The document is a detailed Scope of Work prepared by Johnson + Bailey Architects, P.C. for the City of Murfreesboro's Roof Replacement project at the Cannonsburgh Village Haynes Museum located at 312 Front Street. The project involves comprehensive roof replacement for the primary building and front porch structure, including the removal of existing Galvalume roofing panels, underlayment, and rake boards, and the installation of a new standing seam metal roof system. The scope includes inspecting and replacing deteriorated roof deck boards (assuming 560 SF), installing new eave fascia boards, gutter flashing, gutters, downspouts, and a self-adhered roofing underlayment membrane. The work is to be performed in a clean, professional manner, with no more than 25% of metal roofing and deck boards removed at any time, and Cannonsburgh Village will remain open to the public during the project.
The standing seam metal roofing specifications detail extensive requirements for materials, fabrication, installation, and warranty. The metal panels will be 26 ga. Galvalume with an acrylic coating, installed with concealed clips and fasteners. The manufacturer provides a comprehensive 20-year warranty covering panel materials, finish, and watertightness, contingent upon proper installation and two mandatory inspections by the manufacturer's technical representative. The specifications list multiple acceptable manufacturers, including Berridge Manufacturing Company, Atas International, Englert Series, and others. The installation must comply with various ASTM standards and the SMACNA Architectural Sheet Metal Manual, ensuring high-quality workmanship and long-term performance of the roofing system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Johnson + Bailey Architects, P.C.
100 E Vine St, Suite 700 Murfreesboro, TN 37130
March 17, 2025 Page | 1
Cannonsburgh Village Haynes Museum Reroof – Scope of Work
The following scope describes the work to be completed to the Museum at Cannonsburgh Village owned by the City of Murfreesboro at 312 Front Street, Murfreesboro, TN 37133. The intent of this project is to replace the metal roof to prevent further interior damage to the facility and to allow the building to be reopened to the public.
The scope is as follows:
Demolition Work
1. Remove all existing Galvalume Roofing panels, underlayment, and rake boards at gable ends and dispose of them in accordance with state and local regulations from primary building roof and front porch structure.
Primary Building Roof Work
1. Inspect existing roof deck boards for deterioration. Remove and replace all existing wood roof decking boards that show evidence of deterioration. Assume the replacement of 560 SF of existing roof deck boards for bid proposal. Provide unit price for replacement of additional deck boards on a per square foot basis. New deck boards to be attached to existing roof trusses with 2 ring shank galvanized 10d nails or corrosion resistant 3” #10 wood screws at each truss/rafter location.
2. Install self-adhered roofing underlayment membrane per attached standing seam metal roof specifications.
3. Install 26 ga. Galvalume-wrapped 2x6 eave fascia aboard and eave vent system along both eaves. Eave vent to be Cor-A-Vent S-400 soffit strip vent or approved equal. Vent shall provide 10 square inches of free area per lineal foot.
4. Install new 26 ga. Galvalume gutter flashing and new 6” 26 ga. k-style galvalume gutters.
5. Install new 26 ga. Galvalume-wrapped gable end rake boards with edge flashing installed per roof manufacturer’s instructions.
6. Install new standing seam metal roof system per attached standing seam metal roof specifications.
7. Install 8 new 3”x4” corrugated 26 ga. Galvalume downspouts – 4 at each side of building.
March 17, 2025 Page | 2
Porch Roof Work
1. Remove existing 1X battens at porch roof structure. Remove and replace deteriorated or deformed 2X4 porch rafters.
2. Install new horizontal 1x4 battens at 24” O.C. across porch raters. Fasten with 2, ring shank galvanized 8d nails or corrosion resistant 2” #8 wood screws at each intersection. Shim as required to provide true and flat substrate for new metal roof system.
3. Install new 26 ga. Galvalume-wrapped 2x6 fascia board along rafter ends.
4. Install new 26 ga. Galvalume gutter flashing and new 6” 26 ga. k-style galvalume gutter.
5. Install new standing seam metal roof system per attached standing seam metal roof specifications.
6. Install 2 new 3”x4” corrugated 26 ga. Galvalume downspouts.
*No more than 25% of the metal roofing and deck boards are to be removed at any one time unless the roof structure is cross braced from underneath.
**All work shall be performed in a clean and professional manner and in accordance with manufacturer specifications. The grounds will need to be cleaned daily.
***Cannonsburgh Village except for the museum is to remain open to the public as normal while this project is in progress
STANDING SEAM METAL ROOFING SPECIFICATION
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Preformed metal roofing
B. Miscellaneous trim, flashing, closures, drip flashing, and accessories
C. Sealant
D. Fastening devices
1.2 REFERENCES
A. American Iron & Steel Institute (AISI) Specification for the Design of Coldformed Steel Structural Members.
B. ASTM A-525 Steel Sheet, Zinc-Coated (Galvanized)
C. ASTM E-283-84
D. ASTM E-331-86
E. ASTM E-330 (Modified)
F. Spec Data Sheet - Galvalume Sheet Metal by Bethlehem Corporation
G. SMACNA - Architectural Sheet Metal Manual
H. Building Materials Directory - Underwriter's Laboratories, Test Procedure 580
1.3 ASSEMBLY DESCRIPTION
A. The assembly includes preformed sheet metal roof and siding panels, related accessories, valleys, hips, ridges, eaves, corners, rakes, miscellaneous flashing and attaching devices.
1.4 QUALITY ASSURANCE
A. Manufacturer: Company specializing in Architectural Sheet Metal Products with ten (10) years minimum experience.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Upon receipt of panels and other materials, installer shall examine the shipment for damage and completeness.
B. Panels should be stored in a clean, dry place. One end should be elevated to allow moisture to run off.
C. Panels with strippable film must not be stored in the open, exposed to the sun.
D. Stack all materials to prevent damage and to allow for adequate ventilation.
1.6 WARRANTY
A. Metal Panel Warranty: Manufacturer’s standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including rupturing or perforating.
b. Deterioration of metals and other materials beyond normal weathering.
2. Warranty Period: 20 years from date of Substantial Completion.
B. Panel Finish Warranty: Manufacturer’s standard form in which manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214.
c. Cracking, chipping, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 20 years from date of Substantial Completion.
C. Special Watertightness Warranty: Manufacturer’s standard form, in which manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that fail to remain watertight. Including leaks, within specified warranty period.
1. Warranty Period: 20 years from date of Substantial Completion.
2. Shop drawings must be provided (or reviewed) by the panel manufacturer and approved by the panel manufacturer prior to the installation of the panel system.
3. A minimum of two inspections by the technical representative of the panel system manufacturer are required. The first inspection is to be performed when the underlayament and flashing are in place and the second inspection is to be performed when the roof is complete.
D. Special Installer Warranty: Furnish a written warranty signed by the Panel Applicator for a two year period from the date of substantial completion of the building guaranteeing materials and workmanship for watertightness of the roofing system, flashings, penetrations, and against all leaks.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Berridge Manufacturing Company, Houston, Texas.
B. Atas International, Inc. PC System
C. Englert Series 2000
D. Peterson Aluminum
E. Dimensional Metals, Inc.
F. Metal Sales Manufacturing
G. Ultra-Seam, Inc.
H. AEP Span
I. Metal Roofing Systems, Inc.
J. Premium Metal Roof Systems
K. Sheffield Metals International 1.5" SnapLock 550
L. Metal Max Roofing & Siding MaxSeam Panels
2.2 STANDING-SEAM METAL ROOF PANELS
A. General: Provide factory-formed metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with joint type indicated and mechanically attaching panels to supports using concealed clips in side laps. Include clips, cleats, pressure plates, and accessories required for weathertight installation.
1. Steel Panel Systems: Unless more stringent requirements are indicated, comply with ASTM E 1514.
2. Aluminum Panel Systems: Unless more stringent requirements are indicated, comply with
ASTM E 1637.
B. Vertical-Rib, Batten Seamed Joint, Standing-Seam Metal Roof Panels. Formed with vertical ribs at panel edges and a flat pan between ribs; designed for sequential installation by mechanically attaching panels to supports using concealed clips located under one side of the panels, aligning vertical ribs and snapping on batten seam cap.
1. Basis-of-Design Product: Subject to compliance with requirements, provide Berridge Manufacturing Company; Tee-Panel.
2. Metallic-Coated Steel Sheet: Aluminum-zinc alloy-coated steel sheet complying with ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation; structural quality. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Nominal Thickness: 0.024 inch (0.61 mm)
b. Exterior Finish: Acrylic Coated Galvalume
3. Clips: Tee-Clip to accommodate thermal movement.
a. Material: 0.024-inch-(0.61mm)-nominal thickness, aluminum-zinc alloy-coated steel sheet.
4. Panel Coverage: 12.75 inches (323.85 mm).
5. Panel Height: 1.0 inches (51 mm).
2.3 UNDERLAYMENT MATERIALS
A. Stormguard by G.A.F.
2.4 RIDGE VENT FOR METAL ROOFING
A. Manufacturer’s standard for metal roofing specified.
B. Provide 13.5 square inches minimum of free air ventilation area per linear foot of ridge vent.
2.5 MISCELLANEOUS MATERIALS
A. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal panels unless otherwise indicated.
1. Closures: Provide closures at eaves and ridges, fabricated of same metal as metal panels.
2. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.
B. Flashing and Trim: Provide flashing and trim formed from same material as metal panels as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers. Finish flashing and trim with same finish system as adjacent metal panels.
C. Roof Curbs: Fabricated from same material as roof panels, 0.024 inch (0.61 mm) nominal thickness;
supply an integral full-length cricket for curbs wider than 24 inches (610 mm) supported by a structural metal deck. Fabricate curb flashing from [0.024 inch (0.61 mm)].
D. Panel fasteners: Zinc-coated steel, corrosion resisting steel, zinc cast head, or nylon capped steel, type and size as spproved for the applicable loading requirements.
E. Panel sealants: Provide sealant type recommended by manufacturer that are compatible with panel materials, are nonstaining, and do not damage panel finish.
1. Joint Sealant: Silicone sealant; of type, grade, class, and use classifications required to seal joints in metal panels and remain weathertight; and as recommended in writing by metal panel manufacturer.
2.6 FABRICATION
A. General: Fabricate and finish metal panels and accessories at the factory, by manufacturer’s standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
B. On-Site Fabrication: Subject to compliance with requirements of this Section, metal panels may be fabricated on-site using factory set, non-adjustable, portable roll-forming equipment if panels are of same profile and warranted by manufacturer to be equal to factory-formed panels. Fabricate according to equipment manufacturer’s written instructions and to comply with details shown.
C. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.
D. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer’s recommendations and recommendations in SMACNA’s “Architectural Sheet Metal Manual” that apply to design, dimensions, metal, and other characteristics of item indicated.
1. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
2. Sealed Joints: Form nonexpansion, but movable, joints in metal to accommodate sealant and to comply with SMACNA standards.
3. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal recommended in writing by metal panel manufacturer.
a. Size: As recommended by SMACNA’s “Architectural Sheet Metal Manual” or metal panel manufacturer for application, but not less than thickness of metal being secured.
2.7 FINISHES
A. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in same piece are unacceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
C. Steel Panels and Accessories:
1. Acrylic Coated Galvalume
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal panel supports, and other conditions affecting performance of the Work.
1. Examine roof sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal roof panel manufacturer.
B. Examine roughing-in for components and systems penetrating metal panels to verify actual locations of penetrations relative to seam locations of metal panels before installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support members and anchorages according to ASTM C 754 and metal panel manufacturer’s written recommendations.
3.3 UNDERLAYMENT INSTALLATION
A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Roll laps with roller. Cover underlayment within 14 days or as directed by the underlayment product manufacturer.
1. Apply over the entire roof surface.
2. Lap joints 6 inches minimum.
B. Flashings: Install flashings to cover underlayment.
3.4 METAL PANEL INSTALLATION
A. General: Install metal panels according to manufacturer’s written instructions in orientation, sizes, and locations indicated. Install panels perpendicular to supports unless otherwise indicated. Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Shim or otherwise plumb substrates receiving metal panels to be level to 1/4 inch in 20 ft. (6 mm in 6.1 m).
2. Flash and seal metal panels at perimeter of all openings. Do not begin installation until air- or water-resistive barriers and flashings that will be concealed by metal panels are installed.
3. Locate and space fastenings in uniform vertical and horizontal alignment.
4. Install flashing and trim as metal panel work proceeds.
5. Panels should be continuous without end laps.
6. Align bottoms of metal panels and fasten.
7. Provide weathertight escutcheons for pipe- and conduit-penetrating panels.
B. Fasteners:
1. Steel Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use galvanized-steel fasteners for surfaces exposed to the interior.
2. Aluminum Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use stainless-steel fasteners for surfaces exposed to the interior.
C. Anchor Clips: Anchor metal roof panels and other components of the Work securely in place, using manufacturer’s approved fasteners according to manufacturers’ written instructions.
D. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action as recommended in writing by metal panel manufacturer.
E. Standing-Seam Metal Roof Panel Installation: Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended in writing by manufacturer.
1. Install clips to supports with self-tapping fasteners.
2. Install pressure plates, if required, at locations indicated in manufacturer’s written installation instructions.
3. Batten Seam Joint: Nest standing seams and fasten together by installing batten seam cap and completely engage factory-applied vinyl weatherseal.
F. Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.
1. Install components required for a complete metal panel system including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, and similar items. Provide types indicated by metal roof panel manufacturers; or, if not indicated, types recommended by metal roof panel manufacturer.
G. Flashing and Trim: Comply with performance requirements, manufacturer’s written installation instructions, and SMACNA’s “Architectural Sheet Metal Manual.” Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.
1. Install exposed flashing and trim that is without buckling and tool marks, and that is true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and achieve waterproof and weather-resistant performance.
2. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim.
3.5 ERECTION TOLERANCES
A. Installation Tolerances: Shim and align metal panel units within installed tolerance of 1/4 inch in 20 feet (6 mm in 6 m) on slope and location lines as indicated and within 1/8-inch (3-mm) offset of adjoining faces and of alignment of matching profiles.
3.6 FIELD QUALITY CONTROL
A. Manufacturer’s Field Service: Engage a factory-authorized service representative to test and inspect metal roof panel installation, including accessories. Report results in writing.
B. Remove and replace applications of metal roof panels where tests and inspections indicate that they do not comply with specified requirements.
C. Additional tests and inspections, at Contractor’s expense, are performed to determine compliance of replaced or additional work with specified requirements.
D. Prepare test and inspection reports.
3.7 CLEANING AND PROTECTION
A. Remove temporary protective coverings and strippable films, if any, as metal panels are installed, unless otherwise indicated in manufacturer’s written installation instructions. On completion of metal panel installation, clean finished surfaces as recommended by metal panel manufacturer. Maintain in a clean condition during construction.
B. Replace metal panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
- END OF SECTION -