2-Orem Public Safety Building Restroom Remodel 2025-10-24.pdf
PDF 9 MB Posted
- Attached to
- 2026 PUBLIC SAFETY RESTROOM REMODEL
- Solicitation number
- 25-043
- Issued by
- Utah County, Utah
About this file
This document is a comprehensive set of construction plans and specifications for a restroom remodel project for the Orem City Public Safety Building located at 95 East Center Street in Orem, Utah. The project involves a renovation of approximately 1,538 square feet of existing restroom and locker room spaces, with work scheduled to be completed by October 24, 2025. The project encompasses architectural, mechanical, plumbing, and electrical modifications, including demolition of existing fixtures, replacement of wall and floor finishes, installation of new plumbing and electrical systems, and accessibility upgrades to meet current ADA and building code requirements.
The project will be designed and managed by WPA Architecture, with mechanical and electrical engineering by Royal Engineering. The scope includes remodeling men's and women's restrooms, showers, and locker areas, with specific attention to accessibility standards, fixture replacements, and system upgrades. The construction documents indicate a comprehensive approach to modernizing the facility, including new tile work, lighting, plumbing fixtures, electrical systems, and compliance with the 2021 International Building Code, International Existing Building Code, and Americans with Disabilities Act standards. The project appears to be funded through the city's capital improvement budget, with no indication of external funding sources or specific budget constraints noted in the documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTION OF BUILDING NOT IN
SCOPE OF WORK
PORTION OF BUILDING INCLUDED
IN REMODEL SCOPE OF WORK -
APPROX. 1,538 SQ. FT.
T
R
I
12627957-0301
STE
S
T A
E DR
G
I V
A
RCH
U TE O F
HA
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
G1.1
COVER SHEET
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
E. PROVIDE ONE RECESSED 2-A FIRE EXTINGUISHER FOR EVERY 3,000 SQ. FT. OF FLOOR
AREA WITH A MAXIMUM TRAVEL DISTANCE OF 75 FEET TO AN EXTINGUISHER.
F. STORAGE OF EQUIPMENT, SOILS, CONSTRUCTION MATERIALS ON PUBLIC RIGHT-OF-WAY
(STREETS/SIDEWALKS) OR EASEMENT IS EXPRESSLY PROHIBITED.
G. GENERAL CONTRACTOR TO PROCURE ALL REQUIRED PERMITS FROM AUTHORITY
HAVING JURISDICTION, INCLUDING BUT NOT LIMITED TO BUILDING, ENGINEERING, RIGHT OF
WAY, AND OTHER PERMITS REQUIRED FOR SUB-CONTRACTOR WORK.
H. GENERAL CONTRACTOR TO PROVIDE REQUIRED FIRE EXTINGUISHERS TO BE PRESENT
DURING CONSTRUCTION.
I. DIMENSIONS ARE SHOWN TO FACE OF STUD, UNLESS NOTED OTHERWISE
GENERAL NOTES
A. ALL EXIT ACCESS DOORS AND EXITS SHALL BE OPENABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. USE OF MANUAL FLUSH
BOLTS, EDGE BOLTS, TOP OR BOTTOM BOLTS, ETC. IS PROHIBITED.
B. GLAZING IN DOORS OR IN FIXED OR OPERABLE PANELS ADJACENT TO A DOOR WHERE
THE NEAREST EXPOSED EDGE IS WITHIN A 24 INCH ARC OF THE DOOR AND WHERE THE
BOTTOM EXPOSED EDGE IS LESS THAN 60 INCHES ABOVE THE WALKING SURFACE MUST
BE TEMPERED.
C. TANK TYPE WATER CLOSETS SHALL HAVE A MAXIMUM WATER USE OF 1.6 GALLONS PER
FLUSH. SHOWERS SHALL HAVE A MAXIMUM FLOW OF 2.5 GALLONS PER MINUTE.
D. BURNING OF CONSTRUCTION WASTE MATERIALS IS PROHIBITED AT ALL TIMES.
ARCHITECTURAL
A2.1 RESTROOM DEMO PLANS
A2.2 RESTROOM REMODEL PLANS
A2.3 ENL. BREAKROOM DEMO & REMODEL PLANS
A8.1 REFLECTED CEILING DEMO PLAN
A8.2 REFLECTED CEILING REMODEL PLAN
OREM CITY PUBLIC SAFETY BUILDING
95 EAST CENTER ST. OREM, UTAH
RESTROOM REMODEL
ARCHITECT
WPA ARCHITECTURE
1535 N. FREEDOM BLVD., SUITE 360
PROVO, UTAH 84604
DAVE EDWARDS
801-374-0800 dedwards@wpa-architecture.com
ELECTRICAL
ROYAL ENGINEERING
1837 SOUTH EAST BAY BLVD.
PROVO, UTAH 84606
DEXTON GRAVES
801.375.2228 dexton.graves@royaleng.com
MECHANICAL
ROYAL ENGINEERING
1837 SOUTH EAST BAY BLVD.
PROVO, UTAH 84606
CHRIS FALSLEV
801.375.2228 chris.falslev@royaleng.com
MECHANICAL
M0.1 MECHANICAL NOTES AND LEGENDS
M1.1 MECHANICAL PLAN
M5.1 MECHANICAL DETAILS
M6.1 MECHANICAL SCHEDULES
M7.1 MECHANICAL SPECIFICATIONS
M7.2 MECHANICAL SPECIFICATIONS
M7.3 MECHANICAL SPECIFICATIONS
GENERAL
G1.1 COVER SHEET
G2.1 ACCESSIBILITY & IEBC REQUIREMENTS
DRAWING INDEX
PLUMBING
P0.1 PLUMBING NOTES AND LEGENDS
P1.1 PLUMBING PLAN
P5.1 PLUMBING DETAILS
P5.2 PLUMBING DETAILS
P6.1 PLUMBING SCHEDULES AND SCHEMATICS
P7.1 PLUMBING SPECIFICATIONS
P7.2 PLUMBING SPECIFICATIONS
ELECTRICAL
E0.0 ELECTRICAL COVER SHEET
E1.1 RESTROOM REMODEL ELECTRICAL PLAN
E5.1 ELECTRICAL DETAILS
E6.1 ELECTRICAL SCHEDULES
E7.1 ELECTRICAL SPECIFICATIONS
1/16" = 1'-0"1
MAIN LEVEL LOCATION PLAN
BAHTBABABA
C: SPRINKLERS:
B. TYPE OF CONSTRUCTION (CIRCLE ONE):
CHANGE IN USE: YES NO MIXED OCCUPANCY: YES NO
NATIONAL ELECTRICAL CODE (NEC)
INTERNATIONAL ENERGY CONSERVATION
CODE (IECC)
INTERNATIONAL FIRE CODE (IFC)
INTERNATIONAL PLUMBING CODE
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL BUILDING CODE (IBC)
YEARYEAR
APPLICABLE CODES
A. OCCUPANCY:
CODE ANALYSIS
B
X
INTERNATIONAL EXISTING BUILDING CODE
(IEBC) 2021
ICC/ANSI 117.1 2017
AMERICAN'S WITH DISABILITIES ACT
X
YES - EXISTING THROUGHOUT
ACCESSIBILITY CLEARANCE NOTES
T SHAPED WHEELCHAIR TURNING SPACE (304.3.2.2)
30" X 48" CLEARANCE FOR WATER CLOSET
(1110.2.2.2.1 & 1110.2.2.2.2)
30" X 48" CLEAR FLOOR SPACE FOR FORWARD
APPROACH TO SINK/WORK SPACE/APPLIANCE
(305.2, 606.2, 1110.2.5)
30" X 48" CLEAR FLOOR SPACE FOR
PARALLEL/ADJACENT APPROACH TO
SINK/APPLIANCE (305.3, 1104.10.1, 1104.11.1.1,
1104.12.2)
30" X 48" CLEAR FLOOR SPACE BEYOND
SWING OF DOOR FOR INDIVIDUAL USE (603.2.2
EXCEPTION, 1103.11.2 EXCEPTION)
56" X 60" CLEARANCE FOR WATER CLOSET
(604.3.1)
66" X 60" CLEARANCE FOR WATER CLOSET
(1103.11.2.4.4)
NOTE: CLEAR FLOOR OR GROUND SPACES, CLEARANCE AT
FIXTURES, AND WHEELSHAIR TURNING SPACES SHALL BE
PERMITTED TO OVERLAP (603.2.2, 1103.11.2.4.4, & 1104.11.3.1.2.2.4)
(ICC/ANSI A117.1-2017)
ADA REFERENCES
(ICC/ANSI A117.1-2017)
1. RESTROOM - 603-606
MIRROR - 603,3
WATER CLOSET - 604
GRAB BARS - 604.5
DISPENSER - 604.7
LAVORATORY - 606
36" LONG GRAB BAR - TYP. (24"
MIN. LENGTH IF REQUIRED BY
OBSTRUCTIONS - FIELD VERIFY)
WATER CLOSET
TOILET PAPER DISPENSER
INSTALLATION AREA
GRAB BAR
VERTICAL GRAB
BAR
WC
GRAB BAR
VERTICAL GRAB
BAR
GRAB BAR
T.O . T
OI
LE
T
SE
AT
17" -19
" M
IN
MI
N
1 1 /2"
"-3
6" (6
.4
"-4
1"
" M
IN
42" MIN 12" MAX
54" MIN
39"-41" (CENTERLINE)
42" MIN 12" MIN
39"-41" (CENTERLINE)
"-1
8"
12" M
IN
" M
IN
" M
IN
24" MIN.
