2006_Rincon Water Reuse.pdf
PDF 6 MB Posted
- Attached to
- Rincon WRF Improvements - CMAR Request
- Solicitation number
- PE-66548-NONST-2026-000000007
- Issued by
- Douglas County, Georgia
About this file
This is a project description document for the City of Rincon, Georgia's Water Reclamation Facility (WRF) improvements project. The City is seeking a Construction Manager at Risk (CMAR) to oversee immediate improvements to the existing Rincon WRF to increase initial capacity and prepare for future expansion. The project will be funded by state grants and utilizes the CMAR delivery method to expedite implementation. Limited preconstruction services will be required, followed by a construction contract with a mutually agreed upon Guaranteed Maximum Price (GMP). The project scope is not limited to a single GMP, and the Owner retains the discretion to add additional scope of work as the project progresses.
The project funding is derived from state grants specifically designated for WRF improvements. The contract structure allows for flexibility in pricing and scope, with the CMAR selected through a competitive proposal process. The accelerated timeline and state funding source reflect the City's priority to rapidly enhance facility capacity while maintaining cost control through the GMP mechanism. No specific renewal options, set-asides, or incumbent information is provided in the available documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .