2-NOI 448-2024-009673.pdf
PDF 281 KB Posted
- Solicitation number
- 260228
- Issued by
- Sedgwick County, Kansas
About this file
This is a Notice of Intent (NOI) for stormwater discharge authorization under the Kansas Water Pollution Control General Permit (NPDES) submitted to the Kansas Department of Health and Environment (KDHE). The document authorizes Fisher Wells, representing Bridger on Central, LLC, to discharge stormwater runoff from construction activities at the Bridger at Central residential subdivision project located at 12822 W Central Avenue in Wichita, Kansas (Sedgwick County). The project encompasses 134 acres of soil disturbance within a total site area of 155.50 acres and involves construction of a new residential subdivision with related utilities. The anticipated construction period extends from June 3, 2024, through June 3, 2029. The project includes excavation of ponds and trenches for underground utilities, with a sedimentation basin to be installed in the drainage area to manage runoff from soil disturbance exceeding ten acres. The NOI was submitted on December 22, 2023, and authorization was granted on April 17, 2024, under Kansas Permit No. S-LA20-0096 and Federal Permit No. KSR122031.
The authorization requires compliance with a Stormwater Pollution Prevention Plan (SWP2 Plan) to be implemented prior to construction commencement. Engineer Austin Gottlob (License No. 17919) developed the construction stormwater pollution prevention plan, which includes design calculations for sediment basins, erosion control measures, and stormwater management features across all construction phases. An annual permit fee of $60.00 is required, payable through the KEIMS system. The project site drains to the Little Arkansas River Basin and has been cleared of environmental constraints, including the absence of contaminated soils, threatened or endangered species habitat, jurisdictional wetlands, and historical or archeological sites. No Municipal Separate Storm Sewer System serves the site, and no surface water drinking intakes are located within one mile of discharge points.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Add01 448-2024-009673.pdf | ||
| 3-BP 448-2024-009673.pdf | ||
| 1-260228 Bid Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 1 of 4
NOTICE OF INTENT (NOI)
For Authorization to Discharge Stormwater Runoff from Construction Activities In accordance with the Kansas Water Pollution Control General Permit Under the National Pollutant Discharge Elimination System (NPDES)
Submission of this Notice of Intent constitutes notice that the party identified in Section I of this form requests authorization for coverage under the Kansas Water Pollution Control general permit, or KDHE issued successor permits, issued for stormwater runoff from construction activities in the State of Kansas. Becoming a permittee obligates the discharger to comply with the terms and conditions of the general permit. A complete request for Authorization for coverage under the general permit must be submitted or the request will not be processed. KDHE will notify owners or operators whose Notice of Intent (NOI) and supporting documentation for Authorization of stormwater runoff associated with construction activities are incomplete, deficient, or denied.
I. OWNER OR OPERATOR ADDRESS, BILLING, CONTACT & RECORDS LOCATION INFORMATION
Owner/Operator Fisher Wells Mailing Address: 1717 N. Main St, Ste 4650
Company Name: Bridger on Central, LLC City, State Zip: Dallas, TX 75201
Phone: Email: fwells@greysteel.com
Contact Name: Fisher Wells Mailing Address: 1717 N. Main St, Ste 4650
Company Name: Bridger on Central, LLC City, State Zip: Dallas, TX 75201
Phone: E-mail: fwells@greysteel.com
PERMIT FEE BILLING INFORMATION
Billing Contact: Fisher Wells Billing Address: 1717 N. Main St, Ste 4650 Dallas, TX 75201
Phone: (314) 800-3519 E-mail: fwells@greysteel.com
II. SITE INFORMATION
Project Name: Bridger at Central Street Address: 12822 W Central Ave
Wichita, KS 67235 County: Sedgwick
Legal Site Description:
Qtr: Qtr: Qtr: SW Section: 13 Township: 27S Range: 02W
Decimal Degrees Latitude: 37.694528 Decimal Degrees Longitude: -97.493972
AUTHORIZED:Submission Received: 12/22/2023 Submission Number:
HQ0-2717-GFKNE YES X NO
Reviewer: Is Authorization Conditional
YES NO X
(if yes, see Section V for conditions)
Larry Hook Are there any Considerations
YES NO X
(if yes, see Section V for considerationsAuthorized By:
Secretary, Kansas Department of Health and Environment KS Permit No.: S-LA20-0096
Issued: April 17,2024 Federal Permit No.: KSR122031
Page Page 11 of of 44Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page
Project Name: Bridger at Central Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 2 of 4
B. Existing Conditions/Uses
1) Is any part of the project located on Indian Country Land?
No
2) If stormwater runoff drains to or through a Municipal Separate Storm sewer System (MS4): MS4 Name:
3) Name of the first receiving water, stream, or lake none, River Basin LA - LITTLE ARKANSAS
4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?
No
5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?
No
6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points?
No
7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within 1000 feet of the project site?
No
Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination
8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?
No
Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.
9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?
No
10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within ½ mile of the facility boundary?
No
C. Project Description
1) Project Description:
Construction of new residential subdivision with related Utilities.
Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development? Yes
2) Anticipated project Start Date: June 3, 2024 and Completion Date: June 3, 2029
3) Estimated total area to be disturbed: 134.00 Acres
4) Total area of the site: 155.50 Acres
5) Do you plan to disturb ten or more acres that are within a common drainage area? Yes
Will a sedimentation basin be installed in that drainage area? Yes
(Attach design calculations for each sedimentation basin.) If a sediment basin is not feasible, on a separate sheet describe similarly effective erosion and sediment control measures to be implemented in lieu of a sedimentation basin.
Page Page 22 of of 44Page
Project Name: Bridger at Central Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 3 of 4
D. Maps
Include an area map showing the outline of the construction site and the topographic features of the area at least one mile beyond the project site.
E. Erosion Control Plan and Best Management Practices
1) Provide a summary of the sequence of major soil disturbing activities including installation of the corresponding stormwater management and pollution control features.
Excavation of ponds and trenches for underground utilities.
2) Provide one or more site plans covering the anticipated soil disturbing activities showing the limits of disturbance, the existing and proposed elevation contours, the types and locations of erosion/sediment control measures and stormwater management/pollution control features during each phase of construction and the locations where stormwater runoff leaves the construction site.
3) Provide a description of the best management practices to be utilized to control erosion and the discharge of sediment and other pollutants in stormwater runoff throughout construction and the design calculations for each sediment basin including total drainage area and storage capacity below the elevation of the mass volume flow outlet device.
See attached.
4) Provide the name and License or Certification Number of the engineer, geologist, architect, landscape architect, or Certified Professional in Erosion and Sediment Control (CPESC) under which the construction stormwater pollution prevention plan has been developed.
Austin Gottlob 17919 Engineer Name License or Certification Number Profession or Field
III. ANNUAL FEES
The first year of the annual permit fee specified in K.A.R 28-16-56 et seq. as amended is currently $60.00 and can be paid through the KEIMS system at time of submittal. The fee must be paid before this NOI will be processed. An invoice for the annual permit fee will be sent to the contact person requesting a permit until such time as the permittee submits a Notice of Termination (NOT).
Failure to pay the annual fee timely may result in termination of the construction stormwater discharge Authorization.
IV. OWNER OR OPERATOR CERTIFICATIONS
I, the undersigned, certify that a Stormwater Pollution Prevention Plan (SWP2 Plan) will be or has been developed for the construction site described in this NOI and supporting documentation. I further certify that the plan will be implemented at the time construction begins, and, as required by the NPDES general permit for Stormwater Runoff from Construction Activity, will revise the SWP2 plan if necessary.
I understand that continued coverage under the NPDES general permit for Stormwater Runoff from Construction Activities is contingent upon maintaining eligibility as provided for in the requirements and conditions of the general permit, and paying the annual fee.
Page Page 33 of of 44Page
Project Name: Bridger at Central Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 4 of 4
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Fisher Wells 12/22/2023 11:24:31 AM Signature (owner or operator) Date
Official Title
V. CONDITIONS AND/OR CONSIDERATIONS OF APPROVAL
Conditions of Authorization - For Official Use Only:
When indicated, Conditions of Authorization are as follows:
NONE
Notes on Consideration – For Official Use Only:
NONE
Page Page 44 of of 44Page
File details come from the government source that posted it. Updated .