2-Housing Rehabilitation General Specifications 2.3.25.pdf
PDF 353 KB Posted
- Solicitation number
- HSD26081
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This General Specifications document outlines rehabilitation work requirements for the Housing Stability Division in Salt Lake City, Utah, governing construction standards for single-family home renovation at 1315 Iola Ave. The specifications establish comprehensive requirements across multiple construction disciplines including site work, concrete, roofing, exterior finishes, mechanical systems, electrical work, plumbing, insulation, interior finishes, kitchen and bath renovations, appliances, and lead hazard reduction. All materials must be new and installed per manufacturer specifications, with the contractor responsible for determining quantities needed to complete the work. Work hours are restricted to 8:00 AM to 6:00 PM Monday through Friday unless otherwise approved by the owner, with a minimum 12-hour notice required before arriving for work. The contractor must obtain all permits, schedule inspections, and comply with current Utah State Construction and Fire Codes, Salt Lake City Ordinances Title 18, EPA Renovation Repair and Painting Program requirements, and all other applicable codes and regulations.
The specifications establish detailed performance standards and material requirements for each work category, including concrete mix specifications (Class 4000 per APWA standards), roofing materials (30-year architectural shingles for residential; 60 mil TPO with 15-year warranty for flat roofs), electrical service upgrades to 150-amp residential service with 20-circuit panel, HVAC furnace installation with minimum 95% AFUE rating, and plumbing fixtures including 40-gallon gas water heaters and ceramic tile or solid surface tub surrounds. The owner shall select finishes, colors, styles, and materials from contractor-provided pre-mixed, in-stock, readily available options meeting the general specifications. Work must comply with lead-based paint hazard reduction requirements including containment, proper disposal, cleaning, and clearance procedures performed by HUD or EPA-certified lead specialists, with interior clearance achievable only through certified laboratory dust sample analysis demonstrating levels below 5 mg/sq. ft. on floors and 40 mg/sq. ft. on interior sills.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Housing Stability Division - 1315 Iola Ave. - HSD26081 - Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Housing Stability 451 South State Street, Room 445, Salt Lake City, UT 84114 Page 1 of 23
General Specifications – Rehabilitation Work
Requirements All materials supplied by the Contractor shall be new and shall be installed in full accordance with the manufacturer's specifications. The Contractor is responsible for determining the quantities needed to complete the specified work.
Where specified, the Owner shall select finish, colors, styles and types of materials from a Contractor-provided selection of pre-mixed, in stock, readily available options which meet the General Specifications. The Contractor shall obtain the Owner’s choice in writing and shall provide a copy of these written choices to the Division if requested.
Contractors and their Subcontractors shall schedule working hours between 8:00am and 6:00pm Monday through Friday. Requests to work on weekends and before or after these hours must be approved by the Owner. The Contractor shall give a minimum 12-hour notice to the Owner before arriving for work.
All work shall comply with all applicable codes and regulations. These include the current adopted Utah State Construction and Fire Codes, the current Salt Lake City Ordinances Title 18 - Building and Construction, the EPA’s Renovation, Repair and Painting Program, and other applicable codes and regulations. The Contractor shall obtain all permits for the work, schedule the inspections, and make any corrections required by the Building Official.
The Contractor is responsible for repairing any property that is damaged in the work area as a result of the work, unless the Contractor could not have foreseen causing the damage.
The Contractor shall be responsible for selecting and implementing means and methods of construction in accordance with all criteria described in these general requirements.
SITE WORK
Tree Removal Cut down and haul away the tree specified. Work shall be done in such a way that no damage is caused to above ground structures, overhead electrical or telecom wires, or other visible property. Remove all of the demolition debris from the site. Grind the tree stump (not including the root system) to 12" below grade. Wood chips from stump grinding may (WW May 20, 2016) remain on site. Work does not include bringing in topsoil fill or finishing of the demolition site. Unless otherwise specified, the Contractor is not responsible for damage to any subsurface obstacles (such as buried low voltage wire, invisible fence or sprinkling system). The Owner shall disclose any known subsurface obstacles that may be near the work area before work begins.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 2 of 23
Tree Trimming Trim the specified trees next to the home to provide a clearance of 2’ horizontally and 8’ vertically from the roof that is free of branches. All cuts shall be neat and at branch junctions.
Sewer Lateral Replacement Replace the existing sewer lateral from house to the City main with a new 4-inch sewer lateral.
Trenchless pipe bursting may be used if approved by Salt Lake City Public Utilities. The Contractor is responsible for obtaining and clearing all applicable permits and meeting all requirements of Salt Lake City Public Utilities, Engineering and Transportation.
Sewer Lining Line the existing sewer lateral from house to the City main with cured-in-place pipe. The work must be pre-authorized by Public Utilities, and then approved after completion. If the work is not approved by Public Utilities, the Contractor shall make the necessary repairs to obtain approval. The Contractor is responsible for obtaining and clearing all applicable permits and meeting all requirements of Salt Lake City Public Utilities, Engineering and Transportation.
