2. Schedule of Items.docx

DOCX document 20 KB Posted

Attached to
127EAW26Q0038 - San Dimas Admin Roof Replacement
Solicitation number
127EAW26Q0038
Issued by

About this file

This is a Schedule of Items pricing template for the San Dimas Admin Roof Replacement construction project, Solicitation 127EAW26Q0038, issued by the Department of Agriculture Forest Service.

The base construction scope includes eight line items for a complete roof replacement system at the San Dimas Administrative facility: existing roof removal; installation of a new 60-mil white reflective PVC membrane roofing system with insulation, coverboard, and drainage improvements; gutter and downspout replacement; roof access component refurbishment including hatches, ladders, and guardrails; exterior roof perimeter lighting replacement; fascia repair, painting and restoration; hazardous materials testing for asbestos; and a roof deck and substrate repair allowance requiring prior government approval. Option 1 includes three additional items: asbestos abatement and disposal, roof perimeter guardrails, and roof anchor points. All items are priced on a lump-sum (LS) basis with unit prices and total prices to be completed by the contractor. The Schedule of Items notes that quantities are estimates and contractors must field verify to satisfy all requirements of the drawings, statement of work, and specifications. All quoted prices must include bond premium costs with no additional charges permitted. Quote submission deadline is July 21, 2026, at 10:00 AM Pacific Time to the Contracting Officer, with an optional organized site visit on July 7, 2026, at 10:00 AM PT. This is a Total Small Business Set Aside solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Base Items: San Dimas Admin Roof Replacement

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
1
Existing Roof Removal
1
LS
$_____________
$_____________
2
New PVC Roofing System (60-mil white reflective PVC membrance, insulation, coverboard, drainage improvements, flashing, walk pads, conduit supports, edge metal, etc.)
1
LS
$_____________
$_____________
3
Gutter and Downspout Replacement
1
LS
$_____________
$_____________
4
Roof Access Components (hatch refurbish, ladder refurbish, guardrail)
1
LS
$_____________
$_____________
5
Exterior Roof Perimeter Lighting Replacement
1
LS
$_____________
$_____________
6
Fascia Repair, Painting and Restoration
1
LS
$_____________
$_____________
7
Hazardous Materials Testing (asbestos sampling)
1
LS
$_____________
$_____________
8
Roof Deck and Substrate Repair Allowance (Work performed under this line item shall require prior Government approval. Unused allowance funds shall not be paid to the Contractor.)
1
LS
$_____________
$_____________
BASE TOTAL:
$_____________

SCHEDULE OF ITEMS - (OPTION 1)

Option Item: San Dimas Admin Roof Replacement

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
A.1
Asbestos Abatement and Disposal
1
LS
$_____________
$_____________
A.2
Roof Perimeter Guardrails
1
LS
$_____________
$_____________
A.2
Roof Anchor Points (number of anchors included)
1
LS
$_____________
$_____________
OPTION 1 TOTAL:
$_____________
BASE + OPTION 1 COMBINED TOTAL:
$___________________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID: