Septic Pump Station Repairs Project Specification Summary
This is a project specification document from the Maryland Department of Planning's Maryland Historical Trust for Jefferson Patterson Park & Museum (JPPM) located in Saint Leonard, Maryland. The project involves repairing a septic pump station near the MAC Lab at 10505 Mackall Road, requiring contractors to furnish all labor, equipment, materials, parts, and services necessary to restore the system that has been in operation since 1994. The specification details include replacement of all piping and flanges, guide rails, pump bases, shut-off valves, check valves, and the pit blower; the work requires confined entry procedures per OSHA and MOSH standards and coordination with museum operations for system shutdowns. A mandatory prebid meeting is scheduled for September 15, 2026, at 9:00 am at the Maintenance Office, and only contractors who attend will be considered for award. The project must be completed within 120 calendar days from the notice to proceed date, with work performed during normal business hours (Monday through Friday, 7:30 am to 4:00 pm, excluding Maryland State Holidays), and the building will remain occupied throughout all project phases.
JPPM offers preference to Certified Small Business (CBS), Small Business Reserve (SBR), Small Business Preference (SBP), and Veteran-Owned Small Business Enterprise (VSBE) contractors. Bid selection is based on multiple evaluation criteria including attendance at the mandatory prebid meeting, small business certification status, contractor qualifications and references, system knowledge, prior experience with JPPM or other Maryland agencies, ability to complete within the timeframe, and cost as the final factor. Contractors must submit completed IFB forms, signed affidavits addressing conflicts of interest and bid/proposal certifications, current insurance certificates listing Maryland Historical Trust as certificate holder, proof of manufacturer's training on equipment, references, and acknowledgment of any amendments. All invoicing must be submitted within 30 days of final inspection completion and approval by the Executive Director or designee, and payment will not be authorized until all work completion inspections and punch list items are completed and approved.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARYLAND DEPARTMENT OF PLANNING
MARYLAND HISTORICAL TRUST
JEFFERSON PATTERSON PARK & MUSEUM
August 31, 2026
PROJECT SPECIFICATIONS
SEPTIC PUMP STATION REPAIRS
I. Summary of Work This project consists of furnishing all labor, overhead, equipment, materials, parts, incidentals, tests, supervision, and services necessary for and incidental to repair the septic pump station located near the MAC Lab, 10505 Mackall Road. The project site is located on Jefferson Patterson Park and Museum (JPPM), 10515 Mackall Road, Saint Leonard, Maryland 20685.
JPPM will give preference to contractors who are Certified Small Business (CBS), which include Small Business Reserve (SBR) and Small Business Preference (SBP), or Veteran-Owned Small Business Enterprise (VSBE). A mandatory prebid meeting will be held. Only contractors who attended the prebid meeting will be considered.
JPPM strongly urges the contractor to visit the site and familiarize themselves with the conditions under which they will perform the work. At the scheduled site visit, each contractor will be permitted to examine and familiarize themselves with the full nature and extent of the work and obtain answers to questions about or clarifications of the contract. It is the sole responsibility of the contractor to familiarize themselves fully with the contents of these specifications. Failure to do so does not relieve the contractor with the successful bid from their obligations to comply with all aspects of this Invitations for Bids (IFB) package for the amount they specify as their bid.
The State of Maryland or JPPM will not make allowance for any errors on the contractor’s part for failure to consider any conditions or circumstances existing on the site that may affect the contemplated work. The fact that the contractor submits a bid will be taken as evidence that the contractor has a full knowledge of the extent and character of the work and the problems in performing it.
II. Permits, Certificates, Laws, Licensing, and Ordinances A. The contractor must procure all necessary permits, certificates, and licenses required by law for the execution of the work. State of Maryland authorized inspection agencies will conduct inspections.
B. The contractor must comply with all requirements of Annotated Code of Maryland, Business Regulation Article (latest revisions and supplements), Code of Maryland Regulations (COMAR)
09.15 (latest revisions and supplements), any and all bulletins, policies, directives, etc. issued by the Maryland Department of Labor, Licensing, and Regulations (DLLR) (latest edition).
Additionally, the contractor must comply with the latest editions of applicable codes, regulations, standards, and laws in performing this work (for example, COMAR, the National Electric Code, International Building Code, International Mechanical Code, International Plumbing Code, etc.). The contractor will remove, replace, and repair any violations when so directed by the Executive Director of JPPM or a designee, at the contractor’s expense.
