The provided file is a Schedule of Items for the ANF FY 25 Road Improvements project in the Angeles National Forest, California. The solicitation (No. 127EAW25R0048) covers road maintenance and improvement activities across multiple forest roads, including blading, drainage restoration, and infrastructure repairs. Specific road sections include Big Santa Anita Canyon, Gould Mesa Road, Brown Mountain Road, Millard Canyon Road, Texas Canyon Road, and Colby Ranch Road.

Key project details include spot surfacing with armor flex block mats, asphalt pavement patching, corrugated metal spillway installations, and road grading. The contract will be awarded to a single contractor who must submit pricing for all listed items, with estimated quantities that require field verification. The project is being conducted by the Department of Agriculture Forest Service, with all requests for information to be submitted to Tanya Torres via email by August 6, 2025. Contractors must provide comprehensive company information, including UEI number and tax ID, when submitting their proposal.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

ANF FY 25 Road Improvements Angeles National Forest

Item
Construction Items
UOI
Qty.
Unit Price
Total Price

ANGELES NATIONAL FOREST ROADS IGCE

805
MOBILIZATION
.01
BASE ITEMS MOBILIZATION
LS
1.0

Sub-Total

811
BLADING
.01
2N40 BIG SANTA ANITA CANYON
MILE
0.5
.02
2N69 GOULD MESA RD
MILE
0.5
.03
2N66 BROWN MTN RD
MILE
5.4
.04
2N65.1 MILLARD CANYON RD
MILE
2.1

Sub-Total

839
RESTORE DRAINAGE FUNCTION
.01
2N40 BIG SANTA ANITA CANYON
MILE
0.5
.02
2N69 GOULD MESA RD
MILE
0.5
.03
2N66 BROWN MTN RD
MILE
5.4
.04
2N65.1 MILLARD CANYON RD
MILE
2.1

Sub-Total

840
CORRUGATED METAL SPILLWAY AND FLUME (24" HEADWALL AND STARTER SECTION)
.01
2N40 BIG SANTA ANITA CANYON
EA
1.0
.02
2N69 GOULD MESA RD
EA
1.0
.03
2N66 BROWN MTN RD
EA
8.0
.04
2N65.1 MILLARD CANYON RD
EA
3.0

Sub-Total

CMRD TOTAL

OHV GRANT ANGELES NATIONAL FOREST ROADS

813
SPOT SURFACING (ARMOR FLEX BLOCK MATS)
.01
5N14 TEXAS CANYON RD
SF
960.0

Sub-Total

OHV TOTAL

RECREATION ANGELES NATIONAL FOREST ROADS

814
ASPHALT PAVEMENT PATCHING
.01
3N24.1 COLBY RANCH ROAD
SF
260.0

Sub-Total

840
CORRUGATED METAL SPILLWAY AND FLUME (24" HEADWALL AND STARTER SECTION)
.01
3N24.1 COLBY RANCH ROAD
EA
3.0

Sub-Total

REC TOTAL

CONTRACT TOTAL

(CMRD+OHV+REC)

SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE MAPS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation. Contractors are required to submit pricing for all items.

NOTE: In accordance with FAR Clause 52.228-16, Performance and Payment Bonds - Other than Construction (NOV 2006), payment for bond premiums shall be included within the contract price and shall not be considered an additional cost.

The contractor shall complete the table below and include the information with their proposal.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID: