This is an Acceptance Criteria List (ACL) for SR BPM Jumper Cable components being procured for the Advanced Light Source Upgrade Project at Lawrence Berkeley National Laboratory.
The document establishes quality assurance and acceptance standards for 1,120 low-loss semi-rigid 141 jumper cables designated for the Beam Diagnostics group. The ACL, prepared by Changchun Sun (CAM and Technical Lead) in February 2026, is classified as "High" level of care and has been approved by Jiani Niu (QA Manager). Five acceptance criteria must be verified by the Beam Diagnostics group for each cable: (1) visual inspection confirming correct labeling, no physical damage, and compliance of inspection reports and certifications; (2) length measurement via TDR within ±10 picoseconds tolerance; (3) S21 coefficient measurement via VNA of ≥0.97 with ±0.0015 tolerance at 500 MHz; (4) magnetic permeability verification for cable and connectors with μ ≤1.08; and (5) connector type verification and connector/termination quality measurement via TDR showing no faults. All verification tests reference supporting document AL-1873-9868. The ACL requires documentation of pass/fail results, NCR (NonConformance Report) numbers if applicable, inspector initials, and verification report/inspection data for each criterion tested.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 8. Response to Questions 1 - RFP AA-2026-04.pdf | ||
| 0. RFP, AA-2026-04.pdf | ||
| 1. AL-1873-9868_SOW.pdf | ||
| 4. Rep Cert Form, AA-2026-04.docx | DOCX document | |
| 5. Price Proposal Schedule, Attachment A RFP AA-2026-04.xlsx | XLSX spreadsheet | |
| 3. Sample Subcontract, AA-2026-04.pdf | ||
| 7. ALS-U Supplier Quality Evaluation Survey, RFP AA-2026-03.pdf | ||
| 6. Past Performance Reference Information Form, AA-2026-04.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR BPM Jumper Cable ACL
Release Date: Mar 31 2026 11:17:04 AM PDT
Document Number: AL-1816-4231 Revision: C
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: AL7001
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
1s t, D
C C
A ut h K ey : 4
M Q
K
LK
8H H
I
Downloaded by: Changchun Sun at April 02, 2026 08:44:04
AL-1816-4231 Rev. C Doc. Status: Released Page 2 of 4
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
TABLE OF CONTENTS
1 Revision History2
2 Approvals2
3 Abbreviations and Acronyms2
4 Authorizing Document2
5 Reference2
6 Acceptance Criteria Listing Form3
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline B Update the length tolerance C Include the review of the inspection report
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Changchun Sun CAM and Technical Lead Jiani Niu QA Manager Windchill Approved / Concurred By jianiniu
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source QA Quality Assurance
4 AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-
1024-3173A.pdf
5 REFERENCE
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
1s t, C
A ut h K ey : 4
M Q
K
LK
8H H
I https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☒ High ☐ Medium ☐ Low
Prepared by: Changchun Sun Group: Beam Diagnostics
Email: CCSUN@lbl.gov Location: Lawrence Berkeley National Lab
Phone: 510-486-7710 Date: Feb, 2026
Part Name: Low-loss semi-rigid 141 Quantity: 1,120
Part Number: S/N (if applicable)
NCR Reviewers
Additional Remarks:
Inspect and Test each SR BPM semi-rigid jumper cable ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
1s t, C
A ut h K ey : 4
M Q
K
LK
8H H
I mailto:CCSUN@lbl.gov
AL-1816-4231 Rev. C Doc. Status: Released Page 4 of 4
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
ITE
M
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO
BE CONDUCTED, VERIFIED or
WITNESSED
SUPPORTING
DOCUMENT ID VERIFYING
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION
REPORT/
INSPECTION DATA
1.
Visual inspection:
Check if the cables are correctly labeled and match specifications
Check there is no damage to the cable
Review the inspection report and certification to ensure their compliance with requirements
AL-1873-9868 Beam
Diagnostics
NCR #: PASS ☐ FAIL ☐
INITIALS DATE
2.
Measure the length with TDR.
The length shall be within +-10 ps
AL-1873-9868 Beam
Diagnostics
3.
Measure S21 coefficient with
VNA. Shall be >= 0.97 and +-
0.0015 at 500 MHz
AL-1873-9868 Beam
Diagnostics
4.
Measure the magnetic permeability for cable and connectors with μ ≤ 1.08
AL-1873-9868 Beam
Diagnostics
45.
Verify connector type. Measure connector and termination quality with TDR. Shall be no fault
AL-1873-9868 Beam
Diagnostics ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
1s t, C
A ut h K ey : 4
M Q
K
LK
8H H
I
File details come from the government source that posted it. Updated .