This is a Quality Assurance Surveillance Plan (QASP) for FEMA's Continuous Improvement Division Blanket Purchase Agreement dated November 18, 2024. The QASP establishes systematic methods to evaluate contractor performance through monitoring, documentation, and quality control measures.
The plan details specific performance standards and acceptable quality levels (AQLs) across key areas including: response to call orders (100% AQL), timely submission of deliverables (98% AQL), monthly progress reports (100% AQL), and quality of deliverables (80% for first drafts, 100% for final drafts). The QASP specifies monitoring methods including direct observation, periodic inspection, customer complaint validation, and 100% inspection sampling. Performance incentives and disincentives are tied to CPARS documentation. The plan requires deliverables to follow the Continuous Improvement Program Style Guide and meet 508 compliance standards. Key government roles are defined, including the Contracting Officer Gregory Crouse and COR Christina Graves from FEMA, though contractor representatives are listed as TBD.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuous Improvement Division (CID)
Continuous Improvement Program Support
Quality Assurance Surveillance Plan
Dated 11/18/2024
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the Continuous Improvement Division Blanket Purchase Agreement. This
QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original
QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities. The following FAR clauses apply to this BPA:
52.246-4 Inspection of Services – Fixed-Price
52.246-6 Inspection of Services – Time-and-Material and Labor-Hour
Attachment "B"
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Gregory Crouse
Organization or Agency: FEMA
Telephone: 301-447-1136
Email: gregory.crouse@fema.dhs.gov
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The
COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
Assigned COR: Christina Graves
Telephone: 202-374-0831
Email: christina.r.graves@fema.dhs.gov
Alternate COR: Kristen Larsen
Telephone: 256-282-8620
Email: Kristen.larsen@fema.dhs.gov
c. Other Key Government Personnel: Michael Icardi
Title: CID Division Director
Telephone: 202-957-4120
Email: michael.icardi@fema.dhs.gov
c. Other Key Government Personnel: Emily Trundle
Title: RFI Branch Chief
Telephone: 202-957-4120
Email: michael.icardi@fema.dhs.gov mailto:gregory.crouse@fema.dhs.gov mailto:christina.r.graves@fema.dhs.gov mailto:michael.icardi@fema.dhs.gov mailto:michael.icardi@fema.dhs.gov
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s representatives for this contract.
a. Program Manager: TBD
Telephone:
Email:
b. Project Manager: TBD
c. CIIS Project Lead: TBD
d. CITAP Project Lead: TBD
e. Disaster After-Action Review Lead: TBD
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary, paragraph in the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality
Level (AQL).
Surveillance of contractor performance will be performed by the employees named in the government roles and responsibilities listed above based on the surveillance methodologies identified in the QASP. The following performance areas of the call order will be the basis from which all surveillance will originate:
4.1 Timeliness and Schedule
4.2 Quality
4.3 Organization and Coordination
4.4 Effective Reporting
5. METHODS OF QUALITY ASSURANCE SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
a. DIRECT OBSERVATION. (Can be performed periodically or through surveillance.)
• Daily/Weekly depending on frequency of deliverables, particularly during onsite collection phases.
b. PERIODIC INSPECTION/SAMPLING (Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
• Review of product status at select intervals in approval process.
• Review of product status at pre-established decision gates.
• Review and application of Quality Control Plan and Quality Assurance and Quality
Control Checklist.
c. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
• Proactive response to customer complaints to address problems.
d. 100% INSPECTION/SAMPLING. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
• Review of product status at select intervals in approval process.
• Review of product status at pre-established decision gates.
• Review and application of Quality Control Plan and Quality Assurance and Quality
Control Checklist.
e. Progress or status meetings.
• Regularly Scheduled based on the individual call order/task requirements
• Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
• Monthly progress reports submitted with invoice but can be requested more frequently if desired.
g. Performance reporting.
• Document Contractor performance in Contractor Performance Assessment Rating System
(CPARS).
• Document performance or quality issues via email for the record for official Contractor file.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
6. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE
Desired
Output Performance Standard
Acceptable
Quality Level
(AQL)
Monitoring
Method
Performance
Incentive /
Disincentive
Response to
Call Orders issued.
Completion date and received within timeframe stipulated.
100% COR reviews call order responses
Incentive:
COR will document high quality/high performance and ensure it becomes part of
Contractor’s past performance record which will be entered at least annually into CPARS.
Disincentive:
COR will document low quality/poor performance and ensure it becomes part of
Contractor’s past performance record which will be entered at least annually into CPARS.
Deliverables submitted on time
Deliverables submitted on or before due dates without reminders from FEMA
98% Program
Manager and/or COR monitor due dates and notes when deliverables are submitted / completed
Monthly progress reports to document ongoing activities
Accurate and complete reports by the 15th of every month. On a monthly basis, the Contractor provides a review of contract performance to communicate
Task achievements, progress to date, and identified performance risks.
100% COR reviews submitted reports for accuracy, completeness and quality
High quality deliverables
Deliverables submitted that meet or exceed requirements and support objectives of PWS.
Deliverables do not require significant rework before being accepted by the government.
First Draft 80% or higher
Final draft 100%
(1 or 2 extra reviews based on complexity of feedback
Program
Manager and/or COR review submitted deliverables and measures quality against standards in
PWS, awarded contract, Quality
Control Plan
(QCP),
QA/QC
Checklist, and project plan as appropriate.
Deliverables formatted correctly and without grammatical and punctuation errors
Continuous Improvement
Program Style Guide and commonly accepted grammar and punctuation styles and standards, like APA, MLA and/or Chicago that are fully 508 compliant.
100% Program
Manager and/or COR review submitted deliverables against Style
Guide and applicable style requirements.
Christina Grave 11/18/2024
Continuous Improvement Division Contracting Officer’s Representative
Date