T-Patch Asphalt Pavement Backfill trenches and patch asphalt pavement per the “T-Patch” design as shown in the drawings below (applies to work in private lanes and driveways where a City Engineering permit is not required):
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 3 of 23
Landscape Restoration [For use with any exterior work that could affect a landscape. Model after the HomeServe Terms and Conditions for sewer line replacement:] After the line is repaired or replaced, provide for basic site restoration to the area disturbed by the repair in a neat and professional manner to the standard of care of a plumber who regularly performs residential sewer line repairs. Such restoration is limited to filling, raking, and reseeding of grass, reinstallation of existing soft landscaping and shrubbery and patching of paved surfaces. We cannot guarantee the survival of any living materials disturbed as a result of the repair and will not be responsible for the replacement of any decorative paving, pathways or landscaping features.
CONCRETE
Sub-Grade Prep Demolish and/or haul away the existing concrete or dirt of the new project area specified. Properly excavate and grade for new concrete. All vegetation and plant matter shall be removed from the pour area to 6 inches below sub-grade. Soft, wet, or unstable areas within the pour area shall be removed to 12 inches below sub-grade and filled with granular material and mechanically compacted. Mechanically compact the entire new pour area before pouring. Proper drainage must be maintained away from the building with the same slope for sub-grade as for finished concrete surface.
Vapor Barrier in Crawl Spaces and/or Unfinished Basements.
Cover the dirt crawlspace with a 10 mil or greater plastic moisture barrier. Overlap any seams and tape them with Waterproof Seam Tape or equivalent. Bring the plastic 6” or more up the wall and fasten.
Stake the plastic down with landscape fabric stakes to keep it in place. Cover exposed foundation walls with 1 ½ in. of rigid, moisture-proof insulation.
Gravel Sub-Grade Excavate and remove 4 inches of sub-grade material from the pour area. Additional areas within the sub-grade area that are soft, wet, or unstable shall be removed. The excavated area shall be graded for proper drainage away from all buildings and structural components such as post footings and columns.
The sub-graded area shall be filled with 4 inches of ¾ minus gravel or road-base and be mechanically compacted before placing any reinforcing steel or concrete.
Ready-Mix Concrete The ready-mix concrete shall be Class 4000, APWA Section 03 30 04. This is the same mix required by Salt Lake City Engineering for public way concrete work (City Mix). The 6.5 bag City Mix [AKA 5200 PSI AA (AE) UDOT S concrete on a Ready-Mix Concrete delivery ticket] shall be used from March 1st through October 1st, and the 7.5 bag City Mix shall be used from October 1st through March 1st. Concrete will not be poured between October 1st and March 1st unless approved by the Division and the Owner. The Contractor shall be responsible to see that the concrete used meets this specification and shall provide copies of the delivery tickets to the Division.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 4 of 23
Exterior Flatwork The new concrete shall be a minimum of 4 inches thick. Proper drainage must be maintained away from the building with a minimum slope of 2% (1/4 inch per foot). A landing outside a door or at the foot of a stairway shall have a maximum slope of 2% (1/4 inch per foot).
Expansion board shall be placed against abutting concrete and tooled or saw-cut control joints shall be placed no more than 8 feet apart. For pours less than 8 feet in width, place control joints the same distance apart as the width of the pour. Control joint depth shall be no less than 25% of the slab thickness.
The finish shall be smooth with a light broom texture.
Contractor shall be responsible for the removal of all forms after the pour, and for the cleanup of the site from concrete spillage, splash, wash out and other construction debris. The form voids around the edges of the newly poured concrete shall be filled with soil and blended into the existing landscape. All existing sprinkler lines or heads that might have been damaged or dislodged as a result of the work shall be repaired or reset. Any damage from the concrete truck or other equipment shall be repaired by the Contractor.
Concrete shall not be poured in adverse weather conditions. Apply to the surface of the newly poured and finished concrete ChemMasters SilenCure, WR Meadows CS309, US Spec APS-25, or an approved alternate [It appears that low-VOC types (water-based) are being pushed, so solvent-based may soon be unavailable. WW 13Sep2016] acrylic curing and sealing compound. Notify the Division of the scheduled pour time 24 hours in advance so that an inspection of the forming and grading may be made, and an alternate sealant can be approved.
The Contractor is responsible for the protection of the concrete from vandalism or accidental imprints until work has been completed on the day of the pour.
Concrete Porch, Cap and Steps New work shall meet existing adjacent walking surfaces to provide a means of egress per current code.
The horizontal surfaces shall shed water away from the building with a maximum slope of 2% (1/4 inch per foot) without pooling.
Footings for porch and steps shall be reinforced with rebar and approved in a footing inspection by the Building Official.
A porch foundation wall shall be 6 inches thick, reinforced with rebar, and doweled to the footing and house foundation.
Steps shall be reinforced with rebar and doweled to the porch foundation wall.
Any cavity under the porch or the steps shall be completely filled with compactable granular material.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 5 of 23
A porch cap shall be 5 ¼ inches thick, overhang the foundation wall by 1 ½ inches, and be dowelled to the foundation wall or the house foundation.
A weather step shall replace an existing in the same configuration.
Notify the Division of the scheduled pour time 24 hours in advance so that an inspection of the grading and forming may be made, and the sealant can be approved before the pour. Concrete shall not be poured in adverse weather conditions.
The formwork shall be stable and secure during the pour. Forms that do not stay in place may result in the rejection of the pour by the Division.
Finish the horizontal surfaces smooth with a light broom texture. Apply foundation plaster to the vertical, above-grade surfaces.
Apply to the surface of the newly poured and finished concrete ChemMasters SilenCure, WR Meadows CS309, US Spec APS-25, or an approved alternate solvent-based acrylic curing and sealing compound.
The Contractor is responsible for the protection of the concrete from vandalism or accidental imprints until work has been completed on the day of the pour.
Remove forms after the pour, and clean from the site concrete spillage, splash, wash out and other construction debris. The form voids around the edges of the newly poured concrete shall be filled with soil and blended into the existing landscape. Any damage from the work, such as dislodged sprinklers or tire tracks in the yard, shall be repaired to the condition existing prior to the work.
ROOFING
Shingle Roof Tear Off Protect the building and plant material as well as possible from damage caused by removal of the existing roofing. Contractor will walk the property with the Owner to identify anything that is sensitive that could be damaged. Remove and dispose of any and all shingle layers down to the decking. Remove or set any and all nails in the decking. The Contractor shall inspect the decking and replace any decking whose structural integrity has been compromised with wood of similar size and dimension. If the decking is skip sheathing than the Contractor shall provide and install 7/16" OSB or approved equal to the entire roof. This shall be nailed on the rafter lines. The roof shall be dried in according to current code requirements. If any rain gutters are removed or disturbed in this process than the Contractor shall have them reinstalled to drain and function properly.
Install a baked enamel preformed 90-degree drip edge on the entire perimeter of the roof that is being reroofed. Provide and install a 30-year architectural shingle that is listed and meets the current applicable codes for residential roofing. Install Grace, Tamko Moisture Guard, GAF Stormguard, or CertainTeed Winterguard ice and water shield before installing synthetic or 15-pound tar paper. Install 30-year Tamko Heritage 30, GAF Timberline 30, or CertainTeed Landmark 30 shingles with five nails per
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 6 of 23 full shingle. Install all new pipe flashings that are galvanized or galvanized "no caulk" flashings. This includes pipe flashings at the power mast and flues but not the power mast. Turtle vents shall be aluminum or galvanized and installed on the back side of the roof. The vents shall provide openings that have a net area in accordance with the current applicable codes.
There shall be proper cementation around all chimneys, plumbing vent, pipes, flue vent pipes, TV antennas and any other protrusion on the roof. All valleys shall be ledgered, cut, or woven. All hip ridges shall be capped. Caps shall be cut square with no unevenness, the same color as the roof, and set to a line.
Where a sloped portion of the roof is intercepted by a chimney (24"or greater), where there is not a saddle or cricket existing, the Contractor shall provide and install a cricket so as to divert the water way from the chimney base. The cricket shall have a 6/12 pitch and shall be as wide as the chimney at the base of the chimney.
Base flashing against a vertical sidewall or chimney shall be step flashing. Install a kickout flashing at the bottom of a run of step flashing. Base flashing against a vertical front wall shall be 4” x 4” “L” flashing.
Where there is an appropriate siding type on a vertical wall, tuck the base flashing under the siding.
Where the base flashing cannot be tucked under the siding, install counter flashing. Caulk shall be 50-year Dow Corning caulk, clear or a matching color.
The roof shall be swept down, and the rain gutters cleaned out. Any and all roofing debris shall be cleaned up and hauled away. The driveway and walkways shall be swept and clean. There will be NO nails found on the premises. All left over supplies shall be removed from the roof and the property.
TPO Roof Protect the building and plant material as well as possible from damage caused by removal of the existing roofing. Remove and dispose of any and all roofing layers down to the decking. Remove or set any and all nails in the decking. The Contractor shall inspect the decking and replace any decking whose structural integrity has been compromised with wood of similar size and dimension. If installing foam board substrate, install a wood nailer the same dimension around the perimeter of the roof. (WW June
28. 2016) If any rain gutters are removed or disturbed in this process the Contractor shall have them reinstalled to drain and function properly.
The TPO roofing shall be 60 mil, meet ASTM D6878, "Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing", and carry at least a 15-year manufacture's written warranty that is supplied to the Owner prior to any payment being made. The Contractor shall be certified by the manufacturer to install that specific brand of TPO roofing.
The Owner shall be responsible for all scheduled maintenance on the roof based on the manufacturer's maintenance schedule that shall be supplied to them by the roofing Contractor. Any and all metal drip edge, pipe flashings, and vents shall be TPO coated and approved by the manufacture and shall carry the same 20-year manufacturer's warranty.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 7 of 23
The roof shall be swept down, and the rain gutters cleaned out. Any and all roofing debris shall be cleaned up and hauled away. The driveway and walkways shall be swept and clean. There will be NO nails found on the premises. All left over supplies shall be removed from the roof and the property.
EXTERIORS
Foundation Re-Plaster Remove all loose and hollow plaster from the foundation and concrete porches and steps. Infill voided areas and re-coat entire area specified using commercially available pre-mixed foundation plaster per manufacturer's instructions.
Foundation Plaster Patch Remove all loose and hollow plaster from the foundation and concrete porches and steps. Re-plaster voided areas using commercially available pre-mixed foundation plaster per manufacturer's instructions.
Finish texture and color shall match and blend into the existing adjacent area as well as possible. The Contractor shall apply a sample in an inconspicuous location for approval of the color by the Owner.
Repoint Brick Repoint exterior brick walls in all spots where there is a gap in the mortar greater than ¼" x ½" or where there is a crack along the mortar longer than 2". Cut out defective joints and rake them to a depth of ¾ inches. Regrout them with mortar using a 1:1:6 mix of Portland cement, lime, and sand. SpecMix #PL-04, or other proprietary Type N mix that contains lime may be used instead. The new mortar shall match the existing as closely as possible. The Contractor shall apply a sample of the mortar in an inconspicuous location for approval of the color by the Owner. The surface to be repointed shall be wet immediately before application. Finish with an appropriate tool or method to match the tooling of the existing mortar as closely as possible. Clean the affected masonry areas to leave them in a condition normally accepted in the trade.
Chimney Cap Remove loose brick courses. Relay the top courses of the chimney brick which have been removed.
Replace any defective bricks with new bricks matching existing as closely as possible.
Clear away loose material and dampen top course of the brick to prepare for the application of the new cap. Install a new cap so that moisture will run off the chimney. The chimney shall be left open and operable with a hole in the top that is equal to the existing. Chimney cap shall be a minimum of 2 inches thick on the outside edge and extend a minimum of 1 - ½ inches horizontally beyond each side of the chimney.
Repoint the exterior brick sides of the chimney per the Repoint Brick Specification.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 8 of 23
Exterior Paint Properly prepare and repaint all exterior wood surfaces on the structure. These surfaces must be thoroughly cleaned, allowed to dry, and scraped to remove all loose or peeling paint to obtain a sound working surface before new paint is applied. Work includes removing loose caulk and removing and cleaning removable items attached to the structure. Holes, cracks, open joints, and other defects will be caulked smooth.
Unless otherwise specified, prep work does not include re-nailing or replacing broken, loose, or missing wood members.
Owner understands that the texture of the scraped paint may show through to the newly painted surface.
If the surface is unfinished, or unpainted, or bare wood, or a repaired or patched surface, a primer coat will be applied before the two finish coats of paint. The Contractor will wait at least 4 hours between applications. Notify the Division of the scheduled 2nd coat application time 24 hours in advance so that an inspection may be made.
The Division may require at no additional expense to the Owner additional coats of paint to eliminate bleed-through of background material, unless the Owner chooses a paint that is incompatible with the existing color. It is up to the Contractor to inform the Division in writing of any conflict that may arise over more than two coats of paint, and the Contractor must wait until the Division settles the matter before painting the house. If more than two coats are needed to cover incompatible paint, the Owner will pay the additional costs on the incompatible paint.
There will be clean painting cuts in all corners, around all trim, and where two colors join. The Owner will verify in writing with the Contractor which windows are not operable before painting and the Contractor will not be responsible for making those windows operable. All windows that were freely operable before painting will be operable after painting.
Windows (This Specification may also apply to patio doors instead of windows.)
Product:
Provide and install Amsco Studio series or equivalent white vinyl windows (or door if a patio door is specified) in the existing jambs or opening. All windows shall have a Posi Lock.
All windows shall be insulated glass (double paned) and at least ¾" overall. Screens shall be included on all operable windows. All screens shall be tubular construction with the ability to rescreen the frame.
All bathrooms shall also have obscured glass.
Installation:
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 9 of 23
All remodel windows shall be installed according to AAMA 2410-03, and all new construction windows shall be installed according to AAMA 2400-10. The new window shall fit the existing jamb and or opening with a maximum of ¼" variance within the opening. The window shall be installed straight, plumb, and level, without twisting and securely anchored in place, in accordance with manufacture's published recommendations and the AAMA 2410-03 and AAMA 2400-10 standards. The sill shall be adequately supported along its entire length. At least three sides of the window will be foamed with Great Stuff Pro low expansion foam (from Dow) or approved equal. A non-hardening sealant compatible with vinyl shall be installed in sufficient quantity to provide a watertight seal between the window and the surrounding construction on the interior and the exterior. Dow 795 or 1199 silicone, or approved equal, shall be used on the exterior and a latex caulk on the inside. Remove and dispose of the existing specified window sashes. Replace any removed & broken wooden stop with new stop that matches the existing. The new stop shall be primed and painted to match the existing jambs.
If there are any gaps bigger than a ¼" the installer shall use backer rod before caulking in the window.
The use of vinyl flat trim (same color as the windows) shall be used if there are any gaps bigger than 3/8".
Exterior Door The door shall be a new pre-hung exterior door. Door shall be fiberglass if a front door, metal if a back door. Installation will include casings, latches, and knobs. Exterior doors will be installed with a single-throw Kwikset, Schlage or Weiser deadbolt lock. All newly installed doors shall be keyed alike. The Contractor will provide the Owner with two sets of keys for the locks.
Fiber Cement Siding Use James Hardie Hardieplank ®, Certainteed WeatherBoards ®, or approved equal fiber cement as defined by the 2006 IBC. Prepare surface by removing nails, repairing sheathing, and applying house-wrap strictly to manufacturer's specifications. Install 1" x 8 ¼" fiber cement lap siding to the surface per manufacturer's instructions.
Vinyl Siding Provide and install vinyl siding per manufacturer's instructions in the specified areas. Existing siding will not be removed. The installation shall include rigid foam insulation backer as per manufacturer's instructions, corner moldings at corners, J channel at openings, and J-boxes at fixtures and vents. The siding material shall be minimum 0.044 inches thick, and shall have a written, 30-year non-prorated warranty from the manufacturer against color fading, peeling, flaking, and cracking. The Owner shall be offered a choice of styles and colors.
Stucco Siding
Put up sheathing materials. You may stucco over any rigid material attached to your support studs. Make sure to follow Salt Lake City building codes while installing the sheathing material.
Cover the plywood with 2 layers of "Grade D" building paper or an equivalent water-resistant barrier.
You may also use 15 lb. per 100 square foot roofing felt (6.8 kg per 9.3 square meters) or some types of
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 10 of 23 house wrap, but do not use a plastic house wrap not intended for stucco. Overlap the paper by at least 4 inches (10 cm) and fasten with roofing nails.
Start at the bottom and overlap the paper or felt as you work your way up.
While not required by most codes, an air gap between the 2 layers is highly recommended to prevent wall rot. A 3D plastic drainage mat between the 2 barriers is one way to accomplish this.
Install casing bead as a plaster stop at the corners of doors and windows. Install weep screed at the base of the wall for better drainage.
Attach metal lath. The metal lath should nail or staple the lath to the studs (not the sheathing) at no less than 7-inch (18 cm) intervals. Overlap the lath by at least ½ inch (1.25 cm) along the long side and 1 inch (2.5 cm) at the end, but not much more.
Be sure to use only galvanized roofing nails or staples designed for use with stucco. Otherwise, your nails or staples will rust and pull loose.
In all exterior stucco applications, you must use G-60 hot-dipped galvanized lath.
Lath shall be at least ¼ inch furring or make up for non-furred lath using furring strips or furring nails.
Install control joints to reduce cracking. Divide the wall into rectangular panels using control joints.
Controls joins shall be no more than 18 ft apart. Also install control joints wherever 2 dissimilar walls meet. If the lath is expanded metal (rather than stucco mesh), cut it behind each control joint to fully separate this rigid material into panels.
Panels shall be as close to square as possible, and no larger than 144 ft2 Mix the scratch coat from 1 part cement material and 2¼ to 4 parts plaster sand. If you are using Type I Portland cement instead of plastic cement, you'll need to add your own hydrated lime; count the final cement and lime mixture as the "1 part cement.
Make sure to use cool water when mixing your stucco, especially if your hose has been sitting in the sun.
If the water is hot or warm, it will cause your stucco to dry too quickly.
The aggregate in the cement should be clean and well graded.
Apply the scratch coat with a square trowel at a 45º angle, firmly pushing it into the lath. This layer should be д inch thick.
The first scratch coat should be thick enough to cover your wire grid.
Score the scratch coat lightly to ensure a good bond with the next coat.
Wet cure the scratch coat. The thick scratch coat must be allowed to cure for 48 hours. Protect the stucco from drying out. Mist or fog the stucco twice daily unless the relative humidity is above 70%.
Protect the wall with a windscreen or sunshade if necessary.
Mix another batch using 1 part cement and 3 to 5 parts sand. Apply another д inch layer of stucco and screed to an even thickness, for a total thickness so far of ¾ inch. Once the brown coat loses its sheen, float it smooth.
Wet cure for at least 7 days.
Cover with the finish coat with a Я inch layer. Apply and float using 1 part cement to 1½ to 3 parts sands.
Rain Gutters Provide and install 5", K- type, seamless gutters per manufacturer's instructions on the eaves of the house. The gutters shall be 0.027" aluminum with a baked enamel coating. The gutters shall have a
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 11 of 23 proper slope so that after installation they do not collect standing water except for minimal damming behind sealant beads. Installation shall include matching downspouts placed as necessary to assure that the gutters drain properly. Downspouts shall be placed so that gutters drain to the ground or a gutter, but not to a roof. The installation shall include splash blocks at the end of each downspout directing the storm water away from the building.
The Owner shall verify downspout location prior to installation. They shall be installed if allowable according to standard installation practices. The Owner shall have a choice of colors.
Steel Railing Provide and install steel railing (“ironwork”), handrail or guardrail as specified, in the area specified. The handrail (or top of a guardrail that also serves as a handrail) channel iron dimension shall be 1 ½" x ¾”.
Unless otherwise specified, the rails will be powder coated. The 1-year Work Guarantee will cover rust on the railing, unless the rust was caused by damage in use. The Owner shall have a choice of colors.
Wood Hand railing Provide and install a wood railing, handrail or guardrail as specified, in the area specified.
Position
The top of a handrail must be parallel to the stairway and mounted at a height between 34 and 38 inches above the front edge of the stair treads. The railing must be continuous for the length of the stairway. In a public building, the handrail must extend at least 12 inches beyond the top and bottom treads.
The railing and mounting hardware must be capable of supporting a weight of 200 pounds applied in any direction at any point. The maximum gap allowed between brackets supporting the handrail is eight feet.
Dimensions
A railing attached to a wall must be at least 1¼ inch and no more than 2 inches thick. The support brackets must hold the railing at a distance of at least 1½ inches from the wall and project a maximum of 3½ inches from the wall. The surface of a railing must be smooth, with no sharp corners.
MECHANICAL
Furnace and A/C Remove and properly dispose of the existing furnace and any related materials. Provide and install a new gas fired forced air furnace with a minimum AFUE rating of 95%, and minimum limited warranties of 20 years on heat exchanger, and 5 years on parts.
Install per the current Dominion Energy Good Practices for Gas Piping and Appliance Installations.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 12 of 23
Install the furnace to the existing duct work, with all supply and return air duct transitions to the new furnace. The filter access shall be conveniently located and have a tightly fitting cover that requires no special tools and presents no cutting hazard. Seal all exposed and accessible duct joints, connections, and seams with duct mastic or UL listed tape.
Install a new appliance shut-off valve on the existing gas line, and any updates needed to bring the installation to code standards (including a gas flex pipe and sediment trap). Unless otherwise specified, the work does not include changes to the gas piping upstream of the shutoff.
Install PVC flue piping to the outside with a flat wall termination or a concentric roof termination. After installation of the furnace, the water heater flue shall be properly sized in accordance with GAMA vent tables and applicable mechanical code.
Provide condensate drainage to the plumbing system. Work includes, if necessary, a condensate drain pump.
Install a new thermostat. The Owner shall have the choice between a set back programmable thermostat and a digital round non-programmable thermostat.
Startup and green sticker the new furnace.
Furnace Sizing Use the most recent version of the Air Conditioning Contractors of America (ACCA) Manual J residential load calculation tool http://www.acca.org/tech/manualj/ (calculate the load with manual J based on the post rehab building envelope) and use the most recent version of ACCA's Manual S for equipment selection. Provide both Manual J and D reports to the Division for review and approval prior to installation.
Furnace Filter The filter access shall be conveniently located and shall be accessed via a tightly fitting cover that requires no special tools to open and close and will not present a cutting hazard.
Air Conditioning Install a minimum of 14 SEER with ENVIRONMENTALLY SOUND R-410A REFRIGERANT.
https://www.energystar.gov/sites/default/files/asset/document/sizingguidelines_O.pdf manufactured Home Cooling Equipment Sizing Guidelines for Energy Star qualified manufactured homes and homes built to the HUD standards 1
Assure performance ratings of capacity, SEER and EER per AHRI Standard 210/240 rating conditions.
Also, each unit bears the UL mark and Each unit is certified to UL 1995 safety standards.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 13 of 23
ELECTRICAL
Electrical – General Requirements The electrical work items will be outlined in the electrical permit. All materials shall be new and shall be UL approved and/or National Electrical Code rated. All drilling, cutting, and fastening shall be neat and true. All electrical equipment abandoned due to the specified work shall be removed. Any areas that may show when any previous panels, boxes, conduits, or raceways are removed as a result of the specified work shall be patched and painted to match the surrounding surface as closely as possible.
Electrical Service Update Replace existing electrical service with a residential, 150-amp, single phase, 3 wire electric service.
Include a main disconnect, 110/220 volt, 20 circuit panel board, outside receptacle, meter socket, weather head, service cable, and double ground rod and cable. Seal exterior service penetrations to maintain a waterproof building envelope. Verify service location and metering provisions with Rocky Mountain Power. Contractor shall pay all charges imposed by the utility company for providing this service connection to this new entrance. The service shall be connected by Rocky Mountain Power to the weather head before payment will be made. All circuits in the panel shall be labeled legibly to indicate the purpose of the circuit.
Electrical Distribution Panel Remove the old fuse box or distribution panel. Provide and install a 150-amp, 110/220 volt, and 20 circuit panel board. If the panel is installed on the exterior of the house, the installation shall include an outside receptacle. All circuits in the panel shall be labeled legibly to indicate the purpose of the circuit.
Electrical Update Update the entire structure as necessary. Furnish and install all the wiring, conduits, wiring devices and equipment, and lighting fixtures, where required necessary to complete the electrical installation according to the latest NEC (as applicable to the currently adopted code), the Salt Lake City Electrical Ordinances and this specification.
All wiring, where possible, will be flush and concealed. Wiring to plugs, lights and switches where run is exposed, must have prior permission by an agreement signed by the Owner and Contractor. As determined by the local Electrical Inspector, all exposed wiring shall be installed in conduit or approved raceways. Specification of the conduit or raceways will be noted in written agreement and given to the Housing and Economic Development Division.
There will be a minimum of two (2) receptacles located in every habitable room and one (1) switched light. The outlets may be switched for a room in lieu of a switched light. (This will require written agreement between the Owner and Contractor). Bathroom and outside outlets will be protected by a ground fault outlet or a breaker in the panel.
As a minimum, the kitchen receptacles shall be installed on two (2) separate 20-amp small appliance circuits, with a minimum of four (4) outlets. These circuits shall have no other outlets, lights or plugs.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 14 of 23
There will be one receptacle for every six (6) feet of counter space, where applicable. Disposal and dishwasher shall be on a separate 20-amp appliance circuit if they are present in the kitchen. The refrigerator shall be on a separate 20-amp appliance circuit.
Where furnace wiring is required, a separate circuit will be installed.
If and where specified, provide and install a hard-wired smoke detector with a battery backup in each bedroom of the house, in a hall that is outside of a bedroom area, in the basement, and on each floor of the house. The smoke detector will be initially equipped with a battery. If hard wired is not available interconnected with battery back (10 year lithium battery) may be used.
If and where specified provide and install a Carbon Monoxide detector on each floor of the house that has a gas appliance. An approved combination smoke detector/carbon monoxide detector may be used.
There shall be lighting at both front and rear exits and the furnace. All convenience outlets wired and installed will be of the grounded type and grounded. The existing wiring may be used if in good condition and is checked by the Electrical Contractor and considered usable. If in question, the local Electrical Inspector will make the final determination. All electrical work will be done by a State Licensed Electrical Contractor. The Contractor is responsible for obtaining necessary electrical permits and approval by the Electrical Inspector.
The Electrical Contractor should confer with the Owner on the location of any new plugs that may have to be installed in a room. The General Contractor will be responsible for patching any areas that may show when any previous panels, boxes, conduits, or raceways were installed. Patching will be done at the request of the Housing and Economic Development Division. This additional work will not be charged to the Owner. The local Electrical Inspector will have the final determination as to the acceptability of the work by the Electrical Contractor.
Any light that is presently in the house will be checked and left operable.
The Contractor will provide and install an outlet in the bathroom that is on a GFI circuit.
All floor plugs will be removed. The plug will be removed, and the box will be covered with a blank. The plug will be replaced with a 110 grounded duplex outlet on a wall as close to the existing plug as possible.
In the kitchen, any receptacle that is above the countertop and within 6' of the edge of the sink must have a Ground Fault outlet.
The refrigerator plug must be below the countertop.
Any diffuser that was originally a part of the installation that is now missing will be replaced.
Unless otherwise specified, knob and tube wiring in the house shall stay in place and in use and is not addressed by this specification.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 15 of 23
Existing circuits that are not grounded shall remain ungrounded unless specifically specified in the Description of Work. Any outlets that are added by the Contractor to an ungrounded circuit will either be a two-prong outlet or else will be an outlet that is protect by a ground fault circuit interrupter.
All new circuits that are provided by the Contractor will be grounded.
Replace Knob-and-Tube Wiring Replace the accessible knob-and-tube wiring in the attic with new NM cable and flagged junction boxes.
Work does not include replacing entire circuits unless otherwise specified. Re-spread any disturbed insulation to an even distribution.
Certify Electrical Distribution Electrician shall inspect all exposed wiring, fixtures, luminaires and devices for proper function and correct installation in accordance with the electrical code in effect at the time of installation. Any equipment or wiring that is found to be improperly functioning or installed shall be replaced with new wiring, devices, fixtures, and luminaires. In distribution panels, check for loose connections and correct these. Check the labeling in the panel, and clearly label all circuits that are not properly labeled. Work does not include replacing knob-and-tube wiring that is under attic insulation.
Bathroom Vent Fan Provide all materials and labor necessary to install a 70 CFM vent fan in the bathroom ceiling. The unit shall include a damper, decorative grill, and it shall be vented to the outside of the building. Unless otherwise specified, the fan shall operate on a separate switch from the bathroom light.
Replace Floor Outlet Replace the existing floor outlet with new electrical outlet meeting current code standards. Either replace the outlet with a new outlet approved for a floor application or replace it with a new outlet on the nearby wall.
If replacing with a wall outlet, cover the floor box with a blank metal plate. If installed on a framed wall, fish wire, and repair tear out. If installed on a masonry wall, use residential surface mounted raceway and a surface-mounted receptacle.
Replace Electrical Outlet Receptacle Replace the existing outlet receptacle with a new duplex outlet receptacle. The new receptacle shall be GFCI protected if located where GFCI protection is required by current code. If the existing circuit is not grounded, the new GFCI receptacle may be left ungrounded.
New Electrical Outlet Receptacle Provide and install a new, grounded, duplex outlet receptacle and required distribution. If installed on a framed wall, fish wire, and repair tear out. If installed on a masonry wall, use residential, surface mounted raceway and a surface-mounted receptacle. If installed in a garage, use metal raceway and a
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 16 of 23 surface mounted receptacle. The new receptacle shall be GFCI protected if located where GFCI protection is required by the Utah UBC.
Garbage Disposal and Circuit Provide and install a Badger 5 or approved equal garbage disposal under sink and connect to waste line.
Install a toggle switch on wall adjacent to sink and power wiring on a separate circuit. Fish wire and patch all tear out.
PLUMBING
Water Heater Install a minimum of 40-gallon gas water heater with a 6-year warranty in the same location as the existing water heater. Install the water heater under a Salt Lake City permit, and per the current Enbridge Gas Good Practices for Gas Piping and Appliance Installations. Work includes a new thermal expansion tank and a new ball valve shutoff. Work also includes any other updates needed to bring the water heater installation to code standards (including manual gas shutoff, gas flex pipe, temperature relief valve pipe, dielectric connections, drain pan, 4-inch connector vent, seismic bracing, and other work as needed). Unless otherwise specified, the work does not include changes to the gas piping upstream of the shutoff, a floor drain, changes to the venting above the 4-inch connector or providing combustion air to the water heater room. Startup and green sticker the new water heater.
INSULATION
Attic Insulation Insulate the attic to R-49 with blown-in cellulose insulation. This will include any baffles as needed, and flags on all junction boxes. Insulate and air-seal the attic access hatch. Facilitate all applicable Dominion Energy and Rocky Mountain Power rebates, including providing the insulation certificate and documentation that must be filled out by the Contractor.
INTERIOR FINISH
Interior Paint Paint interior of the house one tone. Work includes all previously painted doors, interior of closets, and open shelves. All surfaces will be cleaned prior to painting. This will include all necessary wall and ceiling repairs. When complete the repairs will not be obvious. All stickers, pins, nails, hooks, blind and curtain hangars, etc., will be removed prior to painting. All light fixtures, light switch and outlet cover plates, telephone receptacles, thermostats, smoke detectors, HVAC registers and diffusers, railing brackets, etc., will be completely removed prior to painting and will be cleaned and reinstalled afterward. Unless otherwise specified, the blinds will not be reinstalled. All surfaces except doors will be back rolled after spraying.
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 17 of 23
Vinyl Resilient Sheet Flooring Provide and install new vinyl resilient sheet flooring in the areas specified. Work includes floor prep, underlayment, and trim and transitions.
The flooring shall carry a minimum 10-year limited residential warranty from the manufacturer. The Owner shall select the color and style of the new floor covering.
If “glass back” is specified, the flooring shall be Tarkett Fiberfloor CustomPro or approved equal. Install it using the full spread method.
Floor prep: remove all layers of flooring and underlayment to the subfloor unless “embossing” is specified. If an unseen material subject to environmental regulation is found below the existing flooring, the additional cost to remove this per environmental regulations shall be determined in a change order.
When installing over a concrete floor, the floor will be prepared as per manufacturer's recommendation to guarantee the warranty.
The underlayment shall be an appropriately graded APA plywood (i.e. not Lauan) with a sanded face (not touch-sanded) (refer to APA publication L335 “Selection, Installation and Preparation of Plywood Underlayment”).
The flooring shall be laid seamless, unless the size of room is too large for available floor covering. If seams are necessary, they shall receive the manufacturer's seam sealer.
Trim shall include new base and/or shoe moldings, along with transition strips, to hold down all edges of the flooring. Existing base shoe must be removed. Any new shoe molding shall be installed all around the room for a uniform finished appearance. Paint the new molding to match the existing molding as closely as possible.
Flooring details in a bathroom:
Install a metal strip by the tub and set it in a bead of caulk. Use a tub and tile caulk to fill the seam where the flooring meets the metal strip, and the seam where the strip meets the tub.
Pull the toilet before installing the flooring. When resetting the toilet, use a new no-seep bowl wax. If the floor is not level, level the toilet with shims, and caulk the gap with a tub and tile caulk.
If the vanity is removed, install the flooring beneath the vanity. If the vanity or other cabinetry is not removed, install molding around it to hold down edges.
Vinyl Planks.
Provide and install new allure resilient vinyl plank flooring in the areas specified. Work includes floor prep, underlayment, and trim and transitions
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 18 of 23
The flooring shall carry a minimum 10-year limited residential warranty from the manufacturer. The Owner shall select the color and style of the new floor covering.
At least 48 hours prior to installation, place the new vinyl plank flooring in the room for acclimation.
During installation, mix planks from different boxes to blend the dye lots and patterns for a more uniform appearance. Remove the baseboards Prep the subfloor The subfloor surface must be smooth, flat, dry, clean, and solid. Carpet staples or adhesive residue must be removed to ensure proper installation. Use a self-leveler on low spots and / or sand high spots of wood or concrete. Do not sand vinyl flooring – it may contain asbestos.
You may install vinyl planks over vinyl if the existing floor is one layer thick
Tile Floor Remove all existing flooring in the kitchen down to the existing subfloor. Install APA rated plywood underlayment per APA installation instructions. Tile backer may be floated with wire lathe, cement board, or a proprietary system (such as Schluter®-DITRA) installed per manufacturer’s instructions.
Installation shall include tile base, unless otherwise specified.
Carpet The carpet colors and style shall be selected by the Owner from a supplier’s in-stock selection. The carpet will have a minimum 25-ounce face weight and meet FHA UM44D standards. Install according to manufacturer’s recommendations on a re-bonded 6 lb. density pad that has a uniform thickness of 7/16 inch. Include tack less strips, pound down metal strips, appropriate transitions, and all items necessary for a professional installation.
KITCHEN AND BATH FINISH
Kitchen and Bath – General Requirements If there are occupants inhabiting the building during construction, and if the work area includes the only bathroom or kitchen in the house, then provide proper notification of the work and proceed without delay. Full demo of the work area shall start only after ordered materials are available for delivery. Once full demo begins, work shall proceed without interruption until substantial completion. A working toilet shall be provided for the occupants’ use at the end of each workday.
Cabinets Cabinets:
The new cabinets will be factory assembled and finished. They will be constructed particle board: 3/8” for cabinet box and drawer box bottom, and ½” for drawer box sides.
Cabinet faces and door frames will be solid wood. The Owner will have a choice of wood species:
451 South State Street, Room 445, Salt Lake City, UT 84114 Page 19 of 23
Doors and drawer faces will have a plywood panel surrounded by a solid wood frame. The Owner will have a choice of door panel styles from Fashion Cabinet: Santa Fe II, Santa Fe I, Med-Cope, Cathedral II, Cathedral I, or Mediterranean, or approved equals from another manufacturer.
The Owner will have a choice of wood finishes from Fashion Cabinet: any Traditional Finish or approved equals from another manufacturer.
Hinges will be Concealed by Blum, and drawer guides will be E by Blum, or approved equals.
Installation:
Remove and properly dispose of the existing cabinets in the area specified.
The new cabinets shall be secured to each other and to the walls with counter sunk screws through the rails and the stiles of the cabinets. New cabinets shall be anchored securely in a square and plumb position. The doors and drawers shall operate properly, closing fully without gaps at the top, bottom, or sides.
The installation will be complete with necessary filler strips, strip molding, hinges, glides, drawers, and shelves. An exposed side will be overlayed with a prefinished panel.
Where an old cabinet is removed, and the area is not covered by a new cabinet, floors and walls shall be returned to a finished condition.
Countertops-Laminate Remove and haul away the existing countertop in the kitchen. The countertop shall be tri-cove (have a backsplash), unless otherwise specified. The new countertop shall be finished on all exposed edges.