2-Schedule of Work.pdf

PDF 254 KB Posted

Attached to
Reggio Circle Underdrain RFB
Solicitation number
Lehi 2026-04
Issued by
Utah County, Utah

About this file

This is a Bid Schedule for the Reggio Circle Underdrain project in Lehi City, Utah. The project encompasses the installation of underground storm drain infrastructure consisting of approximately 260 linear feet of 8-inch DR21 HDPE storm drain pipe within a Lehi City roadway and 125 linear feet of 8-inch SDR35 PVC pipe within a Lehi City-owned vacant building lot for the purpose of collecting groundwater. The work is organized into three parts: Part A covers general mobilization and site preparation activities including best management practices, testing and commissioning, traffic control, survey staking, and permitting; Part B addresses underdrain collection consisting of drain curtain installation with perforated pipe, clay cut-off wall, and collection manhole with wrapped drain curtain; and Part C covers underdrain outfall including storm drain installation, PVC wye connections, access road construction, and connection to existing storm drain catch basins. The schedule includes additional line items for storm drain manholes, lateral connections, and utility coordination and relocation work. The document is dated 3/26/2026.

All items are to be paid on a lump sum basis rather than individual unit rates, with unit prices for each item including labor, material, and all ancillary components necessary to provide complete installation. Bidders are advised that quantities are approximate and should be verified prior to submission. The bid schedule does not specify pricing terms, set-aside provisions, incumbent information, or award dates in the provided document excerpt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Reggio Circle Underdrain

Item No.

Est.

Quantity

Units Unit Price Total

1 1 LS

2 1 LS

3 1 LS

4 1 LS

5 1 LS

6 1 LS

B - Underdrain Collection

1 35 LF

2 1 LS

3 1 LS

Subtotal

1 125 LF

2 2 EA

3 1 LS

4 1 LS

5 260 LF

6 1 LS

Subtotal

Bid Total (Parts A+B+C)

Description

A - General

Mobilization (~5%)

Best Management Practices (BMPs)

Testing, Commissioning and Cleanup

Traffic and Pedestrian Control (signing, fencing, barriers, etc.)

Survey Staking and Material Testing

Permitting and Project Management

Subtotal

Drain Curtain and 6" Perforated Pipe, complete (including dewatering and trench stabilization)

Clay Cut-Off Wall, complete

C - Underdrain Outfall

Underdrain Collection MH and Wrapped Drain Curtain, complete (including dewatering and trench stabilization)

8" White SDR35 PVC Storm Drain, complete (including asphalt and C&G removal/replacement, and utility coordination/relocation)

8"x4" PVC Wye and 4" Lateral, complete

2. Quantities are approximate and should be verified by the Bidder. All items will be paid on a Lump Sump basis, not by Unit Rate.

Connection to existing SD Catch Basin, complete

Notes: 1. Unit prices for each item indicated include labor, material, and all ancillary components to provide a complete item.

4' Storm Drain Man Hole, complete

12' Wide All Weather Access Road

8" DR21 HDPE Storm Drain, complete (including asphalt and C&G removal/replacement, and utility coordination/relocation)

3/26/2026

File details come from the government source that posted it. Updated .