2. PWS_14 Mar 24_final.pdf

PDF 391 KB Posted

Attached to
Management, Operation and Maintenance of Refuse Incinerator Plant at Yokota Air Base, Japan
Solicitation number
FA520924Q0004
Issued by

About this file

This document is a Performance Work Statement (PWS) for the management, operation, and maintenance of a refuse incinerator plant at Yokota Air Base, Japan under Solicitation No. FA520924Q0004.

The PWS requires the contractor to provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to operate and maintain the refuse incinerator plant in accordance with the manufacturer's manuals, Japan Environmental Governing Standards, and commercial practices. Key requirements include refuse incineration, ash and dust removal, heat recovery, air and water quality analysis, preventative maintenance, minor repairs up to $5,000, and coordinating with other on-site contractors. The contractor must meet specific staffing and training requirements, provide a project manager and assistant, and develop annual and monthly work schedules. The government will provide the facility, utilities, and emergency services. The PWS includes a services summary, government-furnished property and services, and appendices with historical workload, equipment layout, and environmental standards.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA520924Q0004

PERFORMANCE WORK

STATEMENT FOR

MANAGEMENT, OPERATION AND

MAINTENANCE OF

REFUSE INCINERATOR

PLANT AT YOKOTA AIR

BASE, JAPAN

14 Mar 2024

1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform operation and maintenance (O&M) that includes management and minor repair (Para 1.1 thru 1.2), Level II work (para 1.3), by providing the contactor- furnished materials (1.4), of Refuse Incinerator Plant, building 1526 at Yokota Air Base in accordance with manufacture’s operation manuals, Japan Environmental Governing Standards (JEGS) and common commercial practices pursuant to the local law. The Contractor shall accomplish all services below to meet the requirements of this

Performance Work Statement (PWS). Changes in scope are anticipated due to the refuse incinerator plant facility upgrades and enhancements. Estimated workload factors are in Appendix A, drawing for equipment layout of each floor is in Appendix B, and Chapter 2 of JEGS is in Appendix C.

1.1. OPERATION. (CLIN 0001)

1.1.l. The Contractor shall operate all Refuse Incinerator Plant facility’s systems and equipment to provide burning of refuse and heat recovery in accordance with the manufacturer’s operating manuals. Operations shall consist of but not be limited to refuse incineration, refuse and ash weighing, ash and dust removal, shredder operation, water treatment operation, heat recovery operation, and operations of other ancillary equipment. To aid in operations, the Contractor shall obtain detailed instructions, if required, for specific equipment referenced by the manufacturer’s operating manuals. Once acquired, the detailed instructions will become the property of the Government and remain at the refuse incinerator plant facility.

1.1.1.1. The Contractor shall monitor and not burn refuse that will result in toxic emissions, which are in violation of JEGS. Waste that may cause poor incinerator operation will not be burned until the Contractor receives permission from the Contracting Officer’s Representative (COR). JEGS Chapter 2 will show the specific standards that shall meet for flue gas emission.

1.1.2. The Contractor shall have qualified personnel in accordance with manufacturer’s operation manual and commercial standard to provide continued, safe, and proper operation. The Contractor shall provide appropriate number of personnel for 24-hour operations.

1.1.3. Analysis Reports. The Contractor shall schedule and conduct the following analysis for as a minimum, but not limited to air, water, waste and ash in accordance with JEGS. The Contractor shall submit bilingual reports (English & Japanese) with Adobe “pdf” file to the COR for review within three (3) months for dioxin tests and 20 business days for the others after measurements are taken. This analysis shall be conducted by laboratories certified to ISO 17025.

1.1.3.1. Yearly

Air (Dioxin) Fly and bottom Ash (Mercury)

1.1.3.2. Two times a year

Air (Dust, NOx, SOx, HCL, Mercury) Ignition loss

Refuse Composition Ash Extraction Test

Fly and bottom Ash (Dioxin)

1.1.4. Ash. The Contractor shall weigh the ash when it is transported by the ash transport contractor.

1.1.5. Weight and Record. The Contractor shall weigh and record all refuse delivered into the incinerator plant. The record shall describe, as a minimum, name of recorder, weight of refuse, date, time, driver name, vehicle number, source of refuse, types of refuse and pickup area. The Contractor shall submit bilingual reports (English & Japanese) with Adobe “pdf” file to the COR each month with the Contractor's monthly invoice.

1.1.6. Heat Recovery System. The Contractor shall create hot water utilizing excessive heat generated in the refuse incinerator plant during the operation. Total amount of hot water transferred to the adjacent tower apartment (building 1561, 1562 and 1563) shall be recorded in the monthly log. Coordination for hot water supply work with operation and maintenance of tower apartments contractor thru the COR is the Contractor’s responsibility.

1.1.7. Hazardous Material Use. The Contractor shall submit a Safety Data Sheet (SDS) and estimated quantity of usage for any chemical or hazardous materials to be used under this requirement for approval by

Bioenvironmental Engineering, Safety, and Environmental. SDS shall be in English. Requires coordination with Environmental if any HAZMAT need to be stored on base for more than 24 hours.

1.2. MAINTENANCE AND REPAIR. (CLIN 0001)

1.2.l. Routine Maintenance & Inspection.

1.2.l.1. The Contractor shall provide all routine maintenance and inspection work at the incinerator plant.

Routine maintenance shall be in accordance with the manufacturer's operations manuals. Examples of routine maintenance include but are not limited to lubrication of equipment, cleaning of equipment such as air preheaters, induced draft fan, bag filter, ash conveyor, incinerator lead ring, inspection and cleaning of water treatment pumps, pH gauges, various tanks, strainers, filters, screens, nozzles, wastewater plumbing, truck washing facility, water quality, and smokestack.

1.2.l.2. The Contractor shall maintain and inspect the interior of the incinerators in accordance with manufacturer’s operation manuals. Specific areas should include but not necessarily limited to the flue gas channel of the air heater- cooling chamber, combustion chamber and lead ring conveyor under the combustion stoker. In addition, distances between walls in the combustion chamber shall be measured at several locations and recorded weekly. The maintenance and inspection shall occur after cleaning and removing residue such as ash, clinker, metals, rocks and other unburned substances.

1.2.l.3. The Contractor shall conduct monthly inspections of the crane system in accordance with Boiler and

Crane Association authorized by Ministry of Health, Labor, and Welfare for crane maintenance and

DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards. The Contractor shall also perform daily visual checks using a standard checklist recommended by the manufacturer’s operation manuals and approved by the COR.

1.2.l.4. The Contractor shall clean and manage the refuse incinerator plant facility and premises to keep sanitary condition.

1.2.l.5. The Contractor shall disinfect the refuse pit at least once a week or more frequently as required to prevent foul odors and minimize insects.

1.2.l.6. The Contractor shall maintain the markings on piping and equipment and provide touch-up painting on plant equipment as required. The Contractor shall match existing paint in both type and color when performing touch-up painting. Paint material used for touching up painting shall be lead free.

1.2.l.7. The Contractor shall prepare checklists to identify all routine maintenance work identified above. In addition, the Contractor shall include other work deemed necessary as routine maintenance.

1.2.1.8. The Contractor shall retain the routine maintenance and inspection records at the refuse incinerator plant facility for review by the COR upon request.

1.2.1.9 The Contractor is responsible for removing snow from access roads and driveways at the plant to ensure deliveries can be made, and operations continue when necessary.

1.2.2. Annual Inspection. The Contractor shall conduct annual inspection and prepare the equipment condition report. When any repairs and overhaul are determined to be necessary because of annual inspection that is not within the scope of CLINx001, the Contractor shall provide the description of the work scope, the desired period of performance and the price proposal with Adobe “pdf” file.

1.2.3. Minor Repair and Replacement. The Contractor shall, except as otherwise defined in paragraph 1.5.

below, furnish all equipment and labor required to accomplish minor repair and replacement to the refuse incinerator plant facility that require total labor costs not exceeding ¥500,000 per work.

1.3. LEVEL II WORK. (CLIN 0002)

1.3.1. Level II work is defined as any repair, replacement, and new part installation beyond the scope of inspection/maintenance stated in paragraph 1.2.1., 1.2.2., 1.2.3. Level II work must be negotiated between the contractor and the Contracting Officer (CO) and will issue a Task Order. At the Government’s discretion, Level

II work may be accomplished by other sources (including other contracts) designated by the CO. The

Government is under no obligation to give the contractor first rights to Level II work. All Level II work shall be inspected and accepted by COR. Upon the completion of the work, the Contractor shall submit the report within

7 calendar days to the COR. Any repair/replacement work exceeding the stated labor cost limitation of ¥500,000 is Level II Work. The Contractor shall notify the COR and the CO if occurs. The Contractor shall provide information and instruction on the work scope to COR.

1.4. RESERVED

1.5. REIMBURSABLE MATERIALS. (CLIN 0003)

1.5.1. The Contractor is responsible for developing and maintaining adequate level of stock materials. The stock materials shall be purchased and furnished by the Contractor to be used under the contract. All materials procured is required to sustain continued operation and maintenance of the Government owned incinerator.

1.5.1.1. This paragraph refers to the materials furnished by the Contractor. Thus, labor hours to repair and replace parts shall be included in Operation and Maintenance services under maintenance and repair work that includes the minor repair service. The Contractor shall procure all items as required, competitively and at the best market prices obtainable in line with the urgency of delivery requirement. The Contractor shall maintain documented proof of competition from at least three (3) sources on all purchases exceeding the Yen equivalent of $3,000. The Contractor shall get the approval of the COR prior to the purchase of any item, which can be individually procured with a unit price of over ¥100,000. The COR shall obtain the KO’s prior approval for any job order covering an item exceeding $25,000 or Yen equivalent.

1.5.2. The Contractor shall procure all materials, competitively and at the best market prices. In case competition cannot be obtained, the Contractor is required to submit a proof of non-availability of competition.

Any discounts and rebates on materials as obtained by the Contractor shall be credited to the Government.

1.5.3. All the materials that are procured shall be paid at the net purchase cost monthly by the Government. The

Contractor's invoice shall include a listing of all the materials procured by material description, quantity, unit, total purchase costs, original copy of each delivery ticket, sales slip, or other documentation of proof that the material was procured at the best market price.

1.5.4. The materials, parts, and supplies purchased shall be of equal or greater quality than the materials to be replaced. Replacement materials shall be standard products from manufacturers regularly engaged in the production of such materials, parts, and supplies.

1.5.5. The Contractor and the COR shall conduct a quarterly joint inventory for the stock materials. The

Contractor shall create and maintain the stock material inventory record, which reflects the material description, unit cost, and transaction history and current balance on hand.

1.6. SCHEDULE. (Adobe “pdf” file)

1.6.l. Work Management and Scheduling. The Contractor's work schedules shall be prepared and coordinated to provide total management, operation, maintenance, and repair to avoid adverse impact on the refuse incinerator plant operation to the maximum extent practicable.

1.6.1.1. Annual Work Scheduling. The Contractor shall develop the Annual Work Schedule for the performance under this contract. The schedule shall be submitted to the COR for review and approval not later than ten (10) working days after award of contract. The Contractor shall coordinate with and obtain approval from the COR for any changes to the schedule.

1.6.1.2. Monthly Work Schedule. The Monthly Work Schedule shall contain all scheduled work from the

Annual Work Schedule with known additional work. The first month’s schedule shall be submitted to the COR for review along with the Annual Work Schedule, which is ten (10) working days after award of contract. The remaining Monthly Work Schedules shall be submitted to the COR for review and approval not later than ten

(10) days before the beginning of each month.

1.6.1.2.1. The Monthly Work Schedule shall indicate the specific task to be performed, the date it is to be performed, the location where it is to be performed and the estimated man- hours required for each task. The schedule shall be sufficiently detailed to enable the COR to locate and observe the ongoing work if desired.

1.6.1.2.2. The Contractor shall obtain approval from the COR for revisions or changes to any schedules a minimum of eight (8) work hours in advance. The Contractor shall submit reasons for changes in writing to the

COR to support the COR’s approval.

1.7. REPORTS (Adobe “pdf” file)

1.7.1. Operational Logs. The Contractor shall prepare daily and monthly operational logs in accordance with manufacturer’s operation manuals. The Contractor shall retain the logs at the refuse incinerator plant facility for review by the COR upon request. Daily logs shall be completed each day by the close of the following workday.

The monthly log shall be completed within five (5) days from the start of the following month.

1.7.2. Monthly Report. The Contractor shall submit the monthly reports that describe records, as a minimum, hour of incineration, volume incinerated, ash volume, operation hour of shredder, electric power consumed, water consumed, fuel consumed, chemical consumed and volume of transferred hot water. The Monthly Report shall be submitted to the COR each month with the Contractor's monthly invoice.

1.7.3. Repair and Replacement Report. The Contractor shall submit reports for all repair, including Minor

Repair and Replacement, para 1.2.3. above and Level II work, para 1.3.1. above, to the COR with the

Contractor’s monthly invoice, which consist of, but not limited to date of work, area of repair, defective conditions and malfunctions, major parts replaced, sketches of details and photos, man hour of labor, material procured for the work, and statement of warranty if para 1.8. below applies.

1.8. COMMERCIAL WARRANTY. The Contractor agrees to provide the most favorable commercial warranties towards the repaired item/equipment that the manufacturer provides to any customer for the types of items or repaired items furnished under this contract. The Government reserves the right to reject any unserviceable or substandard item/repair and to require replacement with a serviceable like item/repair or acceptable quality item/repair or to require full credit for the item/repair. The Contractor shall maintain records of all warranted items/repairs to include item description, location, manufacturer and model data serial numbers and expiration dates of the warranties or guarantees.

1.9. GENERAL INFORMATION

1.9.1. QUALITY CONTROL. The Contractor shall use the existing quality program to ensure management, operation and maintenance of the refuse incinerator plant facility is performed in accordance with manufacturer’s operation manuals, JEGS and commonly accepted commercial practices.

1.9.2. Quality Assurance. The Government will evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP) by appointing a COR to monitor performance to ensure services are received.

1.9.3. Government Remedies. The CO shall follow FAR 52.212-4, Contract Terms and Conditions-

Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.9.4. Hours of Operation.

1.9.4.1. Hours of Operation. The Contractor shall perform the services required under this contract during the following hours: Monday through Sunday, from 0000 to 2400 hours, except U.S. recognized holidays listed in Para 1.10.4.3.

1.9.4.2. Normal Duty Hours. The normal duty hour is from 0000 thru 2400 hours.

1.9.4.3. Non-Operating Days. The Contractor is not required to operate the refuse incinerator plant facility on the following listed days, however, shall be always on site.

New Year’s Day 1 January

Independence Day 4 July

1.9.5. SECURITY REQUIREMENTS.

1.9.5.1. The Contractor employees will be issued base passes (identification cards), which shall be always carried by the individual bearers while on United States Government premises. The Contractor shall submit written requests for issuance of base passes to the 374 CES/CEOES and shall be responsible for all base passes issued to his/her employees and employees of any subcontractors. The Contractor shall return all base passes to the Japanese Pass Section at Yokota Air Base upon termination of employment or completion of the contract.

1.9.5.2. Key Control. The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and used by unauthorized persons. No keys issued to the Contractor by the Government shall be duplicated.

1.9.5.3. The Contractor shall immediately report to the COR any occurrences of lost keys.

1.9.5.4. In the event keys, other than master keys, are lost, the Contractor will be required, upon written direction of the CO, to rekey or replace the affected lock(s). The Government, however, at its option, may replace the affected lock(s) or perform rekeying and deduct the cost incurred from the monthly payment due to the Contractor. In the event a master key is lost, all locks and keys for that affected system shall be replaced by the Government and the total cost incurred will be deducted from the monthly payment due to the Contractor.

1.9.5.5. The Contractor shall prohibit the use of keys issued by the Government by any persons other than the Contractor’s employees and the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in performance of assigned work in those areas.

1.9.5.6. Lock Combinations. The Contractor shall control access to the Government provided lock combinations to preclude unauthorized entry.

1.9.6. SPECIAL QUALIFICATIONS.

1.9.6.1. Project Manager. The Contractor shall provide a Project Manager (PM) who shall act fully on behalf of the Contractor on all matters relating to daily operation of this contract and perform overall management of the entire work requirements. The Project Manager shall meet the qualification of “Technical

Manager of the Refuse Treatment Plant (ごみ処理施設技術管理⼠)” in accordance with “Waste

Management and Public Cleansing Law (廃棄物の処理及び清掃に関する法)”, therefore PM shall possess a certificate of the “Technical Manager” as required in the aforementioned law. The name of this person, and Assistant Project Manager (APM), who shall act for the Contractor when the Project Manager is absent, shall be designated in writing to the CO. APM is required to possess the same level of certification as the PM.

1.9.6.2. Either the PM or an APM shall be always present at the refuse incinerator plant during 0730 to

1630 hours. Other than the mentioned hours, the PM or APM shall be available within two (2) hours.

1.9.6.3. The PM and APM shall be designated in writing within five (5) days after notice of award and upon change of personnel. The letter of designation shall be supported by the copy of certificates/licenses and record of experience as proof of their qualifications. The required licenses/certificates shall be current and updated when the changes occur.

1.9.6.4. The PM and APM must be able to read, write, speak and understand English, or provide a translator.

1.9.6.5. Contractor Employees. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.9.6.5.1. The Contractor employees shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name.

1.9.6.5.2. The Contractor is required to provide employees who have the following listed certificates/licenses at all times during the normal working hours. The Contractor shall submit a list with the employee’s name, name of licenses/certificates with a copy of the licenses/certificates, date obtained and validation. The list and copy of licenses/certificates with the face picture shall be displayed on the wall of office area in the refuse incinerator plant facility during the period of contract for the COR inspection. The required licenses/certificates shall be current and updated when the changes occur.

1. Technical Manager of the Refuse Treatment Plant (ごみ処理施設技術管理⼠)

2. Chief Electric Engineer, Class 3 (第3種電気主任技術者)

3. Hazardous Material Handler, Otsu Group 4 (危険物取扱者 ⼄種 4 種)

4. Individual being trained exclusively for Operation, Inspection, and Demolition Works at Refuse

Incinerator Plant IAW para 34 thru 36 of Article 36 of Ordinance of Labor Safety and Hygiene (労働安全

衛⽣規則第 36 条第 34〜36 号の規定に基づき廃棄物焼却施設内における運転、点検等作業及び解体作

業に関する特別教育修了者)

5. Supervisor of Anoxic Area Work (酸素⽋乏危険作業主任者)

6. Crane Operator (below 5 ton) (クレーンオペレーター、5トン未満)

7. *Forklift Operator or Small-sized Special Motor Vehicle Operator such as Payloader (フォークリフト運

転⼿或いはペイローダー等⼩型特殊免許取得者)

8. **Supervisor of Specified Chemical Substance (特定化学物質等作業主任者:ダイオキシン取り扱い

者を含む)

Notes: *Optional or required only when it is determined by the Contractor that this equipment are necessary during the operation.

**Only the licensed personnel shall perform the dioxin and other chemical analysis tests as required in paragraph 1.1.3 (Analysis Reports). The subject full tasks can be delegated to the licensed company if no one in the Contractor’s company meets the license requirement, however the

Contractor shall submit a copy of license with the personnel and the name of the company for delegation.

1.9.6.5.3. Tank Custodian. The Contractor shall take “Tank Custodian” training at Bldg 4137, 374 LRS/LGRF with COR’s coordination, and the Contractor shall keep required record of fuel tank (date of refueling, amount used, fuel level, etc.).

1.9.7. CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities. The Contractor shall comply with additional energy policies upon notification by CO.

1.9.8. PHASE-OUT PLAN

1.9.8.1. Phase Out/Expiration Transition Tasks. The Contractor shall assist the Government in transitioning into the follow-on contract upon notification of expiration of the current contract. As part of this transition, the Contractor shall insure that management, operation and maintenance services are followed through the full term of the contract. The Contractor shall not defer any required maintenance procedures scheduled during the final contract period for the purpose of avoiding responsibility or transferring responsibility to the succeeding party. During the final seven (7) days of the contract, the Contractor shall permit personnel specified by the CO to observe any and all operations performed under the terms of the contract. This will be negotiated at a later point in time if needed.

1.9.8.2. Scheduling. The Contractor shall develop a phase-out schedule within ten (10) working days after the date of the notice of expiration of this contract.

1.9.8.3. Training for the Government Personnel and/or Follow-On Contractor. The Contractor shall provide a minimum of 160 hours of training for maintenance people as named by the Government.

Training topics shall include operation and maintenance responsibilities and functions for the refuse incinerator plant facility and equipment.

1.9.8.4. The Contractor shall furnish all follow-on training beginning with the contract award for the follow-on contract and before the completion date of this contract. The training shall continue until the specified number of training hours has been furnished, even beyond the last date of the performance period for this contract, if necessary. The exact schedule for all training shall be coordinated with the

COR. The requirements of this paragraph shall be furnished as a basic part of this contract, without further cost to the Government. In the event the Government does not exercise options, such training shall take place at the end of the last option, which is exercised.

1.10. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY OR OVERSEES COMBATANT COMMANDER.

Services requirements under this PWS are not determined essential to be performed during a crisis.

1.11. CONTROLLED MEDICAL BURNS

Government reserves the right to perform controlled medical burns.

2. SERVICES SUMMARY

PERFORMANCE

OBJECTIVE

PWS

PARAGRAPH

PERFORMANCE

THRESHOLD

METHOD OF

ASSESSMENT

SS#1. Operation &

Maintenance including minor repair

1.1 thru 1.2 98% of the required operations and maintenance are completed satisfactorily

Periodic Inspection

SS#2. Level II Work 1.3. 100% of the Level II work are completed satisfactorily

100% Inspection

SS#3. Stock Materials 1.4. 100% of the stock material inventory record are maintained properly

100% Inspection

SS#4. Work Schedule and

Reporting Requirements

1.6. and 1.7. 100% of the work schedule, operational logs, reports are accomplished

100% Inspection

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. GOVERNMENT FURNISHED FACILITY

3.1.1. General Information. The Government will furnish or make available facility described in paragraph below. No hazards have been identified for which work-around have been established. Should a hazard be subsequently identified, the Government corrects hazards according to base-wide Government developed and approved plans of abatement considering safety and health priorities. A higher priority for the correction will not be assigned to the facility provided hereunder merely because of this contracting initiative. The fact that no such conditions have been identified does not warrant or guarantee that no possible hazard exists, or that work-around procedures will not be necessary or that the facility as furnished will be adequate to meet the responsibilities of the Contractor. Compliance with the local laws and regulations for the protection of their employees is exclusively the obligation of the Contractor. Further, the Government shall assume no liability or responsibility for the Contractor’s compliance or noncompliance with such requirements, with the exception of the aforementioned requirement to make corrections according to approved plans of abatement subject to base-wide priorities.

3.1.2. Government Furnished Facility Information. The Government will furnish the Contractor the following facility:

Facility No. 1526 Refuse incinerator plant:

Manufacturer: Takuma Co., Ltd. Model: SDB-0305* with Bag Filter

Stoker-fired and Automatic Batch Furnace (ストーカ式機械化バッチ炉)

Manufactured Year: 1984

Burning Capacity: 11 Ton/8 hours per incinerator Ignition Fuel: Diesel Qty: 2 EA

Dimensions: 204,342 SF

Office Area: 324 SF (29 SM)

Bathing/Bathroom Area: 88.56 SF (8.2 SM)

Locker/Resting Room Area: 181.44 SF (16.8 SM)

* Note: Operable for 24 hours-a-day

3.1.3. The Government furnished facility shall be used only in the performance of this contract. The

Contractor shall not use the Government furnished facility to work on any project, proposal, or bid that does not relate to this contract.

3.1.4. Modifications to Government furnished Facility. Before making any modifications to the office area, shower room area, restroom area and locker/resting room area of the Government furnished facility, even if at the expense of the Contractor, the Contractor shall obtain prior approval from the COR. The Contractor shall return the office area, shower room area, restroom area and locker/resting room area to the Government in the same condition as received, fair wear and tear and approved modifications are acceptable.

3.1.5. Facility Abuse. The Contractor shall notify the COR of all suspected facility abuse or vandalism. The

Government will determine validity of all suspected facility abuse or vandalism. Unless damage repairs can be classified as emergency repairs, the Contractor shall not begin repair unless directed by the CO. The Contractor shall provide the COR with written cost estimates of repair of all suspected facility abuse when requested by the COR.

3.1.6. Manufacturer’s Operation Manuals. The Contractor shall store the manufacturer’s operation manuals and other equipment manuals/instructions/drawings for the Government furnished facility in a place that will allow the COR and the Government authorized personnel easy access during the normal duty hours.

3.2. GOVERNMENT FURNISHED SERVICES

3.2.1. Government Furnished Utilities. The Government will provide utilities (electric, water and sewer) at no cost to the Contractor for the sole purpose of accomplishment of this contract.

3.2.2. Fuel. The Government will provide diesel fuel for holding the tank at the refuse incinerator plant facility, which is for ignition of incinerator plant. The Contractor shall maintain and monitor fuel levels in the tank and shall request to order diesel fuel to 374 LRS/LGRF, 225-9187, as needed.

3.2.3. Telephone Services. The Government will provide access to at least one Class C (base only) line in the office area at the refuse incinerator plant facility for official calls use only.

3.2.4. Facility Maintenance Service: The Government will provide building maintenance service except for the equipment and the damages stipulated at paragraph 3.1.5. The Contractor shall notify the COR when any defects to the facility are identified.

3.2.5. The Government shall, without cost to the Contractor, supply reasonable amounts of water and electricity required to perform the requirements of this PWS. The Government will provide, for emergency purposes only, the following services by dialing DSN 911, or Commercial 042-511-9110. In the event of a medical emergency, accident, or injury involving the Contractor personnel during performance of duties under this contract, services will be rendered in order to save life or to stabilize for transportation to a local medical treatment facility. The Contractor shall reimburse the Government for the emergency medical services. Any time the Contractor uses one (1) of the below services; the Contractor shall immediately report it to the COR and follow up with a written report of all the details within 48 hours.

a. Security Police, DSN 911, 042-511-9110

b. Fire Protection, DSN 911, 042-511-9110

c. Hospital Emergency, DSN 911, 042-511-9110

APPENDICES

A. Historical Workload

B. Equipment layout of each floor

C. Chapter C, Japan Environmental Governing Standards (JEGS)