2. AL-1887-9968_SR_BPM_flexible_jumper_cable_ACL_docx.pdf
PDF 463 KB Posted
- Attached to
- BPM Cables - Flexible LMR for ALS-U
- Solicitation number
- AA-2026-05
- Issued by
-
Department of Energy
About this file
This is an Acceptance Criteria List (ACL) document for the Advanced Light Source Upgrade Project at Lawrence Berkeley National Laboratory, establishing quality assurance standards for SR BPM jumper cables.
The document specifies acceptance criteria for 1,068 units of Flexible LMR-195 coaxial cables designated for the Beam Diagnostics group. The acceptance criteria are classified at the "High" level of care and require four mandatory inspections and tests, all supported by document AL-1881-8085. Item 1 requires visual inspection to verify correct labeling, matching specifications, and absence of cable damage, with review of inspection reports and certificates for compliance. Item 2 mandates length measurement using Time Domain Reflectometry (TDR), with tolerance of ±10 picoseconds. Item 3 requires S21 coefficient measurement using a Vector Network Analyzer (VNA), with specifications of ≥0.94 and ±0.0015 at 500 MHz. Item 4 calls for connector type verification and measurement of connector and termination quality using TDR, with zero faults permitted. The Beam Diagnostics group serves as the verifying entity for all tests. Each test line item includes fields for documenting NonConformance Reports (NCRs) if failures occur, pass/fail determination, date, and inspector initials. The document was prepared by Changchun Sun (CAM and Technical Lead) in February 2026 and approved by Jiani Niu (QA Manager) on March 30, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question Answer AA-2026-05 Rev. 1.pdf | ||
| Question Answer AA-2026-05.pdf | ||
| 5. Past Performance Reference Information Form, AA-2026-05.docx | DOCX document | |
| 0. RFQ AA-2026-05.pdf | ||
| 4. Rep Cert Form, AA-2026-05.docx | DOCX document | |
| 1. AL-1881-8085_SOW_SR_BPM_Flexible_Jumper_Cables_docx.pdf | ||
| 3. Sample Subcontract, AA-2026-05.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR BPM Jumper Cable ACL
Release Date: Mar 30 2026 1:54:53 PM PDT
Document Number: AL-1887-9968 Revision: A
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: AL7001
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
0t h, D
C C
A ut h K ey : Q
LU
8D
A P4
P3
Downloaded by: Changchun Sun at April 02, 2026 08:45:16
AL-1887-9968 Rev. A Doc. Status: Released Page 2 of 4
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
TABLE OF CONTENTS
1 Revision History2
2 Approvals2
3 Abbreviations and Acronyms2
4 Authorizing Document2
5 Reference2
6 Acceptance Criteria Listing Form3
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline B
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Changchun Sun CAM and Technical Lead Jiani Niu QA Manager Windchill Approved / Concurred By jianiniu
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source QA Quality Assurance
4 AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-
1024-3173A.pdf
5 REFERENCE
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
0t h, D
C C
A ut h K ey : Q
LU
8D
A P4
P3 https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☒ High ☐ Medium ☐ Low
Prepared by: Changchun Sun Group: Beam Diagnostics
Email: CCSUN@lbl.gov Location: Lawrence Berkeley National Lab
Phone: 510-486-7710 Date: Feb, 2026
Part Name: Flexible LMR-195 Quantity: 1,068
Part Number: S/N (if applicable)
NCR Reviewers
Additional Remarks:
Inspect and Test SR BPM flexible (LMR195) jumper cable ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
0t h, D
C C
A ut h K ey : Q
LU
8D
A P4
P3 mailto:CCSUN@lbl.gov
AL-1887-9968 Rev. A Doc. Status: Released Page 4 of 4
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
ITE
M
NO.
REQ ID /
DCC doc
CHARACTERISTIC OR TEST TO
BE CONDUCTED, VERIFIED or
WITNESSED
SUPPORTING
DOCUMENT ID VERIFYING
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION
REPORT/
INSPECTION DATA
1.
Visual inspection:
Check if the cables are correctly labeled and match specifications
Check there is no damage to the cable
Review the inspection report and certificate to ensure compliance with requirements
AL-1881-8085 Beam
Diagnostics
NCR #: PASS ☐ FAIL ☐
INITIALS DATE
2.
Measure the length with TDR.
The length shall be within +-10 ps
AL-1881-8085 Beam
Diagnostics
3.
Measure S21 coefficient with
VNA. Shall be >= 0.94 and +-
0.0015 at 500 MHz
AL-1881-8085 Beam
Diagnostics
4.
Verify connector type. Measure connector and termination quality with TDR. Shall be no fault
AL-1881-8085 Beam
Diagnostics ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
0t h, D
C C
A ut h K ey : Q
LU
8D
A P4
P3
File details come from the government source that posted it. Updated .