2 SV0193-26 Avery Dennison Full Text.pdf

PDF 496 KB Posted

Attached to
Avery Dennison Reflective Materials
Solicitation number
SV0193-26
Issued by

About this file

This is a Request for Proposals (RFP) issued by UNICOR, Federal Prison Industries, Inc. for a two-year firm fixed-price requirements contract for Avery Dennison brand reflective and overlay products. The solicitation covers 10 specific line items including brown and white overlay and reflective sheets in various sizes, ranging from 24" to 48" widths, and an application tape. The total quantities range from 1,100 to 28,000 square feet per item.

Key details include a solicitation number of SV0193-26, with proposals due on 1/9/2026 at 2pm EST. The contract will have Economic Price Adjustment and is unrestricted. UNICOR's desired delivery is 45 calendar days or sooner from receipt of each delivery order. Vendors must submit signed offers via email to Wesley.Newell2@usdoj.gov on the SF1449 form, provide three Business Management Questionnaires for past performance evaluation, and be registered in the System for Award Management (SAM). The contract will be awarded to one offeror, with technical and past performance being considered more important than price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TERMS OF DELIVERY ARE F.O.B. DESTINATION TO:

UNICOR, Federal Prison Industries, Inc.

14601 BURBRIDGE RD SE

CUMBERLAND MD 21502-8724

Solicitation is issued as a two (2) year firm fixed price requirements type contract with Economic Price Adjustment for PCU326130326130S Laminated Plastic Plate, Sheet (Except Packaging), and Shape Manufacturing: Secondary Products.

Offerors who do not agree with the Producer Price Index listed above are required to submit the price index that they believe is correct to the contracting officer at least five (5) calendar days prior to the due date for offers. The index submitted will be evaluated, and changed by amendment to the solicitation if necessary.

PPI #____________________________________________

Solicitation is Unrestricted.

QUESTIONS PERTAINING TO THIS SOLICITATION WILL ONLY BE ADDRESSED IN

WRITING VIA EMAIL TO: Wesley.Newell2@central.unicor.gov. NO PHONE CALLS PLEASE.

This solicitation is for Avery Dennison brand products:

1 NSH051T48AO OL-2009-BROWN-OVERLAY-48"X50YD 25,000.00 FT2

2 RSH031124

T-1520-COE-BROWN-CLASS-1-RFL-1-

24"X50YD 1,100.00 FT2

3 RSH031130

T-1520-COE-BROWN-CLASS-1-RFL-1-

30"X50YD 10,000.00 FT2

4 RSH031136

T-1520-COE-BROWN-CLASS-1-RFL-1-

36"X50YD 7,900.00 FT2

5 RSH031148

T-1520-COE-BROWN,CLASS-1,RFL-

1,48"X50YD* 28,000.00 FT2

6 RSH751324PA WHITE-HIGH-INT-PRISMATIC-24"X50YD 1,500.00 FT2

7 RSH751330PA WHITE-HIGH-INT-PRISMATIC-30"X50YD 2,000.00 FT2

8 RSH751336PA WHITE-HIGH-INT-PRISMATIC-36"X50YD 4,800.00 FT2

9 RSH751348PA WHITE-HIGH-PRISMATIC-48"X50YD 9,000.00 FT2

10 TPEA048 4075RLA,APPLICATION-TAPE-AVERY 15,000.00 FT

UNICOR’s desired delivery is 45 calendar days or sooner from receipt of each delivery order issued. Vendors are required to provide their best manufacturing/delivery time for evaluation which will be evaluated under technical factors as a go/no go. Delivery schedule will be established at time of award. Delivery orders will be issued in accordance with 52.216-19.

Vendors shall submit signed and dated offers via email to Wesley.Newell2@usdoj.gov. Due to security considerations, do not send offers via U.S. mail. Offers shall be submitted on the SF1449.

OMB Clearance 1103-0018.

The date and time for receipt of proposals is 1/9/2026 at 2pm EST. Offer must indicate Solicitation No. SV0193-26, time specified for receipt of offer, name, address and telephone number of Offeror, technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation, terms of any expressed warranty, price and any discount terms.

Offer must include acknowledgment of all amendments, if any.

THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE

OFFEROR:

SAM UNIQUE ENTITY NUMBER:_______________________________________

VENDOR'S POINT OF CONTACT: _____________________________________

VENDOR'S TELEPHONE: _____________________________

VENDOR'S EMAIL ADDRESS: ________________________________________

VENDOR'S BUSINESS SIZE (i.e. SMALL, LARGE, ETC.): __________________

By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System Award Management) prior to submitting a proposal, during performance and through final payment of any contract resulting from this solicitation.

_______________________________________________ Signature

The Administrative Contracting officer is Wesley Newell: Wesley.Newell2@usdoj.gov.

mailto:Wesley.Newell2@usdoj.gov

PART I: INFORMATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Part 12 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested and a written solicitation will not be issued. The solicitation number is SV0193-26 and this solicitation is issued as a Request For Proposals (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-03. The North American Industry Classification System code is 326130. This requirement is unrestricted. UNICOR, Federal Prison Industries, Inc., intends to enter into a 2-year, firm-fixed-price, requirements contract for the following commercial item(s):

This is a name brand justified solicitation.

Avery Dennsion products:

1 NSH051T48AO OL-2009-BROWN-OVERLAY-48"X50YD 25,000.00 FT2

2 RSH031124

T-1520-COE-BROWN-CLASS-1-RFL-1-

24"X50YD 1,100.00 FT2

3 RSH031130

T-1520-COE-BROWN-CLASS-1-RFL-1-

30"X50YD 10,000.00 FT2

4 RSH031136

T-1520-COE-BROWN-CLASS-1-RFL-1-

36"X50YD 7,900.00 FT2

5 RSH031148

T-1520-COE-BROWN,CLASS-1,RFL-

1,48"X50YD* 28,000.00 FT2

6 RSH751324PA WHITE-HIGH-INT-PRISMATIC-24"X50YD 1,500.00 FT2

7 RSH751330PA WHITE-HIGH-INT-PRISMATIC-30"X50YD 2,000.00 FT2

8 RSH751336PA WHITE-HIGH-INT-PRISMATIC-36"X50YD 4,800.00 FT2

9 RSH751348PA WHITE-HIGH-PRISMATIC-48"X50YD 9,000.00 FT2

10 TPEA048 4075RLA,APPLICATION-TAPE-AVERY 15,000.00 FT

ALL ITEMS WILL BE AWARDED TO ONE OFFEROR. FAILURE TO SUBMIT AN OFFER

ON ALL ITEMS MAY PREVENT AN OFFER FROM BEING CONSIDERED FOR AWARD.

NOTICE TO GOVERNMENT WHEN CONTRACTOR(S) DELAYS:

In the event the contractor(s) encounter difficulty in meeting performance requirements, or when there is an anticipated difficulty in complying with the delivery terms or completion dates, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely delivery/performance of this contract, the contractor must immediately notify the Field Administrative Contracting Officers at UNICOR Cumberland or in writing, giving pertinent details. This information will not be construed as a waiver by the Government of the required delivery schedule, or the Governments rights to impose consideration against delinquencies or other remedies provided by this contract.

Contractor agrees that FPI is in the category of the most favored or best commercial customer category of the Contractor and as such, the Contractor will:

During the contract period, the Contractor shall report to the Contracting Officer all price reductions offered to the category of customers that are considered by the Contractor to be their most favored or best commercial customer.

1. A price reduction shall apply to purchases under this contract if, after the award date, the Contractor-

i) Revises downward its commercial catalog, price list, schedule, etc., to its best commercial customers (or category of customers) below the awarded price under this contract;

ii) Grants more favorable discounts or terms and conditions to its best commercial customers than those contained in this contract that would result in prices below the awarded price under this contract, an/or

iii) Grants special discounts to its best commercial customer (or category of customers) that would result in prices lower than the awarded price under this contract.

2. The Contractor shall offer the price reduction to FPI with the same effective date, and for the same time period, as extended to the commercial customer (or category of customers).

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

The Contractor shall notify the Contracting Officer of any price reduction subject to this clause as soon as possible, but not later than 15 calendar days after its effective date.

Future requirements for these or similar items from this or other UNICOR factories may be added to the resulting contract if considered to fall within the scope of work and the price is determined to be fair and reasonable.

INVOICES ARE TO BE EMAILED TO:

Accounts.payable@usdoj.gov

PART II: FAR CLAUSES

52.211-16, Variation in Quantity (APR 1984) of five percent (5%) increase or five percent (5%) decrease, applied to the quantity per line item in each delivery order;

52.212-4, Contract Terms and Conditions - Commercial Products And Commercial Services (NOV 2023).

52.216-18, Ordering (AUG 2020).

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from _01/31/2026_ through _01/30/2028 .

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered “issued” when-

(1) If sent by mail (includes transmittal by U.S. Mail or private delivery service), the government deposits the order in the mail;

(2) If sent by fax, the government transmits the order to the contractor's fax number; or

(3) If sent electronically, the government either— mailto:Accounts.payable@usdoj.gov

(i) Posts a copy of the delivery order or task order to a government document access system, and notice is sent to the contractor; or

(ii) Distributes the delivery order or task order via email to the contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

(END OF CLAUSE)

52.216-21, Requirements (Oct 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 45 calendar days after contract validity end.

52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024)

(a) Definition. As used in this clause– “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.

“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR Part 82 subpart G with supplemental tables of alternatives available at (http://www.epa.gov/snap/).

“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.

“Ozone-depleting substance,” means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as—

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II, including, but not limited to, hydrochlorofluorocarbons.

(b) The Contractor shall label products that contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR part 82, subpart E, as follows:

WARNING

Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

(c) The Contractor shall refer to EPA's SNAP program (available at http://www.epa.gov/snap) to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at http://www.epa.gov/snap.

(End of clause)

Buy American-Supplies (Oct 2022)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

http://www.epa.gov/snap http://uscode.house.gov/ https://www.epa.gov/snap https://www.epa.gov/snap https://www.acquisition.gov/far/2.101#FAR_2_101

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into an end product.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the end product.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at

FAR 25.105 .

Domestic end product means—

(1) For an end product that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured end product mined or produced in the United States;

(ii) An end product manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind as those that the agency determines are not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality are treated as domestic. Components of unknown origin are treated as foreign. Scrap generated, collected, and prepared for processing in the United States is considered domestic; or http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim https://www.acquisition.gov/far/25.105#FAR_25_105

(B) The end product is a COTS item; or

(2) For an end product that consists wholly or predominantly of iron or steel or a combination of both, an end product manufactured in the United States, if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all the components used in the end product. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the end product and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the end product contains multiple components, the cost of all the materials used in such end product is calculated in accordance with the definition of "cost of components".

End product means those articles, materials, and supplies to be acquired under the contract for public use.

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign end product means an end product other than a domestic end product.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) 41 U.S.C. chapter 83, Buy American, provides a preference for domestic end products for supplies acquired for use in the United States. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for an end product that is a COTS item (see 12.505(a)(1)), except that for an end product that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the end product, excluding COTS fasteners.

http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter83&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section1907&num=0&edition=prelim https://www.acquisition.gov/far/12.505#FAR_12_505

(c) Offerors may obtain from the Contracting Officer a list of foreign articles that the Contracting Officer will treat as domestic for this contract.

(d) The Contractor shall deliver only domestic end products except to the extent that it specified delivery of foreign end products in the provision of the solicitation entitled "Buy American Certificate."

(End of clause)

52.229-3 Federal, State, and Local Taxes. (Feb 2013);

52.232-18, Availability of Funds (APR 1984);

52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004);

52.246-15, Certificate of Conformance (APR 1984)

52.247-34, F.O.B. Destination (Jan 1991). delivery shall be FOB destination to UNICOR Cumberland Sign, 14601 Burbridge Road SE, Cumberland, MD, 21502.

52.252-2, Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

___________www.acquisition.gov__________________

52.252-6, Authorized Deviation in Clauses (NOV 2020). (a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Local Level Economic Price Adjustment clause (48 CFR Chapter 16) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation. (END OF CLAUSE) DOJ-01 Whistleblower Information Distribution (OCT 2021)

Within 30 days of contract award, the contractor and its subcontractors must distribute the “Whistleblower Information for Employees of DOJ Contractors, Subcontractors, Grantees, or Sub- Grantees or Personal Services Contractors” (“Whistleblower Information”) document to their employees performing work in support of the products and services delivered under this contract (https://oig.justice.gov/sites/default/files/2020-04/NDAA-brochure.pdf). By agreeing to the terms and conditions of this contract, the prime contractor acknowledges receipt of this requirement, in accordance with 41 U.S.C. § 4712 and FAR 3.906 & 52.203-17, and commits to distribution. Within 45 days of award, the contractor must provide confirmation to the contracting officer verifying that it has distributed the whistleblower information as required.

(End of Clause)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

A. Limiting Access to Privacy Act and Other Sensitive Information

(1) Privacy Act Information

In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act information may be found at https://www.justice.gov/opcl/doj-systems-records.1 Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.

(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment

Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.

(3) Prior Approval Required to Hire Subcontractors

The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

(4) Separation Checklist for Contractor Employees

The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1)

1 “[T]he term ‘record’ means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, his education, financial transactions, medical history, and criminal or http://www.dhs.gov/privacy http://www.gpo.gov/fdsys/ employment history and that contains his name, or the identifying number, symbol, or other identifying particular assigned to the individual, such as a finger or voice print or a photograph.” 5 U.S.C. § 552a(a)(4). “[T]he term ‘system of records’ means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.” 5 U.S.C. § 552a(a)(5).

return of any Government-furnished equipment; (2) return or proper disposition of personally identifiable information (PII)2, in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.

In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).

Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.

B. Privacy Training, Safeguarding, and Remediation

(1) Required Security and Privacy Training for Contractors

The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII. These courses, along with more information about DOJ security and training requirements for Contractors, are available at https://www.justice.gov/jmd/learndoj. The Federal Information Security Modernization Act of 2014 (FISMA) requires all individuals accessing DOJ information to complete training on records management, cybersecurity awareness, and information system privacy awareness. Contractor employees are required to sign the “Privacy Rules of Behavior,” acknowledging and agreeing to abide by privacy law, policy, and certain privacy safeguards, prior to accessing DOJ information. These Rules of Behavior are made available to all new users of DOJ’s computer network and to trainees at the conclusion of DOJ-OPCL-CS-0005.

The Contractor should maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required privacy and cybersecurity training.

https://www.justice.gov/jmd/learndoj https://www.congress.gov/bill/113th-congress/senate-bill/2521/text?overview=closed https://www.congress.gov/bill/113th-congress/senate-bill/2521/text?overview=closed

(2) Safeguarding PII Requirements

Contractor employees must comply with DOJ Order 0904 and other guidance published to the publicly-available Office of Privacy and Civil Liberties (OPCL) Resources page3 relating to the safeguarding of PII, including the use of additional controls to safeguard sensitive PII (e.g., the encryption of sensitive PII). This requirement flows down from the Prime Contractor to all Subcontractors and lower tiered subcontracts.

(3) Non-Disclosure Agreement Requirement

Prior to commencing work, all Contractor personnel that may have access to PII or other sensitive information shall be required to sign a Non-Disclosure Agreement (NDA) and the DOJ IT Rules of Behavior. The Non-Disclosure Agreement:

a) prohibits the Contractor from retaining or divulging any PII or other sensitive information, or derivatives therefrom, furnished by the Government or to which they may otherwise come in contact as a result of their performance of work under the contract/task order that is otherwise not publicly available, whether or not such information has been reduced to writing; and

b) requires the Contractor to report any loss of control, compromise, unauthorized disclosure, or unauthorized acquisition of PII or other sensitive information to the component-level or headquarters Security Operations Center within one (1) hour of discovery.

The Contractor should maintain signed copies of the NDA for all employees as a record of compliance. The Contractor should also provide copies of each employee’s signed NDA to the Contracting Officer before the employee may commence work under the contract/task order.

(4) Prohibition on Use of PII in Vendor Billing and Administrative Records

The Contractor’s invoicing, billing, and other financial or administrative records or databases is not authorized to regularly store or include any sensitive PII or other confidential government information that is created, obtained, or provided during the performance of the contract without the written permission of the Senior Component Official for Privacy (SCOP). It is acceptable to list the names, titles and contact information for the Contracting Officer, COR, or other personnel associated with the administration of the contract in the invoices as needed.

(5) Reporting Actual or Suspected Data Breach

Contractors must report any actual or suspected breach of PII within one hour of discovery.4 A “breach” is an incident or occurrence that involves the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where: (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose. The report of a breach must be made to DOJ. The Contractor must cooperate with DOJ’s inquiry into the incident and efforts to minimize risks to DOJ or individuals, including remediating any harm to potential victims.

a) The Contractor must develop and maintain an internal process by which its employees and Subcontractors are trained to identify and report the breach, consistent with DOJ Instruction 0900.00.015, Reporting and Response Procedures for a Breach of Personally Identifiable Information.

b) The Contractor must report any such breach by its employees or Subcontractors to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000);

Component-level Security Operations Center and Component-level Management Team, where appropriate; the COR; and the Contracting Officer within one (1) hour of the initial discovery.

c) The Contractor must provide a written report to the DOJ Security Operations

Center (dojcert@usdoj.gov, 202-357-7000) within 24 hours of discovery of the breach by its employees or Subcontractors. The report must contain the following information:

i. Narrative or detailed description of the events surrounding the suspected loss or compromise of information.6 Date, time, and location of the incident.

ii. Amount, type, and sensitivity of information that may have been lost or compromised, accessed without authorization, etc.

iii. Contractor’s assessment of the likelihood that the information was compromised or lost and the reasons behind the assessment.7

iv. Names and classification of person(s) involved, including victim, Contractor employee/Subcontractor and any witnesses.

v. Cause of the incident and whether the company’s security plan was followed and, if not, which specific provisions were not followed.8

vi. Actions that have been or will be taken to minimize damage and/or mitigate further compromise.

vii. Recommendations to prevent similar situations in the future, including whether the security plan needs to be modified in any way and whether additional training may be required.

d) The Contractor shall provide full access and cooperation for all activities determined by the Government to be required to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents.

mailto:dojcert@usdoj.gov mailto:dojcert@usdoj.gov

e) At the Government’s discretion, Contractor employees or Subcontractor employees may be identified as no longer eligible to access PII or to work on that contract based on their actions related to the loss or compromise of PII.

(6) Victim Remediation

At DOJ’s request, the Contractor is responsible for notifying victims and providing victim remediation services in the event of a breach of PII held by the Contractor, its agents, or its Subcontractors, under this contract. Victim remediation services shall include at least 18 months of credit monitoring and, for serious or large incidents as determined by the Government, call center help desk services for the individuals whose PII was lost or compromised. When DOJ requests notification, the Department Chief Privacy and Civil Liberties Officer and SCOP will direct the Contractor on the method and content of such notification to be sent to individuals whose PII was breached. By performing this work, the Contractor agrees to full cooperation in the event of a breach.

The Contractor should be self-insured to the extent necessary to handle any reasonably foreseeable breach, with another source of income, to fully cover the costs of breach response, including but not limited to victim remediation.

C. Government Records Training, Ownership, and Management

(1) Records Management Training and Compliance

a) The Contractor must ensure that all employees and Subcontractors that have access to PII as well as to those involved in the creation, use, dissemination and/or destruction of PII take the DOJ Records and Information Training for New Employees (RIM) training course or another training approved by the Contracting Officer or COR. This training will be provided at the outset of the Subcontractor’s/employee’s work on the contract and every year thereafter. The

Contractor shall maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required records management training.

b) The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records containing PII and those covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format, mode of transmission, or state of completion.

(2) Records Creation, Ownership, and Disposition

a) The Contractor shall not create or maintain any records not specifically tied to or authorized by the contract using Government IT equipment and/or Government records or that contain Government Agency information. The Contractor shall certify, in writing, the appropriate disposition or return of all Government information at the conclusion of the contract or at a time otherwise specified in the contract. In accordance with 36 CFR 1222.32, the Contractor shall maintain and manage all Federal records created in the course of performing the contract in accordance with Federal law. Records may not be removed from the legal custody of DOJ or destroyed except in accordance with the provisions of the agency records schedules.

b) Except as stated in the Performance Work Statement and, where applicable, the

Contractor’s Commercial License Agreement, the Government Agency owns the rights to all electronic information (electronic data, electronic information systems or electronic databases and all supporting documentation and associated metadata created as part of this contract. All deliverables (including all data and records) under the contract are the property of the U.S. Government and may be considered federal records, for which the Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

c) The Contractor shall not retain, use, sell, disseminate, or dispose of any government data/records or deliverables without the express written permission of the Contracting Officer or Contracting Officer’s Representative. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. § 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the Agency records schedules.

D. Data Privacy and Oversight

(1) Restrictions on Testing or Training Using Real Data Containing PII

The use of real data containing PII from any source for testing or training purposes is generally prohibited. The Contractor shall use synthetic or de-identified real data for testing or training whenever feasible.

(2) Requirements for Contractor IT Systems Hosting Government Data

The Contractor is required to obtain an Authority To Operate (ATO) for any IT environment owned or controlled by the Contractor or any Subcontractor on which Government data shall reside for the purposes of IT system development, design, data migration, testing, training, maintenance, use, or disposal.

(3) Requirement to Support Privacy Compliance

a) If this contract requires the development, maintenance or administration of information technology9, the Contractor shall support the completion of the

Initial Privacy Assessment (IPA) document, if requested by Department personnel. An IPA is the first step in a process to identify potential privacy issues and mitigate privacy risks. The IPA asks basic questions to help components assess whether additional privacy protections may be needed in designing or implementing a project10 to mitigate privacy risks, and whether compliance work may be needed. Upon review of the IPA, the OPCL determines whether a Privacy Impact Assessment (PIA) document and/or SORN, or modifications thereto, are required. The Contractor shall provide adequate support to complete the applicable risk assessment and PIA document in a timely manner, and shall ensure that project management plans and schedules include the IPA, PIA, and SORN (to the extent required) as milestones. Additional information on the privacy compliance process at DOJ, including IPAs, PIAs, and SORNs, is located on the DOJ OPCL website (https://dojnet.doj.gov/privacy/), including DOJ Order 0601, Privacy and Civil Liberties. The Privacy Impact Assessment Guidance and Template outline the requirements and format for the PIA.

b) If the contract involves an IT system build or substantial development or changes to an IT system that may require privacy risk assessment and documentation, the Contractor shall provide adequate support to DOJ to ensure DOJ can complete any required assessment, and IPA, PIA, SORN, or other supporting documentation to support privacy compliance. The Contractor shall work with personnel from the program office, OPCL, the Office of the Chief Information Officer (OCIO), and the Office of Records Management and Policy to ensure that the privacy assessments and documentation are kept on schedule, that the answers to questions in the documents are thorough and complete, and that questions asked by the OPCL and other offices are answered in a timely fashion.

The Contractor must ensure the completion of required PIAs and documentation of privacy controls consistent with federal law and standards, e.g. NIST 800-53, Rev. 5; and compliance with the Privacy Act of 1974, E-Government Act of 2002, Federal Information Security Modernization Act of 2014, and key OMB guidelines, e.g., OMB Circular A-130.

(End of Clause)

2852.233-70 PROTESTS FILED DIRECTLY WITH THE DEPARTMENT OF JUSTICE

(JAN 1998)

(a) The following definitions apply in this provision:

https://dojnet.doj.gov/privacy/

(1) "Agency Protest Official" means the official, other than the contracting officer, designated to review and decide procurement protests filed with a contracting activity of the Department of Justice.

(2) "Deciding Official" means the person chosen by the protestor to decide the agency protest; it may be either the Contracting Officer or the Agency Protest Official.

(3) "Interested Party" means an actual or prospective offeror whose direct economic interest would be affected by the award of a contract or by the failure to award a contract.

(b) A protest filed directly with the Department of Justice must:

(1) Indicate that it is a protest to the agency.

(2) Be filed with the Contracting Officer.

(3) State whether the protestor chooses to have the Contracting Officer or the Agency Protest Official decide the protest. If the protestor is silent on this matter, the Contracting Officer will decide the protest.

(4) Indicate whether the protestor prefers to make an oral or written presentation of arguments in support of the protest to the deciding official.

(5) Include the information required by FAR 33.103(d)(2):

(i) Name, address, facsimile number and telephone number of the protestor.

(ii) Solicitation or contract number.

(iii) Detailed statement of the legal and factual grounds for the protest, to include a description of resulting prejudice to the protestor.

(iv) Copies of relevant documents.

(v) Request for a ruling by the agency.

(vi) Statement as to the form of relief requested.

(vii) All information establishing that the protestor is an interested party for the purpose of filing a protest.

(viii) All information establishing the timeliness of the protest.

(c) An interested party filing a protest with the Department of Justice has the choice of requesting either that the Contracting Officer or the Agency Protest Official decide the protest.

(d) The decision by the Agency Protest Official is an alternative to a decision by the Contracting Officer. The Agency Protest Official will not consider appeals from the Contracting Officer's decision on an agency protest.

(e) The deciding official must conduct a scheduling conference with the protestor within five (5) days after the protest is filed. The scheduling conference will establish deadlines for oral or written arguments in support of the agency protest and for agency officials to present information in response to the protest issues. The deciding official may hear oral arguments in support of the agency protest at the same time as the scheduling conference, depending on availability of the necessary parties.

(f) Oral conferences may take place either by telephone or in person. Other parties may attend at the discretion of the deciding official.

(g) The protestor has only one opportunity to support or explain the substance of its protest.

Department of Justice procedures do not provide for any discovery. The deciding official may request additional information from either the agency or the protestor. The deciding official will resolve the protest through informal presentations or meetings to the maximum extent practicable.

(h) An interested party may represent itself or be represented by legal counsel. The Department of Justice will not reimburse the protester for any legal fees related to the agency protest.

(i) The Department of Justice will stay award or suspend contract performance in accordance with FAR 33.103(f). The stay or suspension, unless over-ridden, remains in effect until the protest is decided, dismissed, or withdrawn.

(j) The deciding official will make a best effort to issue a decision on the protest within twenty

(20) days after the filing date. The decision may be oral or written.

(k) The Department of Justice may dismiss or stay proceeding on an agency protest if a protest on the same or similar basis is filed with a protest forum outside the Department of Justice.]

JAR 2852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (JAN 1985)

(a) Michael Southern, telephone 301-784-1000 is hereby designated to act as Contracting Officer's Representative (COR) under this contract.

(b) The COR is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contract effort fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payments.

(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions, it is desirable to alter/change contractual obligations or the Scope of Work, the Contracting Officer shall issue such changes in writing and signed.

Revised Local clause FPI 1000H1 Economic Price Adjustment

(a) Twelve (12) months after contract award date, and every twelve (12) months thereafter, contract prices for the succeeding twelve (12) month period may be adjusted in accordance with the change in PCU326130326130S using the simple percentage method described in the U.S.

Department of Labor, Bureau of Labor Statistics “Escalation Guide for Contracting Parties, available at http://www.bls.gov/ppi/ppiescalation.htm (calculated as follows: index at time of calculation, divided by index at time base price was set, and the result multiplied by base price, equals adjusted price).”)]. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REQUEST

THIS ADJUSTMENT.

(b) Adjustments may be requested after the preliminary price index for the month of the anniversary of contract award has been published but not to exceed 90 days after the eligible adjustment date (i.e., anniversary of the contract award date). Requests that are made after the 90-day limit will not be honored and the contract pricing will not be adjusted. The contractor shall submit any requests for adjustments in writing to the contracting officer. Requests shall include a copy of the relevant index and must be within the allowed time period for adjustment. Any adjustments authorized as a result of the adjustment request will not be retroactive. The date the completed request is received by the contracting officer will be the effective date of any changes in price. Economic price increases will not be granted if the http://www.bls.gov/ppi/ppiescalation.htm contractor has any past due orders at time of request.

(c) The contractor also is required to request downward price adjustments. All downward adjustments will be retroactive to the authorized adjustment date as specified in this clause. If downward price adjustments are not requested and this is later revealed through audits or otherwise, the contractor shall reimburse the Government the amount overcharged plus interest. Interest will be computed at the rate set annually by the Secretary of the Treasury for late contract payments. Interest will accrue from the date the adjustment should have been made.

(d) In computing any price adjustment, the preliminary/first-published index for the month and year of contract award will be compared to the preliminary/first-published index for the contract anniversary month of the adjustment year. This index is not seasonally adjusted. If this index is temporarily unavailable or permanently discontinued, the contracting parties shall either use the index one level up (i.e., the broader index under which the selected index was listed) or agree in writing upon a substitute index.

(e) No adjustment shall be made if the referenced change is less than 2%. Total upward adjustment for the contract period, including any option periods, shall not exceed 10% of the original contract base price, based on the original or option period contract price; downward adjustments are not limited.

(f) Indices are available from PPI data can be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .