About this file

This file contains architectural drawings for the Lebanon County Municipal Building Abatement Project, prepared by EHC Associates for the County of Lebanon, Pennsylvania. The project encompasses asbestos abatement and selective demolition work at the County's Municipal Building located at 400 South 8th Street, Lebanon, Pennsylvania 17042. The scope of work includes removal and disposal of asbestos-containing materials such as spray-applied fireproofing, contaminated ceiling and floor tile construction, pipe and fitting insulation, and vinyl cove base. The project is divided into three phases and includes installation of polyethylene critical barriers and plywood hard barriers, with HVAC negative pressure requirements maintaining 6-8 air changes per hour. A non-mandatory pre-bid meeting is scheduled for Tuesday, May 12, 2026, at 2:00 PM at the project site, with sealed bids due no later than Thursday, May 28, 2026, at 1:00 PM through the PennBid Program. Complete bidding documents will be available at no cost beginning May 5, 2026.

The drawings specify that all existing construction components not designated for removal must be protected from damage, and contractors are responsible for coordinating electrical, HVAC, and plumbing disconnections to ensure building operations outside the abatement area remain unaffected. The owner retains the option to retain possession of any removed materials or equipment unless determined to be contaminated with asbestos. Contractors must verify all quantities and field conditions prior to commencing work. The contract award and specific pricing terms are not detailed in the drawing documents provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WYVUYVCVG ,BWCBCG bt

WCC 6RXWKP QWK 6WP

uHEDQRQA b6 F2CWV u9J6heh 7e8h7< t8h=7=b6u J8=u8=h-b"669 V n9he967=eh6 h e

P n u

EHC Associates 2502 Horseshoe Road Lancaster, PA 17601

717-656-3008 office@ehcassociates.com

Project N o.: 240299-001

D ate: M ay 11, 2026

D raw n By: J.D .H

G round & Floor 1

Asbestos Flooring Abatem ent Plan

C S

Scale: 1/8"=1'-0"

C O

VER

SH

EET

FO

R

TH

E C

O U

N

TY O

F LEBAN

O

N

400 SO

U

TH

8TH

STR

EET

LEBAN

O N

, PEN

N

YSLVAN

IA 17042

AT

TH

E C

O U

N

TY O

F LEBN

O

N M

U N

IC

IPAL BU

ILD

IN

G

400 SO

U

TH

8TH

STR

EET

LEBAN

O N

, PEN

N

YSLVAN

IA 17042

EH

C

PR

O

JEC

T N

U M

BER

: 240299-001

D

ATE: M

AY 11, 2026

LIST O

F D R

AW

IN

G S:

C S - C

O

VER

SH

EET

AC

.01 - G

R O

U N

D

AN

D

FLO

O R

1 - ASBESTO

S C

EILIN

G

/ SPR

AY APPLIED

FIR

EPR

O O

FIN

G

ABATEM

EN

T PLAN

AF.01 - G

R

O U

N D

AN

D

FLO

O

R

1 - ASBESTO

S FLO

O

R

IN

G

ABATEM

EN

T PLAN

D .01 - G

R O

U N

D

AN

D

FLO

O R

1 - SELEC

TIVE D

EM

O

LITIO

N

PLAN

FYQ

H K FORC

H V

WYVUYVCVG ,BWCBCG bt

WCC 6RXWKP QWK 6WP

uHEDQRQA b6 F2CWV u9J6heh 7e8h7< t8h=7=b6u J8=u8=h-b"669 V n9he967=eh6

FYQ

H K FORC

H F

FH K G

C

ORC

H o b u h R u e e n

F

FH K G

C

ORC

H o b u h R n e 8h u e e n hb n e h e n

758(U12 57+ hb n e n

758(U12 57+ h e

P n u

EHC Associates 2502 Horseshoe Road Lancaster, PA 17601

717-656-3008 office@ehcassociates.com

1. R em ove and dispose of asbestos-containing fire proofing and associated over spray.

2. R em ove and dispose asbestos contam inated spline ceiling and lay in ceiling construction in its entirety.

3. M ain H

VAC

trunks shall rem ain in place, flexible ducts and associated louvers shall be rem oved from m ain trunk lines and disposed of as asbestos contam inated w aste.

4. Existing plum bing lines shall rem ain in place and be protected from dam age. Any associated insulation shall be rem oved and disposed of as contam inated w aste.

5. Electrical lines and low voltage cables shall rem ain in place and be protected from dam age. any electrical lines/ outlets, etc. in w alls to be dem olished shall be shutdow n, disconnected and m ade safe by the abatem ent contractors electrical subcontractor.

6. The w ork area shall be placed under negative pressure by use of H

EPA filtered air filtration devices. The w ork area shall be set up to m aintain 6-8 air changes per hour, or a m inim um of .03 on a m anom eter until final air clearance is achieved.

Project N o.: 240299-001

D ate: M ay 11, 2026

D raw n By: J.D .H

G round & Floor 1

Asbestos C eiling/ Spray

Applied Fireproofing Abatem ent Plan

AC

.01

Scale: 1/8"=1'-0"

G R

O U

N D

FLO

O

R

- C

EILIN

G

/ SPR

AY APPLIED

FIR

EPR

O O

FIN

G

ABATEM

EN

T

ASBESTO

S-C

O N

TAIN

IN

G

SPR

AY APPLIED

FIR

EPR

O

O

FIN

G

ABO

VE ASBESTO

S

C O

N

TAM

IN

ATED

SPLIN

E AN

D O

R

LAY IN

C O

N

STR

C U

TIO

N

TO

BE R

EM

O

VED

ASBESTO

S-C

O N

TAIN

IN

G

PIPE AN

D

FITTIN

G

IN

SU

LATIO

N

TO

BE R

EM

O

VED

FLO

O

R

1 - ASBESTO

S-C O

N

TAIN

IN

G

C

EILIN

G

AN

D

SPR

AY

APPLIED

FIR

EPR

O O

FIN

G

ABATEM

EN

T PLAN

PH

ASE 1

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

FR

O

M

FLO

O R

TO

D

EC

K. STO

P C O

N

STR

C U

TIO

N

2" FR

O

M D

EC

K AN

D

IN

STALL SPR

AY

FO

AM

BETW

EEN

TH

E D

EC

K AN

D

TH

E TO

P PLATE.

TER

R

AZZO

FLO

O R

TO

R

EM

AIN

, PR

O

TEC

T FR

O M

D

AM

AG

E

PLASTER

C

EILIN

G

C O

N

STR

U C

TIO

N

TO

BE

R

EM

O

VED

W O

O D

/ PLASTER

C

EILIN

G

C O

N

STR

U C

TIO

N

TO

BE R

EM

O

VED

TER

R

AZZO

FLO

O R

TO

R

EM

AIN

- PR

O

TEC

T FR

O M

D

AM

AG

E

PLASTER

C

EILIN

G

C O

N

STR

U C

TIO

N

TO

BE R

EM

O

VED

PH

ASE 2

PH

ASE 3

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

FR

O

M

FLO

O R

TO

D

EC

K. STO

P C O

N

STR

C U

TIO

N

2" FR

O

M D

EC

K AN

D

IN

STALL SPR

AY

FO

AM

BETW

EEN

TH

E D

EC

K AN

D

TH

E TO

P PLATE.

ABATEM

EN

T LEG

EN

D

ASBESTO

S ABATEM

EN

T N

O

TES:

ABATEM

EN

T G

EN

ER

AL N

O

TES

1. The ow ner has the option to retain possession of any rem oved m aterials or equipm ent unless determ ined to be contam inated w ith asbestos. Item s to be retained shall be identified prior to abatem ent and dem olition procedures. Item identified shall be rem oved and stored at a location provided by the client.

2. The contractor shall protect all existing construction that rem ains in place.

3. The contractor shall be responsible for hiring a subcontractor qualified to identify and coordinate electrical, H

VAC

and Plum bing disconnects and shut dow

ns. The w ork shall be coordinated so that the offices and building activities outside the abatem ent area are not affected.

4. The abatem ent contractor is responsible for field verifying all quantities and conditions.

FYQ

H K FORC

H V

WYVUYVCVG ,BWCBCG bt

WCC 6RXWKP QWK 6WP

uHEDQRQA b6 F2CWV u9J6heh 7e8h7< t8h=7=b6u J8=u8=h-b"669 V n9he967=eh6

FYQ

H K FORC

H F

FH K G

C

ORC

H o b u h R u e e n

F

FH K G

C

ORC

H o b u h R n e 8h u e e n hb n e n

758(U12 57+ hb n e n

758(U12 57+ h e

P n u

EHC Associates 2502 Horseshoe Road Lancaster, PA 17601

717-656-3008 office@ehcassociates.com

1. R em ove and dispose of asbestos-containing floor tile as noted.

2. R em ove and dispose of floor tile m astic by use of H EPA shrouded floor grinding equipm ent.

3. R em ove and dispose of vinyl cove base, cove base adhesives and w ood base as needed to abate flooring delineated on the plans.

4. C eram ic floor tile in restroom s shall rem ain in place and be protected from dam age.

5. Terrazzo flooring in corridors shall rem ain in place and be protected from dam age.

6. The w ork area shall be placed under negative pressure by use of

H EPA filtered air filtration devices. The w ork area shall be set up to m aintain 6-8 air changes per hour, or a m inim um of .03 on a m anom eter until final air clearance is achieved.

1. The ow ner has the option to retain possession of any rem oved m aterials or equipm ent unless determ ined to be contam inated w ith asbestos. Item s to be retained shall be identified prior to abatem ent and dem olition procedures. Item identified shall be rem oved and stored at a location provided by the client.

2. The contractor shall protect all existing construction that rem ains in place.

3. The contractor shall be responsible for hiring a subcontractor qualified to identify and coordinate electrical, H

VAC

and Plum bing disconnects and shut dow

ns. The w ork shall be coordinated so that the offices and building activities outside the abatem ent area are not affected.

4. The abatem ent contractor is responsible for field verifying all quantities and conditions.

Project N o.: 240299-001

D ate: M ay 11, 2026

D raw n By: J.D .H

G round & Floor 1

Asbestos Flooring Abatem ent Plan

AF.01

Scale: 1/8"=1'-0"

G R

O U

N D

FLO

O

R

- FLO

O R

IN

G

ABATEM

EN

T

FLO

O

R

TILE AN

D M

ASTIC

TO

BE R

EM

O

VED

C

AR

PET O

VER

FLO

O

R

TILE AN

D M

ASTIC

TO

BE R

EM

O

VED

W

ALL C

O N

STR

C

U

TIO

N

TO

BE R

EM

O

VED

EXISTIN

G

C O

N

STR

U C

TIO

N

TO

R

EM

AIN

FLO

O

R

1 - FLO

O R

IN

G

ABATEM

EN

T PLAN

PH

ASE 1

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

FR

O

M

FLO

O R

TO

D

EC

K. STO

P C O

N

STR

C U

TIO

N

2" FR

O

M D

EC

K AN

D

IN

STALL SPR

AY

FO

AM

BETW

EEN

TH

E D

EC

K AN

D

TH

E TO

P PLATE.

TER

R

AZZO

FLO

O R

TO

R

EM

AIN

, PR

O

TEC

T FR

O M

D

AM

AG

E

C

ER

AM

IC

FLO

O

R

TILE

C O

N

STR

C U

TIO

N

TO

R

EM

AIN

C O

N C

R

ETE FLO

O R

TO

R

EM

AIN

TER

R

AZZO

FLO

O R

TO

R

EM

AIN

- PR

O

TEC

T FR

O M

D

AM

AG

E

C

ER

AM

IC

FLO

O

R

TILE C

O N

STR

U

C

TIO

N

TO

R

EM

AIN

PH

ASE 2

PH

ASE 3

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

AN

D

PLYW

O

O D

H

AR

D

BAR

R

IER

ABATEM

EN

T LEG

EN

D

ASBESTO

S ABATEM

EN

T N

O

TES:

ABATEM

EN

T G

EN

ER

AL N

O

TES

IN

STALL PO

LYETH

YLEN

E C R

ITIC

AL BAR

R

IER

FR

O

M

FLO

O R

TO

D

EC

K. STO

P C O

N

STR

C U

TIO

N

2" FR

O

M D

EC

K AN

D

IN

STALL SPR

AY

FO

AM

BETW

EEN

TH

E D

EC

K AN

D

TH

E TO

P PLATE.

C O

N C

R

ETE FLO

O R

TO

R

EM

AIN

h n u t e u =7

=e h h e t e u =7

=e h o h e

F

F F

F

F

F F

F F

F

F F

F F

,ORWH FWORC FYWH

V

F

F

F

F

F

F

V

VORUH

'ORG

FYVH

W

W

V

,ORWH QORC FYVH

F F

V

FC

OR2 FYVH

,FOR' FYW

H

F

2 2 2

U

Q

Q F

F

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FF

FF

FF

FF

FF

FF

FF

FF

FFFFFFFF

FFFF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FC

FV

FV

FV

FV

FV

FV

FVFV

FV

FV

FV

FV

FV

FV

FV

FV

FVFVFV

FV

FV

FV FV

FV

FVFV

FV

FV

FV

FV

F

F

W V

F

F

,ORWH QOR' FYWH

2 ,YW

H

,ORC

H

F

F

F

Q F

F

U

U

U

Q

Q

F

Q

Q

FC

FC FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FC

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FC

FV

FV

FV

FV

FV

FV

FV

FV

FV

FV

FV

FV

FV

FV

FVFV

FV

FV

FV

FV FV

FV

FV

FV

FC

t e u =7

=e h u h

9t e u=7=e h uu 8

9t e u=7=e h n e

0 0ue e n 0=h=6" 8

9t e u=7=e h

9;=67=h-e h67n

7=e h

FYQ

H K FORC

H V t e u =7

=e h b u h R n e 8h u e e n

WYVUYVCVG ,BWCBCG bt

WCC 6RXWKP QWK 6WP

uHEDQRQA b6 F2CWV u9J6heh 7e8h7< t8h=7=b6u J8=u8=h-b"669 V n9he967=eh6

FYQ

H K FORC

H F t e u =7

=e h b u h R u e e n

F

FH K G

C

ORC

H o b u h R u e e n

F

FH K G

C

ORC

H o b u h R n e 8h u e e n hb n e n

758(U12 57+ hb n e n

758(U12 57+ h e

P n u

EHC Associates 2502 Horseshoe Road Lancaster, PA 17601

717-656-3008 office@ehcassociates.com

D em olition Key N otes

1. R em ove existing w all construction.

2. R em ove existing w all construction as required for new construction. C oordinate w ork w ith C onstruction M anager.

3. Floor finishes to be rem oved. See Flooring abatem ent plan.

4. R em ove existing door and fram e.

5. R em ove existing door, existing fram e to rem ain.

6. R em ove existing casew ork, counters and/or shelving.

7. R em ove ceiling construction in its entirety. See ceiling/ fireproofing abatem ent plan.

8. R em ove existing plum bing fixture and cap lines.

9. R em ove existing plum bing fixture.

10. R em ove existing w all finishes.

11. R em ove existing w indow blinds and associated hardw are.

12. Existing M EP above ceilings to be rem oved. See ceiling/ fireproofing abatem ent plan.

1. The ow ner has the option to retain possession of any rem oved m aterials or equipm ent unless determ ined to be contam inated w ith asbestos. Item s to be retained shall be identified prior to abatem ent and dem olition procedures. Item identified shall be rem oved and stored at a location provided by the client.

2. The contractor shall protect all existing construction that rem ains in place.

3. The contractor shall be responsible for hiring a subcontractor qualified to identify and coordinate electrical, H

VAC

and Plum bing disconnects and shut dow

ns. The w ork shall be coordinated so that the offices and building activities outside the abatem ent area are not affected.

4. The contractor is responsible for field verifying am ounts and field conditions.

Project N o.: 240299-001

D ate: M ay 11, 2026

D raw n By: J.D .H

G round & Floor 1

Selective D em olition

D .01

Scale: 1/8"=1'-0"

File details come from the government source that posted it. Updated .