2. DRAFT_Dutton Hill G-Z IRSC Appendix A.pdf
PDF 418 KB Posted
- Attached to
- Dutton Hill G-Z Stewardship IRSC - R3 Coconino National Forest, Flagstaff Ranger District, Arizona
- Solicitation number
- 12363N26R4001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Technical Specifications for Service Work Items for the Dutton Hill G-Z Stewardship Integrated Resource Service Contract (IRSC) on the Coconino National Forest in Arizona. The project aims to complete forest management treatments across 8,821 acres of Ponderosa Pine forest and savanna/grasslands, with a projected start date of September 2025. The primary objectives include reducing the likelihood of catastrophic wildfires in rural communities, improving forest health, reducing fuel loading, and providing over 95,000 CCF of timber to local timber industries.
The project is divided into three treatment areas: Double Springs (626 acres), Dutton Hill (4,210 acres), and LO Pocket (3,933 acres). Work will involve a combination of mechanical and hand thinning, including cutting and removing timber, improving tree growth and vigor, re-introducing low-intensity fire, and thinning from below in ponderosa pine stands. The contract aligns with the President's Executive Order 14225 on Immediate Expansion of American Timber Production and includes specific requirements for tree marking, timber stand improvement, leave tree marking, and heritage site work. The Forest Service will provide tree marking paint and conduct quality assurance inspections throughout the project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dutton Hill G-Z Stewardship IRSC Coconino National Forest Page 1 of 20 Flagstaff Ranger District
Revised 01.06.2022
APPENDIX A
TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS
SECTION I – DESCRIPTION OF WORK:
The Flagstaff Ranger District on the Coconino National Forest in Arizona requires this mission essential project to complete forest management treatments that will reduce the likelihood of catastrophic wildfires to the surrounding rural communities of Williams, Sedona, Munds Park and Flagstaff, AZ. This project was identified for Region 3 in the attachment to the Secretary's Memorandum 1078-006. This work will include a combination of mechanical and hand thinning which will remove hazardous fuels and provide over 95,000 CCF of timber to the local timber industries. The Dutton Hill G-Z IRSC comprises three project treatment areas: Double Springs (626 acres), Dutton Hill (4,210 acres), and LO Pocket (3,933 acres). The total project area consists of 8,821 acres of Ponderosa Pine forest and savanna/grasslands. This project will increase the pace and scale of forest restoration treatments by contracting project layout and preparation activities. These activities will facilitate logging activities across the 8,821 acres and are in line with the President's Executive Order 14225, Immediate Expansion of American Timber Production (3/1/2025) and related USDA Secretarial Memo 1078-006 (4/3/2025). This project has a projected start date of September 2025. The objectives of this project are to increase forest health and vigor sustaining long term timber production and reduce hazardous fuels and decreasing the threat of catastrophic wildfire within the Wildland Urban Interface by accomplishing the following:
1. Improve forest health by increasing residual tree growth, vigor, and crown development.
2. Reduce fuel loading and re-introduce low-intensity fire by implementing mechanical fuel treatments and preparatory work to manage the effects of the re-introduction of fire as a disturbance mechanism. Removing activity slash from FS lands when feasible.
3. Thin from below in ponderosa pine stands and restoring savanna and grassland vegetation types.
4. Remove included sawtimber and non-sawtimber from the Contract Area.
5. Mechanically remove small diameter trees to landings to be burned by FS or chipped/removed from contract area.
6. Provide wood products to local industry by utilizing timber and other forest products.
SECTION II – GOVERNMENT FURNISHED PROPERTY
The government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with FAR clause 52.245-1 Government Property incorporated by reference in the contract.
1. Tree marking paint with registered tracer and material safety data sheet (refer to accountability standards listed below).
Tree Marking Paint – Accountability and Handling (Attachment 1 – USFS Region 3 Tracer Paint Accountability Plan and Attachment 2 – Region 3 Tree Marking Contractor’s Daily Paint Accountability Log)
SECTION III – WORK ITEMS
Mandatory Item 1: Double Springs Treatment Area
Mandatory Item 1a: Cut and Remove Included Timber:
Units 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 (626 acres)
Cut and remove from Contract Area all included products which meet the minimum specifications as identified in Appendix B.
• Cut and remove all designated sawtimber, non-sawtimber, and biomass within each cutting unit.
Page 2 of 20 Flagstaff Ranger District
• All landings and skid trails shall be treated in accordance with the provisions in Appendix B.
• Road Maintenance shall be implemented as per Appendix C and will be commensurate with use.
• Construction and obliteration of created temporary roads shall be done in accordance with the provisions listed in Appendix B.
Mandatory Item 1b: Timber Stand Improvement Units 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 (626 acres)
The requirement for timber stand improvement involves cutting conifers greater than 6 feet tall and less than 6 inches DBH (sub-merchantable), in addition to non-merchantable trees greater than 6 inches DBH.
• Cut all trees less than 6 inches DBH and greater than 6 feet in height.
• Cut all trees that have undesirable characteristics (See Undesirable Tree Characteristics below):
o Leaning or bent (>15 degrees from vertical axis; often related to prolonged suppression) o Any crook, sweep, or fork in stem o Poor crown form (one-sided, narrow, or sparse) o Multiple, dead, or broken tops o Presence of insects, diseases, or animal damage, including any visible evidence of dwarf mistletoe
(i.e, fruiting bodies) o Any physical or mechanical damage Note: Trees considered undesirable have ONE OR MORE of the above.
• In all cutting units except for Unit 2, retain all trees that have desirable characteristics (See Desirable Tree Characteristics below):
o Straight, vertical stem (leaning <15 degrees from vertical axis) o Well-formed crown (wide, full, symmetrical) o Live, single top with vigorous annual terminal growth o Free of animal, insect or disease damage and/or symptoms, including dwarf mistletoe Absence of physical or mechanical damage Note: Trees considered desirable have ALL the above.
• Cut all trees in areas infected with dwarf mistletoe.
• Cut all trees under the canopy of yellow pines. (See attachment 5 for yellow pine visual aid)
• Trees shall be either be brought into the landing to be machine piled, hand piled in the unit or lopped and scattered in accordance with Appendix B C6.7#.
Item 1b Cutting Unit Table with Prescriptions.
Cut Unit Acres Prescription
1 88 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
2 24 Cut all trees less than 6” DBH
3 28 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
4 41 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
5 89 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
6 105 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
Page 3 of 20 Flagstaff Ranger District
7 23 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
8 96 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
9 30 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
10 102 Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
Mandatory Item 2: Dutton Hill Treatment Area (4,219 acres)
Item 2a: Repaint Cut Unit Boundaries and Deferrals using FS methods All Units (306,665 feet)
Contractor shall re-paint all boundary trees and interior deferral areas for an estimated 311,629 feet.
• Paint all previously painted boundary and deferral trees for all units. Trees were previously painted with orange tracer paint. All previous marks on boundary trees should be covered with new paint of the same color over the existing paint.
• If previously marked boundary tree(s) cannot be located, contractor shall paint a new boundary tree located along established boundary using a GPS device such that each boundary tree shall be visible from one tree to the next.
o All painted bands/lines shall be 2 to 3 inches wide, and all unit numbers shall be painted in block form with double-digit number stacked vertically. Unit numbers shall be large enough to be easily read at 100 feet.
• The Contractor shall only use Government furnished paint.
• Painting shall be done in accordance with manufacturer’s directions.
• The Contractor shall follow the attached Tracer Paint Accountability Plan (Attachment 1).
Item 2b: Repaint Leave Tree Mark Units using FS methods Units 2, 6, 9, 12, 21, 25, 27, 29, 31 (619 acres)
The Dutton Hill Treatment Area was previously marked and leave tree units identified in for this item requiring re-painting.
• Re-paint all individual “leave” trees.
o If stump mark is not painted over existing paint or then it shall be painted on the downhill side of the tree.
o The diagonal mark around the bole of the tree shall be located above or below the previous mark to allow COR to inspect.
• All marks shall be 1.5 to 2 inches wide and shall be visible from all sides. Marks shall be sufficiently visible for an operator to differentiate between trees to be left and those to cut.
• The Contractor shall only use Government furnished paint.
Page 4 of 20 Flagstaff Ranger District
Item 2c: Leave Tree Marking - Convert DxP Units to Leave Tree Mark Units 8, 10, 13, 14, 24, 28, 30 (2,639 acres)
Use existing silviculture prescriptions/marking guides (Attachment 3) to convert units previously designated as Designation by Prescription to Leave Tree Mark units. Digital prescription guides are available for use at Contractors request.
• Each designated leave tree shall be marked with tracer paint.
• Paint diagonal slash marks on the bole of each designated tree:
o Each diagonal slash shall be painted at an angle between 30 and 60 degrees and located between 4.5 feet and 7 feet above ground level.
o Diagonal slash marks shall be painted so they are clearly visible from all sides of the tree, with the tail end of one slash located directly above or below the tail end of the next slash.
• Paint horizontal stump marks on each tree.
o Horizontal stump marks shall be painted at ground level and touching the forest floor, ensuring the paint penetrates the nooks, crevices, and fissures of the bark.
o Each stump mark shall be 6-9” long and painted on the downhill side of the tree.
• All marks shall be 1.5 to 2 inches wide and sufficiently visible for an operator to differentiate between trees to be left and those to cut.
• The Contractor shall only use Government furnished tracer paint.
Item 2d: Timber Cruise Implementation
Conduct cruise plots in accordance with FS provided cruise design. Cruisers will follow procedures outlined in the cruise plan and take measurements in accordance with Handbook 2409.12; See Attachment 6 – Timber Cruising Handbook.
Work will be accepted based on a formal inspection by a Forest Service Zone Check Cruiser following procedures set forth in the Timber Cruising Handbook FSH 2409.12, Chapter 60 and associated Region 3 and Forest supplements.
(See Attachment 6 – Timber Cruising Handbook)
When final cruise has been completed and accepted, the FS will complete an independent Timber Sale Appraisal using the R3 regional appraisal system to determine the Advertised Timber Rate and Bid Premiums to be collected according to the “Timber Appraisal and Bid Premium” notes section on page 5 of the Solicitation.
Mandatory Item 3: LO Pocket Treatment Area (3,934 acres)
Item 3a: Repaint Cut Unit and Deferral Boundaries All Units (288,831 feet)
Contractor shall re-paint all boundary trees and interior deferral areas for an estimated 288,831 feet.
• Paint all previously painted boundary and deferral trees for all units. All previous marks on boundary trees should be covered with fresh paint.
• If previously marked boundary tree(s) cannot be located, contractor shall paint a new boundary tree located along established boundary using a GPS device such that each boundary tree shall be visible from one tree to the next.
o All painted bands/lines shall be 2 to 3 inches wide, and all unit numbers shall be painted in block form with double-digit number stacked vertically. Unit numbers shall be large enough to be easily read at 100 feet.
• The Contractor shall only use Government furnished paint.
Page 5 of 20 Flagstaff Ranger District
Item 3b: Repaint Leave Tree Mark Units Units 13, 27, 29, 30 (606 acres)
Contractor shall re-paint all trees previously painted by the FS with orange tracer paint on 606 acres.
• Re-paint all individual “leave” trees.
o If stump mark is not painted over existing paint or then it shall be painted on the downhill side of the tree.
o The diagonal mark around the bole of the tree shall be located above or below the previous mark to allow COR to inspect.
• All marks shall be 1.5 to 2 inches wide and shall be visible from all sides. Marks shall be sufficiently visible for an operator to differentiate between trees to be left and those to cut.
• The Contractor shall only use Government furnished paint.
Item 3c: Leave Tree Marking: Convert DxP Units to Leave Tree Mark Units 1, 2, 3, 4, 7, 8, 20, 24, 26, 33 (2,304 acres)
Use existing silviculture prescriptions/marking guides (Attachment 4) to convert units previously designated as Designation by Prescription to Leave Tree Mark units. Digital prescription guides are available for use at Contractors request.
• Each designated leave tree shall be marked with tracer paint.
• Paint diagonal slash marks on the bole of each designated tree:
o Each diagonal slash shall be painted at an angle between 30 and 60 degrees and located between 4.5 feet and 7 feet above ground level.
o Diagonal slash marks shall be painted so they are clearly visible from all sides of the tree, with the tail end of one slash located directly above or below the tail end of the next slash.
• Paint horizontal stump marks on each tree.
o Horizontal stump marks shall be painted at ground level, ensuring the paint penetrates the nooks, crevices, and fissures of the bark.
o Each stump mark shall be 6-9” long and painted on the downhill side of the tree.
• All marks shall be 1.5 to 2 inches wide and sufficiently visible for an operator to differentiate between trees to be left and those to cut.
• The Contractor shall only use Government furnished paint.
Item 3d: Timber Cruise Implementation
Conduct cruise plots in accordance with FS provided cruise design. Cruisers will follow procedures outlined in the cruise plan and take measurements in accordance with Handbook 2409.12; See Attachment 6 Timber Cruising Handbook.
Work will be accepted based on a formal inspection by a Forest Service Zone Check Cruiser following procedures set forth in the Timber Cruising Handbook FSH 2409.12, Chapter 60 and associated Region 3 and Forest supplements. (See Attachment 6 Timber Cruising Handbook.)
When final cruise has been completed and accepted, the FS will complete an independent Timber Sale Appraisal using the R3 regional appraisal system to determine the Advertised Timber Rate and Bid Premiums to be collected according to the “Timber Appraisal and Bid Premium” notes section on page 5 of the Solicitation.
Page 6 of 20 Flagstaff Ranger District
Optional Item 4: Dutton Hill Treatment Area (4,219 acres)
Item 4a: Cut and Remove Included Timber (6”-24” DBH)
All Units (4,219 acres)
Cut and remove from Contract Area all included products which meet the minimum specifications as identified in Appendix B. Appendix C Road Maintenance requirements are commensurate with use.
• Cut and remove all designated sawtimber, non-sawtimber, and round biomass within each cutting unit.
• All landings and skid trails shall be treated in accordance with the provisions in Appendix B.
• Road Maintenance shall be implemented as per Appendix C and will be commensurate with use.
• Construction and obliteration of created temporary roads shall be done in accordance with the provisions listed in Appendix B.
Item 4b: Timber Stand Improvement (<6” DBH and >6’ in Height) Units 2, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 34, 35 and 36 (4,219 acres)
The requirement for timber stand improvement involves cutting conifers 6 feet tall or greater and less than 6 inches DBH (sub-merchantable), in addition to non-merchantable trees greater than 6 inches DBH.
• In cutting Unit 9B, and C, 25A, 31C, cut all trees less than 6 inches DBH and greater than 6 feet in height.
• In all remaining cut units except Unit 13, retain all trees that have desirable characteristics less than 6”
DBH and greater than 6 feet tall (See Desirable Tree Characteristics below):
o Straight, vertical stem (leaning <15 degrees from vertical axis) o Well-formed crown (wide, full, symmetrical) o Live, single top with vigorous annual terminal growth o Free of animal, insect or disease damage and/or symptoms, including dwarf mistletoe Absence of physical or mechanical damage Note: Trees considered desirable have MOST, if not all the above.
• And, Cut all trees 6 feet tall or greater and less than 6” DBH that have undesirable characteristics (See Undesirable Tree Characteristics below):
o Leaning or bent (>15 degrees from vertical axis; often related to prolonged suppression) o Any crook, sweep, or fork in stem o Poor crown form (one-sided, narrow, or sparse) or <40% live crown ratio o Multiple, dead, or broken tops o Presence of insects, diseases, or animal damage, including any visible evidence of dwarf mistletoe
(i.e, fruiting bodies) o Any physical or mechanical damage
Note: Trees considered undesirable have ONE OR MORE of the above.
• In cutting Unit 13, retain all desirable ponderosa pine 6 feet tall or greater and less than 6” DBH, except cut all within 50’ a live aspen and cut all trees 6 feet tall or great and less than 6” DBH with undesirable characteristics as described above.
• In all cutting units, Trees shall be either be brough into the landing to be machine piled, hand piled in the unit or lopped and scattered in accordance with Appendix B C6.7#.
Item 4b Cutting Unit Table with Prescriptions.
Cut Unit Acres Prescription
2 119 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
4 190 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
6 34 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
7 19 Retain all desirable ponderosa <6” dbh. Cut all non-desirable
Page 7 of 20 Flagstaff Ranger District
8 128 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
9 46 A, D-Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh. B, C- Cut all ponderosa <6” dbh.
10 430 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
11 29 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
12 22 ?
13 569 Retain all desirable ponderosa <6” dbh, except cut all ponderosa <6” dbh w/in 50’ of live aspen. Cut all non-desirable ponderosa <6” dbh.
14 135 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
21 53 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
22 178 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
23 98 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
24 500 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
25 48 A-Cut all ponderosa <6” dbh. B- Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
26 127 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
27 47 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
28 103 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
29 65 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
30 774 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
31 163 A, B, D-Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh. C- Cut all ponderosa <6” dbh.
34 140 Retain all desirable ponderosa <6” dbh. Cut all non-desirable ponderosa <6” dbh.
35 223 Retain all desirable ponderosa <6” dbh. Cut all non-desirable
36 22 ?
Optional Item 5: LO Pocket Treatment Area (3,934 acres)
Item 5a: Cut and Remove Included Timber All Units (3,934 acres)
Cut and remove from Contract Area all included products which meet the minimum specifications as identified in Appendix B. Appendix C Road Maintenance requirements are commensurate with use.
• Cut and remove all designated sawtimber, non-sawtimber, and round biomass within each cutting unit.
• Road Maintenance shall be implemented as per Appendix C and will be commensurate with use.
• All landings and skid trails shall be treated in accordance with the provisions in Appendix B.
Page 8 of 20 Flagstaff Ranger District
• Construction and obliteration of created temporary roads shall be done in accordance with the provisions listed in Appendix B.
Item 5b: Timber Stand Improvement All Units (3,934 acres)
The requirement for timber stand improvement involves cutting conifers greater than 6 feet tall and less than 6 inches DBH (sub-merchantable), in addition to non-merchantable trees greater than 6 inches DBH.
• Cut all trees less than 6 inches DBH and greater than 6 feet in height.
• Cutt all trees that have undesirable characteristics (See Undesirable Tree Characteristics below):
o Leaning or bent (>15 degrees from vertical axis; often related to prolonged suppression) o Any crook, sweep, or fork in stem o Poor crown form (one-sided, narrow, or sparse) o Multiple, dead, or broken tops o Presence of insects, diseases, or animal damage, including any visible evidence of dwarf mistletoe
(i.e, fruiting bodies) o Any physical or mechanical damage Note: Trees considered undesirable have ONE OR MORE of the above.
• In all cutting units except for Unit 2, retain all trees that have desirable characteristics (See Desirable Tree Characteristics below):
o Straight, vertical stem (leaning <15 degrees from vertical axis) o Well-formed crown (wide, full, symmetrical) o Live, single top with vigorous annual terminal growth o Free of animal, insect or disease damage and/or symptoms, including dwarf mistletoe Absence of physical or mechanical damage Note: Trees considered desirable have ALL the above.
• Cut all trees in areas infected with dwarf mistletoe.
• Cut all trees under the canopy of yellow pines. (See Attachment 5 for yellow pine visual aid)
• Trees shall be either be brough into the landing to be machine piled, hand piled in the unit or lopped and scattered in accordance with Appendix B C6.7#.
Item 5b Cutting Unit Table with Prescriptions.
Cut Unit Acres Prescription
1 373
Retain only desirable trees throughout the stand. Cut all trees which are non-desirable, infected with dwarf mistletoe, in areas infected with dwarf mistletoe, or under the canopy of yellow pine.
2 92
Retain only desirable trees throughout the stand. Cut all trees which
3 314
4 849
5 128
Page 9 of 20 Flagstaff Ranger District
7 124
Retain only desirable trees throughout the stand. Cut all trees which
8 35
9 76
10 295
11 77
13 291
17 24
19 141
23 16
24 184
25 78
26 122
27 202
28 140 Retain only desirable trees throughout the stand. Cut all trees which
Page 10 of 20 Flagstaff Ranger District
29 15 Retain desirable and acceptable pine < 6” dbh throughout the unit.
Vary spacing between trees from 5 to 20 feet, leaving no more than 20 trees per 1/10th acre.
30 98
Retain only desirable trees throughout the stand. Cut all trees which
33 116
Optional Item 6: Dutton Hill Heritage Site Work
6a: Complete Site Update:
28 sites Site Update
Re-record previously inventoried sites in the project area.
Reconcile previously recorded sites using previous documentation, adding additional information where appropriate to meet current CNF archaeological recording standards. Discuss any changes to the site boundary (expansions or reductions) and any previously recorded features that could not be relocated with the COR.
All project work will confirm to the guidelines in Attachment 7, General Requirements for Survey on the Coconino National Forest.
• Site Description o In the form of site cards. See exhibit 1 in attachment 7.
• Condition Assessment o If the site has been damaged, indicate the nature and severity of damage. For the purposes of this section, cattle grazing, tree growth, normal weathering, and erosion are not usually considered damage. Only indicate these types of condition if they have caused damage beyond that which would normally be expected, like if a tree is growing inside a pit house, an arroyo has cut through the site, or a major cattle drive has impacted the site.
o On a 0-5 scale, rank the severity of damage done to the site. 0 is pristine, undisturbed, and 5 is completely destroyed, no longer useful for any archaeological study. Remember to consider the site as a whole for this ranking and don’t allow severe damage in one area color your perception of the entire site. For example, if a burial area has been severely vandalized by pothunters, but the pueblo has not been pot hunted, do not rank the site as a 5, but, perhaps as 2 or 3. If any ranking other than 0 is used, you must indicate what the nature and cause of damage is.
• Documentation of features
• Updated photographs o Digital Standards: Minimum 1600 x 1200 at 5 megapixel.
o Digital photographs will be provided on a CD or another electronic transfer device as part of the project electronic documentation submitted with the final report. Alternative formats for electronic data submission should be agreed upon with the District or Forest archaeologists before field work begins.
o Photographs should show site features, diagnostic pottery, projectile points, and other artifacts, as well as identifying site characteristics and important landmarks for relocating the site. The use of a mug board with the site identification number clearly visible in the photograph is desirable.
o Digital photos will be taken of every recorded site providing at least two site overviews from different directions with the datum tree visible or pointed out, as well as individual photos of site features and/or diagnostic artifacts.
o Photographs will use the following digital naming format: District prefix followed by site number followed by a number, and descriptive information. For example, 02-2491. 01.site
Page 11 of 20 Flagstaff Ranger District overview.north.date.jpg OR include a photo log (provided by CNF) to detail photo information. Photo logs are required for ‘detailed’ projects such as data recovery. Photo logs are to be provided in the same data folder as the digital photos when provided to the CNF. Other photos, such as scenic, project, etc, titled as descriptive.
• Plan view site map
Updated Geometry and Marking
• GPS Boundaries -o All site boundaries and site datums must have their spatial locations recorded using GPS devices that have sub-meter accuracy. Locations will be reported using Universal Transverse Mercator (UTM) coordinates, North American Datum (NAD) 1983. Site cards will identify the GPS unit model used to plot site areas. Project generated spatial data must be compatible with ArcGIS Pro 3.2 o CNF attribute data for isolates and linear sites (only) must be completed for all final deliverable spatial data. A blank CNF geodatabase will be provided to the contractor to assist in this process.
o At a minimum, the location of the site tag (datum), and site boundaries must be captured using GPS.
o Geospatial data shall be submitted in an NRM Heritage Mobile format, consistent with CNF standards. A blank geodatabase template may be provided for collection of data for input into the NRM Heritage Mobile application.
• Paint Boundaries o The perimeter of the site will be marked by spraying a white horizontal band, at least two inches wide, at a height of approximately 6 ft. above the ground, around trees that circle the site. In addition, a spot above 6 in. in diameter will be painted at the base of each tree so banded with the spot facing into the site.
o The perimeter of the site will be additionally marked by tying pink fluorescent flagging tape at chest height on the painted trees with the knot and a trailing strand of flagging tape on the outside of the tree, facing away from the center of the site.
o Both painted bands and flagging tape must be inter-visible and not obstructed by branches or foliage.
White painted stakes, posts, or lathe that are clearly visible may be used to identify o The datum tree of the site will be marked by spraying two white horizontal bands, each at least two inches wide, at a height of approximately 6ft. above the ground.
National Register of Historic Places (NRHP) site eligibility recommendation
• Criterion D of 36-CFR-60.4
Complete NRM Heritage data entry
a. Complete data entry of site records into the FS NRM database using NRM Mobile (CNF Staff will provide a data package and training materials). Please consult with CNF Staff if contractor elects to conduct site recording using NRM Mobile in the field. Otherwise, a data package will not be provided until requested after the draft report has been reviewed.
b. Complete production of digital site records (printed from NRM) with digital site maps, photos and any artifact illustrations in PDF format. Please place site specific documents (digital or sketch map(s), photos, and artifact illustrations) within a site-specific PDF by site number, for example, 03040209999.pdf Digital photos from site recordings in jpg format with a file name equivalent to the site number, ex. 03040200292.01.jpg. Digital photo files organized by site will be submitted with final deliverables.
c. Newly recorded and revisited site boundaries and survey coverage will be inputted into the FS NRM database for final submittal. A shapefile of site boundaries and survey coverage will be submitted with the draft report.
d. CNF attribute data for isolates and linear sites (only) must be completed for all final deliverable spatial data. A blank CNF geodatabase will be provided to the contractor to assist in this process.
Final Site Packets
• A PDF containing captioned site photos, a plan view site map, and the NRM Heritage database-generated site form.
Page 12 of 20 Flagstaff Ranger District
SECTION III – CONTROL OF WORK
The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with Federal, State, and local statutes, standards, orders, permits and other regulations.
The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.
Work may be done any time during the term of the contract, except under the following conditions:
(1) When conditions are such that operations shall be restricted or ceased due to increased fire risk.
(2) When seasonal operating restrictions for active raptor nests are in effect. All active nest sites and areas of restriction are shown on CAM and listed in the solicitation under Protection Measures Needed for Plants Animals, Cultural Resources, and Cave Resources. Restrictions would apply:
(3) If new nests are discovered,
(4) When soil moisture conditions create excessive risk of damage to the soil,
(5) When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR.
(6) The government reserves the right to prioritize the order in which Units are treated.
(7) If any cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist.
Areas excluded from treatment shall be deleted from the contract.
SECTION IV – INSPECTION AND ACCEPTANCE
For All Work Items:
At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in-the-field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
Quality assurance will be performed by the Government during the contract at regular intervals. Methods may include visual survey and review of contractor quality control documents. Unacceptable work shall require rework at no cost to the Government. All work shall meet all the standards listed in above sections.
Government Inspection Procedures - The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily. The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.
1. Each unit will be inspected as a separate unit. Unit will not be averaged with other units for acceptance or payment.
2. When units are completed and ready for government inspection, Contractor’s designated Project manager shall request unit inspection in writing, prior to moving out of the general area.
Page 13 of 20 Flagstaff Ranger District
3. The COR, or designated inspector, will determine compliance with contract specifications through informal visual inspections. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
Government Inspection Procedures – Formal Plots (Items 1a, 4a, and 5a)
Follows specifications found in Appendix B, C6.36# - Acceptance of Work.
Government Inspection Procedures – (Items 2a, 3a, 6)
Work will be accepted on the basis of visual inspection by the CO through the COR or designated inspector. The Contractor’s inspection data shall be provided to the COR before the U.S. Forest Service begins its inspection.
The U.S. Forest Service will check a minimum of 10 percent of the total distance of each treatment unit to be inspected. This will constitute a minimum inspection for determining satisfactory performance.
Government Inspection Procedures – Formal Plots (Items 2b, 3b)
Work will be accepted on the basis of visual or formal inspection by the CO through the COR or designated inspector. The Contractor’s inspection data shall be provided to the COR before the U.S. Forest Service begins its inspection. If formal inspection is used, Table 1 describes the minimum number of random or systematic plots to be inspected per cutting unit (or group of cutting units). Plots will be fixed or variable radius, with additional specifications provided in the task order. The inspection will evaluate the extent to which previously marked trees were remarked (including boundary trees) and proper paint application. The Contractor shall notify the COR upon completion of each cutting unit or group of cutting units (as defined on the task order), at which point the U.S.
Forest Service shall complete the inspection and inform the Contractor of the inspection results within fourteen
(14) business days.
Government Inspection Procedures – Formal Plots (Items 2c, 3c)
Work will be accepted on the basis of visual or formal inspection by the CO through the COR or designated inspector. The Contractor’s inspection data shall be provided to the COR before the U.S. Forest Service begins its inspection. If formal inspection is used, Table 1 describes the minimum number of random or systematic plots to be inspected per cutting unit (or group of cutting units). Plots may be fixed or variable radius.
Table 1. Minimum No. Plots per Cut Unit Cut Unit Size Minimum No. Plots Up to 40 acres 15
40 to 100 acres 30
Over 100 acres
30 plots plus an additional plot for every 10 acres over 100 acres (e.g. 420 acres would require 30 plots for first 100 acres and 32 plots for remaining 320 acres for a total of 62 plots
Typical performance elements to be inspected include residual basal area; proper placement of groups, interspaces, and regeneration openings; distribution and size of groups; distribution and width of interspaces and/or regeneration openings; tree removal within regeneration openings, residual tree quality; designation of mandatory reserve trees; and proper paint application.
The Contractor shall notify the COR upon completion of each cutting unit or group of cutting units (as defined on the task order), at which point the U.S. Forest Service shall complete the inspection and inform the Contractor of the inspection results within fourteen (14) business days.
Page 14 of 20 Flagstaff Ranger District
Government Inspection Procedures – Formal Plots (Items 2d and 3d)
Work will be accepted on the basis of a formal inspection by the Zone Check Cruiser, following procedures set forth in the Timber Cruising Handbook FSH 2409.12, Chapter 60 and associated R3 and forest supplements.
Inspections are cumulative and regardless of the completion date will contribute to the final inspection results.
The following describes the phases of the inspection process:
a) At any point during the cruise, the Contractor may request an initial field check of 1-5 cruise plots to ensure that cruise specifications and procedures are being followed. Upon receipt of all of the Contractor’s cruise data by the COR, the U.S. Forest Service shall complete the partial inspection and inform the Contractor of the inspection results within fourteen (14) business days.
b) Unless a previous inspection has already been requested and completed, the Contractor shall notify the COR and supply the U.S. Forest Service with completed cruise data at or near the time when 30 percent of the cruise plots have been completed. Upon receipt of all of the Contractor’s cruise data by the COR, the U.S. Forest Service shall complete a field check of 1-5 cruise plots and inform the Contractor of the inspection results fourteen (14) business days.
c) Upon completion of the cruise, the Contractor shall notify the COR and supply the government with all completed cruise data. Upon receipt of all data, the U.S. Forest Service shall complete the formal check cruise and inform the Contractor of the results within thirty (30) business days. Calculations of the accuracy of the cruise shall be based on a comparison of the Zone Check Cruiser’s data and the Contractor's data.
d) Handwritten work will only be accepted if completely legible. This includes, but is not limited to paperwork and information recorded on ribbons, stakes, and trees.
Government Inspection Procedures – Deliverables (Items 2d and 3d)
Cruise data provided by the Contractor to the U.S. Forest Service shall be in a format which will load into the current version of FSCruiser and Cruise Processing (National Cruise System). This will be accomplished by using Timber Cruise Cards (currently Form R3-2400-28A Rev.5/2007) or the FSCruiser program for field data recorders. Timber Cruise Cards will be furnished, if necessary, by the U.S. Forest Service prior to commencing work. Data recording procedures will be covered at the pre-work meeting.
Government Inspection Procedures – Formal Plots (Items 1b, 4b, 5b)
1. In the event visual inspection indicates work and / or rework to be in non-compliance with contract specifications, a series of verification plots shall be installed by the Government to determine compliance with specifications and percent of satisfactory work for treatment of each unit not meeting specification as observed with visual inspection.
2. Government verification plots will consist of a series of fixed area plots and variable radius plots along transects to record whether density, basal area, best tree selection, and other requirements are being met and to what extent.
3. Plots and grid will be distributed so that a representative sample is obtained.
4. The COR or designated inspector will mark the center of each plot on the ground using flagging, stakes, or pin flags. Additional flagging will be hung near the plot center so that it may be seen from a distance. The inspector will include the plot number, their initials and date on the flagging.
5. Plots will be numbered to correlate with the inspection form and transects on a unit map.
6. The minimum number of verification plots, per treatment unit, shall be as follows:
Unit Acreage Minimum No. of Plots 1 – 9 1 plot 10 – 29 2-3 plots
Page 15 of 20 Flagstaff Ranger District
30 – 59 4-6 plots 60 – 99 7-10 plots 100 11 plots
7. Determination of acceptability of the work performed will be based on Government verification inspections and will be considered conclusive.
8. At each plot, the Government will examine the plot area and record findings on the items listed below:
a. Plot number
b. Number of trees to be left on plot.
c. Number of trees left on plot.
d. Number of satisfactory trees.
e. Number of deficient trees.
f. Number of excess trees.
- Stumps containing live limbs which are not in accordance with specifications herein will be counted as excess trees.
- Cut trees which are still attached at the stump will be counted as excess trees
- Trees meeting cut specifications will be counted as excess trees
- Trees in excess of trees to be left will be counted as excess
9. Work quality will be calculated on the form as follows:
No. Trees Deficient + No. Excess Trees -------------------------------------------------- = % Unsatisfactory work No. Trees to be left
100% – % Unsatisfactory work = % Work Quality
Unsatisfactory Cutting Items 1a, 4a and 5a
1. If the work quality falls below 85 percent, the COR will immediately notify the Contractor, in writing, and order him to improve the quality of subsequent tree cutting. If the quality of subsequent tree cutting is not raised above the 85 percent minimum acceptable standard within 24 business hours after receipt of such written notice, the Contractor’s right to proceed may be terminated and the contract considered in default.
2. When the work quality falls below 90 percent as a result of excess trees, the Government may elect to do one of the following:
(a) Order rework to be performed and withhold payment until excess trees are cut and the results of a post-rework Government inspection show work quality to be at least 85 percent or more. No rework shall be performed unless ordered or authorized by the COR.
(b) Order that no rework be performed and payment will either be made at a reduced rate, or not at all, as determined from the Thinning Inspection Report.
3. Repeated failure to produce work quality at or above the 85 percent minimum acceptable standard will be considered reason for contract termination and default action.
Reinspection Upon Contractor Request
1. If Government inspection results are unacceptable to the Contractor, a reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure
Page 16 of 20 Flagstaff Ranger District will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots.
2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.
3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.
Government Inspection Procedures – Items 1-6
Table 1 – Minimum Acceptable Quality Levels (AQL) of Work
ITEM DESCRIPTION SCHEDULE UNIT Min AQL
1a Cut and Remove Included Timber
MANDATORY
ACRE N/A 4a OPTIONAL
5a OPTIONAL
1b Timber Stand Improvement
MANDATORY
ACRE 95% 4b OPTIONAL
5b OPTIONAL
2a Repaint Cut Unit Boundaries & Deferrals MANDATORY FEET 100%
3a
2b Repaint LTM Units MANDATORY ACRE 95%
3b
2c Leave Tree Marking MANDATORY ACRE 95%
3c
2d Timber Cruise Implementation MANDATORY EACH 95%
3d 6 Heritage Site Work Optional EACH 100%
SECTION V – PAYMENT METHODS
Method of Measurement for Acreages Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and is final unless:
a. The contract is modified or,
b. The Government makes a determination to remeasure or,
c. The Contractor exercises his/her option under the following Remeasurement provisions:
Remeasurement
1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed.
Page 17 of 20 Flagstaff Ranger District
All requests for remeasurement must be made prior to payment for each completed unit. Remeasurement will be performed by the Government.
2. If remeasurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the remeasurement. Under this condition, payment will be made on the acreage stated on the project maps. If the remeasurement indicates the actual acreage varies by more than the above factors from that stated on the project maps, the payment will be made on the remeasured acreage and the Forest Service will pay for the cost of the remeasurement.
Acceptance and Payment
1. Percentages as calculated herein shall be rounded to the nearest whole percent.
2. No allowance for variation or portion of a variation will be added which will create a percentage greater than 100 percent.
Acceptance and Payment:
Items 2a and 3a - Repaint Cut Unit Boundaries & Deferrals, Item 6 - Dutton Hill Heritage Site Work - Complete Site Update
1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 % of their bid rate.
2. Contractor shall rework any areas or entire units at no additional cost to the Government, when work is deemed to be unacceptable by visual inspection.
3. If after rework, the work quality is measured with informal inspection to be 100%, the Contractor will be paid 100 % of their bid rate. If the percentage is less than 100%, the work is unacceptable, and no payment will be made.
Acceptance and Payment:
Items 1b, 4b, and 5b - Timber Stand Improvement Items 2b and 3b - Repaint LTM Units Items 2c and 3c - Leave Tree Marking Items 2d and 3d - Timber Cruise Implementation
1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
2. For work quality measured to be 95% or higher with formal plots, Contractor will be paid 100% of their bid rate.
3. Contractor shall rework any areas or entire units at no additional cost to the Government, when work is deemed to be unacceptable by visual or formal inspection.
4. If after rework, the work quality is measured with formal inspection to be between 95% and 100%, payment will be made by the actual percentage. If the percentage is less than 95%, the work is unacceptable, and no payment will be made.
* Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.
SECTION VI – DEFINITIONS
ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s). A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.
Page 18 of 20 Flagstaff Ranger District
BIOMASS TREES: Any conifer material 2 feet in height to 4.9 inches DBH.
BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.
CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.
COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut. As described by the contract or otherwise marked to be cut.
CUTTING UNIT: See Treatment Unit definition
DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.
DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.
DECKING: Stockpiling of trees in a designated area.
DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless.
This is the start of the file's text. The full file is on GovTribe.