42" MAX.
SOAP DISPENSER
SURFACE
MOUNTED
(S.D.)
PAPER TOWEL
DISPENSER
SURFACE
MOUNTED (P.T.)
TOWEL DISP/ WASTE
RECEPTACLE
RECESSED
(P.T.)
MIRROR SURFACE
MOUNTED
(MIRR.)
SEAT COVER
DISPENSER
(S.C.)
TOILET PAPER
DISPENSER
(T.P.)
1'-9 " U
.N .O
2'- 5"
U .N
.O
3'- 4"
3'- 4"
4'- 0"
M
AX
IM
UM
MA
X.
3'- 4"
MEN
" M
IN
0"
M
AX
WALL MOUNTED SIGNAGE TO BE
LOCATED ON LATCH SIDE OF DOOR
& CLEAR OF DOOR SWING, MOUNT AT
48" MIN., 60" MAX. TO CENTERLINE
OF SIGN FROM FINISH FLOOR.
MEN
MEN
HEIGHT OF LETTERING,
5/8" TO 2" MAX, WITH
UPPER CASE CHARACTERS
CORRESPONDING
GRADE 2 BRAILLE
INSTALL ON THE RIGHT
SIDE OF DOUBLE DOORS
SIGN'S USED IN PROJECT
MEN WOMEN
MEN WOMEN
(a)
FRONT APPROACH - PULL SIDE
(b)
FRONT APPROACH - PUSH SIDE
(c)
HINGE APPROACH - PULL SIDE
DOOR W/ CLOSER & LATCH
(d)
HINGE APPROACH - PULL SIDE
(e)
HINGE APPROACH - PUSH SIDE HINGE APPROACH - PULL SIDE
DOOR W/ BOTH CLOSER & LATCH
(f)
LATCH APPROACH - PULL SIDE
(g)
" M
IN
" M
IN
18" MIN. 12" MIN. 36" MIN.
" M
IN
42" MIN. 54
" M
IN
" M
IN
22" MIN. 48
" M
IN
22" MIN. 48
" M
IN
24" MIN.
OBSTRUCTED HIGH SIDE APPROACH
MAX.
10"
" M
AX
" M
AX
" M
AX
> 10" - 24"
" M
AX
UNOBSTRUCTED SIDE REACH UNOBSTRUCTED FORWARD REACH
10" MAX.
15" M
IN
" M
AX
1'-3 " M
IN
" M
AX
OBSTRUCTED HIGH FORWARD APPROACH
20" MAX.
" M
AX
> 20" - 25" MAX.
" M
AX
WALL-HUNG WATER CLOSET FLOOR MOUNTED WATER CLOSET
" M
IN
60" MIN. 60" MIN.
" M
IN
9"
1"
2'- 3"
7"
" T
OP
O
F
RI
M
3'- 0"
" M
AX
T
O
RE
FL
EC
TIN
G
SU
RF
AC
E 8"
PROTECT WATER
SUPPLY & DRAIN
PIPES FROM CONTACT
(606.6)
1/4" x 2" STEEL BRACKET
(PAINTED 3-COATS)
1" x 4" BACKER
BOARD
CABINET FACE
3/4" PLYWOOD BACKING
SOLID SURFACE VANITY
TOP WITH 4" BACK SPLASH
3/8" RADIUS
MIRROR (603.3)
PROVIDE BACKING
FOR WALL BRACKET
T
R
I
12627957-0301
STE
S
T A
E DR
G
I V
A
RCH
U TE O F
HA
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
G2.1
ACCESSIBILITY & IEBC
REQUIREMENTS
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
1/2" = 1'-0"1
ACCESSIBILE TOILET CLEARANCES
1/2" = 1'-0"5
ACCESSORY MOUNTING HEIGHTS
3/8" = 1'-0"4
SIGN MOUNTING DETAIL
3/8" = 1'-0"6
ACCESSIBILE DOOR CLEARANCES
1/2" = 1'-0"7 RANGE REACH DIAGRAMS
3/8" = 1'-0"3
ACCESSIBILE TOILET COMPARTMENT
1/2" = 1'-0"2
ACCESSIBLE VANITY DETAIL
2021 IEBC CODE REQUIREMENTS
EXISTING OCCUPANCY CLASSIFICATION: B
PROPOSED OCCUPANCY CLASSIFICATION: B (SEE SHEET G1.1)
IEBC SECTION 301
“THE REPAIR, ALTERATION, CHANGE OF OCCUPANCY, ADDITION OR RELOCATION
OF ALL EXISTING BUILDINGS SHALL COMPLY WITH SECTION 301.2, 301.3 OR 301.4.”
FOR THIS PROJECT, THE FOLLOWING SECTIONS WERE USED FOR DETERMINING
CODE COMPLIANCE:
□ 301.2 REPAIRS (IEBC CHAPTER 4)
■ 301.3 ALTERATIONS, ADDITION OR CHANGE OF OCCUPANCY
□ 301.3.1 PRESCRIPTIVE COMPLIANCE METHOD (IEBC CHAPTER 5)
■ 301.3.2 WORK AREA COMPLIANCE METHOD (IEBC CHAPTERS 6-12)
□ 301.3.3 PERFORMANCE COMPLIANCE METHOD (IEBC CHAPTER 13)
□ 301.4 RELOCATED BUILDINGS (IEBC CHAPTER 14)
IEBC SECTION 306 – ACCESSIBILITY FOR EXISTING BUILDINGS
THE FOLLOWING SECTIONS APPLY:
■ 306.3 MAINTENANCE AND REPAIR
■ 306.4 EXTENT OF APPLICATION
□ 306.5 CHANGE OF OCCUPANCY
□ 306.6 ADDITIONS
■ 306.7 ALTERATIONS
IEBC CHAPTER 6 – CLASSIFICATION OF WORK
THE FOLLOWING CLASSIFICATION(S) APPLIES TO THE WORK:
■ 602 ALTERATION – LEVEL 1 (CHAPTER 7) “LEVEL 1 ALTERATIONS INCLUDE
THE REMOVAL AND REPLACEMENT OR THE COVERING OF EXISTING
MATERIALS, ELEMENTS, EQUIPMENT, OR FIXTURES USING NEW MATERIALS,
ELEMENTS, EQUIPMENT, OR FIXTURES THAT SERVE THE SAME PURPOSE.”
□ 603 ALTERATION – LEVEL 2 (CHAPTER 8) “LEVEL 2 ALTERATIONS INCLUDE
THE ADDITION OR ELIMINATION OF ANY DOOR OR WINDOW, THE
RECONFIGURATION OR EXTENSION OF ANY SYSTEM OR THE INSTALLATION
OF ANY ADDITIONAL EQUIPMENT, AND SHALL APPLY WHEN THE WORK
AREA IS EQUAL TO OR LESS THAN 50 PERCENT OF THE BUILDING”
□ 604 ALTERATION – LEVEL 3 (CHAPTER 9) “LEVEL 3 ALTERATIONS APPLY
WHERE THE WORK AREA EXCEEDS 50 PERCENT OF THE BUILDING AREA.”
□ 605 CHANGE OF OCCUPANCY (CHAPTER 10)
□ 606 ADDITIONS (CHAPTER 11)
□ 607 HISTORIC BUILDINGS (CHAPTER 12)
IEBC CHAPTER 7: ALTERATIONS – LEVEL 1
701.2 “AN EXISTING BUILDING OR PORTION THEREOF SHALL NOT BE ALTERED
SUCH THAT THE BUILDING BECOMES LESS SAFE THAN ITS EXISTING CONDITION.”
SECTION 702 BUILDING ELEMENTS AND MATERIALS
THE FOLLOWING MATERIALS ARE BEING MODIFIED IN THE WORK AND ARE TO
COMPLY WITH THE REFERENCED IBC SECTION:
■ 702.1 INTERIOR FINISHES (IBC CHAPTER 8)
■ 702.2 INTERIOR FLOOR FINISH (IBC SECTION 804)
■ 702.3 INTERIOR TRIM (IBC SECTION 806)
□ 702.4 WINDOW OPENING CONTROL DEVICES ON REPLACEMENT WINDOWS
□ 702.5 REPLACEMENT WINDOW FOR EMERGENCY ESCAPE AND RESCUE
OPENINGS
■ 702.6 BARS, GRILLES, COVERS OR SCREENS
■ 702.7 MATERIALS AND METHODS (IBC, IECC, IMC, IPC & IFGC)
SECTION 703 FIRE PROTECTION:
703.1 "ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS THE LEVEL
OF FIRE PROTECTION PROVIDED."
SECTION 704 MEANS OF EGRESS:
704.1 "ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS THE LEVEL
OF PROTECTION PROVIDED FOR THE MEANS OF EGRESS."
SECTION 705 REROOFING - (NOT APPLICABLE)
SECTION 706 STRUCTURAL - (NOT APPLICABLE)
SECTION 707 ELECTRICAL - (NOT APPLICABLE)
SECTION 708 ENERGY CONSERVATION - (NOT APPLICABLE):
“LEVEL 1 ALTERATIONS TO EXISTING BUILDINGS OR STRUCTURES DO NOT REQUIRE
THE ENTIRE BUILDING OR STRUCTURE TO COMPLY WITH THE ENERGY
REQUIREMENTS OF THE IECC OR IRC. THE ALTERATIONS SHALL CONFORM TO THE
ENERGY REQUIREMENTS OF THE IECC OR IRC AS THEY RELATE TO THE NEW
CONSTRUCTION ONLY.”
SECTION 803 FIRE PROTECTION
THE FOLLOWING COMPONENTS ARE BEING MODIFIED IN THE WORK AND ARE TO
COMPLY WITH THE IEBC:
□ 803.1.1 CORRIDOR RATINGS – NO RATING REQUIRED PER IBC TABLE 1020.2
■ 803.2 AUTOMATIC SPRINKLER SYSTEMS – SYSTEM PROVIDED
□ 803.3 STANDPIPES – BUILDING DOES NOT CONTAIN MORE THAN ONE
TENANT
■ 803.4 FIRE ALARM AND DETECTION – SYSTEM PROVIDED
SECTION 804 MEANS OF EGRESS
THE FOLLOWING COMPONENTS ARE BEING MODIFIED IN THE WORK AND ARE TO
COMPLY WITH THE IEBC:
■ 804.8 MEANS-OF-EGRESS LIGHTING
■ 804.8.1 ARTIFICIAL LIGHTING REQUIRED – PROVIDED
□ 804.8.2 SUPPLEMENTAL REQUIREMENTS FOR MEANS-OF-EGRESS
LIGHTING
□ 804.9 EXIT SIGNS – PROVIDED
□ 804.10 HANDRAILS
□ 804.11 REFUGE AREAS
□ 804.12 GUARDS
SECTION 805 STRUCTURAL
□ 805.2 EXISTING STRUCTURAL ELEMENTS CARRYING GRAVITY LOADS
□ 805.3 EXISTING STRUCTURAL ELEMENTS RESISTING LATERAL LOADS
□ 805.4 VOLUNTARY LATERAL FORCE-RESISTING SYSTEM ALTERATIONS
4.7
E E
D D
C C
EXISTING
JANITOR
EXISTING
CORRIDOR
EXISTING FEMALE
LOCKERS
EXISTING
WOMENS
EXISTING
MENS
A2.1 3D A2.1A2.1A2.1
A2.1 5D
A2.1 2D A2.1A2.1A2.1
A2.1 4D
2D 3D
2 2
5 2
EXISTING MALE
LOCKERS
7 1 1 13 3 3
WEST
NORTH
2 4222
EAST
OPEN TO
BEYOND
SOUTH
WEST
13 111 3 3
EAST
SOUTH
2 4226
WEST
NORTH
EAST
A. REMOVE EXISTING WALL FINISHES TO ABOVE CEILING WHERE
EXIST. TILE IS TO BE REMOVED AND NEW TILE IS TO BE
INSTALLED. EXISTING WALL FRAMING SHALL REMAIN. SEE WALL
CONSTRUCTION TYPE 1-2 ON SHEET A2.2.
B. REMOVE & REPLACE ALL EXISTING TOILET ROOM ACCESSORIES.
GENERAL NOTES
T
R
I
12627957-0301
S
TE
S
T A
E DR
G
I V
A
RCH
U TE O F
H
A
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
A2.1
RESTROOM DEMO PLANS
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
DEMOLITION NOTES
1/4" = 1'-0"1
DEMOLITION FLOOR PLAN
1/4" = 1'-0"3D
MENS DEMO ELEVATIONS
1/4" = 1'-0"5D
MENS SHOWER DEMO ELEV.
1/4" = 1'-0"2D
WOMENS DEMO ELEVATIONS
1/4" = 1'-0"4D
WOM. SHOWER DEMO ELEV.
1 REMOVE & DISPOSE OF EXISTING TOILET
2 REMOVE & DISPOSE OF EXISTING SINK
3 REMOVE & DISPOSE OF EXISTING TOILET PARTITIONS, DOORS &
HARDWARE
4 REMOVE & DISPOSE OF EXISTING COUNTERTOP
5 REMOVE & DISPOSE OF EXISTING FLOOR FINISH
6 REMOVE & DISPOSE OF EXISTING WALL/BASE FINISHES
7 REMOVE & DISPOSE OF EXISTING URINAL
8 REMOVE & DISPOSE OF EXISTING PAPER TOWEL DISPENSER
9 REMOVE & DISPOSE OF EXISTING MIRROR
10 REMOVE & DISPOSE OF EXISTING SHOWER HEAD & SLIDE BAR
11 REMOVE & DISPOSE OF EXISTING GRAB BARS
12 REMOVE & DISPOSE OF EXISTING MARBLE THRESHOLD
13 REMOVE & DISPOSE OF EXISTING WALL
1 EXISTING LOCKERS TO REMAIN
2 EXISTING BENCH TO REMAIN
3 EXISTING FLOOR DRAIN TO REMAIN - MAINTAIN EXISTING SLOPE
EXISTING NOTES
NOTE:
ALL EXISTING PLUMBING VENTING ASSOCIATED w/ SINKS, TOILETS, URINALS, SHOWERS, ETC. SHALL BE REMOVED AND REPLACED. THIS
INCLUDES ALL EXISTING ASSOCIATED COMPONENTS ABOVE THE
FLOOR SLAB.
54.7
E
D D
C C
A2.2
A2.2
A2.2
A2.2
1 2
CL
EA
R
3'- 0"
5/
8"
140A
LOCKERS
140B
SHOWER
MENS
129A
SHOWER
WOMENS
EXISTING
JANITOR
EXISTING
CORRIDOR
A2.1 5D
1-1
MALE LOCKERS
FEMALE LOCKERS
GB36
GB18
1 1 13 13 3
PTDW-1
TP
CTW
4'- 0"
PTDW-1
CTW
4'- 0"
MIRR
SD
56 755 6
PT
PTDW-1
2'-
"4'- 0"
CTW
TP
GB18
GB42
ND
15 7
PTDW-1
4'- 0"
CTW
1 1 12 2 33 34
PTDW-1
4'- 0"
1'-5
PTDW-1
CTW
GB36 GB42
GB18
TP
2'-
3 5 7
PTDW-1
4'- 0"
CTW
MIRR
2'-
SD SD
5555 6 66 7
OPEN TO
BEYOND
PTDW-1
4'- 0"
PT
PTDW-1
CPTB
PTDW-1 PTDW-1
4'- 0"
CTW
EXIST. LOCKERS
TO REMAIN
CTW
CTB
PTDW-1
GB90
GB18
CTW
CTW
MA
X.
1'-7
MIRR 90" W x 36" H MIRROR, SEE INT. ELEV. +40" MAX. A.F.F
SD SOAP DISPENSER
TP TOILET PAPER DISPENSER
GB 18 GRAB BAR 18" LONG
GB 36 GRAB BAR 36" LONG
GB 42 GRAB BAR 42" LONG
GB 90 90 DEGREE GRAB BAR (ACCESSIBLE SHOWER)
PT PAPER TOWEL DISPENSER
ND FEMININE NAPKIN DISPENSER
SC TOILET SEAT COVER
FINISH LEGEND
FLOORS
BASE
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
PTDW-1 TEXTURED AND PAINTED
GYPSUM BOARD
N/ACOLOR: REPOSE GRAYSHERWIN WILLIAMS
WALLS
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
WALL FIELD COLOR
EGGSHELL
PTF PORCELAIN TILE FLOOR DALTILE STYLE: HARMONIST
COLOR: RYTHM HM31
GROUT: MAPEI #27 'SILVER'
12" x 12"
CTW CERAMIC TILE WALL 6" x 18"COLOR: COLOR WHEEL LINEAR - ARCTIC WHITE 0190
FINISH: SEMI-GLOSS
GROUT: MAPEI #27 'SILVER'
DALTILE BRICK INSTALL PATTERN. PROVIDE
SCHLUTER JOLLY @ TOP AND EXPSED
EDGES
CEILING
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
PTDC PAINTED GYPSUM BOARD N/AMATCH EXISTINGMATCH EXISTING FIELD VERIFY. MATCH COLOR AND SHEEN
MILLWORK
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
N/A --QC QUARTZ COUNTER COLOR: AURORA SNOW - CL101HANSTONE
PTDW-2 N/ACOLOR: IRON ORESHERWIN WILLIAMS TRIM / DOOR FRAME COLOR
SEMI-GLOSS
PAINTED DOOR FRAMES
CTB CERAMIC TILE DALTILE 6" x 18" FLAT TOP COVE BASECOLOR: COLOR WHEEL LINEAR - ARCTIC WHITE 0190
FINISH: SEMI-GLOSS
BRICK INSTALL PATTERN. PROVIDE
SCHLUTER RENO-U @ TILE TO CARPET
TRANSITIONS
TOILET PARTITION
MARK MATERIAL TYPE MANUFACTURER # / COLOR SIZE NOTES
N/A INSTALL PER MANUFACTURER RECOMMENDATIONS.
COLOR TO BE VERIFIED WITH PHYSICAL SAMPLE.
TPTN TOILET PARTITION DURALINE SERIES - COMPACT GRADE LAMINATE (CGL),
OVER-HEAD BRACED. COLOR: PEARL GREY 475-SEI.
BOBRICK
RB RUBBER BASE MATCH EXISTING 4" FIELD VERIFY EXIST. RESILIENT BASEMATCH EXISITNG
N/A INSTALL PER MANUFACTURER RECOMMENDATIONS.
COLOR TO BE VERIFIED WITH PHYSICAL SAMPLE.
UPTN URINAL PARTITION DURALINE SERIES - COMPACT GRADE LAMINATE (CGL)
COLOR: PEARL GREY 475-SEI.
BOBRICK
3 5/8" MTL. STUDS @
16" O.C. - EXTEND
FRAMING TO EXIST.
ROOF/FLOOR DECK
1/2" TILE BACKER
BOARD
TILE FINISH - SEE
FINISH SCHEDULE
EXIST. WALL
FRAMING TO REMAIN
5/8" GYPSUM
BOARD - PAINT
SOUND ATTENUATION
BATT INSULATION
T
R
I
12627957-0301
S
TE
S
T A
E DR
G
I V
A
RCH
U TE O F
H
A
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
A2.2
RESTROOM REMODEL
PLANS
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
1/4" = 1'-0"2
WOMENS #129
1/4" = 1'-0"5
MENS #140
1/4" = 1'-0"4
SHOWER #140B
1/4" = 1'-0"3
SHOWER #129A
1/4" = 1'-0"1
REMODEL FLOOR PLAN
1 WATER CLOSET - SEE PLUMBING DRAWING
2 URINAL - SEE PLUMBING DWG's
3 PRE-FINISHED TOILET PARTITION - SEE FINISH LEGEND
4 PRE-FINISHED URINAL PARTITION - SEE FINISH LEGEND
5 SINK - SEE PLUMBING DWG'S
6 CONCEALED METAL COUNTER SUPPORT BRACKET. MOUNT TO
EXISTING FRAMING
7 2CM QUARTZ COUNTERTOP AND BACKSPLASH
8 WALL MOUNTED FOLDING SHOWER BENCH. BOBRICK B-5181
SHALL BE THE BASIS OF DESIGN
9 SHOWER HEAD w/ SLIDE BAR - SEE PLUMBING DWG's
10 GRAB BAR . PROVIDE SOLID BACKING IN WALL FOR
SUPPORT
11 REMOVE AND REINSTALL EXISTING BENCH. PAINT METAL
SUPPORT POSTS SW 'IRON ORE'. SAND EXIST. FINISH FROM
WOOD BENCH SEAT - STAIN IN 'CANE' COLOR
SHEET NOTES
ACCESSORY ABBREVIATIONS
FINISH SCHEDULE
RM.
NUMBER
ROOM
NAME
FLOOR
FINISH
BASE
FINISH
WALL FINISH CEILING
FINISH COMMENTS
NORTH EAST SOUTH WEST
128 FEMALE LOCKERS PTF RB PTDW-1 PTDW-1 PTDW-1 PTDW-1 EXIST.
129 WOMENS PTF CTB CTW / PTDW-1 CTW / PTDW-1 CTW / PTDW-1 CTW / PTDW-1 PTDC
129A SHOWER PTF CTB CTW / PTDW-1 CTW CTW CTW / PTDW-1 PTDC
140 MENS PTF CTB CTW / PTDW-1 CTW / PTDW-1 CTW / PTDW-1 CTW / PTDW-1 PTDC
140A LOCKERS PTF RB PTDW-1 PTDW-1 PTDW-1 PTDW-1 PTDC
140B SHOWER PTF CTB CTW / PTDW-1 CTW CTW CTW PTDC
147 MALE LOCKERS PTF RB PTDW-1 PTDW-1 PTDW-1 PTDW-1 EXIST.
1 1/2" = 1'-0"
1-1 WALL CONSTRUCT. TYPE 1-1
1 1/2" = 1'-0"
1-2 WALL CONST. TYPE 1-2
GENERAL NOTES
A. MAINTAIN EXISTING SLOPE IN FLOOR TO EXIST. FLOOR DRAINS.
B. REMOVE EXISTING WALL FINISHES TO ABOVE CEILING WHERE
EXIST. TILE IS TO BE REMOVED AND NEW TILE IS TO BE
INSTALLED. EXISTING WALL FRAMING SHALL REMAIN. SEE WALL
CONSTRUCTION TYPE 1-2 ON SHEET A2.2.
C. TOILET ROOM ACCESSORIES SHALL BE PROVIDED BY OWNER
AND INSTALLED BY CONTRACTOR.
NOTE:
ALL EXISTING PLUMBING VENTING ASSOCIATED w/ SINKS, TOILETS, URINALS, SHOWERS, ETC. SHALL BE REMOVED AND REPLACED. THIS
INCLUDES ALL EXISTING ASSOCIATED COMPONENTS ABOVE THE
FLOOR SLAB.
a
2'
3' b
EXISTING BREAK
ROOM
REMOVE EXISTING WINDOW
AND PORTION OF WALL
BELOW IT TO THE EXISTING
FLOOR SLAB REMOVE APPROX. 8'-0"
LONG x 5'-0" WIDE
SECTION OF EXIST. LAWN
a
2'
3' b
EXISTING BREAK
ROOM STOREFRONT DOOR
AND WINDOW SYSTEM -
DARK BRONZE FINISH
TO MATCH EXISTING -
SEE DETAIL 3/A2.3
3'-
1/2
5'-0"
8'- 0"
4" CONC. SLAB OVER
4" GRAVEL BASE -
SLOPE AWAY FROM
BUILDING @ 1/4" PER
FOOT
ALIGN TO EDGE
OF EXIST. WINDOW
7'- 0"
2" 1'-8
2"
FIE
LD
V
ER
IFY
9'- 0"
2" 2'-
2"
3'- 2"
3'-
2'-
0"
1 1/2" 6"
2"
3'-7 1/2" +/-
2"
6" 1 1/2"
7 1/2"
FILED VERIFY
3'-11 1/2" +/- 7 1/2"
DARK BRONZE
ALUMINUM STOREFRONT
FRAME TO MATCH
EXIST.
PRECAST
WINDOW TRIM TO
MATCH EXIST. -
(BOTH SIDES)
TYP.
EXIST. PRE-CAST TO
REMAIN. PROTECT
DURING CONSTRUCTION
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
2 EA CONT. HINGE 112HD EPT 628 IVE
1 EA ELEC PANIC HARDWARE LXRX-LC-QEL-98-EO-CON 24 626 VON
VDC
1 EA RIM CYL. HOUSING 20-079 626 SCH
1 EA MORTISE CYLINDER 26-094 626 SCH
HOUSING
1 EA PRIMUS CORE 91-861-XP EV29SL R 626 SCH
(FOR DEVISE TRIM)
2 EA LONG DOOR PULL 9264F 36" 20" O 630- IVE
2 EA OH STOP 100S ADJ 630 GLY
1 EA SURFACE CLOSER 4040XP EDAW/62G 689 LCN
1 EA SURF. AUTO OPERATOR 4642CS WMS 120 VAC 689 LCN
(FLUSH CEILING MOUNT)
1 EA PA MOUNTING PLATE 4040XP-18PA (AS REQ'D) 689 LCN
1 EA CUSH SHOE SUPPORT 4040XP-30 (AS REQ'D) 689 LCN
1 EA WEATHERSTRIPPING BY ALUMINUM DOOR/FRAME
MANUFACTURER
2 EA DOOR SWEEP BY ALUMINUM DOOR/FRAME
MANUFACTURER
1 EA THRESHOLD BY ALUMINUM DOOR/FRAME
MANUFACTURER
2 EA WIRE HARNESS (HINGE CON-XX (AS REQUIRED) SCH
TO HARDWARE)
1 EA CREDENTIAL READER BY DIVISION 28
HARDWARE IS FOR DOOR WITH WIDE STILE
OPERATIONS:
DOOR IS NORMALLY LATCHED AND SECURED
DOOR MAY BE PROGRAMMED TO REMAIN UNLOCKED ON A SCHEDULE THROUGH ACCESS
CONTROL SYSTEM
PRESENTING VALID CREDENTIAL TEMPORARILY RETRACTS LATCHBOLT FOR ENTRY WHEN
DOOR IS LOCKED
DOOR IS MONITORED THROUGH ACCESS CONTROL OR SECURITY SYSTEM
DOOR IS SECURED UPON LOSS OF POWER TO THE DEVICE
FREE EGRESS AT ALL TIMES
POWER COMES FROM ACCESS CONTROL CABINET IN THE IT ROOM.
1 EA STRIKE 9400 1/2" SURFACE MOUNTED 630 ASSA
SOLUTION
DOOR HARDWARE
T
R
I
12627957-0301
STE
S
T A
E DR
G
I V
A
RCH
U TE O F
HA
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
A2.3
ENL. BREAKROOM DEMO
& REMODEL PLANS
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
1/4" = 1'-0"1
ENLARGED BREAK ROOM DEMO PLAN
1/4" = 1'-0"2
ENLARGED BREAK ROOM REMODEL PLAN
GLAZING LEGEND
1 1" INSULATED, DUAL PANE LOW-E GLAZING SYS. W/
FULLY TEMPERED GLASS
1/4" = 1'-0"3
DOOR TYPE
4.7
4.7
E E
D D
C C
2 2
2 2
3 3
T
R
I
12627957-0301
STE
S
T A
E DR
G
I V
A
RCH
U TE O F
HA
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
A8.1
REFLECTED CEILING
DEMO PLAN
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
SHEET NOTES
1 REMOVE & DISPOSE OF EXISTING CEILING FINISH
2 REMOVE & DISPOSE OF EXISTING LIGHT FIXTURE
3 REMOVE & REPLACE EXISTING MECHANICAL GRILLE
4 REMOVE & DISPOSE OF EXISTING SPRINKLER HEAD
GENERAL NOTES
1/4" = 1'-0"1
DEMOLITION REFLECTED CEILING PLAN
A. CONTRACTOR SHALL TEST THE PERFORMANCE OF THE
EXISTING EXHAUST FAN SYSTEM AND REPLACE IF MINIIMUM
CFM VALUES CALLED OUT IN THE MECHANICAL DRAWINGS
ARE NOT MET.
B. RESPONSIBILITY OF THE CONTRACTOR TO FEILD VERIFY
EXISTING CONDITIONS.
C. CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE &
TRACK WHERE BUTTED UP AGAINST DEMOLISHED WALL -
CONTRACTOR TO FEILD VERIFY.
D. REFER TO MECHANICAL AND ELECTRICAL PLANS FOR
LIGHTING AND MECHANICAL SYSTEM LAYOUT.
GYPSUM BOARD CEILING -
PAINT (SEE FINISH SCHEDULE)
RECESSED CAN LIGHT - SEE
ELECTRICAL DWGS.
RETURN DIFFUSER - SEE
MECHANICAL DWGS.
SUPPLY DIFFUSER - SEE
MECHANICAL DWGS.
WALL MOUNTED LIGHT - SEE
ELECTRICAL DWGS.
CEILING LEGEND
4.7
4.7
E E
D D
C C
T
R
I
12627957-0301
STE
S
T A
E DR
G
I V
A
RCH
U TE O F
HA
RAW
LICENSE
B. DE
C
S T
IT
E
D
DE A
D
T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W
P A
A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.
A ll ri g h ts r e se rv e d
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
OCT. 7, 2025
A8.2
REFLECTED CEILING
REMODEL PLAN
RESTROOM
REMODEL
95 E. Center Street
Orem, Utah 84057
OCTOBER 24, 2025
OREM CITY
PUBLIC
SAFETY
BUILDING
OWNER REVIEW SET
GENERAL NOTES
A. CONTRACTOR SHALL TEST THE PERFORMANCE OF THE
EXISTING EXHAUST FAN SYSTEM AND REPLACE IF MINIIMUM
CFM VALUES CALLED OUT IN THE MECHANICAL DRAWINGS
ARE NOT MET.
B. RESPONSIBILITY OF THE CONTRACTOR TO FEILD VERIFY
EXISTING CONDITIONS.
C. CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE &
TRACK WHERE BUTTED UP AGAINST DEMOLISHED WALL -
CONTRACTOR TO FEILD VERIFY.
D. REFER TO MECHANICAL AND ELECTRICAL PLANS FOR
LIGHTING AND MECHANICAL SYSTEM LAYOUT.
1/4" = 1'-0"1
REMODEL REFLECTED CEILING PLAN
DESIGN CONTACTS
MECHANICAL SYMBOLS
SITE CONDITIONS
DUCTWORK SEISMIC SUPPORT NOTES: COMMISSIONING NOTES:
SUBMITTALS:
MECHANICAL SHEET INDEX
APPLICABLE CODES
PROJECT MECHANICAL NOTES:
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
M0.1
95 E. Center Street Orem, Utah 84057
OCTOBER 3, 2025
PERMIT SET
drawing title design professional stamp client info sheet number
RESTROOM
REMODEL
OREM CITY
PUBLIC
SAFETY
BUILDING
Th es e pl an s, d ra w in gs , a nd d es ig ns a re th e ex cl us iv e pr op er ty o f W
PA
A rc hi te ct ur e an d sh al l n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n co ns en t.
Al l r ig ht s re se rv ed
THESE DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND THE
INFORMATION CONTAINED HEREIN IS INCOMPLETE UNLESS IN CONJUNCTION WITH
ROYAL ENGINEERING'S INTERPRETATIONS, DECISIONS, OBSERVATIONS AND
ADMINISTRATIONS. USE OR REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN
PART WITHOUT ROYAL ENGINEERING'S CONSENT IS IN VIOLATION OF COMMON LAW.
COPYRIGHTS, STATUTORY AND OTHER RESERVED RIGHTS. REFER TO ACT 17 U.S.C. PAR.
511 (1991). WHICH PREEMPTS STATE AND LOCAL PUBLIC RECORD ACTS. REFER TO ACT
17 U.S.C. PAR. 301 (1991).
COPYRIGHT © JOB# DATE PLOTTED: 10/24/2025
MECHANICAL
PROVO, UTAH 84606
FAX: 801.375.2676
ELECTRICAL
1837 S. EAST BAY BLVD.
PHONE: 801.375.2228
J25123.00
R
DE
S T
IG
RE
S
ET
A
F UET O
A T
L
H
AEPR FO ISS NO
NE
RE
ENGI
MECHANICAL NOTES &
LEGENDS
MECHANICAL PLAN
N
MECHANICAL KEYED NOTES:
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
M1.1
95 E. Center Street Orem, Utah 84057
OCTOBER 3, 2025
PERMIT SET
drawing title design professional stamp client info sheet number
RESTROOM
REMODEL
OREM CITY
PUBLIC
SAFETY
BUILDING
Th es e pl an s, d ra w in gs , a nd d es ig ns a re th e ex cl us iv e pr op er ty o f W
PA
A rc hi te ct ur e an d sh al l n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n co ns en t.
Al l r ig ht s re se rv ed
THESE DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND THE
INFORMATION CONTAINED HEREIN IS INCOMPLETE UNLESS IN CONJUNCTION WITH
ROYAL ENGINEERING'S INTERPRETATIONS, DECISIONS, OBSERVATIONS AND
ADMINISTRATIONS. USE OR REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN
PART WITHOUT ROYAL ENGINEERING'S CONSENT IS IN VIOLATION OF COMMON LAW.
COPYRIGHTS, STATUTORY AND OTHER RESERVED RIGHTS. REFER TO ACT 17 U.S.C. PAR.
511 (1991). WHICH PREEMPTS STATE AND LOCAL PUBLIC RECORD ACTS. REFER TO ACT
17 U.S.C. PAR. 301 (1991).
COPYRIGHT © JOB# DATE PLOTTED: 10/24/2025
MECHANICAL
PROVO, UTAH 84606
FAX: 801.375.2676
ELECTRICAL
1837 S. EAST BAY BLVD.
PHONE: 801.375.2228
J25123.00
R
DE
S T
IG
RE
S
ET
A
F UET O
A T
L
H
AEPR FO ISS NO
NE
RE
ENGI
MECHANICAL PLAN
BRANCH DUCT TAKE-OFF WITH DAMPER DETAIL
TYPICAL DUCT WITH INSULATION & STRAP HANGER DETAIL
DUCT LINER DETAIL
DIFFUSER / GRILLE WITH FLEX DUCT DETAIL
DUCT CONSTRUCTION DETAIL
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
M5.1
95 E. Center Street Orem, Utah 84057
OCTOBER 3, 2025
PERMIT SET
drawing title design professional stamp client info sheet number
RESTROOM
REMODEL
OREM CITY
PUBLIC
SAFETY
BUILDING
Th es e pl an s, d ra w in gs , a nd d es ig ns a re th e ex cl us iv e pr op er ty o f W
PA
A rc hi te ct ur e an d sh al l n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n co ns en t.
Al l r ig ht s re se rv ed
THESE DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND THE
INFORMATION CONTAINED HEREIN IS INCOMPLETE UNLESS IN CONJUNCTION WITH
ROYAL ENGINEERING'S INTERPRETATIONS, DECISIONS, OBSERVATIONS AND
ADMINISTRATIONS. USE OR REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN
PART WITHOUT ROYAL ENGINEERING'S CONSENT IS IN VIOLATION OF COMMON LAW.
COPYRIGHTS, STATUTORY AND OTHER RESERVED RIGHTS. REFER TO ACT 17 U.S.C. PAR.
511 (1991). WHICH PREEMPTS STATE AND LOCAL PUBLIC RECORD ACTS. REFER TO ACT
17 U.S.C. PAR. 301 (1991).
COPYRIGHT © JOB# DATE PLOTTED: 10/24/2025
MECHANICAL
PROVO, UTAH 84606
FAX: 801.375.2676
ELECTRICAL
1837 S. EAST BAY BLVD.
PHONE: 801.375.2228
J25123.00
R
DE
S T
IG
RE
S
ET
A
F UET O
A T
L
H
AEPR FO ISS NO
NE
RE
MECHANICAL DETAILS
EXISTING VARIABLE VOLUME UNIT
EXISTING EXHAUST FAN SCHEDULE
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
M6.1
95 E. Center Street Orem, Utah 84057
OCTOBER 3, 2025
PERMIT SET
drawing title design professional stamp client info sheet number
RESTROOM
REMODEL
OREM CITY
PUBLIC
SAFETY
BUILDING
Th es e pl an s, d ra w in gs , a nd d es ig ns a re th e ex cl us iv e pr op er ty o f W
PA
A rc hi te ct ur e an d sh al l n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n co ns en t.
Al l r ig ht s re se rv ed
THESE DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND THE
INFORMATION CONTAINED HEREIN IS INCOMPLETE UNLESS IN CONJUNCTION WITH
ROYAL ENGINEERING'S INTERPRETATIONS, DECISIONS, OBSERVATIONS AND
ADMINISTRATIONS. USE OR REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN
PART WITHOUT ROYAL ENGINEERING'S CONSENT IS IN VIOLATION OF COMMON LAW.
COPYRIGHTS, STATUTORY AND OTHER RESERVED RIGHTS. REFER TO ACT 17 U.S.C. PAR.
511 (1991). WHICH PREEMPTS STATE AND LOCAL PUBLIC RECORD ACTS. REFER TO ACT
17 U.S.C. PAR. 301 (1991).
COPYRIGHT © JOB# DATE PLOTTED: 10/24/2025
MECHANICAL
PROVO, UTAH 84606
FAX: 801.375.2676
ELECTRICAL
1837 S. EAST BAY BLVD.
PHONE: 801.375.2228
J25123.00
R
DE
S T
IG
RE
S
ET
A
F UET O
A T
L
H
AEPR FO ISS NO
NE
RE
MECHANICAL SCHEDULES
SECTION 23 Mechanical - GENERAL PROVISIONS Not all specification items are used in every project.
PART 1 - GENERAL
- Scope:
A. Provisions of this section apply to all work specified in all sections under Division 23.
B. In addition, work in Division 23 is governed by the provisions of the Bidding Requirements, Contract Forms, General Conditions and all sections under Division 1, General Requirements.
C. Contractor is responsible for results deviating from the plans.
- Examination of Premises: Visit the site, verify all measurements and job conditions, and pay all costs necessary to perform the work. Coordinate division of fee responsibilities with the General Contractor.
- The Mechanical Contractor shall be licensed and hold a current contracting license that has been valid for a minimum of two years as a Mechanical Contractor in the State where the project is located.
- The Mechanical Contractor shall have a minimum of five years experience installing commercial cooling and heating systems similar to those described in these specifications and provide a list of previous projects, including name of project and contact person names and phone numbers as a separate document in addition to the mechanical bid submitted if required by the General Contractor.
- The Mechanical Contractor shall be able to bond work he is bidding to perform and shall provide a written statement from the bonding agency proposed to be used for this project as a separate document in addition to the mechanical bid submitted if required by the General Contractor. The bonding agency shall be one having a Best's insurance rating of A or A+.
- Regulations, Permits, Fees, Charges, Inspections:
A. Regulations: Comply with all applicable codes, rules and regulations. All materials and work must comply with local construction, mechanical, plumbing, electrical and fire codes. As a minimum, comply with the following: IBC, IMC, IPC, NEC, NFPA codes and all City codes.
B. In addition to the requirements of all governing codes, ordinances and agencies, conform to the requirements of the following codes and standards.
1. 2021 International Mechanical Code
2. 2021 International Building Code
3. 2021 International Energy Conservation Code
4. 2021 International Plumbing Code
5. 2021 International Fuel Gas Code
6. ASHRAE 90.1 - 2022
***Current codes adopted by the respective jurisdiction will supercede this list of codes.
C. Fees and Permits: Pay all connection, installation, use, development, etc., fees and/or charges. Obtain and pay for all required permits and licenses. Coordinate division of fee responsibilities with the General Contractor.
D. Inspections: All work must be inspected and approved by local authorities. Prior to final approval, furnish the Architect with certificates of inspections and approvals by the local authorities in accordance with Division 1.
1. Preheat and interpass temperature shall be determined by temperature indicating stick (crayon), contact pyrometers or other equally suitable means.
- Drawings and Specifications:
A. Refer to Division 1 for information on submittals and shop drawings.
B. If a conflict exists between the drawings and specifications, promptly notify the Architect and Engineer.
- Record Drawings:
A. Provide record drawings for all work under sections in Division 22 & 23. See Division 1 for detailed requirements covering preparation of record drawings.
- Work and Materials:
A. Unless otherwise specified, all materials must be new and of the quality specified. The workmanship shall be of a quality that is acceptable to the Architect and is equal to the standards of the trades. Contractor must staff the project with sufficient skilled workmen, including a fully qualified construction Superintendent, to complete the work in the time allotted. The Superintendent must be qualified to supervise all of the work in his work category.
- Approvals of Materials and Equipment:
A. Refer to Division 1 for description of material and equipment for prior approvals and substitutions. Submittals Must be received by Engineer 10 days prior to due date/bid opening.
- Maintenance Manual:
A. Prior to completion of the project, compile a complete equipment and maintenance manual for all equipment supplied under sections of Division 23, as described in Division 1.
B. Manuals shall be bound in a three-ring binder. A preliminary submittal of the manual shall be made to the Architect 90 days after receiving approved submittals.
Final submittal of the manual shall be made four weeks prior to substantial completion of the project.
- Equipment Purchases:
A. Arrange for purchase and delivery of all materials and equipment within 15 days after approval of submittals. Coordinate with General Contractor.
- Cooperative Work:
A. Correct without charge any work requiring alteration due to lack of proper supervision or failure to make proper provision in time. Correct without charge any damage to adjacent work caused by the alteration. See Division 1 for additional requirements.
B. Cooperative Work Includes:
1. General supervision and responsibility for proper location, rough-in and size of work related to Division 22 & 23 but provided under other divisions of these specifications.
2. Installation of sleeves, inserts and anchors bolts for work under sections in Division 23.
3. Electrical work as specified herein. Refer to Division 26 for requirements.
- Construction Facilities:
A. General: Under this division of the specifications execute all work in a manner to provide safe and lawful ingress and egress to the Owner's establishment and such facilities shall be kept clear of materials or equipment as directed by the Architect. Refer to Division 1 for additional requirements.
B. Furnish and maintain from the beginning to the completion of all work all lawful and necessary guards, railings, fences, canopies, lights, and warning signs. Take all necessary precautions required by city and state laws to avoid injury or damage to any and all persons and property.
- Guarantee:
A. Guarantee all material, equipment, and workmanship for all sections under Division 23 in writing to be free from defects of material and workmanship for one year from date of final acceptance as outlined in Division 1.
B. Replace without charge any material or equipment proving defective during this period.
C. The guarantee shall include performance of the equipment under all conditions of load, installing any additional items of control and/or protective devices as required and the replacing of any refrigerant lost.
- Mechanical Wiring:
A. Provide all temperature control wiring, all interlock wiring, and equipment control wiring for the equipment that is to be provided under this Division unless specifically shown on electrical drawings. All wiring shall be not less than No. 14 insulated, color coded wire in electrical metallic tubing. Installation shall comply with Division 26.
B. Before ordering motors, equipment, etc., verify the available voltage and phase with the electrical trades.
- Electrical Work:
A. Electrical wiring, including power wiring and control wiring (except as otherwise specified under Automatic Temperature Controls), all raceways, wiring, outlet and junction boxes, and labor for installation of the wiring and equipment shall be included in Electrical Division 26 of the specifications.
B. All starters in motor control centers are to be furnished and installed under the Electrical Division of the specifications.
C. Under the Automatic Temperature Control section of these specifications, furnish and install all wiring, conduit, electric automatic temperature control devices, thermostats, relays, pneumatic electric switches, automatic control switches and pilot lights. See the Automatic Temperature Control Section, for additional detailed information.
D. All loose starters and control devices for equipment furnished under Division 23 (except as otherwise specified under Automatic Temperature Control Section) are to be furnished under that particular section of Division 23 and installed under the electrical division.
E. Contractor shall be responsible for the checking and testing of all controls and the interlocks for a complete and satisfactory operating system.
F. Before ordering any motors and equipment. Verify the available voltage and phase for all motors with the Electrical Contractor.
G. Submit a complete list of all motors prior to final closeout of job indicating the location, horsepower, voltage, phase specified in Table 132 of ANSI B.1.
- Welding Codes and Standards:
A. All welding and other criteria covered by this specification shall be in accordance with the following code:
1. ASME Boiler and Pressure Vessel Code
2. Section IX ANSI Code for Power Piping: B31.1
- Product Handling
A. Protection: Take all precautions necessary to protect the materials of this section, before, during and after installation.
B. Replacements: In the event of damage immediately repair all damaged and defective work to the approval of the Engineer, at no additional cost to the Owner.
- Job Conditions
A. Examination of site: Examine the site and include in bid proposal all conditions under which work is to be performed.
- Miscellaneous
A. Permit and Fees: Apply and pay for all necessary permits, inspections, examinations and fees or charges required by Public Authorities having jurisdiction.
B. Locations and Accessibility: Contractor shall fully inform their self regarding peculiarities and limitations of space available for installation of work under this section for valves, motors, controls and other devices requiring service. Maintenance and adjustments shall be placed in fully accessible positions and locations, provide access doors and/or panels where required in ductwork and/or construction whether specifically detailed or not, and render all such devices accessible.
C. Scaffolding: Furnish all scaffolding, rigging and hoisting as required for the proper execution of the work.
D. All HVAC equipment shall be labeled. Information on labels shall include: Identification number and name same as the drawings, flow and static pressure and the area to which the unit serves. Labels shall be black faced laminate with white engraved lettering at least 3/16 inch high.
E. All gas fired equipment shall include a label indication that the appliance has been adjusted, modified or re-calibrated for the altitude wherein the project is to be located. The appliance shall also include a compliance statement indicating that the appliance has been adjusted, modified or re-calibrated for the proper operation at the altitude of the project and shall be listed capable for use with natural gas or propane gas if propane is listed on the drawings.
- Submittals
A. Shop Drawings: Within 15 days after award of contract, and before any of the materials of this section are fabricated and delivered to the jobsite, submit complete shop drawings and equipment submittals for the Engineer to review in accordance with these specifications. Show all details of all ductwork and equipments pads.
B. Product Data:
1. Submit six (6) copies of all manufacturer's product data simultaneously with all shop drawings submittals.
2. Product data to include, all air conditioning equipment, hangers, fans and other standard items as required to complement shop drawings for a submittal indications products to be used on this work.
C. Record Drawings: Maintain throughout the progress of the work project record drawings and submit to the Owner.
D. Operating Manuals and Maintenance Manuals:
1. Submit four (4) copies of all operating instructions, control diagrams and maintenance manuals to owner representative.
2. Fully instruct Owner's operating personnel and demonstrate performance, operation and maintenance of equipment. Amount of allocated for said instruction and demonstration of equipment and systems shall be part of these obligations. Submit to Engineer a letter signed by Owner's representative who will operate system stating that he has been fully instructed by contractor about operation and maintenance of equipment and system.
E. Guarantees: In addition to equipment warranties, furnish a written guarantee against defects in materials and workmanship for one year. Guarantee shall include repair of damage to, or replacement of any part of equipment or premises caused by leaks or breaks in pipe or equipment provided under this section.
- Equipment Identification
A. Except for individual room heating units and items furnished under temperature control all items of mechanical equipment, including fans, pumps, boilers, electrical switches, starters for mechanical equipment and gauges shall be labeled.
B. Information on labels shall include the following:
1. Identification number and name. Generally this number and name shall be the same as that shown on the drawings or in the specifications.
2. If the item is a fan provide/show cfm.
3. If the item is a pump, provide/show, show gpm flow and feet of head.
4. If the item is part of a unit, the label shall have in addition to its item number, the number of the main item it is serving.
5. Valves shall be tagged with the area/rooms served and their normal operating positions shall be indicated.
6. Where the main unit is served by the valve is apparent, only the valve function needs to be included on the nameplate.
C. The types of Nameplates shall be as follows:
1. The valve tags shall be 1/2 inch embossed aluminum tapes with identification on one side for valves. Tags for magnetic starters shall be screwed to the metal starter cover. Gauge tags shall be 1 inch x 2 inch embossed aluminum with identification on one side listing area/system served with a stainless steel tag wire.
2. Equipment nameplates shall be black faced laminate with white engraved lettering at least 3/16 inches high.
D. Valve tags shall be connected to valve stems by steel rings or chains. Screws shall be used for equipment labels prior to installation. The contractor shall submit to the Engineer a complete list of all valves and each item of equipment to be identified with the proper identification.
- Fire Stopping
A. Only tested and approved fire stop systems shall be used.
B. Fire stop system installation must meet requirements of ASTM E-814, UL 1479 or UL 2079 tested assemblies that provide a fire rating equal to that of construction being penetrated.
C. Proposed fire stop materials and methods shall conform to applicable having codes having local jurisdiction.
D. Fire stop systems are not to reestablish the structural integrity of the load bearing partitions/assemblies, or support live loads and traffic. Installer shall consult the Structural Engineer prior to penetrating any load bearing assembly.
E. For those fire stop applications that exist for which no UL tested system is available through a manufacturer, and engineering judgment derived from similar UL system design or other test, will be submitted to local authorities having jurisdiction for their review and approval prior to installation. Engineer judgment drawings must follow requirements set forth by the International Fire stop Council.
F. The work of this section shall be accomplished by a single source contractor or by those contractors who, by their contract, are penetrating rated construction with their work. Regardless of responsibility the General Contractor shall be responsible to assure and verify that all products, systems, etc. used under this section are appropriate and meet the intent of this specification and is accomplished by factory trained workmen.
G. Acceptable manufacturers are subject to compliance with through penetration firestop systems listed in the UL fire resistance directory. Provide products from the following manufacturers as identified:
1. Hilti Inc.
2. 3M Corporation
3. STI/Specified Technologies Inc.
4. Metacaulk/Rectorseal Corporation
5. Tremco
6. Cafco/Isolatek International
7. Nelson Firestop Product.
H. Use only firestop products that have been UL 1479, ASTM E-814, or UL 2079 listed for specific fire-rated construction conditions conforming to construction assembly type, penetrating item type, annular space requirements and fire-rating involved for each separate instance.
I. Cast-in-place firestop devices for use with non-combustible and combustible plastic pipe (closed and open piping systems) penetrating concrete floors, the following products are acceptable:
1. HILTI CP 680 cast-in-place firestop device.
2. HILTI CP 681 tub box kit for use with tub installations.
J. Sealants, caulking materials, or foams for use with non-combustible items including steal pipe, copper pipe, rigid steel conduit and electrical metallic tubing (EMT).
The following products are acceptable:
1. HILTI FS-One Intumescent Firestop Sealant
2. HILTI CP 604 Self-leveling Firestop Sealant
3. HILTI CP 620 Fire Foam
4. HILTI CP 606 Flexible Firestop Sealant
5. HILTI CP 601S Elastomeric Firestop Sealant
K. Sealants or caulking materials for use with sheet metal ducts. The following products are acceptable:
1. HILTI CP 601S Elastomeric Firestop Sealant
2. HILTI CP 606 Flexible Firestop Sealant
3. HILTI FS-One Intumescent Firestop Sealant
L. Intumescent sealants, caulking materials for use with combustible items (penetrants consumed by high heat and flame) including insulated metal pipe, PVC jacketed, flexible cable or cable bundles and plastic pipe. The following products are acceptable:
1. HILTI FS-One Intumescent Firestop Sealant
M. Firestop collar or wrap devices attached to assembly around combustible plastic pipe (closed or open piping systems). The following products are acceptable.
1. HILTI CP 642 Firestop Collar
2. HILTI CP 643 Firestop Collar
3. HILTI CP 645 Firestop Sleeve
N. Materials used for complex penetrations made to accommodate cable trays, multiple steel and copper pipes, electrical busways in raceways. The following products are acceptable.
1. HILTI CP 637 Trowelable Firestop Mortar/Compound
2. HILTI FS 657 Fire Block
3. HILTI CP 620 fire Foam
O. Non curing, re-penetrable materials used for large size/complex penetrations made to accommodate cable trays, multiple steel and copper pipes, electrical busways in raceways. The following products are acceptable:
1. HILTI FS 657 Fire Block
1535 n. freedom blvd. suite 360 provo, utah 84604
801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information
no. date description
M7.1
95 E. Center Street Orem, Utah 84057
OCTOBER 3, 2025
PERMIT SET
drawing title design professional stamp client info sheet number
RESTROOM
REMODEL
OREM CITY
PUBLIC
SAFETY
BUILDING
Th es e pl an s, d ra w in gs , a nd d es ig ns a re th e ex cl us iv e pr op er ty o f W
PA
A rc hi te ct ur e an d sh al l n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n co ns en t.
Al l r ig ht s re se rv ed
THESE DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND THE
INFORMATION CONTAINED HEREIN IS INCOMPLETE UNLESS IN CONJUNCTION WITH
ROYAL ENGINEERING'S INTERPRETATIONS, DECISIONS, OBSERVATIONS AND
ADMINISTRATIONS. USE OR REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN
PART WITHOUT ROYAL ENGINEERING'S CONSENT IS IN VIOLATION OF COMMON LAW.
COPYRIGHTS, STATUTORY AND OTHER RESERVED RIGHTS. REFER TO ACT 17 U.S.C. PAR.
511 (1991). WHICH PREEMPTS STATE AND LOCAL PUBLIC RECORD ACTS. REFER TO ACT
17 U.S.C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .