2005 Cloverleaf Plan Set.pdf
PDF 4 MB Posted
- Attached to
- AML 2005 Cloverleaf No. 4 Shafts
- Solicitation number
- 21-422DNR-DIREC-B-20164
- Issued by
- Macon County, Illinois
About this file
This document is a set of plans and specifications for the Clover Leaf No. 4 Mine Shaft Remediation project in Montgomery County, Illinois. The project is being managed by the Illinois Department of Natural Resources (IDNR) Office of Mines and Minerals Abandoned Mined Lands Reclamation Division. The work includes restoring disturbed areas, protecting existing utilities, maintaining access roads, and implementing erosion control measures during construction. The project site is located on the premises of an operating industry, and the contractor must coordinate their work to minimize disruption. The plans include details for the main shaft, air shaft, and mine marker. No specific bid due date or award information is provided in the document.
The plans do not include any pricing terms, set asides, incumbent information, or funding details. The contractor will be responsible for providing their own field engineering services to execute the project as specified. The IDNR Project Manager will provide oversight and direct the contractor on aspects like material stockpile locations and equipment operations to accommodate plant operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Forms A Section V.18.1~10.docx | DOCX document | |
| AML2005 Bid Sheet 02.04.2021.pdf | ||
| Cloverleaf Specifications 02.04.21.pdf | ||
| Standard Business Terms and Conditions.pdf | ||
| Forms B V.20.1~43.docx | DOCX document | |
| Standard Certifications ~1.pdf | ||
| Vendor Questions and Answers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Text Sheet
Text Summary of Quantities /
Text General Notes
Text Clover Leaf No. 4 Mine Shaft Remediation AML-GMmE-2005 Montgomery County
Text Sheet
Text
Text Summary of Quantities /
Text General Notes / Location Map
Text Date:
Text Checked By:
Text Drawn By:
Text 12/15/2020
Text J. Karl
Text State of Illinois Department of Natural Resources Office of Mines and Minerals Abandoned Mined Lands Reclamation Division
Text 12/15/2020
Text D. Kimmle
Text General Notes 1. Unless otherwise noted on the plans, all disturbed areas within the construction limits shall be restored to pre-construction conditions. Those areas which are not currently disturbed shall be fertilized, seeded, and mulched in accordance with the Project Specifications. 2. The Contractor is responsible for visiting the site and familiarizing himself with the existing conditions and the proposed remediation work prior to submitting a bid. 3. The Contractor shall provide and pay for all field engineering services to execute the project as specified in the Field Engineering section of the Project Requirements. 4. The Contractor is responsible for locating and protecting all existing utilities. 5. Unless noted on the plans, all onsite access roads may be used for construction and must be maintained during construction and restored to original or better condition at the completion of work by the Contractor. Access roads to the site as designated on the plans are to be maintained to the satisfaction of the IDNR Project Manager. 6. The construction limits shall be staked by the Contractor prior to construction. The Contractor is responsible for the repair and/or restitution at his own expense for all damages done to any area outside the construction limits. Construction Notes 7. Tree and brush removed shall be completed in accordance with the Project Specifications. Tree clearing shall be completed prior to April 1 or after October 14. 8. The work will occur on the premises of an operating industry. The Contractor shall coordinate his work to minimize disruption to operations, particularly traffic flow on the premises. The locations of material stockpiles, equipment parking, and equipment operations may be restricted at the direction of the IDNR Project Manager to accommodate plant operations. 9. Woven wire fencing surrounding the airshaft shall be removed prior to initiating excavation activities at this location. Fence posts and rolled fencing shall be placed at a location on site designated by the IDNR Project Manager. 10. The Contractor shall schedule his operations and take such precautions that may be necessary to prevent or minimize erosion. Failure to comply with this requirement shall cause the Contractor to be fully responsible for repairing any eroded areas and cleaning up areas or drainage structures that have become silted in or damaged. At a minimum, silt fencing shall be installed at the location of airshaft remediation in a manner that protects siltation to the surrounding wetlands. Silt fence installation shall be in accordance with IDOT Standard 280001-07.
Summary of Quantities
Text Site Map
Text Clover Leaf No. 4 Mine Shaft Remediation AML-GMmE-2005 Montgomery County
Text Sheet
Text
Text Date:
Text Checked By:
Text Drawn By:
Text 12/15/2020
Text J. Karl
Text State of Illinois Department of Natural Resources Office of Mines and Minerals Abandoned Mined Lands Reclamation Division
Text
NOTE:
Text 12/15/2020
Text D. Kimmle
Text
Text 100'
Text 200'
300'
Text Main Shaft / Air Shaft Detail
Text Clover Leaf No. 4 Mine Shaft Remediation AML-GMmE-2005 Montgomery County
Text Sheet
Text
Text Date:
Text Checked By:
Text Drawn By:
Text 12/15/2020
Text J. Karl
Text State of Illinois Department of Natural Resources Office of Mines and Minerals Abandoned Mined Lands Reclamation Division
Text Mine Marker Detail
Text 12/15/2020
D. Kimmle
File details come from the government source that posted it. Updated .