2-ATTACHMENT B - SITE LAYOUT AND SHELTER DETAIL.pdf

PDF 795 KB Posted

Attached to
GJ26-156 UCA Parker Mountain Radio Tower and Shelter Installation
Solicitation number
GJ26-156
Issued by
Juab County, Utah

About this file

This is a site layout and shelter detail document for the Utah Communications Authority's Parker Mountain Radio Tower and Shelter Installation project located on State Trust Lands in Parker Range, Piute County, Utah (GPS coordinates: 38.324602, -111.892773). The document provides technical specifications and architectural drawings for a telecommunications shelter installation, including detailed dimensions for equipment rack placement, HVAC systems (both internal and external), ducting, PV junction boxes, antenna grounding systems, LP fuel lines, solar conduits, and bus bar configurations. Questions regarding the solicitation are due by May 29, 2026, no later than 10:00 AM Mountain Time, with submissions due by June 4, 2026, no later than Noon Mountain Time, both to be submitted via U3P.

The layout drawings specify precise measurements for shelter dimensions (60 feet length with various width specifications), equipment spacing, and external utility placements. The document includes grounding system conduit routing, LP sensor conduit locations, and Andrew PN 252138 antenna specifications with a 20-inch bus bar. HVAC clearances of 5 feet 9 inches to 5 feet 13.75 inches are designated, with finished floor heights of 4 feet 2 inches and 1 foot 8 inches noted. The document serves as a technical reference for bidders to understand the physical infrastructure requirements and spatial constraints for the radio tower and shelter installation project.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parker Mountain 5-18-26

Ducting

DUCTING

Rack

8'-5"

20'-3"

12'-0" 12'-0"

60'-0"

7'-4" 2

Rack

P25

R1

In t.

H

V A

C

C e n te re d

2'-0"

11'-9"

5'-8"

5'-8"

5'-8"

3'-2" 3'-2" 3'-2"

5'-8"

5'-8"

5'-8"

3'-2" 3'-2" 3'-2"

20'-3"

'-2

1'-10"

E x te rn a l H V

A C

E x te rn a l H V

A C

17'-0"

'-1

/4

7'-4"

PV

Junction

PV

Junction

PV

Junction

Andrew

PN 252138

Andrew

PN 252138

20" Bus Bar

23'-1"11'-1 1/2" 11'-1 1/2"

Conduit To Grounding System

North

8'-5"

South

LP Fuel Line

EastWest

'-1

HV

AC

Parker Mountain

5'-4"

Solar Conduits

'-1

/2 A

F F

'2

A

F F

1'-8"

LP Sensor Conduit

External HVACExternal HVAC

1'-6" 1'-6"

Parker Draft 2, 3-13-26.vsdx
Site Layout
Shelter
Antenna & Tower
Grounding
Page-5
Blank Page

File details come from the government source that posted it. Updated .