C. The contractor and subcontractors must comply with minimum insurance requirements established under Annotated Code of Maryland, Business Regulation Article. The contractor shall submit with the bid a copy of current insurance certificates. The certificate holder must list Maryland Historical Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032.
All insurance certificates must be kept current during the term of the work or contract. Please email updated insurance certificates to jppm.accountspayable@maryland.gov or mail to the Business Manager at JPPM.
D. The contractor must provide proof of the necessary qualifications to perform the work by supplying letters of reference or a summary of experience, in a format acceptable to the State.
The contractor will designate an individual who will be responsible for all services to be performed under the contract.
mailto:jppm.accountspayable@maryland.gov
JEFFERSON PATTERSON PARK AND MUSEUM
2 - SPECIFICATION, Septic Pump Station Repairs
III. Bid Submission Packet A. JPPM must receive the bid on or before the due date. The contractor may submit their standard bid sheet but must also submit the filled out and signed IFB sheet. The following items must be submitted with the bid:
1. The completed Invitation for Bid form.
2. Signed Bid/Proposal Affidavit (attachment 1).
3. Signed “Conflict of Interest Affidavit and Disclosure” (attachment 2).
4. Certified Small Business (CBS) certifications or Veteran-Owned Small Business Enterprise
(VSBE) certification.
5. Completed reference sheets (attachment 4).
6. Proof of manufacturer’s training on equipment listed in the specifications.
7. Copy of current insurance certificates. The certificate holder must list Maryland Historical
Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032. Insurance certificates must be kept current during the term of the work or contract. Please mail updated copies to the business manager at JPPM.
8. Acknowledgement of receipt of any amendment(s) to this IFB. Please supply a letter on the company’s letterhead acknowledging receipt of amendments.
B. Please fill in and submit the “No Reply” form (attachment 5) if you do not wish to provide a bid.
JPPM will regard any bids without the required and completed paperwork, or any bids received after the due date, as non-responsive.
C. If any amendment(s) to the IFB are distributed, all bidders must acknowledge receipt of the amendment(s).
D. The contractor must be validly formed and in good standing (or qualified to do business) in the State with the Maryland State Department of Assessments and Taxation. See website https://egov.maryland.gov/BusinessExpress/EntitySearch.
IV. Safety The contractor will adhere to the Maryland Occupational Safety and Health Act (MOSHA) and U.S.
Department of Labor, Occupational Safety and Health Administration (OSHA) laws, rules, and regulations as they apply to this project.
V. Quality Assurance and Workmanship
A. The contractor will engage experienced technicians who have completed similar work using similar material and to the same extent as the work required for this Project that has resulted in a record of successful in-service performance.
B. The contractor is responsible for any work subcontracted to others. It is the contractor’s responsibility to ensure that any subcontractor hired adheres to the specifications and contract terms and conditions. The contractor must supply the Executive Director of JPPM or a designee the list of subcontractors the contractor intends to utilize prior to any work commencing.
C. The contractor must perform the work to the satisfaction of the Executive Director of JPPM or a designee, including the duty to:
1. install all material and complete all work in a first-class manner. Any materials or equipment installed that does not present an orderly and reasonably neat workmanlike appearance and operation must be removed and replaced when so directed at the contractor’s expense.
2. perform all cutting and patching necessary for the installation of the new work. Patching will be uniform in appearance and match the surrounding surface.
3. perform all necessary alterations, cutting, fitting, etc., of the existing work as necessary or required to make satisfactory connections between new and existing work when the work specified hereunder connects to any existing work.
https://egov.maryland.gov/BusinessExpress/EntitySearch
2 - SPECIFICATION, Septic Pump Station Repairs
VI. Inspection Upon Completion of Work A. The Executive Director of JPPM or a designee will conduct an inspection with the contractor upon completion of the work to confirm that all work described in the contract has been completed in a satisfactory manner.
B. If the contractor has completed the work described in the contract in a satisfactory manner, both parties will sign a document confirming that the contractor has completed all work in a satisfactory manner.
C. If the contractor has not completed the work described in the contract in a satisfactory manner, the parties will develop a “work list”.
D. Once the contractor performs all the work included on the “work list”, the parties will begin the inspection process anew.
E. JPPM will not authorize payment or begin to process bills for payment until the parties have inspected the work, the contractor has completed the punch or work list items, and all re-inspections have occurred.
F. This inspection process does not in any way void or negate any warranties and JPPM reserves all its rights and remedies in the event the work proves to be unsatisfactory. The inspection document shall not serve as final acceptance of the work. The inspection document confirms only that the parties completed a preliminary review of the work immediately after completion.
VII. Cleaning A. The contractor shall: remove all debris daily; at the end of each workday, remove empty cans, rags, rubbish, and other discarded materials from the site; continuously keep walkways, driveways, and outdoor living areas broom clean. The contractor will leave the work site in an orderly and clean manner.
B. Upon completion of this work, the contractor will leave the job site in as good or better condition as they found it before the commencement of the work. At the completion of the project, the contractor will immediately remove all their equipment and construction debris from the project site. The State reserves the right to keep all purchased but unused materials, parts, and supplies. The contractor must dispose of all federally or state regulated waste (e.g., asbestos, lead) as mandated by federal and state laws and regulations and must provide a Chain of Custody to the Executive Director of JPPM or a designee.
VIII. Other Conditions A. The contractor will complete all work during a normal workday. A normal workday is defined as
Monday through Friday, 7:30 am to 4:00 pm, except for Maryland State Holidays. The contractor may make mutually agreeable arrangements with the Executive Director of JPPM or a designee to come in earlier, later, or on non-working days without extra cost to the State.
B. The contractor must protect existing utilities. The contractor will verify the location of all existing utilities and is responsible for their protection and any relocation as required to complete the project.
C. The contractor will coordinate their work with that of other contractor(s) and staff members working on the premises.
D. The contractor is responsible for all damage to life and property due to its activities or those of its agents or employees relating to the services required under the work described herein.
Damage caused by the contractor will be reported to JPPM on the day of discovery and must be repaired within 30 calendar days.
E. The contractor will notify the Executive Director or a designee prior to any work that would result in the disturbance of soil in or around the work site. The Regional Archaeologist or a designee must be present to approve and monitor soil disturbance on the property.
F. Upon arrival on site to perform an inspection, service call, or repair, the contractor must check in with the Maintenance Supervisor or a designee. Immediately upon the conclusion of each
2 - SPECIFICATION, Septic Pump Station Repairs inspection, service call, or repair, the contractor will notify the Maintenance Supervisor or a designee that the work has been completed.
IX. Duration of the Contract The contractor will complete all work within 120 calendar days upon receiving the notice to proceed date.
X. Payment to Contractor A. The contractor will submit all invoices for the work described herein within thirty (30) days of the completion of the final inspection of the work and the approval of the Executive Director of JPPM or a designee.
B. The contractor must invoice any approved additional work separately and provide the written document signed by the Executive Director of JPPM or a designee authorizing the additional work.
C. The contractor will submit all invoices, upon completion of the work described herein to the satisfaction of the Executive Director of JPPM or a designee, showing the purchase order number on each copy and submit to Jefferson Patterson Park and Museum, ATTN: Business Manager, 10515 Mackall Road, Saint Leonard, MD 20685-2433. Electronic invoices shall be sent to jppm.accountspayable@maryland.gov with ATTN: Business Manager clearly indicated in the email.
XI. Detailed Specifications A. The contractor is furnishing all materials, labor, tools, equipment, overhead to include travel, and incidentals as necessary to complete the following:
1. Work is being done because of corrosion and worn equipment. The system has been in operation since 1994.
2. This work requires septic pump shut down. The contractor must coordinate shutdowns with the museum.
3. Use confined entry procedures per OSHA and MOSH. Contractors are responsible for venting pits of hazardous air.
4. Replace all piping. This includes flanges.
5. Replace guide rails, top rails, and anchors.
6. Replace pump bases. Pump 1 will not seat properly.
7. Replace shut off valves and check valves.
8. Replace the pit blower.
B. The contractor will provide any work not specifically mentioned in the IFB but reasonably implied for the complete, safe, and satisfactory completion of the project.
C. If the contractor notes any existing defects not caused by the contractor while performing the work, during diagnosis, or start and operational checks, the contractor will provide the Executive Director of JPPM or a designee an immediate verbal notification, followed by a detailed report within five (5) business days from the date that contractor noted the defect, indicating what components require further work or replacement, recommendations, and itemized costs including labor, parts, and materials. Upon approval, the Executive Director of JPPM or a designee will provide a written and signed document approving the additional work necessary to correct the defect.
D. The building(s) will be occupied during all phases of this project. The contractor will plan and execute all work in such a manner as to reduce interference with the normal function of the building(s).
1. The contractor must provide adequate protection where required for the existing building(s), contents of same, and all building occupants.
2. The contractor must take particular care to prevent water infiltration into building(s).
mailto:jppm.accountspayable@maryland.gov
2 - SPECIFICATION, Septic Pump Station Repairs
3. The contractor will always keep all driveways and walkways clear of materials, debris, etc.
times so there will be no interference with the usual traffic serving the building(s).
4. The contractor must ensure that emergency vehicles have free and clear access to all points on the property.
5. The contractor will plan and execute all work to ensure, to the extent possible, that there is no interruption in the utilities servicing the building(s). The contractor will schedule any interruptions in advance.
E. If it is not possible for contractor to avoid interference with the normal use of the building or area, the work shall be performed at such a time or times as mutually agreed upon between the contractor and the Executive Director of JPPM or a designee.
XII. Materials A. The contractor is furnishing all parts, materials, incidentals, and supplies to complete this work. Replacement parts and material will meet all specifications and ratings of listed or removed items and be of the same type, style, and be interchangeable. The Executive Director of JPPM or a designee must approve parts and materials or any substitutions. Parts, material, and other supplies include but are not limited to:
1. Shut off valves.
2. Check valves.
3. Piping.
4. Flanges.
5. Blower motor, in kind replacement.
F. The contractor will provide, as if specified herein, any materials and supplies not specifically mentioned but reasonably implied for the complete, safe, and satisfactory completion of the project.
G. Asbestos containing material is prohibited. An asbestos containing material is defined as a material that contains one percent or more of asbestos by weight. The contractor will supply paperwork that indicates the composition of materials used (i.e., supplier’s and/or manufacturer’s legal statement or certification and Safety Data Sheet). The contractor is responsible for the replacement of any asbestos containing material they install in contravention of this provision at no cost to the State.
XIII. Pricing The contractor must provide pricing as indicated below. Additional prices are separate and in addition to, but not included in the total cost of the work described herein. Additional prices are intended to cover potentially unforeseen but possible repairs that the contractor may find while performing this work. The contractor may only complete this additional work if it is approved by the Executive Director of JPPM or a designee.
A. On the IFB form opposite item no. 1, the contractor shall insert cost to repair the septic pump station as detailed herein.
XIV. Basis for Selection A. This IFB may be cancelled, and the State may reject any bids when it is in the best interest of the State to do so.
B. The Selection Committee will choose the bid based on the most favorable evaluated bid price.
Evaluation criteria include responsiveness of the bid to the project requirements, and which bid is the most advantageous to JPPM. The selection of the contractor is based on
1. Attending the mandatory prebid meeting. Vendors who did not attend the mandatory prebid meeting will not be considered.
2. Certified Small Business (CBS) or Veteran-Owned Small Business Enterprise (VSBE) certification.
2 - SPECIFICATION, Septic Pump Station Repairs
3. Qualifications and references.
4. System knowledge.
5. JPPM’s or other Maryland agency’s previous experience with the contractor.
6. Ability to complete the project within the time allotted.
7. Cost.
XV. IFB Mandatory State Provisions A. Bidders should give specific attention to the identification of those portions of their proposals that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the State under the Access to Public Records Act, State Government Article, Title 10, Subtitle 6, Annotated Code of Maryland;
B. Minority business enterprises and small businesses are encouraged to respond to this IFB;
C. By submitting a bid to this IFB, a bidder represents that it is not in arrears in the payment of any obligation due and owing the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of the contract if selected for contract award;
D. If JPPM determines before award that facts or circumstances exist giving rise to, or which could in the future give rise to, a conflict of interest, JPPM may request a bidder to provide a conflict of interest affidavit and disclosure. JPPM may also terminate the contract after award, in whole or in part, if it considers termination necessary to avoid an actual or potential conflict of interest;
E. JPPM shall give preference to products and equipment that are mercury-free as required under COMAR 21.11.07.07 where applicable.
F. All bidders certify that they will not engage in the unlawful manufacture, distribution, dispensing, possession, or use of drugs or the abuse of drugs or alcohol in the performance of the procurement, in compliance with the State’s Drug and Alcohol Free Workplace Policy and
COMAR 21.11.08.03.B.
| I. Summary of Work |
| II. Permits, Certificates, Laws, Licensing, and Ordinances |
| III. Bid Submission Packet |
| 5. Completed reference sheets (attachment 4). |
| 6. Proof of manufacturer’s training on equipment listed in the specifications. |
| IV. Safety |
| V. Quality Assurance and Workmanship |
| VI. Inspection Upon Completion of Work |
| VII. Cleaning |
| VIII. Other Conditions |
| IX. Duration of the Contract |
| X. Payment to Contractor |
| XI. Detailed Specifications |
| XII. Materials |
| XIII. Pricing |
| XIV. Basis for Selection |
| XV. IFB Mandatory State Provisions |