2-EMC SR-73 RANCHES Bid Set 1.pdf

PDF 51 MB Posted

Attached to
EMC SR-73, Ranches Pkwy & Campus Drive Improvements
Solicitation number
EMC-FY27-01
Issued by
Utah County, Utah

About this file

This is a bid set document for Eagle Mountain City, Utah, related to the SR-73 Ranches Parkway & Campus Drive Improvements project. The project involves constructing a new traffic signal at the intersection of Ranches Parkway and Campus Drive, along with associated roadway improvements including asphalt removal and pavement, curb and gutter installation, raised median curb, sidewalk, signage, and pavement markings. Additionally, the project includes reconfiguration of existing traffic signals at three intersections: Ranches Parkway and Pony Express Parkway, Ranches Parkway and SR-73, and Spring Run Parkway and Walmart access, with similar associated roadway improvements. Bids will be opened on or around the scheduled closing date, and results will be posted after evaluation. Vendors who submit proposals will receive notification of bid results via email, including a spreadsheet with all vendor names and bid amounts.

Bidders must submit a 5% bid bond with their proposal documents, provide insurance verification and a Certificate of Insurance at contract signing, and post both a 100% Performance Bond and 100% Payment Bond upon contract award. Bids received after the scheduled closing time will not be considered. Bidding documents must include company contact information, contact person name, email, and phone number. The city will notify all participating vendors of the bid results through email distribution of the evaluation spreadsheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .