This document is a detailed Generator Specifications file for FEMA, specifically outlining requirements for generators ranging from 401kW and above. The solicitation is for an indefinite-delivery, indefinite-quantity (IDIQ) contract vehicle with firm fixed-price delivery orders, set to be awarded for up to 3 years as a Small Business Set-Aside under NAICS code 335312. The comprehensive specifications cover multiple generator sizes (500kW and 1mW), with strict technical requirements including Tier 4FINAL emissions standards, three-phase switchable voltage configurations, integrated fuel tanks, specific environmental and transportation specifications, and mandatory features such as industrial silencers, air ride suspension, and automatic tire inflation systems.
Key procurement details include an issuing date of December 16, 2025, with responses due by January 13, 2026. Prospective offerors must be registered in the System for Award Management (SAM) database and complete online representations and certifications. The solicitation requires vendors to submit detailed technical specification sheets, provide training for FEMA mechanics, include diagnostic capabilities, and meet stringent generator performance standards across various power ranges. The generators are intended for portable prime power use, with requirements for weather-proofing, sound attenuation, specific electrical configurations, and comprehensive safety and monitoring systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2.4.1 Amendment 0001_Generators 401kW and Above_Questions Govt Responses.pdf | ||
| 2.4.1 Amendment 0001_70FB7026R00000008_401kW and Above.pdf | ||
| 2.2.1 RFP 401kW & Above 12.16.25.pdf | ||
| 2.2.1 Attachment 4_Vendor Specifications 401kW Above FILL IN.xlsx | XLSX spreadsheet | |
| 2.2.1 Attachment 2_ SOW Generator Above IDIQ 12.5.2025.pdf | ||
| 2.2.1 Attachment 5 Past Performance Questionnaire (PPQ) (002).pdf | ||
| 2.2.1 Attachment 1_Generators 401kW & Above - PRICING - FILL IN.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEMA_400kW Below
| FEMA REQUIRED GENERATOR SPECIFICATIONS - (400kW BELOW) NOVEMBER 2024 | ||||||
| RATING INFORMATION - Non Negotiable | ||||||
| Prime Power Rating (kW): | 20kW | 50kW | 100kW | 200kW | 300kW | 400kW |
| FEMA Acceptable kW Min-Max Range: (units within this range will be ACCEPTED for the particular kW requirement) | 15-35kW (low range) (15-60kW) | 36-60kW (high range) (15-60kW) | 61-100kW | 101-200kW | 201-300kW | 301-400kW |
| Unit kVA (.8 power factor): | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 |
| GENERATOR SPECIFICATIONS | ||||||
| Enclosure: | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) |
| Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | |
| Sound Attenuated | Sound Attenuated | Sound Attenuated | Sound Attenuated | Sound Attenuated | Sound Attenuated | |
| Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | |
| Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | |
| Phase: | 3 Phase, Switchable | 3 Phase, Switchable | 3 Phase, Switchable | 3 Phase, Switchable | 3 Phase, Switchable | 3 Phase, Switchable |
| Switchable: | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital (CD-Disk) or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator |
| Voltage 3 Phase: | 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable |
| Voltage 1 Phase: | 120/240 Switchable | 120/240 Switchable | 120/240 Switchable | 120/240 Switchable | 120/240 Switchable | 120/240 Switchable |
| Generator RPM: | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 |
| Generator Output Circuit Breaker: | YES | YES | YES | YES | YES | YES |
| Frequency: | 60 HZ | 60 HZ | 60 HZ | 60 HZ | 60 HZ | 60 HZ |
| No. Poles | 4 | 4 | 4 | 4 | 4 | 4 |
| Excitation: | Brushless with AVR OR Brushless with IVR | Brushless with AVR OR Brushless with IVR | Brushless with AVR OR Brushless with IVR | Brushless with AVR OR Brushless with IVR | Brushless with AVR OR Brushless with IVR | Brushless with AVR OR Brushless with IVR |
| Frequency Regulation (Steady State): | 0.25% | 0.25% | 0.25% | 0.25% | 0.25% | 0.25% |
| Alternator Heat Rise: | Class H OR Class F insulation wire | Class H OR Class F insulation wire | Class H OR Class F insulation wire | Class H OR Class F insulation wire | Class H OR Class F insulation wire | Class H OR Class F insulation wire |
| Sound Level: | NTE 66dB(A) full load @ 23 ft. | NTE 66dB(A) full load @ 23 ft. | NTE 66dB(A) full load @ 23 ft. | NTE 74dB(A) full load @ 23 ft. | NTE 72dB(A) full load @ 23 ft. | NTE 69dB(A) full load @ 23 ft. |
| Mounting | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE | Skid Mounted to include FORK POCKETS: two ea. 6" x 10" // Design/construction of skids end caps must include 8" x 4" .25 MILD STEEL RECTANGULAR TUBE |
| Rub Spacers: On sides w/ doors | Rub Spacers: On sides w/ doors | Rub Spacers: On sides w/ doors | Rub Spacers: On sides w/ doors | Rub Spacers: On sides w/ doors | Rub Spacers: On sides w/ doors | |
| Load Terminal (Bus Bar) | Bus bar with lugs | Bus bar with lugs | Bus bar with lugs | Bus bar with lugs | Bus bar with lugs | Bus bar with lugs |
| Load Terminal (Output Connections): | Cam-lok Connectors | Cam-lok Connectors | Cam-lok Connectors | Cam-lok Connectors | Cam-lok Connectors | Cam-lok Connectors |
| INTEGRALLY MOUNTED AUTOMATED LOAD BANK SYSTEM (REQUIRED: 36kW - 400kW) | ||||||
| Integrally mounted Automated Load bank System: explain in detailed specifications how proposed load bank meets the FEMA Requirements (REQUIRED: 36kW - 400kW) | Not Applicable | Fully integrated (mounted) into generator | Fully integrated (mounted) into generator | Fully integrated (mounted) into generator | Fully integrated (mounted) into generator | Fully integrated (mounted) into generator |
| Not Applicable | FULLY AUTOMATED, zero operator input required | FULLY AUTOMATED, zero operator input required | FULLY AUTOMATED, zero operator input required | FULLY AUTOMATED, zero operator input required | FULLY AUTOMATED, zero operator input required | |
| Not Applicable | SHALL have ability to apply a minimum 40% resistive load during periods of low temperature/load conditions | SHALL have ability to apply a minimum 40% resistive load during periods of low temperature/load conditions | SHALL have ability to apply a minimum 40% resistive load during periods of low temperature/load conditions | SHALL have ability to apply a minimum 40% resistive load during periods of low temperature/load conditions | SHALL have ability to apply a minimum 40% resistive load during periods of low temperature/load conditions | |
| Not Applicable | SHALL have the capability to constantly monitor, sense and manage exhaust temperature with automatic shut-off for periods of high load conditions | SHALL have the capability to constantly monitor, sense and manage exhaust temperature with automatic shut-off for periods of high load conditions | SHALL have the capability to constantly monitor, sense and manage exhaust temperature with automatic shut-off for periods of high load conditions | SHALL have the capability to constantly monitor, sense and manage exhaust temperature with automatic shut-off for periods of high load conditions | SHALL have the capability to constantly monitor, sense and manage exhaust temperature with automatic shut-off for periods of high load conditions | |
| Not Applicable | SHALL have indicator light incorporated into unit to indicate when load bank system is on (on/off "dummy" light) | SHALL have indicator light incorporated into unit to indicate when load bank system is on (on/off "dummy" light) | SHALL have indicator light incorporated into unit to indicate when load bank system is on (on/off "dummy" light) | SHALL have indicator light incorporated into unit to indicate when load bank system is on (on/off "dummy" light) | SHALL have indicator light incorporated into unit to indicate when load bank system is on (on/off "dummy" light) | |
| ENGINE EMISSIONS AND DESIGN | ||||||
| Emissions: explain in detailed specifications how generators would be manufactured with Tier4FINAL engines) | Tier 4FINAL | Tier 4FINAL | Tier 4FINAL | Tier 4FINAL | Tier 4FINAL | Tier 4FINAL |
| Engine Design: | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR |
| Tier 4 Engine Capability: provide proof/documentation in detailed specifications that engines will meet Tier4 Engine Capability requirements | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 |
| Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | |
| ENGINE ACCESSORIEs (REQUIRED) | ||||||
| Engine Accessories: provide a list of the individual engine accessory requirements in the detailed specifications indicating that vendor meets FEMA requirement | Fuel Filter | Fuel Filter | Fuel Filter | Fuel Filter | Fuel Filter | Fuel Filter |
| Lube Oil Filter | Lube Oil Filter | Lube Oil Filter | Lube Oil Filter | Lube Oil Filter | Lube Oil Filter | |
| Intake Air Filter | Intake Air Filter | Intake Air Filter | Intake Air Filter | Intake Air Filter | Intake Air Filter | |
| Lube Oil Cooler | Lube Oil Cooler | Lube Oil Cooler | Lube Oil Cooler | Lube Oil Cooler | Lube Oil Cooler | |
| Fuel transfer pump | Fuel transfer pump | Fuel transfer pump | Fuel transfer pump | Fuel transfer pump | Fuel transfer pump | |
| Fuel priming pump | Fuel priming pump | Fuel priming pump | Fuel priming pump | Fuel priming pump | Fuel priming pump | |
| Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | |
| Emergency Shut-off | Emergency Shut-off | Emergency Shut-off | Emergency Shut-off | Emergency Shut-off | Emergency Shut-off | |
| Fuel/Water Separator | Fuel/Water Separator | Fuel/Water Separator | Fuel/Water Separator | Fuel/Water Separator | Fuel/Water Separator | |
| Water Pump | Water Pump | Water Pump | Water Pump | Water Pump | Water Pump | |
| Oil Pump | Oil Pump | Oil Pump | Oil Pump | Oil Pump | Oil Pump | |
| Full flow lubrication oil filters | Full flow lubrication oil filters | Full flow lubrication oil filters | Full flow lubrication oil filters | Full flow lubrication oil filters | Full flow lubrication oil filters | |
| Pressure relief valve | Pressure relief valve | Pressure relief valve | Pressure relief valve | Pressure relief valve | Pressure relief valve | |
| Dipstick oil level indicator | Dipstick oil level indicator | Dipstick oil level indicator | Dipstick oil level indicator | Dipstick oil level indicator | Dipstick oil level indicator | |
| Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | |
| BATTERY | ||||||
| Battery Type: | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) |
| Solar Charger: | Yes | Yes | Yes | Yes | Yes | Yes |
| Master Shutoff: | Include a master battery shut-off switch | Include a master battery shut-off switch | Include a master battery shut-off switch | Include a master battery shut-off switch | Include a master battery shut-off switch | Include a master battery shut-off switch |
| CONTROL PANEL | ||||||
| Control Panel, to Include (but not limited): provide a list of the control panel requirements in detailed specifications indicating that vendor meets FEMA requirement | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter | Engine Analog Hour meter - 12volt or 24volt (unit depending) - must be integrated into control panel AND must match digital hour meter |
| Three Position panel mounted switch (Stop-Manual-Auto) | Three Position panel mounted switch (Stop-Manual-Auto) | Three Position panel mounted switch (Stop-Manual-Auto) | Three Position panel mounted switch (Stop-Manual-Auto) | Three Position panel mounted switch (Stop-Manual-Auto) | Three Position panel mounted switch (Stop-Manual-Auto) | |
| Oil pressure gauge | Oil pressure gauge | Oil pressure gauge | Oil pressure gauge | Oil pressure gauge | Oil pressure gauge | |
| Water temperature gauge | Water temperature gauge | Water temperature gauge | Water temperature gauge | Water temperature gauge | Water temperature gauge | |
| A/C output Amperage | A/C output Amperage | A/C output Amperage | A/C output Amperage | A/C output Amperage | A/C output Amperage | |
| Volt Meter | Volt Meter | Volt Meter | Volt Meter | Volt Meter | Volt Meter | |
| Frequency Meter | Frequency Meter | Frequency Meter | Frequency Meter | Frequency Meter | Frequency Meter | |
| Fuel Gauge | Fuel Gauge | Fuel Gauge | Fuel Gauge | Fuel Gauge | Fuel Gauge | |
| Battery Voltmeter | Battery Voltmeter | Battery Voltmeter | Battery Voltmeter | Battery Voltmeter | Battery Voltmeter | |
| Phase selector switch with phase voltage & amperage | Phase selector switch with phase voltage & amperage | Phase selector switch with phase voltage & amperage | Phase selector switch with phase voltage & amperage | Phase selector switch with phase voltage & amperage | Phase selector switch with phase voltage & amperage | |
| DPF cleaning cycle indication | DPF cleaning cycle indication | DPF cleaning cycle indication | DPF cleaning cycle indication | DPF cleaning cycle indication | DPF cleaning cycle indication | |
| Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | Programmable Remaining Fuel (tank) Level % Indicator - for external tank as well (if external tank is a requirement) | |
| Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | Fuel leak detected warning light - for external tank as well (if external tank is a requirement) | |
| Externally Mounted Interface or any interface mounted exposed to sun (if applicable): | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure |
| Generator Output Bus Separate From Control Panel - Located in a Separate Lockable Panel: | Yes | Yes | Yes | Yes | Yes | Yes |
| AC (Generator) & DC (Engine) Controls Enclosed in a Separate Box or Separated by Divider: | Yes | Yes | Yes | Yes | Yes | Yes |
| SAFETY | ||||||
| SAFETY: provide list of safety feature requirements in detailed specifications indicating that vendor meets FEMA requirement | High water temperature | High water temperature | High water temperature | High water temperature | High water temperature | High water temperature |
| Low oil pressure | Low oil pressure | Low oil pressure | Low oil pressure | Low oil pressure | Low oil pressure | |
| Over speed | Over speed | Over speed | Over speed | Over speed | Over speed | |
| Engine over crank | Engine over crank | Engine over crank | Engine over crank | Engine over crank | Engine over crank | |
| Low Coolant | Low Coolant | Low Coolant | Low Coolant | Low Coolant | Low Coolant | |
| Low DEF Level | Low DEF Level | Low DEF Level | Low DEF Level | Low DEF Level | Low DEF Level | |
| FUEL | ||||||
| Fuel Tank: Internal 24 hour: | Internal Belly Tank - no requirement for external tank; MUST BE UL 142 Double--wall w/ 24hr capacity | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Not Applicable |
| Fuel Tank: 24 hour external - Gallon Requirement: | Not Applicable | 258 gallons | 258 gallons | 552 gallons | 787 gallons | 787 gallons |
| Fuel Tank: 24 hour external | Not Applicable | UL 142 Double-wall w/ capacity sufficient - 24- hour EXTERNAL tank | UL 142 Double-wall w/ capacity sufficient - 24- hour EXTERNAL tank | UL 142 Double-wall w/ capacity sufficient - 24- hour EXTERNAL tank | UL 142 Double-wall w/ capacity sufficient - 24- hour EXTERNAL tank | UL 142 Double-wall w/ capacity sufficient - 24- hour EXTERNAL tank |
| Not Applicable | External tank Gauge - connect to the Generator Control Panel | External tank Gauge - connect to the Generator Control Panel | External tank Gauge - connect to the Generator Control Panel | External tank Gauge - connect to the Generator Control Panel | External tank Gauge - connect to the Generator Control Panel | |
| Not Applicable | Must have four way fork pockets | Must have four way fork pockets | Must have four way fork pockets | Must have four way fork pockets | Must have four way fork pockets | |
| Basin (internal) equipped with liquid level sensor for leakage into basin - link to generator | Basin (external) equipped with liquid level sensor for leakage into basin - link to generator | Basin (external) equipped with liquid level sensor for leakage into basin - link to generator | Basin (external) equipped with liquid level sensor for leakage into basin - link to generator | Basin (external) equipped with liquid level sensor for leakage into basin - link to generator | Basin (external) equipped with liquid level sensor for leakage into basin - link to generator | |
| Fuel Tank: 24 hour external - Storage/Transportation Capability | Not Applicable | Shall be double stackable with fuel / triple stackable empty | Shall be double stackable with fuel / triple stackable empty | Shall be double stackable with fuel / triple stackable empty | Shall be double stackable with fuel / triple stackable empty | Shall be double stackable with fuel / triple stackable empty |
| Fuel Tank: 24 hour external - Lockable | Not Applicable | Lockable integral cabinet which secures fuel and equipment; MUST have the ability to fuel the generator while locked | Lockable integral cabinet which secures fuel and equipment; MUST have the ability to fuel the generator while locked | Lockable integral cabinet which secures fuel and equipment; MUST have the ability to fuel the generator while locked | Lockable integral cabinet which secures fuel and equipment; MUST have the ability to fuel the generator while locked | Lockable integral cabinet which secures fuel and equipment; MUST have the ability to fuel the generator while locked |
| Fuel Lines: | Not Applicable | include 25ft of fuel line (w/ H4 connectors) between external tank and generator | include 25ft of fuel line (w/ H4 connectors) between external tank and generator | include 25ft of fuel line (w/ H4 connectors) between external tank and generator | include 25ft of fuel line (w/ H4 connectors) between external tank and generator | include 25ft of fuel line (w/ H4 connectors) between external tank and generator |
| Fuel Valve: | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow |
| Diesel Engine Fluid (DEF) Tank (integrated into generator): | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) |
| WARRANTY | ||||||
| Engine Warranty: provide exact warranty hours/years in detailed specifications | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 20kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 50kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 100kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 200kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 300kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D109" of Attachment 4: 400kW tab |
| Generator Warranty: provide exact warranty hours/years in detailed specifications | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 20kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 50kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 100kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 200kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 300kW tab | Manufacture Warranty: provide exact warranty hours/years in cell "D110" of Attachment 4: 400kW tab |
| OTHER REQUIREMENTS | ||||||
| Unit Designed as a Portable Prime Power Unit (Not a Standby Unit Modified for Prime Power Use) | Yes | Yes | Yes | Yes | Yes | Yes |
| Exhaust: | Industrial Silencer/Muffler | Industrial Silencer/Muffler | Industrial Silencer/Muffler | Industrial Silencer/Muffler | Industrial Silencer/Muffler | Industrial Silencer/Muffler |
| Training: provide brief overview of training outline in detailed specifications | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. This includes how to switch/set the output voltages and phase configurations on the generator and voltage regulators. Training shall occur AFTER the delivery of all units to that given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. |
| Diagnostic/Troubleshooting: provide brief overview of diagnostic/troubleshooting in detailed specifications | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | Diagnostics/Troubleshooting: The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) |
| Miscellaneous: | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation | Fabrication and permanent attachment of exterior metal spacers/rub-knuckles to facilitate side by side (rub free) transportation |
| Height Requirements for Air Transportation: | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell | Generators are NTE 104" in order to meet air transportation ability if required. Please include height measurement in the "comments" cell |
| Delivery Timeline: provide information regarding meeting the FEMA delivery timeline requirement in detailed specifications; this is its own FACTOR 2 evaluation criteria but a requirement of the technical specifications | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. |
| Generator Identification: | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification |
| Submission of Data Specification Sheets: | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (NTE 15 pages) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) |
RFP: 400kW Below - ALL SITES April 2019
FEMA_401kw Above
| FEMA REQUIRED GENERATOR SPECIFICATIONS - 400kW and Above NOVEMBER 2024 | ||
| RATING INFORMATION - Non Negotiable | ||
| FEMA Prime kW Rating REQUIREMENT: | 500kW | 1mW (1000kw) |
| FEMA Acceptable kW Min-Max Range: (units within this range will be ACCEPTED for the particular kW requirement) | 401-704kW | 705kW - 1mW |
| Unit kVA (.8 power factor): | 0.8 | 0.8 |
| GENERATOR SPECIFICATIONS | ||
| Enclosure: | MUST be weather proofed to withstand different climates units will be maintained in and deployed to. This INCLUDES ability for water to drain (avoiding rust) | MUST be weather proofed to withstand different climates units will be maintained in and deployed to |
| Rustproof coating OR Rustproof system applied | Rustproof coating OR Rustproof system applied | |
| Sound Attenuated | Sound Attenuated | |
| Parts MUST be readily available on the open market / off the shelf (COTS) | Parts MUST be readily available on the open market / off the shelf (COTS) | |
| Stainless Steel door handles & hinges | Stainless Steel door handles & hinges | |
| Phase: | 3 Phase, switchable | 3 Phase, switchable |
| Switchable: | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator |
| Voltage 3 Phase: | 120/240, 139/240, 277/480v Switchable | 120/240, 139/240, 277/480v Switchable |
| Generator RPM: | 1800 | 1800 |
| Generator Output Circuit Breaker: | Yes | Yes |
| Frequency: | 60 HZ | 60 HZ |
| No. Poles | 4 | 4 |
| Excitation: | Brushless with IVR OR Brushless with AVR | Brushless with IVR OR Brushless with AVR |
| Frequency Regulation (Steady State): | 0.25% | 0.25% |
| Alternator Heat Rise: | Class H OR Class F Insulation Wire | Class H OR Class F Insulation Wire |
| Sound Level: | NTE 74dB(A) full load @ 23 ft. | NTE 76dB(A) full load @ 23 ft. |
| Mounting: CONUS - See additional Tab for Chassis SPECIFICATIONS | Chassis Trailer with Air Ride Suspension - Meeting California Transportation Requirements | Chassis Trailer with Air Ride Suspension - Meeting California Transportation Requirements |
| Mounting: OCONUS - See additional Tab for Chassis SPECIFICATIONS | SKID with an Option to ADD Chassis (Will identify in SOW for TO) |
| IF CHASSIS - Trailer with Air Ride Suspension -Meeting California Transportation Requirements | Chassis Trailer with Air Ride Suspension - Meeting California Transportation Requirements | ||
| Load Terminal (Bus Bar) | Bus bar with lugs | Bus bar with lugs | |
| Load Terminal (Output Connections): | Cam-lok Connectors | Cam-lok Connectors | |
| ENGINE | |||
| Emissions: explain in detailed specifications how generators would be manufactured with Tier4FINAL engines - no aftermarket modification) | Tier 4FINAL (Tier 4F) | Tier 4FINAL (Tier 4F) | |
| Engine Design: | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | 4-cycle, water cooled DIESEL, Ultra Low Sulfur Diesel, turbocharged, direct injection. Charged Air Cooled EGR | |
| Number of Engines needed to meet kW Requirement (>705kW) | Not applicable for this requirement | No more than 2 engines may be utilized PER unit: |
IF MODIFICATIONS are necessary; must NOT affect manufacture warranty.
IF more than 2 engines, demonstrate in detailed drawings Pralleling multiple engines (no more than 2) is allowed;
parallel systems MUST BE demonstrated in detailed drawings of its capability and submitted with proposal
| Tier 4 Engine Capability: provide proof/documentation in detailed specifications that engines will meet Tier4 Engine Capability requirements IF APPLICABLE | Meet requirements as outlined in 40 CFR Part 89.102 | Meet requirements as outlined in 40 CFR Part 89.102 | |
| Parts for the engines MUST be readily available on the open market / off the shelf | Parts for the engines MUST be readily available on the open market / off the shelf | ||
| ENGINE ACCESSORIES (Required) | |||
| Engine Accessories: provide a list of the individual engine accessory requirements in the detailed specifications indicating that vendor meets FEMA requirement | Fuel Filter | Fuel Filter | |
| Lube Oil Filter | Lube Oil Filter | ||
| Intake Air Filter | Intake Air Filter | ||
| Lube Oil Cooler | Lube Oil Cooler | ||
| Fuel transfer pump | Fuel transfer pump | ||
| Fuel priming pump switch, MUST be integrated into the control panel | Fuel priming pump switch, MUST be integrated into the control panel | ||
| Emergency Shut-off | Emergency Shut-off | ||
| Fuel/Water Separator | Fuel/Water Separator | ||
| Water Pump | Water Pump | ||
| Oil Pump | Oil Pump | ||
| Full flow lubrication oil filters | Full flow lubrication oil filters | ||
| Pressure relief valve | Pressure relief valve | ||
| Dipstick oil level indicator | Dipstick oil level indicator | ||
| Water Temperature & Lube Oil Pressure Gauge | Water Temperature & Lube Oil Pressure Gauge | ||
| Overflow Bottle / Tank | Overflow Bottle / Tank | ||
| BATTERY | |||
| Battery Type: | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | Sealed Gel Cell OR Absorbed Glass Matt (AGM) | |
| Solar Charger: | Yes | Yes | |
| Master battery shutoff: | Must include a master battery shut-off switch | Must include a master battery shut-off switch | |
| CONTROL PANEL | |||
| Control Panel, to Include (but not limited): provide a list of the control panel requirements in detailed specifications indicating that vendor meets FEMA requirement | Three Position panel mounted engine control (Stop-Manual-Auto) | Three Position panel mounted engine control (Stop-Manual-Auto) | |
| Ability to view and reset diagnostics of all controls | Ability to view and reset diagnostics of all controls | ||
| True RMS AC metering, 3 phase | True RMS AC metering, 3 phase | ||
| Oil pressure gauge | Oil pressure gauge | ||
| Water temperature gauge | Water temperature gauge | ||
| A/C output Amperage | A/C output Amperage | ||
| Volt Meter | Volt Meter | ||
| Frequency Meter | Frequency Meter | ||
| Fuel Gauge | Fuel Gauge | ||
| Battery Voltmeter | Battery Voltmeter | ||
| DPF cleaning cycle indication | DPF cleaning cycle indication | ||
| Programmable Remaining Fuel (tank) Level % Indicator | Programmable Remaining Fuel (tank) Level % Indicator | ||
| Fuel leak detected warning light | Fuel leak detected warning light | ||
| Externally Mounted Interface or any interface mounted exposed to sun (if applicable): | Cover plexiglass with UV resistant film from the factory to reduce exposure | Cover plexiglass with UV resistant film from the factory to reduce exposure | |
| Generator Output Bus Separate From Control Panel - Located in a Separate Lockable Panel: | Yes | Yes | |
| AC (Generator) & DC (Engine) Controls Enclosed in a Separate Box or Separated by Divider: | Yes | Yes | |
| SAFETY | |||
| Safety: Engine shutdown on: provide a list of safety feature requirements in detailed specifications indicating that vendor meets FEMA requirement | High water temperature | High water temperature | |
| Low oil pressure | Low oil pressure | ||
| Over speed | Over speed | ||
| Engine over crank | Engine over crank | ||
| Low Coolant | Low Coolant | ||
| Low DEF Level | Low DEF Level | ||
| FUEL | |||
| Integrated Fuel Tank: | UL 142 Double-wall w/ capacity sufficient - 24- hour tank integrated into generator | UL 142 Double-wall w/ capacity sufficient - 24- hour tank integrated into generator | |
| External Fuel Point: Fuel Tank & DEF Tank | Yes | Yes | |
| Fuel Valve: | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | Yes, Parker H4 male and female quick disconnect (NTE 3") & dust cap - sufficient enough to meet efficient fuel flow | |
| Diesel Exhaust Fluid (DEF) Tank (integrated into generator): | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | Internal storage, EPA approved to provide fluid to operate at full rated load (24hrs) | |
| WARRANTY | |||
| Engine Warranty: | Manufacture Warranty: provide exact warranty hours / years in cell "D97" of Attachment 4: 500kW tab | Manufacture Warranty: provide exact warranty hours / years in cell "D96" of Attachment 4: 1mW tab | |
| Generator Warranty: | Manufacture Warranty: provide exact warranty hours / years in cell "D98" of Attachment 4: 500kW tab | Manufacture Warranty: provide exact warranty hours / years in cell "D97" of Attachment 4: 1mW tab | |
| Chassis Trailer Warranty (Air Ride Suspension): | Manufacture Warranty: provide exact warranty hours / years in cell "D99" of Attachment 4: 500kW tab | Manufacture Warranty: provide exact warranty hours / years in cell "D98" of Attachment 4: 1mW tab | |
| OTHER REQUIREMENTS | |||
| Unit Design: Portable Prime Power Unit (not standby unit modified for prime power use): | Yes | Yes | |
| Exhaust: | Industrial Silencer/Muffler | Industrial Silencer/Muffler | |
| Paralleling Capability: | Multi-mode operation (island, and utility parallel), load sharing; manual and automatic paralleling capability; include ALL BOM and REQUIRED cables | Multi-mode operation (island, and utility parallel), load sharing; manual and automatic paralleling capability; include ALL BOM and REQUIRED cables | |
| Training: Provide training outline in RFP submission | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. Training shall occur AFTER the delivery of all units to given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. Training shall include how to switch/set the output voltages and phase configurations on the generator and voltage regulators. | The vendor SHALL provide training opportunities for FEMA Mechanics on operational guidance with your equipment. Training shall occur AFTER the delivery of all units to given location; no later than 30 days after receipt of generators. Training date and time are TBD dependent on generator delivery timeline; to be agreed upon by the contractor and the Government. Training shall include how to switch/set the output voltages and phase configurations on the generator and voltage regulators. | |
| Diagnostics/Software: Provide outline in RFP submission | The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-Disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | The vendor SHALL provide any hardware and/or software, manuals or other documentation (in digital (CD-Disk) or hard copy), to include all diagnostic codes, that will enable FEMA Mechanics to perform all diagnostic's available for the generator(s) | |
| Height Requirements for Air Transportation - When unit is REMOVED from Chassis: | Generators are NTE 104" in order to meet air transportation ability if required WHEN UNIT IS REMOVED FROM CHASSIS. | ||
| Please include height measurements in cell "D91" of Attachment 4: 500kW tab | 40' High Cube container will be ACCEPTABLE to meet mission requirement |
Please include height measurements in cell "D106" of Attachment 4: 1mW tab
| Delivery Timeline: | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. | Per government solicitation, provide within the proposal submission a detailed projected delivery timeline. |
| Generator Identification: | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification | The vendor SHALL provide the following: Capacity plate and 6-digit identification number for generator identification |
| Submission of Data Specification Sheets: | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) | In addition to completing Attachment 4, vendors are required to provide to the government at time of proposal submission, detailed technical specification sheets for each kW size requirement (15 pages per requirement / 30 pages total) |
| RFP: | 400kW Above - CONUS |
| April 2019 |
Chassis Trailer Specifications
| FEMA REQUIRED CHASSIS SPECIFICATIONS (401kW ABOVE) November 2024 | ||
| RATING INFORMATION - Non Negotiable | ||
| FEMA Prime kW Rating REQUIREMENT: | 500kW | 1mW (1000kw) |
| FEMA Acceptable kW Min-Max Range: (units within this range will be ACCEPTED for the particular kW requirement) | 401-704kW | 705kW - 1mW |
| Unit kVA (.8 power factor): | 0.8 | 0.8 |
| CHASSIS SPECIFICATIONS | ||
| Meet California Transportation Requirements: | Air Ride Suspension | Air Ride Suspension |
| Anti-locking breaking system | Anti-locking breaking system | |
| Meet FEMA Transportation Requirements: | Automatic Tire Inflation System (ATIS) |
tc={05219E91-D160-4650-AE17-2BB63802336C}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Question was asked about ordering LOW PROFILE tires for wheels. This is since it will be air bag equipped, the ride height can be adjusted to meet air transportation requirements. | Automatic Tire Inflation System (ATIS) | ||
| Digital hub-odometer | Digital hub-odometer |
Question was asked about ordering LOW PROFILE tires for wheels. This is since it will be air bag equipped, the ride height can be adjusted to meet air transportation requirements.
FEMA_401kw Above OCONUS
| FEMA REQUIRED GENERATOR SPECIFICATIONS - 400kW and Above (OCONUS) UPDATED: July 2021 | ||
| RATING INFORMATION - Non Negotiable | ||
| FEMA Prime kW Rating REQUIREMENT: | 500kW | 1mW (1000kw) |
| FEMA Acceptable kW Min-Max Range: (units within this range will be ACCEPTED for the particular kW requirement) | 401-704kW | 705kW - 1mW |
| Unit kVA (.8 power factor): | 0.8 | 0.8 |
| GENERATOR SPECIFICATIONS | ||
| Enclosure | Weather Proof/Resistant, Sound Attenuated, parts MUST be readily available on the open market / off the shelf | Weather Proof/Resistant, Sound Attenuated, parts MUST be readily available on the open market / off the shelf |
| Phase: | 3 Phase, swtichable | 3 Phase, swtichable |
| Switchable: | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator | The vendor SHALL provide any hardware and/or software, manuals, or other documentation (in digital or hard copy) that provide detailed directions which will allow FEMA mechanics to switch/set output voltages and phase configurations on the generator and voltage regulator |
| Voltage 3 Phase: | 120/208, 139/240, 277/480v Switchable | 120/208, 139/240, 277/480v Switchable |
| Generator RPM: | 1800 | 1800 |
| Generator Output Circuit Breaker: | Yes | Yes |
| Frequency: | 60 HZ | 60 HZ |
| No. Poles | 4 | 4 |