2.05b Attach2 DPM PWS Attachments Combined G1toG6.pdf

PDF 7 MB Posted

Attached to
AUTEC HHG SUPPORT SERVICES OUTBOUND Federal contract opportunity
Solicitation number
N6883622Q0228
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to AUTEC HHG SUPPORT SERVICES OUTBOUND, newest first.
File Type Posted
2.08_N6883622Q02280003.pdf PDF
2.05_N6883622Q02280002.pdf PDF
2.08 Amendment N6883622Q02280001.pdf PDF
2.05 N6883622Q0228 AUTEC RFQ.pdf PDF
2.05a Attach1 Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G1-1

ATTACHMENT G1

FIGURES

The following pages contain the Figures referenced in this part.

Figure Description Page

G1-1 Household Goods Descriptive Inventory .........................................................................G1-2

G1-2 Packing List of Household Goods....................................................................................G1-3

G1-3 Location of Permanent Markings on ASTM-D4169-01 Wood HHG Box.......................G1-4

G1-4 Location of Permanent Markings on MIL-STD-1489 HHG Box ....................................G1-5

G1-5 Container Marking for Household Goods ........................................................................G1-6

G1-6 Military Shipping Label for Personal Property ................................................................G1-7

G1-7 Markings of Unaccompanied Baggage ............................................................................G1-8

G1-8 Joint Statement of Loss and Damage at Delivery (DD Form 1840).................................G1-9

G1-9 Notice of Loss or Damage (DD Form 1840R) ...............................................................G1-10

G1-10 Transportation Control and Movement Document (TCMD) (DD Form 1384) .............G1-11

G1-2

Figure G1-1. Household Goods Descriptive Inventory

G1-3

G1-4

G1-5

G1-6

G1-7

G1-8

G1-9

G1-10

G2-1

ATTACHMENT G2

PUBLICATIONS AND COMMERCIAL STANDARDS

The publications below have been coded as mandatory or advisory. The contractor is obligated to follow those coded as mandatory. The contractor will be guided by those publications coded “advisory” to the extent necessary to accomplish requirements in the Performance Work Statement. Each applies to the current edition, unless otherwise specified.

Table G2-1. Publication Codes Specification

Title Mandatory Advisory

ASTM-D3953-02 Standard Specification for Strapping, Flat Steel and Seals

X

ASTM-D4169-01 Standard Practice for Performance Testing of Shipping Containers and Systems

X

ASTM-D5118/D5118M-95 Standard Practice for Fabrication of Fiberboard Shipping Boxes

X

ASTM-D5168-98 Standard Practice for Fabrication and Closure of Triple Wall Corrugated Fiberboard Containers

X

ASTM-D6039/D6039M-02 Standard Specification for Crates, Wood, Open and Covered

X

ASTM-D6251 Standard Specification for Wood Cleated Panelboard Shipping Boxes

X

International Standards for Phytosanitary Measures Publication No. 15

International Standards for Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material (WPM) in International Trade

X

Military Standard-129 Department of Defense Standard Practice, Military Marking For Shipment and Storage

X

PPP-C-1797A Cushioning Material, Resilient, Low Density, Unicellular Polypropylene Foam

X

DTR 4500.9-R Defense Transportation Regulation, Part II, Cargo Movement and Part IV, Personal Property

X

SDDC PAMPHLET 55-12 Commercial Containers for Department of Defense Household Goods Shipments

X

NOTE: All publications marked as Mandatory will be maintained at the contractor’s facilities.

Copies of government publications may be obtained by submitting a written request to:

DLA Document Services Headquarters 5450 Carlisle Pike Bldg. 09 PO Box 2020 Mechanicsburg, PA 17055-0788

G2-2

Copies of commercial standards may be obtained by submitting a written request to:

American Society of Testing and Materials 100 Barr Harbor Drive West Conshohocken, PA 19428-2959

Telephone Number: 610 832-9585 Facsimile: 610 832-9555

The request must contain the title of the specification, its number, and date.

Supplements or amendments to these mandatory publications may be issued during the life of the contract and must be in full force and effect as soon as possible but not later than 30 days after receipt by the contractor. Changes in the contract price due to publication supplements and amendments may be considered under the Changes clause.

Household Goods Descriptive Inventory. See CDRL 0001.

Contractor’s Quality Control Program. See Contract Data Requirements List

(CDRL) 0002.

Monthly SDS Metrics Report. See CDRL 0003.

Claims Correspondence. See CDRL 0007.

Weight Tickets. See CDRL 000.

Joint Statement of Loss and Damage at Delivery. See CDRL 000

The following abbreviations and their meanings are used in the CDRL.

ASREQ - As Required COR - Contracting Officer DAC - Day after contract start DS - Destination EAS - Each shipment MTHLY Monthly N/A Not applicable ONE/R - One time with revisions PPSO - Personal Property Shipping Office QTRLY - Quarterly WKLY – Weekly

G3-1

ATTACHMENT G3

CONTRACTOR DOCUMENTS REQUIREMENT LISTINGS

G3-1

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments regarding this burden estimate or any other aspect of collecting of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person must be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. Data Item No.

