2-Tooele 2026 Trail Design Summary Report.pdf
PDF 4 MB Posted
- Attached to
- Natural Surface Trail Construction
- Solicitation number
- DF26-34
- Issued by
- Tooele County, Utah
About this file
This is a Trail Design Summary Report prepared by Pointe Strategies LLC for Tooele County Parks & Recreation in Tooele, Utah, detailing specifications for three natural-surface singletrack trail segments. The project encompasses three distinct trail sections: the Jaguar Trail (5,623 linear feet), the Cassity Drive Connector (3,962 linear feet), and the Middle Canyon to Skyline Drive Connector (2,569 linear feet), for a combined total of 12,154 linear feet of trail construction. All three trails are designed as natural surface singletrack with native soil, compacted surfaces, 48-inch width, and outslope ranges of 2-4 percent. The Jaguar Trail features a 6 percent average grade, while the Cassity Drive Connector and Middle Canyon to Skyline Drive Connector feature 4 percent and 5 percent average grades, respectively. All three trails are marked with pink flagging and require builders to observe property boundaries, with the Middle Canyon connector requiring determination of public access routes around private land.
The estimated construction costs for the three trail segments are $59,050 for the Jaguar Trail, $41,600 for the Cassity Drive Connector, and $30,800 for the Middle Canyon to Skyline Drive Connector, totaling $131,450 for all construction work. The contract will be awarded to a single qualified contractor responsible for furnishing all labor, supervision, equipment, materials, transportation, mobilization, access coordination, safety measures, environmental protection, restoration, and closeout work. The contractor must guarantee pricing for ninety days, with contract duration extending through project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Tooele County Service Contract.pdf | ||
| 3-DF26-34 Trail Construction RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T O
O
EL
E
TR
A
IL
D
ES
IG
N
SU
M M
A R
Y M
EM
O
2314 N Garfi eld Ave Loveland CO 80538
Tel: 970.218.2805
ISSUE: Date
DRAWN BY: JT
SHEET NUMBER
REV NOTES
PAGE NAME
C-1
2026 TOOELE TRAIL DESIGN
SUMMARY MEMO
CONSULTANT
PROJECT LOCATION
Pointe Strategies LLC 2314 N Garfi eld Ave Loveland CO 80538 Tel: 970.218.2805
OWNER
Latitude: 40.519075 Longitude: -112.257943
Tooele County Parks & Recreation 2930 West Highway 112, Tooele, UT 84074
T O
O
EL
E
TR
A
IL
D
ES
M
A R
Y M
EM
O
2314 N Garfi eld Ave Loveland CO 80538
Tel: 970.218.2805
ISSUE: Date
DRAWN BY: JT
SHEET NUMBER
REV NOTES
PAGE NAME
D-1
JAGUAR TRAIL
Trail type:
Natural surface singletrack
Trail surface:
Native soil, compacted
Trail length:
5623 ft
Trail width:
48 in
Average grade:
6 %
Outslope:
2-4 %
Flagging color:
Pink
Estimated construction cost:
$59,050
T O
O
EL
E
TR
A
IL
D
ES
M
A R
Y M
EM
O
2314 N Garfi eld Ave Loveland CO 80538
Tel: 970.218.2805
ISSUE: Date
DRAWN BY: JT
SHEET NUMBER
REV NOTES
PAGE NAME
D-2
CASSITY DR CONNECTOR
Trail type:
Natural surface singletrack
Trail surface:
Native soil, compacted
Trail length:
3962 ft
Trail width:
48 in
Average grade:
4 %
Outslope:
2-4 %
Flagging color:
Pink
Estimated construction cost:
$41,600
Ensure builder Ensure builder observes property observes property boundaryboundary
T O
O
EL
E
TR
A
IL
D
ES
M
A R
Y M
EM
O
2314 N Garfi eld Ave Loveland CO 80538
Tel: 970.218.2805
ISSUE: Date
DRAWN BY: JT
SHEET NUMBER
REV NOTES
PAGE NAME
D-3
MIDDLE CANYON TO SKYLINE
DRIVE CONNECTOR
Trail type:
Natural surface singletrack
Trail surface:
Native soil, compacted
Trail length:
2569 ft
Trail width:
48 in
Average grade:
5 %
Outslope:
2-4 %
Flagging color:
Pink
Estimated construction cost:
$30,800
Ensure builder Ensure builder observes property observes property boundaryboundary
Connect trail to Connect trail to Middle Canyon Middle Canyon parking if desiredparking if desired
Determine best public access route Determine best public access route around private landaround private land
File details come from the government source that posted it. Updated .