plans
912 56th St, Kenosha, WI 53140
Spec. # Description
06 10 00.B1 PROVIDE ALL REQUIRED BLOCKING FOR ACCESSORIES;
GRAB BARS, CABINETS AND MECHANICAL FIXTURES
26 05 00.01 RELOCATE LIGHT SWITCH LOCATION; NEW LOCATION PER
PLAN
26 05 00.03 FIELD VERIFY EXISTING OUTLET LOCATIONS; MINIMUM (01)
OUTLETS REQUIRED IN ADDITION TO OUTLET LOCATIONS
SHOWN ON PLAN; BASED ON EXISTING CONDITIONS
COORDINATE LOCATION WITH OWNER
26 05 00.05 EXISTING ELECTRICAL PANEL
26 05 00.08 NEW CIRCUITS FOR AREA 02 TO EXISTING ELECTRICAL
PANEL; COORDINATE CIRCUIT AVAILABILITY WITH COUNTY
27 00 00.01 NEW CARD READER LOCATION; CONTRACTOR TO PROVIDE
CABLE PULL AND CARD READER ROUGH IN
27 00 00.02 ALL REMODEL AREA 02 NEW DATA LOCATIONS TO ROUTE
BACK TO EXISTING IT 2112; COORDINATE WITH COUNTY IT;
CONTRACTOR TO PROVIDE ALL DATA PULL
27 00 00.06 RELOCATE EXISTING CARD TO NEW LOCATION; GENERAL
CONTRACTOR TO PROVIDE ALL NEW CABLE PULL AND
ROUGH IN; NEW LOCATION PER PLANS
2"
8' -6
8'-4 1/4"
BR PANEL
1'-6"
BR PANEL
6'-10 1/4"
3A300
First Floor 0'-0"
EXISTING ACOUSTICAL
CEILING TO REMAIN; SEE
REFLECTED CEILING PLANS
(09 29 00) 5/8" GYPSUM BOARD
FINISH (09 91 00) PAINT PER ROOM
FINISH SCHEDULE
(08 14 29) WOOD DOOR; BULLET
RESISTANT UL RATED LEVEL III;
SEE SPECIFICATIONS
3100A waiting
(09 29 00) BULLET REISITANT WALL
SYSTEML UL RATED LEVEL III; SEE
SPECIFICATIONS
(09 65 00) WALL BASE PER ROOM
FINISH SCHEDULE
(08 56 71) ARMORTEX BULLET
RESISTANT HOLLOW METAL
WINDOW SYSTEM - UL RATED
LEVEL III; SEE SPECIFICATIONS
(06 61 00) SOLID SURFACE
COUNTER TOP
(08 56 71) VOICE PORT; LEVEL III
RATED SYSTEM
(08 56 71) PASS THRU TRAY;
LEVEL III RATED SYSTEM
(09 91 00) PAINT PER ROOM
FINISH SCHEDULE
reception waiting
8' -6
2' -6
1'-6"2'-0"
(09 51 00) ACOUSTICAL CEILING SYTEMS;
SEE REFELCTED CEILING PLANS
(09 29 00) GYPSUM BOARD WALL FINISH;
PAINT PER ROOM FINISH SCHEDULE
(08 56 71) BULLET RESISTANT HOLLOW
METAL WINDOW SYSTEM; SEE
SPECIFICATIONS
(08 56 71) VOICE PORT; SEE
SPECIFICATIONS
(08 56 71) PASS THRU TRAY; SEE
SPECIFICATIONS
(06 61 00) SOLID SURFACE
COUNTER TOP
(09 29 00) BALLISTIC GRADE FIBER GLASS
PANEL; UL RATING LEVEL III
(09 29 00) GYPSUM BOARD WALL FINISH;
PAINT PER ROOM FINISH SCHEDULE
(06 61 00) SOLID SURFACE COUNTER
TOP SUPPORT BRACKET
KC Basement 0'-0"
FI
EL
D
VE
RI
FY
E
XI
ST
IN
G C
EI
LI
NG
H
EI
G
HT
7'
-1 0"8'
-1 0"
(09 51 00.01) ACOUSTICAL CEILING
SYSTEM; SEE ROOM FINISH
SCHEDULES AND CEILING PLAN
1' -0
FI
EL
D
VE
RI
F Y
E
XI
ST
IN
G F
LO
O
R
ST
R U
CT
UR
E
HE
IG
H T
'-1
/8
(09 29 00.07) 3-5/8" METAL STUD
WALL
(09 29 00.C4) ANCHOR METAL STUD
WALL TO EXISTING FLOOR
(09 29 00.08) BRACE METAL STUD
WALL TO EXISTING FLOOR
STRUCTURE
(09 29 00.01) 5/8" GYPSUM WALL
BOARD; PAINT PER SCHEDULE
(09 65 00.02) 4" VINYL WALL BASE
PER ROOM FINISH SCHEDULE
(07 21 00.B1) BATT INSULATION
3'-0" 2'-1" 3'-0"
8'-1"
3' -0
UNDER
COUNETR
FRIDGE
BY OWNER
(06 10 00) PROVIDE ALL REQUIRED
BLOCKING FOR ACCESSORIES;
GRAB BARS, CABINETS AND
MECHANICAL FIXTURES
(09 51 00) ACOUSTICAL CEILING
SYSTEM; SEE SPECIFICATIONS
(06 61 00) SOLID SURFACE COUNTER
TOP; SEE SPECIFICATIONSSINK FAUCET; PROVIDED BY
OWNER - INSTALLED BY G.C.
(06 40 00) BASE CABINET;
SIZE PER ELEVATIONS AND
DETAILS
(09 29 00) 5/8" GYPSUM BOARD
FINISH; (09 91 00) PAINT PER ROOM
FINISH SCHEDULE
(09 65 00) WALL BASE PER ROOM
FINISH SCHEDULE2'
-1 0"
3102A
5'-8" 3'-4" 4 7/8"2'-10" 10'-6 7/16" hall
8' -6
First Floor 0'-0"
3A300
(09 51 00) EXISTING ACOUSTICAL
CEILING; SEE REFLECTED CEILING
PLANS
(09 29 00) 5/8" GYPSUM BOARD
FINISH (09 91 00) PAINT PER ROOM
FINISH SCHEDULE
(08 14 29) WOOD DOOR; BULLET
RESISTANT UL REATED LEVEL III;
SEE SPECIFICATIONS
(09 29 00) BULLET RESISTANT WALL
SYSTEM UL RATED LEVEL III; SEE
SPECIFICATIONS
(09 65 00) WALL BASE PER ROOM
FINISH SCHEDULE
(08 56 71) ARMORTEX BULLET
RESISTANT HOLLOW METAL
WINDOW SYSTEM - UL RATED
LEVEL III; SEE SPECIFICATIONS
(06 61 00) SOLID SURFACE
COUNTER TOP
(08 56 71) VOICE PORT; LEVEL III
RATED SYSTEM
(08 56 71) PASS THRU TRAY;
LEVEL III RATED SYSTEM
(09 91 00) PAINT PER ROOM
FINISH SCHEDULE
3100A
1'-6" 3'-0" 10 1/4" 3'-0" 1'-6"
9'-10 1/4"4'-1 3/4" 5 5/16"
2' -6
2' -1
0" 5'
-8
3111A3110A3109A
8' -6
7' -2 hall
FIELD VERIFY EXISTING DIMENSION
18'-11 1/8"
(09 51 00) ACOUSTICAL CEILING
SYSTEM; SEE SPECIFICATIONS
(09 29 00) 5/8" GYPSUM BOARD
FINISH; (09 91 00) PAINT PER ROOM
FINISH SCHEDULE
(09 65 00) WALL BASE PER ROOM
FINISH SCHEDULE
(08 11 00) HOLLOW METAL DOOR
FRAME
3107A
13'-3 1/2"7'-2 7/8"3'-0"
6"
(09 51 00) ACOUSTICAL CEILING
SYSTEM; SEE SPECIFICATIONS
(09 29 00) 5/8" GYPSUM BOARD
FINISH; (09 91 00) PAINT PER ROOM
FINISH SCHEDULE
(09 65 00) WALL BASE PER ROOM
FINISH SCHEDULE
(08 11 00) HOLLOW METAL DOOR
FRAME
hall
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved SCALE: As indicated
3A300Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 03 - Sections and Details
912 56th St, Kenosha, WI 53140
3/8" = 1'-0"3 Waiting 301 - East
3/4" = 1'-0"7 Bullet Resistant Counter - Reception 302 1/2" = 1'-0"8 Typical 3-5/8" Stud Wall - Area 03
3/8" = 1'-0"22 Hall 3104 - West Kitchenette
3/8" = 1'-0"1 Hall 3103 - North 3/8" = 1'-0"2 Reception 3101 - West
3/8" = 1'-0"5 Hall 3108 - East 3/8" = 1'-0"4 Hall 3108 - North
3A300
EXISTING CEILING
TO REMAIN
EXISTING CEILING
TO REMAIN
02 05 00.L202 05 00.L2
02 05 00.L2 02 05 00.L2
02 05 00.L2 02 05 00.L2
02 05 00.L2
02 05 00.L2
02 05 00.L2
02 05 00.L202 05 00.L2
02 05 00.L2
02 05 00.L2
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
EXISTING 2X2 ACT
8' - 6"
A.F.F.
2X2 ACT
8' - 6"
*SEE 3M200 FOR NEW SUPPLY AND RETURN AIR LOCATION. ALL DUCT WORK TO BE
COORDINATED AROUND LIUGHT FIXTURES
EXISTING CEILING SCHEDULE - REMODEL AREA 03
DESCRIPTION EXISTING TOTAL
EXISTING 2X4 TROFFER LIGHT FIXTURE
RELOCATED
(PER PLAN) DEMOLISHED
EXISTING 2X2 TROFFER LIGHT FIXTURE
41 EA.
EXISTING TO
REMAIN
31 EA. 10 EA. 0 EA.
4 EA. 0 EA. 3 EA. 1 EA.
ALTERNATE #2 - UPGRADE ALL LIGHT FIXTURES TO LED - COUNTY TO PURCHASE
LIGHT FIXTURES - G.C. TO INSTALL
EXISTING CEILING
TO REMAIN
EXISTING CEILING
TO REMAIN
*SEE PROPOSED CEILING PLAN FOR CEILING TYPES; ALTERNATE #2
TO BE THE UPGRADING OF ALL LIGHT FIXTURES IN THE AREA OF WORK
TO 2X2 LED FIXTURES SUPPLIED BY THE COUNTY AND INSTALLED BY THE G.C.
WORK INCLUDED IN ALTERNATE #3 WILL BE THE REPLACMENT OF ACT TILES
AND PATCHING OF CEILING GRID FOR NEW DESIGN.
09 51 00.03
*SEE 3M200 FOR NEW SUPPLY AND RETURN AIR LOCATION. ALL DUCT WORK TO BE
COORDINATED AROUND LIUGHT FIXTURES
1. REMOVE LOOSE PAINT AND
MISCELLANEOUS HANGING OBJECTS
FROM WALLS AND CEILINGS AT ALL
AREAS TO RECEIVE NEW FINISHES.
2. PATCH AND REPAIR ALL EXISTING
FLOOR SLABS AND WALL SURFACES
DAMAGED FROM DEMOLITION OR
PRIOR USE.
3. PATCH ALL AREAS OF ELECTRICAL
AND MECHANICAL DEMOLITION THAT
WILL NOT BE REUSED.
4. CONTRACTOR TO FIELD VERIFY ALL
EXISTING DIMENSIONS AND
CONDITIONS. IN THE EVENT OF A
DISCREPANCY BETWEEN THE
DRAWINGS AND THE EXISTING
CONDITIONS, NOTIFY THE ARCHITECT
BEFORE PROCEEDING.
5. DO NOT REMOVE ANY ITEMS WHICH
JEOPARDIZE THE STRUCTURAL
INTEGRITY OF THE BUILDING. IF
HIDDEN ELEMENTS OR DETERIORATED
ELEMENTS ARE ENCOUNTERED,
NOTIFY THE ARCHITECT IMMEDIATELY.
6. PROTECT ALL ADJACENT AREAS AND
ITEMS "TO REMAIN" DURING
DEMOLITION/CONSTRUCTION.
REPAIR/REPLACE ALL ITEMS DAMAGED
DURING CONSTRUCTION.
7. EXISTING BUILDING CONDITIONS
SHOWN ON THESE DRAWINGS ARE
DERIVED FROM DRAWINGS OF THE
ORIGINAL BUILDING AND FROM LIMITED
FIELD OBSERVATION.
8. THE CONTRACTOR SHALL PROVIDE
AND MAINTAIN ADDITIONAL MEANS OF
EGRESS AS NEEDED AS A RESULT OF
CONSTRUCTION SEQUENCING AND/OR
REGULATORY REQUIREMENTS.
GENERAL PROJECT NOTES
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
KEYNOTE LEGEND
SCALE: As indicated
3A400Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 03 - Ceiling Plans
912 56th St, Kenosha, WI 53140
1/4" = 1'-0"1 Area 03 - Ceiling Plan - Proposed
Spec. # Description
02 05 00.L2 RELOCATED EXISTING LIGHT FIXTURE; ACT CEILING TO BE
PATCHED AND REPLACED AS NEEDED FOR NEW LIGHTING
DESIGN
09 51 00.03 NEW 2X2 LIGHT FIXTURE; FIXTURE PROVIDED BY OWNER AND
INSTALLED BY G.C.
1/8" = 1'-0"2 Alternate #2 - Area 03 - Ceiling Plan
C R
C R waiting reception office hall existing office existing office office office office hall existing conference storage
27 00 00.01
27 00 00.04
27 00 00.05
C
C 2 C
C
C2
C2
C2
C2
C
FRIDGE OUTLET
MICROWAVE OUTLET
3'-4" A.F.F.
3'-4" A.F.F.
existing electrical room
26 05 00.09
20 AMP
DEDICATED COPY/PRINT
C
C
TV
27 00 00.06
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
KEYNOTE LEGEND
SCALE: As indicated
3IT200Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 03 - Technology & Electrical Plans
912 56th St, Kenosha, WI 53140
Spec. # Description
26 05 00.09 NEW CIRCUITS FOR AREA 03 TO EXISTING ELECTRICAL PANEL;
COORDINATE CIRCUIT AVAILABILITY WITH COUNTY
27 00 00.01 NEW CARD READER LOCATION; CONTRACTOR TO PROVIDE
CABLE PULL AND CARD READER ROUGH IN
27 00 00.04 RELOCATE EXISTING UNDER COUNTER DOOR OPEN SYSTEM
TO NEW LOCATION; PROPOSED LOCATION
27 00 00.05 RELOCATE EXISTING UNDER COUNTER DOOR OPEN SYSTEM
TO NEW LOCATION; EXISTING LOCATION
27 00 00.06 RELOCATE EXISTING CARD TO NEW LOCATION; GENERAL
CONTRACTOR TO PROVIDE ALL NEW CABLE PULL AND
ROUGH IN; NEW LOCATION PER PLANS
EX
F
C-
EX
F
C-
EX
F
C-
EX FC-9EX FC-7
EX
F
C-
X
8" DIAMETER
230 CFM
12 X 8
8" DIAMETER
230 CFM
8" DIAMETER
120 CFM
8" DIAMETER
120 CFM
8" DIAMETER
120 CFM
X
8" DIAMETER
200 CFM
6" DIAMETER
80 CFM
20 X 8
8" DIAMETER
125 CFM
10" DIAMETER
320 CFM
10" DIAMETER
320 CFM
8" DIAMETER
135 CFM
16 X 8
X
X
8" DIAMETER
190 CFM
8" DIAMETER
150 CFM
EXISTING TO
REMAIN
EXISTING TO
REMAIN
EXISTING
TO
REMAIN
EXISTING
TO
REMAIN
EXISTING TO
REMAIN
EXISTING TO
REMAIN
EXISTING TO
REMAIN
23 05 00.06
23 05 00.07 existing reception existing waiting existing conference existing stair existing office existing office existing office existing storage existing office existing electrical existing hall existing vestibule existing vestibule existing office existing reception
23 05 00.06
23 05 00.07
23 05 00.06
23 05 00.07
23 05 00.06
23 05 00.07
23 05 00.07
23 05 00.07
23 05 00.07
23 05 00.0923 05 00.09
8 X 6
X
T
23 05 00.10
23 05 00.11
23 05 00.06
23 05 00.12
T 23 05 00.12
T
FC-7
FC-8
FC-9
23 05 00.11
EX
F
C-
EX
F
C-
EX
F
C-
EX FC-9EX FC-7
EX
F
C-
DUCTOWRK TO BE COORDINATED AROUND ALL LIGHT
FIXTURES. SEE CEILING PLANS
X8
12 x 8
X
20 X 8
16 X 8
X
X
23 05 00.08
23 05 00.08
23 05 00.05
23 05 00.08
23 05 00.08 reception waiting office hall existing office existing office office hall office office existing conference
23 05 00.03
23 05 00.05
23 05 00.07
23 05 00.06
23 05 00.06
23 05 00.07
23 05 00.02
23 05 00.07
23 05 00.0623 05 00.06
23 05 00.07
T
T
T
FC-7
FC-8
FC-9
23 05 00.13
23 05 00.03
1. ALL DUCTWORK IS DIAGRAMMATIC
AND COORDINATEDTO THE BEST
AVAILABLE INFORMATION.
CONTRACTOR SHALL VERIFY
STRUCTURE AND LOCATION OF OTHER
TRADES PRIOR TO FABRICATION
2. LIMIT FIXTURE RUNS TO A MAXIMUM OF
5'-0" AND ROUTE AS STRAIGHT AS
POSSIBLE.
3. SYSTEM SHALL BE BALANCED BY THE
INSTALLING CONTRACTOR. BALANCE
AIR FLOWS FOR GRILLES AND
EQUIPMENT TO +/- 10% OF SCHEDULED
AIRFLOWS. INCLUDE SYSTEM
MANUFACTURER, MODEL, SERIAL
NUMBER, RPM, HORSEPOWER,
VOLTAGE, AMPERAGE, ETC. IN
REPORTS. SUBMIT THE BALANCING
REPORTS TO THE DESIGN
PROFESSIONAL BEFORE A
COMPLIANCE STATEMENT CAN BE
SUBMITTED.
4. MECHANICAL LOW VOLTAGE WIRING
SHALL BE BY THE HVAC CONTRACTOR.
5. COORDINATE DIFFUSER LAYOUT WITH
LIGHTING LAYOUT.
6. THE CONTRACTOR SHALL PROVIDE
THE OWNER WITH WRITTEN
INSTRUCTION FOR THE OPERATION
AND MAINTENANCE OF THE SYSTEM
AND EQUIPMENT.
7. THERMOSTAT LOCATIONS SHALL BE
REVIEWED BY THE OWNER, TENANT
AND CONTRACTOR BEFORE
INSTALLATION. CONTROLS SHALL BE
LOCATED 48" ABOVE FINISH FLOOR
8. PROVIDE VOLUME DAMPER AT ALL
LOCATION WHERE NEW DUCT LEAVES
MAIN TRUCK DUCT.
GENERAL MECHANICAL NOTES
01 ADDENDUM #1 MAY 19, 2020
REV. / DESCRIPTION DATE
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
PLAN NORTH
KEYNOTE LEGEND
SCALE: As indicated
3M200Kenosha County - Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project
April 24, 2020
Area 03 - HVAC Plan
912 56th St, Kenosha, WI 53140
3/16" = 1'-0"1 Area 03 - HVAC Plan - Existing
3/16" = 1'-0"2 Area 03 - HVAC Plan - Proposed
Spec. # Description
23 05 00.02 RELOCATED SUPPLY AIR
23 05 00.03 RELOCATED RETURN AIR
23 05 00.05 NEW RETURN AIR
23 05 00.06 EXISTING RETURN AIR TO REMAIN
23 05 00.07 EXISTING SUPPLY AIR TO REMAIN; MECHANICAL
CONTRACTOR TO FIELD VERIFY LOCATION AND DUCT
DIAMETER - TYPICAL AT ALL SUPPLY AIR LOCATIONS
23 05 00.08 NEW FLEX DUCT TO RELOCATED AIR SUPPLY; BALANCE PER
MECHANICAL CONTRACTOR DESIGN
23 05 00.09 RELOCATE EXISTING SUPPLY AIR TO NEW LOCATION; SEE
PROPOSED HVAC PLAN
23 05 00.10 EXISTING DUCT TO REMAIN
23 05 00.11 RELOCATE EXISTING AIR RETURN; SEE PROPOSED PLAN FOR
NEW LOCATION
23 05 00.12 EXISTING THERMOSTAT TO REMAIN; MECHANICAL
CONTRACTOR TO FIELD VERIFY ALL LOCATIONS
23 05 00.13 RELOCATE THERMOSTAT LOCATION FOR FC-9
Pre-Bid Sign in Sheet
May 7, 2020
COMPANY NAME PERSON NAME E-MAIL PHONE BIDDING DIVISION
PETER SCHWABE, INC TIM CRAWLEY TCRAWLEY@PSHWABE.COM 262.765.9688 GENERAL CONTRACTOR
KPH CONSTRUCTION CORP. BRYAN HENNE ESTIMATING@KPHBUILDS.COM 414.647.1530 GENERAL CONTRACTOR
STUCKEY CONST. COMPANY ED STUCKEY ESTUCKEY@STUCKEYCONSTRUCTION.COM 847.336.8575 GENERAL CONTRACTOR
ABSOLUTE CONSTRUCTION MIKE WIEDENBECK MWIEDENBECK@ABSOLUTECONSTRUCTION.COM 262.456.6802 GENERAL CONTRACTOR
JUST MECHANICAL CHRIS WITT CHRISW@JUSTSERVICEINC.COM 262.364.9385 HVAC
VALIANT ELECTRIC JEFF HUBER JEFF@VALIANTELECTRIC.COM 262.657.7070 ELECTRICAL / LOW VOLTAGE
RASCH CONSTRUCTION STEVE RASCH STEVE@RASCHCONSTRUCTION.COM 262.657.6542 GENERAL CONTRACTOR
ELECTRICAL SYSTEMS SEAN MEEHAN SEANMEEHAN@ESSELECTRIC.COM 262.818.1768 ELECTRICAL / LOW VOLTAGE
MJ RUSSELL CONSTRUCTION MARK RUSSELL MJRUSSELLBUILDERS@GMAIL.COM 815.289.3282 GENERAL CONTRACTOR
Kenosha County – Victim Witness, Juvenile Intake and District Attorney Relocation and Partial Remodel Project – Kenosha County Courthouse and Molinaro Building
| KCJIDA - Addendum #1 |
| KCJIDA_Addendum #1 - Drawings |
| KCJIDA_01 - Title Sheet |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_A002 - Wall Types & Typical Details |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_2A201 - Area 02 - Proposed Floor Plan |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_2IT200 - Area 02 - Technology & Electrical Plans |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_3A300 - Area 03 - Sections and Details |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_3A400 - Area 03 - Ceiling Plans |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_3IT200 - Area 03 - Technology & Electrical Plans |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
| KCJIDA_3M200 - Area 03 - HVAC Plan |
| Sheets |
| 01 - Title Sheet |
| 2A201 - Area 02 - Proposed Floor Plan |
| 2IT200 - Area 02 - Technology & Electrical Plans |
| 3A300 - Area 03 - Sections and Details |
| 3A400 - Area 03 - Ceiling Plans |
| 3IT200 - Area 03 - Technology & Electrical Plans |
| 3M200 - Area 03 - HVAC Plan |
| A002 - Wall Types & Typical Details |
KCJIDA_Sign in Sheet - Attendance
File details come from the government source that posted it. Updated .