2. Title of Data Item Household Goods Descriptive Inventory

3. Subtitle 17. Price Group

4. Authority (Data Acquisition Document No.) 5. Contract Reference Part III, Para.5.a

6. Requiring Office COR 18. Est.

Total7. DD 250 Req

DS

9. Dist Statement Required

10. Frequency One/R

12. Date of 1st Submission 14. Distribution

a. Addressee

b. Copies

8. App Code 11. As of Date N/A

13. Subsequent Submit Final Reg Rep

16. Remarks Basic version submitted at preaward survey conference. Updated version submitted on contract start date. Contract has Schedule I

15. Total

1. Data Item No.

2. Title of Data Item Contractor's Quality

3. Subtitle 17. Price Group

4. Authority (Data Acquisition Document No.) 5. Contract Reference Part I, Para A.2.b.

6. Requiring Office COR 18. Est.

Total7. DD 250 Req

DS

9. Dist Statement Required

10. Frequency

EAS

12. Date of 1st Submission 14. Distribution

a. Addressee

b. Copies

8. App Code 11. As of Date N/A

13. Subsequent Submit Final Reg Rep

16. Remarks Basic version submitted at preaward survey conference. Updated version submitted on contract start date.

Schedule I,

15. Total

1. Data Item No.

2. Title of Data Item SDS Metrics Report

3. Subtitle 17. Price Group

4. Authority (Data Acquisition Document No.) 5. Contract Reference Part I, Para A.5.i

6. Requiring Office COR 18. Est.

Total7. DD 250 Req

DS

9.Dist Statement Required

10. Frequency Monthly

12. Date of 1st Submission 14. Distribution

a. Addressee

b. Copies

8. App Code 11. As of Date N/A

13. Subsequent Submit Final Reg Rep

16. Remarks Inventories not required on inbound shipments. Schedule I and III.

15. Total

1. Data Item No.

2. Title of Data Item 3. Subtitle 17. Price Group

4. Authority (Data Acquisition Document No.) 5. Contract Reference 6. Requiring Office COR 18. Est.

Total7. DD 250 Req

DS

9.Dist Statement Required

10. Frequency 12. Date of 1st Submission 14. Distribution

a. Addressee

b. Copies

8. App Code 11. As of Date 13. Subsequent Submit Final Reg Rep

16. Remarks Exception sheets are made on shipments from NTS when contractor's representative and storage contractor's representative disagree on condition of goods. Maintained in contractor's file and made available to claims office. 15. Total

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

G3-1

G4-1

a. Schedule I - Drayage included applies in those instances when a shipment requires drayage to an air, water, or other terminal for onward movement after completion of the shipment preparation by the contractor. If it is being moved from a residence or other pickup point to the contractor’s warehouse for onward movement by another freight company, carrier, drayage not included applies.

b. Schedule II - Drayage included means delivery of the shipment from destination contractor’s facility or other destination point to the final delivery point as ordered. When shipment or partial removal of items from shipment is performed and prepared for customer’s pickup at destination delivery point, drayage not included applies.

Employee. A civilian individual:

a. Employed by an Agency (See Agency), regardless of status or grade.

b. Employed intermittently as an expert or consultant and paid on a daily, while actually employed, basis.

c. Serving without pay or at $1 a year (5 U.S.C. § 5701(2), Definitions) (also referred to as “invitational traveler” for temporary duty travel purposes only).

ATTACHMENT G4

DEFINITIONS

This part defines words and terms commonly used in this performance work statement.

Bluebark. United States military personnel, United States citizen civilian employees of the Department of Defense, and the dependents of both categories who travel in connection with the death of an immediate family member. It also applies to designated escorts for dependents of deceased military members. Furthermore, the term is used to designate the personal property shipment of a deceased member.

Call Number or Lot Number. A locally assigned control number provided by the ordering activity when a requirement for services is placed with the contractor. For inbound shipments, the number is normally assigned when the Personal Property Shipping Officer receives the freight bill or written receiving notice from the contractor. For outbound or local drayage shipments, the number is normally assigned at the time the order is placed with the contractor.

Complete Service. The rate bid per each item includes all related services, such as long carry, stairs, elevators, excessive distances, necessary to perform the complete pickup and delivery of the personal property shipment.

Containerization. The use of containers to unitize cargo for transportation, supply, and storage.

Containerization incorporates supply, transportation, packaging, storage, and security together with visibility of container and its contents into a distribution system from source to user.

Contracting Officer. The Service member or Department of Defense civilian with the legal authority to enter into, administer, modify, and/or terminate contracts.

Direct Procurement Method. A method of shipment in which the Government manages the shipment throughout. Packing, containerization, local drayage, delivery, unpacking, storage, and related services are obtained from commercial firms under a contractual arrangement or by the use of Government facilities and employees.

Drayage.

G4-2

GCWT. Code to designate gross hundredweight. Defense Transportation Regulation – Part IV 22 September 2014 Personal Property Government-Owned Containers. Government-Owned Containers (GOC) include all exterior wooden shipping containers purchased by the Government or constructed by the contractor for services under a contract. GOCs include containers meeting the requirements of American Society for Testing and Materials (ASTM) D4169-01, Standard Practice for Performance Testing of Shipping Containers and Systems, ASTM D5118/D5118M-95, Standard Practice for Fabrication of Fiberboard Shipping Boxes, ASTM D6251/D6251M-01, Standard Specification for Wood-Cleated Panelboard Shipping Boxes, and Military Surface Deployment and Distribution Command Pamphlet 55-12. GOCs include all wooden exterior-shipping containers purchased by the Government and received by the contractor awarded those services identified in Schedule II, Inbound Services.

Household Goods. See the Joint Federal Travel Regulations, Appendix A (http://www.defensetravel.dod.mil/site/travelreg.cfm) for uniformed members and the Joint Travel Regulations, Appendix A (http://www.defensetravel.dod.mil/site/travelreg.cfm) for Department of Defense civilian employees for definitions of household goods.

International. The movement of household goods or unaccompanied baggage between a point in the Continental United States and a point in an overseas area.

Intertheater. The movement of household goods or unaccompanied baggage between one overseas theater and another overseas theater.

I ntratheater. The movement of household goods or unaccompanied baggage within one overseas theater.

Issuing Officer. Only authorized or acting Personal Property Shipping Offices may issue Personal Property Bills of Lading. Such authorized persons may be military personnel or civilian employees of the government on duty at the issuing office. As stated in 41 CFR §101-41.302-4, accountability for Personal Property Bills of Ladings used by a contractor-shipper remains with the issuing office. The name and title of the issuing officer and the name and address of the issuing office, rather than those of the contractor-shipper must appear on the Personal Property Bills of Lading.

Item or Article. The terms item and article used in this Regulation are interchangeable. Each shipping piece or package and the contents constitute one item.

Lot Number. See Call Number.

Member. A commissioned officer, commissioned warrant officer, warrant officer, and enlisted person, including a retired person, of the Uniformed Services.

NOTE: “Retired person” includes members of the Fleet Reserve and Fleet Marine Corps Reserve who are in receipt of retainer pay.)

Member/Employee. Any member of the Government’s uniformed or civilian service.

Metrics. A statistical measurement of performance.

NCWT. Code used to designate net hundredweight.

Ordering Officer. The contracting officer of a using activity or a Government individual appointed by the contracting officer authorized to order services under the contract.

G4-3

NOTE: Excluded from PBP&E/Pro-Gear are:

(a) Commercial products for sale/resale used in conducting business,

(b) Sports equipment,

(c) Office furniture,

(d) Household furniture,

(e) Shop fixtures,

(f) Furniture of any kind even though used In Connection With (ICW) the PBP&E (e.g., bookcases, study/computer desks, file cabinets, and racks),

(g) Personal computer equipment and peripheral devices,

(h) Memorabilia including awards, plaques or other objects presented for past performance, (includes any type of going away gifts, office decorations, pictures, etc.)

Outsize Air Cargo. A single item that exceeds 1,000 inches long by 117 inches wide by 105 inches high in any one dimension.

Packaging. The processes and procedures used to protect materiel from deterioration, damage, or both. It includes cleaning, drying, preserving, packing, marking, and unitization.

Packed by Owner. Those articles packed in a container by the owner.

Packing. Assembly of packaged items into a shipping container with necessary blocking, bracing, cushioning, weatherproofing, reinforcement, and marking.

Personal Property. Household goods, unaccompanied baggage, privately-owned vehicles and mobile homes, as defined in the Joint Federal Travel Regulations and the Joint Travel Regulations.

Personal Property Shipping Officer (PPSO). The individual designated by authority to perform assigned traffic management functions at military installations or activities, regardless of whether or not that is the organizational title of the individual. For the purpose of this contract, the term PPSO includes representatives designated to order the services required and to inspect and evaluate those services performed by the contractor for acceptance or rejection.

Professional Books, Papers, and Equipment for Member/Employee. (Also called PRO or PRO- Gear.) Articles of household goods in a Customer’s possession needed for the performance of official duties at the next or a later destination. Examples of Professional Books, Papers, and Equipment include:

a. The following items are considered PBP&E/Pro-Gear:

(1) Reference material.

(2) Instruments, tools, and equipment peculiar to technicians, mechanics, and members of the professions.

(3) Specialized clothing such as diving suits, flying suits; astronaut’s suits, flying suits and helmets, band uniforms, chaplain’s vestments, and other specialized apparel not normal or usual uniform or clothing.

(4) Communications equipment used by a member in association with the Military Affiliated Radio System.

(5) Individually owned or specially issued field clothing and equipment.

(6) Government-or uniformed service-owned accountable Organizational Clothing and Individual Clothing property issued to the employee or member by the Service/DOD COMPONENT for official use.

G4-4

(i) Table service including flatware (including serving pieces), dishes (including serving pieces, salvers and their heating units), other utensils, and glassware.

Other items of a professional nature that are not necessary at the next/subsequent PDS, such as text books from previous schools unrelated to future duties, personal books, even if used as part of a past professional reading program or course of instruction and reference material that ordinarily would be available at the next/subsequent PDS either in hard copy or available on the Internet.

Pro Number. The abbreviation of the word progressive and is usually prefixed to an agent’s record numbers on freight bills.

Quality Assurance Evaluator (QAE). Representative of the Personal Property Shipping Officer who has been appointed as a QAE to be responsible for providing technical assistance to the contracting officer in administration of the contract. The QAE must be responsible for inspection and acceptance of materials and services rendered by the contractor.

Residence. Normally considered to be the home, barracks, or other dwelling of the Service/Agency customer.

Unaccompanied Baggage. (See the Joint Federal Travel Regulations and the Joint Travel Regulations, Appendices A for complete definition.) That portion of the member’s/employee’s authorized weight allowance of personal property that is not transported free on a ticket used for personal travel and which is shipped separately from the bulk of the household goods. This shipment may be shipped by the expedited transportation mode. Examples are: personal clothing; professional books and equipment needed on arrival for performance of official duties; pots, pans, linens, and other light housekeeping items;

collapsible cribs, playpens and baby carriages; small radios, portable televisions and small tape recorders;

special equipment required for patients; and other items required for the health, comfort, and morale of the member/employee. (In addition, refer to individual Service/Agency Regulations for specific definition of unaccompanied baggage.)

G5-1

ATTACHMENT G5

ACRONYMS

Acronym

AMC

BL

BLOC

CD

CDRL

CLIN

CONUS

CP

CPPSO

CU

CW

CWT

DBO

DD Form

DPM

DTR

FAR

GCWT

GOC

HHG

ITGBL

JPPSO

JTR

MSC

MSL

NCWT

NTS

OCONUS

PBP&E

PBO

POD

POE

POF

PPGBL/BL

PPPO

PPSO

PRO

QAE

Meaning Air Mobility Command Bill of Lading Bill of Lading Office Code Contractor Disassembled Contract Data Requirements List Contract Line Item Number Continental United States Carrier Packed Consolidated Personal Property Shipping Office Cube Containerized Warehouse Hundredweight Disassembled by Owner Department of Defense Form Direct Procurement Method Defense Transportation Regulation Federal Acquisition Regulation Gross Hundredweight Government-Owned Container Household Goods International Through Government Bill of Lading Joint Personal Property Shipping Office Joint Travel Regulations Military Sealift Command Military Shipping Label Net Hundredweight Nontemporary Storage Outside Continental United States Professional Books, Papers and Equipment Packed By Owner

Port of Debarkation Port of Embarkation Privately Owned Firearms Personal Property Government Bill of Lading/Bill of Lading Personal Property Processing Office Personal Property Shipping Office PRO-Gear (Professional Books, Papers and Equipment) Quality Assurance Evaluator

G5-2

RDD Required Delivery Date SDDC Military Surface Deployment and

Distribution Command

Acronym

SDS

Meaning

Service Delivery Summary SF Standard Form SOW Statement of Work TCMD Transportation Control Movement

Document TCN Transportation Control Number TGBL Through Government Bill of

Lading TP No. Transportation Priority Number UB Unaccompanied Baggage

G6-1

ATTACHMENT G6

DIRECT PROCUREMENT METHOD (DPM) CLAIMS AND LIABILITY PROCEDURES

A. CLAIMS PROCESS FOR SHIPMENTS

1. Claims Filing:

a. Member/employees who have property lost and/or damaged in transit and wish to file against the contractor must file their claims within 2 years from the delivery date of the shipment that gave rise to the claim. If the member/employee submits the claim within 9 months of the delivery date, the contractor must be liable for the full, undepreciated replacement value on all lost or destroyed items. If a claim is not completely settled after 30 days, members/employees may transfer the claim to the Service Military Claims Office (MCO). Members/employees may transfer a claim immediately, and still be eligible for Full Replacement Value (FRV), under the following conditions:

b. War or armed conflict: For the purpose of filing with the contractor within 2 years, if a claim for loss and/or damage accrues during war or an armed conflict in which an armed force of the United States is involved, or has accrued within 2 years before war or an armed conflict begins, and there is good cause for delay in filing due to that armed conflict or war, the claim must be presented within a reasonable time frame as determined by the MCO after the cause no longer exists, or after the war or armed conflict ends, whichever is earlier. An armed conflict begins and ends as stated in concurrent resolution of Congress or a decision of the President. This same exception must apply to the 9-month filing period required to trigger the contractor liability for FRV. Any extension granted by this provision must be at least as long as the duration of the good cause and may be longer, at the discretion of the contractor. If the contractor anticipates denial of an extension, they may contact the Service Military Claims HQ for an advisory opinion.

c. When a member/employee transfers a claim to the MCO, the MCO may contact the contractor using the toll-free number or electronic mail (e-mail) address given to the member/employee, to determine if the contractor has already obtained estimates. If the contractor has obtained estimates, the contractor must transmit the estimates within 24 hours, or the next business day if notification occurs on a Friday, Saturday, or the day before a holiday, by facsimile (fax) or e-mail to the MCO. If the contractor has not obtained estimates, the MCO may give the contractor until the next business day to decide whether to inspect and obtain estimates on those items requiring estimates, and to make arrangements with the member/employee and repair firms for the estimates. If the contractor decides to inspect and obtain estimates, the estimates must be obtained by the second business day after contact unless the member/employee agrees to allow additional time. If the contractor is unable to obtain estimates within 2 business days and the

(1) Notice that the contractor has made a final offer on the claim or denied it in full.

(2) Notification by the United States Transportation Command (USTRANSCOM) that the contractor is in bankruptcy.

(3) Notification that the contractor contract is terminated.

(4) The contractor’s failure to comply with the catastrophic loss provisions in Paragraph A.13, and as verified by the MCO.

(5) The contractor’s failure to comply with essential items provisions in Paragraph A.14, and as verified by the MCO.

G6-2 member/employee does not agree to allow additional time, the MCO must proceed to adjudicate and settle the claim.

d. The MCO may assert a demand against the contractor for liability as established in Paragraph B. The contractor is not liable for payment of items for which the contractor has already paid the member/employee, if the correspondence between the contractor and the member/employee clearly indicates prior settlement was in full for the entire claim or was in full for the particular item and customer is satisfied.

2. Exceptions to Filing Claims Directly with the Contractor:

a. Filing with the delivery contractor satisfies the requirement for all contractors in the chain of custody that a claim must be filed directly with a contractor to entitle the member/employee to settlement on the basis of FRV. Exceptions to the requirement that the member/employee file directly with the contractor must be granted on a case-by-case basis, in writing, by the MCO.

Some examples of exceptions are:

(1) No access to a telephone or fax machine.

(2) Claims for deceased member/employees (Bluebark) involving surviving family members not familiar with the claims process.

(3) Language barriers in the claims filing process.

3. Substantiation of Claims:

a. In addition to the minimum requirements needed to meet timely filing, all claims must include the following information in order for the contractor to begin the settlement process: any notices of concealed damages or loss that were found after the date of delivery, and not previously provided to contractor under Paragraph A.4; sufficient information about the shipment to enable the contractor to locate a copy of the bill of lading (BL), service order, or inventory; a description of each item that is lost; and a list of each item that is damaged including a statement of the

e. For purposes of qualifying for FRV and for meeting the 2-year limit for filing claims directly with the contractor, a claim submitted directly by the member/employee to the contractor must be submitted within 9 months from the delivery date to be eligible for FRV or 2 years for depreciated value. The claim must identify the member/employee; contain facts sufficient to identify the shipment or shipments involved; must assert a demand for a specific or determinable amount of money; and, must list each lost and damaged item and give a description of the damage.

f. For shipments that have been in the custody of one or more contractors or a warehouse that are not agents of the delivering contractor, then the 9-month limit for obtaining FRV and the 2-year limit for filing the claim is met for all contractors and warehouses in the chain of custody, if the claim is filed with the delivering contractor within the 9-month or 2-year time limit. If the delivering contractor believes some of the loss and/or damage occurred while the goods were in the custody of a prior contractor or warehouse, the delivering contractor must forward the claim to the prior contractor with the documents or other evidence that establish the prior contractor or warehouses liability. The delivering contractor must also advise the member/employee the date the claim was forwarded, the items for which the delivery contractor is denying liability, and the address/telephone number of the prior contractor or warehouse to which the claim was forwarded.

Filing with the delivery contractor satisfies the requirement for all contractors and warehouses in the chain of custody that a claim must be filed directly with a contractor to entitle the member/employee to FRV settlement.

G6-3 nature, location and extent of the damage. The description of items lost and/or damaged must also include the date of purchase of each item (if known); the age of each item (if known); or, for items that were not purchased (e.g., gifts or bequests), the date the member/employee acquired the item, along with an estimate of the original purchase price or value at time of purchase/acquisition (if known).

4. Notice of Loss and/or Damage:

a. Recording loss and/or damage. When unloading or unpacking articles at destination, the contractor must, in coordination with the member/employee, check the inventory prepared at origin and inspect each article for loss and/or damage. The contractor must, along with the member/employee record loss and/or damage on a DD Form 1840, Joint Statement of Loss or Damage at Delivery, Figure G6-1. The DD Form 1840 must indicate any differences in count and condition from that shown on the inventory prepared at origin and must be jointly signed by the contractor and the member/employee. For split shipments or partial deliveries, a separate DD

b. For claims filed directly with the contractor within 9 months of the delivery date, the contractor is responsible for obtaining all repair estimates or replacement cost estimates needed to settle the claim. The contractor may request the assistance of the closest MCO to obtain the name of reputable repair firms. If the contractor is still unable to obtain a repair or replacement estimate on an item, the contractor may ask the member/employee to obtain the estimates, provided the contractor agrees to pay all estimate fees and drayage costs incurred, even if the final settlement does not include payment for that item. If the member/employee is unable or unwilling to get the estimate(s), the contractor must adjudicate the claim based on the other evidence in the file. The member/employee must cooperate with any reasonable request from the contractor in making items available for repair or for repair estimates. If the member/employee does not cooperate, the contractor must seek assistance from the closest MCO of the member/employee’s Service. If the member/employee still does not cooperate, the contractor may delay settlement on those items that need estimates until the member/employee makes the item(s) available.

c. For claims that are not filed within 9 months of the delivery date, but are correctly filed in accordance with (IAW) Paragraph A. 1, the member/employee must provide the contractor with repair and replacement estimates on any item for which the amount claimed exceeds $100.00. See Paragraph A. 6, Repair Estimates, for rules on use of contractor estimates for claims filed with the military.

d. Internal damage rule: If the claim includes repair of internal damage to appliances or electronic items, and there is no new external damage to the item, the claim must be supported by additional substantiation regardless of the amount claimed. For these items, the member/employee must submit both a written statement explaining how they know the item was working when tendered to the contractor, along with an estimate of repair that includes both an explanation of the damage and a statement by the repair technician as to their opinion of the cause of the damage. For claims filed directly with the contractor, the same information must be required to establish that the loss or damage occurred in transit. However, on those claims that are filed directly with the contractor within 9 months of the delivery date, the contractor must attempt to obtain the repair estimate, including the repair technician’s opinion as to the source of damage, and must have the right to request assistance from the member/employee under the rules stated in Paragraph A.3.b.

G6-4

Form 1840/DD Form 1840R, Notice of Loss or Damage, Figure G6-2, must be completed for each delivery of property to member/employee.

5. Inspection by the Contractor:

a. The contractor may inspect the damaged items at any time prior to settlement of the claim, but may not deny a claim solely on the basis it was unable to inspect any item. If the member/employee has repaired an item before the contractor inspection, the member/employee must provide the repair bill or some other evidence of the damage and repair cost to the

b. The DD Form 1840/1840R must be prepared in five copies by the contractor. The contractor must obtain a receipt by member/employee signature in the space provided on the Form and provide the member/employee three copies of the DD Form 1840/1840R. The contractor must furnish the origin Personal Property Shipping Office (PPSO) a completed copy of the Form within 75 days after the delivery date. If the member/employee waits until the 75th day to submit the DD Form 1840R to the contractor, the contractor must have 48 hours to submit the DD Form 1840R to the PPSO. One copy of the form must be held in the contractor’s files for further reference.

c. Upon delivery of the Household Goods (HHG) or Unaccompanied Baggage (UB), it is the joint responsibility of the contractor and the member/employee to record all known loss and/or damage that is found at delivery on the DD Form 1840. Later discovered loss or transit damage must be listed on the DD Form 1840R, or a reasonable facsimile thereof. The contractor must accept the DD Form 1840R, as overcoming the presumption of correctness of the delivery receipt, if it is transmitted or postmarked within 75 calendar days of the delivery date. Notice is not required if a claim is filed with the contractor within 75 days of delivery. Neither the DD Form 1840 nor DD Form 1840R are conclusive; both can be rebutted by other evidence.

d. If notice of loss and/or damage of HHG or UB is postmarked or transmitted to the contractor more than 75 calendar days after the delivery date, the loss and/or damage on that notice must be presumed not to have occurred while the goods were in the possession of the contractor unless there is good cause for the delay, as determined by the MCO. Good cause may include, but is not limited to, officially recognized absence or hospitalization of the member/employee during all or a portion of the period of 75 calendar days from the date of delivery. In case of recognized official absence, the Service MCO must provide the contractor with the proof of the officially recognized absence and the additional days granted must not exceed the period of official absence.

e. Contractors failure to provide the DD Form 1840/1840R to the member/employee and to have proof thereof must eliminate any requirement for notification to the contractor. Notice using the DD Form 1840/1840R is not required by the contractor in the case of major incidents requiring the contractor to notify USTRANSCOM and the PPSO of the incident. Such incidents include fire, pilferage, vandalism, and similar incidents that produce significant loss, damage, or delay.

f. The inventory prepared at origin and the delivery receipt is valid evidence that either the MCO or the contractor must consider along with timely notification in determining whether or not a member/employee has sustained loss and/or damage in the shipment.

g. The member/employee must use the DD Form 1844, List of Property and Claims Analysis Chart, Figure G6-3 or a reasonable facsimile thereof, when submitting a claim to the contractor or MCO. The DD Form 1844 can be obtained from the MCO, or it may be generated by the Transportation Service Provider (TSP) Contractor or MCO automated data system.

G6-5 contractor. If the member/employee has disposed of a damaged item, they must give the contractor evidence that the item was damaged beyond economical repair.

b. If, before a claim is filed, a member/employee calls the contractor and asks for either inspection of an item or permission to dispose of items, the contractor must provide notification of inspection or disposal permission to the member/employee within 2 business days of being contacted. In such cases, if the contractor gives notice to inspect the items, they must do so within 45 calendar days of being contacted by the member/employee unless the member/employee grants a further extension.

c. If the member/employee refuses to permit the contractor to inspect, the contractor must contact the Service MCO and request assistance in arranging an inspection of the goods. If the member/employee causes a delay by refusing inspection, the contractor must be provided with an equal number of days to perform the inspection (45 calendar days plus delay days caused by member/employee).

(1) The contractor previously provided a reasonable estimate, or

(2) The contractor previously offered to pay the member/employee a value that matches or exceeds the repair cost for all items on the estimate, or

(3) The item damaged is repairable and the contractor offered to repair it at no cost to the member, or

(4) The contractor previously offered to pay the replacement cost or to replace it in kind.

b. All estimates provided by the contractor must identify a repair firm willing and able to make the repair within a reasonable time, for the amount stated. The repair firm must be reputable, having a reputation for timely and satisfactory performance. All estimates must be itemized.

c. If an MCO receives an itemized repair estimate from the contractor before a claim is settled, the MCO must use that estimate provided it is the lowest, and meets the criteria in Paragraph A.6.b, above. If the contractor estimate is the lowest overall estimate and is not used, the MCO must advise the contractor in writing of the reason the lowest overall estimate was not used in determining the contractor’s liability.

d. If the contractor sends the MCO a lower repair estimate after the recovery demand is made by the MCO, the lower repair estimate must be considered in the recovery rebuttal or appeal process.

The lower estimate must prove the repair was unreasonable based on the value of the item before it was damaged.

e. If a contractor has made an inspection/estimate based upon the DD Form 1840R and the member/employee subsequently updates the notice, the contractor is authorized to make an

6. Repair Estimates:

a. Responsible party: The contractor is responsible for paying all repair estimates required to process any and all claims filed directly with the contractor by the member/employee. The MCO is responsible for paying for all repair estimates required to process and substantiate any and all claims filed with the MCO by the member/employee. The contractor is responsible to pay all estimate costs and other costs associated presented by an MCO as a result of claims transferred to the MCO by the member/employee pursuant to, claims filing in Paragraph A.1, unless:

G6-6 additional inspection/estimate. The contractor must contact the MCO to determine if a deduction of $75.00 or actual inspection cost (lesser amount) is authorized from the contractor’s liability for performing the second inspection/estimate.

f. The contractor must ensure qualified repair firms and subcontractors perform the repairs. If requested by the MCO or member/employee, they must provide the name and telephone number of the repair firm doing the work

7. Settlement of Loss and Damage Claims:

a. For loss and/or damage claims, the contractor must pay, deny, or make an offer within 60 days of receipt of a complete, substantiated claim.

b. The contractor must complete payment to the member/employee within 30 days of receipt of notice the member/employee has accepted a full or partial settlement.

c. In cases where more than one independent contractor or TSP is responsible for the loss/and or damage, the contractor or TSP receiving a claim from the delivery contractor has a 60 day period for payment, denial or a final written offer. The 60 day period begins upon receipt of the claim from the delivery contractor, not on the date that the delivery contractor originally received the claim.

8. Partial Settlements:

a. If the member/employee cannot reach a mutually acceptable settlement directly with the contractor for all or a portion of their claim, they can accept a partial settlement from the contractor on item(s) on which the member/employee and contractor have reached an agreement.

If the member/employee elects to accept partial settlement, the contractor may pay the member/employee for item(s) on which an agreement has been reached. The member/employee may transfer any unsettled portion of their claim to an MCO. The MCO may assert a recovery demand on the contractor. The contractor must not be liable for payment on any item(s) already paid to the member/employee if correspondence between the contractor and the member/employee lists the item(s) as “payment is being made” and clearly indicates that prior payment was in full and final satisfaction.

9. Quick Claim Settlement:

a. The contractor may establish a quick claim settlement procedure to quickly resolve and pay claims for minor loss and/or damage discovered at the time of delivery. Such procedures should cover payment of less than $500.00 total. Payment must be made within 5 days of delivery. The process of settling and paying such claims must be left to the discretion of each contractor. Any small claim settlement agreements can only contain a limited release of liability and must specifically list the item(s) and the damage for which payment is being made. The member/employee must be advised that they may still file claims for later discovered loss and/or damage. A copy of the settlement agreement must be made available to the MCO, on request. If the member/employee receives a “quick” claim settlement and then files an additional claim, the member/employee must indicate they received a quick claim settlement and may not file an additional claim for any item(s) settled through the quick claim process.

G6-7

(1) The item has been missing for at least 7 days from the date of delivery and the contractor has been notified pursuant to essential items, Paragraph A.14.

(2) The item is necessary for daily life, such that it must be replaced within 2 business days of notice to contractor.

(3) The item has in fact been replaced.

d. The contractor must take possession of salvage item(s) at the member/employee’s residence, or other location acceptable to the member/employee, not later than 30 days after receipt of a complete claim from either the member/employee or the MCO. However, in no case must the 30-day period for the contractor to take possession end until after the period allowed for the contractor’s inspections (see inspection by the contractor, Paragraph A.5. The 30-day pickup period can be extended by an agreement between the contractor and the member/employee. If the member/employee refuses to cooperate with the contractor they should contact the Service MCO and request assistance. At any time the member/employee may ask the contractor for permission to dispose of an item. The contractor must provide a response within 2 days (Paragraph A.5).

e. The contractor may not exercise salvage rights if the depreciated replacement value of all salvageable items totals less than $100.00, or in the case of a single salvageable item, the item has a value of less than $50.00. However, if a shipment has more than one salvageable item and one of the items has a value of $50.00 or more, the contractor may exercise salvage rights even if the total of all salvageable items is $100.00 or less.

f. The contractor may not exercise salvage rights on any item that is hazardous or dangerous to the health or safety of the member/employee or the member/employee’s family. Such items include, but are not limited to, broken mirrors or glass, spoiled food, moldy mattresses, or other

10. Salvage:

a. To the extent not prohibited by law or agreement, the contractor is entitled to take possession of and sell for salvage any damaged item(s) for which they paid either the depreciated or full, undepreciated replacement cost, or replaced the damaged item(s) with a new item(s).

b. If the contractor pays the member/employee the depreciated or full undepreciated replacement cost of a lost item(s), and the lost item(s) is subsequently located, the contractor must notify the contracting officer, transportation officer (to) and the member/employee for instructions. The member/employee may decide to either request or decline delivery of the item(s). If the member/employee elects to receive a found item(s), the member/employee must refund any amount paid on those item(s). If the member/employee declines delivery of the item(s), the contractor may retain the item(s) for salvage.

c. If the contractor locates an item(s) within 60 days of receipt of notice of the loss, and a claim on that item(s) has not yet been paid, then the member/employee must be obligated to accept delivery of the item(s) in lieu of a claim, even if the member/employee has already replaced the item(s). If the contractor locates a lost item(s) more than 60 days after receipt of notice of the loss, but the item(s) has not been replaced, and a claim on the item(s) has not been paid, then the member/employee must be obligated to accept delivery of the item(s) in lieu of a claim. If a lost item(s) is later delivered with damage, the time limits for qualifying for FRV protection and for filing claims on that item(s) must not commence until the delivery of that item(s). Not withstanding the above, any essential item(s), as described in essential items, Paragraph A.14, that have been replaced may be declined by the member/employee before the 60 day period has run. This provision applies only when:

G6-8 fabric items. Exception: The member/employee must retain antiques, figurines, and crystal with a single item value of $50.00 or more for potential salvage.

g. If the contractor is unable to exercise salvage rights due to the disposal of an item(s) by the member/employee, the contractor may reduce its liability by 25 percent on any item that has a depreciated replacement value of $50.00 or more. The contractor is entitled to no deduction for salvage on a single item with a depreciated replacement value of less than $50.00 unless the total combined depreciated replacement value of all items that have been disposed of is $100.00 or more.

11. Claims for $25.00 or Less:

a. To reduce administrative costs, the Services agree they must not pursue a claim against a contractor for loss and/or damage to HHG or UB transported under this document, if the amount of the claim is $25.00 or less. This provision does not apply to claims submitted directly to the contractor by a member/employee.

12. Dispute Resolution:

a. If a member/employee does not accept a settlement offered by the contractor, the member/employee may transfer a claim to the MCO. If the member/employee transfers a claim to the military, the MCO must resolve the member/employee’s claim IAW the Service’s claims regulations. The MCO must then assert a recovery claim against the contractor. The contractor must pay, deny, or make an offer on the recovery claim within 60 days of receipt of the claim, unless an extension is granted.

b. If the contractor and the MCO cannot reach a mutual settlement on the recovery claim, the Service may collect the amount of its recovery claim by administrative offset from money that is owed to the contractor for transportation services, or from any other payment due the contractor directly from the Government. If payments to the contractor are made by a third party payment system, the contractor agrees that the MCO may direct the party paying the contractor to divert all or part of any payment to the military finance center in order to accomplish offset to pay a Government claim from a prior shipment.

c. In cases where more than one independent contractor or TSP has had custody of the shipment, the claim must be filed with the delivery contractor. The delivery contractor who first receives the claim may forward it to a prior contractor or TSP in the chain of custody. If the prior contractor or TSP disputes the liability and alleges the delivery contractor was liable, the member/employee may transfer the claim to the MCO for resolution of the claim without giving prior notice to the delivery contractor.

13. Catastrophic Loss Payments:

a. The contractor is responsible for identifying and making partial/advance payments to member/employees who have suffered a catastrophic loss. These payments are designed to relieve a member/employee’s hardship associated with the loss of all or a majority of their HHG or UB. The payments are an advance and should not exceed the member/employee’s expected total liability. The member/employee is required to file a claim for their loss. Any advance payment made must be deducted from the member/employee’s eventual award. Such payments are subject to the same maximum liability and rules as all payments.

G6-9

(1) Refrigerators or other appliances necessary for the safe storage and preparation of food.

(2) Necessary medical equipment.

(3) Mattresses.

c. Upon notification of the loss of an essential item(s) by the member/employee, transportation officer/contracting officer or MCO and/or USTRANSCOM, the contractor must either pay for such items; provide temporary or permanent replacements for them, or such other arrangement as agreed to by member/employee. Such action must be taken within 2 business days of notification, regardless of whether a claim has been filed. Any payments made by the contractor pursuant to this paragraph must be considered an advance on any claim and should not exceed the contractor’s expected total liability. The member/employee is required to file a claim for their loss. Any advance payment made must be deducted from the member/employee’s eventual settlement. Such payments are subject to the same maximum liability and rules applying to all payments under the contract.

b. Catastrophic loss occurs when over 60 percent of the inventory line items in a given shipment are lost, damaged, or destroyed. Contractors may declare any loss catastrophic and make a partial payment. If the contractor cannot contact the member/employee within 48 hours of the catastrophic event, they must make payment or come to an agreement on payment within 48 hours of making contact. Catastrophic losses and payments must be recorded with the origin/destination transportation office, contracting office and MCO.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .