This is a Notice of Intent (NOI) for authorization to discharge stormwater runoff from construction activities submitted to the Kansas Department of Health and Environment (KDHE) under the National Pollutant Discharge Elimination System (NPDES) for the Courtyards at Jacob's Farm residential development project located at 647 N 135th Street West in Wichita, Kansas. The project is a residential development with public infrastructure spanning 153 total acres with 120 acres of anticipated soil disturbance. The owner/operator is Perfection Signature Properties, LLC (Scott Lehner), with MKEC Engineering, Inc. (Kara Anderson) serving as the contact engineer. The anticipated project start date is May 1, 2023, with a completion date of May 31, 2028. The stormwater runoff will drain through the City of Wichita's Municipal Separate Storm Sewer System to an unnamed tributary in the Lower Arkansas River Basin. The authorization approval was issued on April 5, 2023, with the Kansas Permit Number S-AR94-1834 and Federal Permit Number KSR121392, with an expiration date of July 31, 2027.

The NOI approval is conditional upon implementation of a Stormwater Pollution Prevention Plan (SWP2 Plan) and compliance with erosion and sediment control measures, including silt fence installation, perimeter protection, stabilized construction exits, inlet and outlet protection, and construction of sedimentation basins for drainage areas exceeding ten disturbed acres. The authorization applies only to construction areas shown on the Erosion Control Plan sheet and excludes future phase areas. The annual permit fee of $60.00 is required for the first year and must be paid through the KEIMS system, with subsequent invoices to be issued annually until a Notice of Termination is submitted. The engineering and erosion control plan was developed under the direction of Kara Anderson (License/Certification Number 18596). No conditions of authorization were imposed, though the authorization note specifies applicability only to identified construction areas.

View the file

Other files

File Type Posted
3-260180 Bid Table.pdf PDF
1-BP 458-2025-085619.pdf PDF
5-Attachment 3-Ks SWPPP 220296N.pdf PDF
4-Attachment 2-2026-06-17 LSG-0778-FF Permit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 1 of 4

NOTICE OF INTENT (NOI)

For Authorization to Discharge Stormwater Runoff from Construction Activities In accordance with the Kansas Water Pollution Control General Permit Under the National Pollutant Discharge Elimination System (NPDES)

Submission of this Notice of Intent constitutes notice that the party identified in Section I of this form requests authorization for coverage under the Kansas Water Pollution Control general permit, or KDHE issued successor permits, issued for stormwater runoff from construction activities in the State of Kansas. Becoming a permittee obligates the discharger to comply with the terms and conditions of the general permit. A complete request for Authorization for coverage under the general permit must be submitted or the request will not be processed. KDHE will notify owners or operators whose Notice of Intent (NOI) and supporting documentation for Authorization of stormwater runoff associated with construction activities are incomplete, deficient, or denied.

I. OWNER OR OPERATOR ADDRESS, BILLING, CONTACT & RECORDS LOCATION INFORMATION

Owner/Operator Scott Lehner Mailing Address: 443 N MAIZE RD Company Name: Perfection Signature Properties, LLC City, State Zip: WICHITA, KS 67212 Phone: (316) 729-1900 Email: scott@perfectionbuilders.com

Contact Name: Kara Anderson Mailing Address: 411 N WEBB RD Company Name: MKEC Engineering, Inc. City, State Zip: WICHITA, KS 67206 Phone: E-mail: kanderson@mkec.com

PERMIT FEE BILLING INFORMATION

Billing Contact: Scott Lehner Billing Address: 443 N MAIZE RD

WICHITA, KS 67212

Phone: (316) 729-1900 E-mail: scott@perfectionbuilders.com

II. SITE INFORMATION

Project Name: Courtyards at Jacob's Farm Street Address: 647 N 135TH ST W

WICHITA, KS 67235

County: Sedgwick

Legal Site Description:

Qtr: Qtr: Qtr: SE Section: 14 Township: 27S Range: 02W

Decimal Degrees Latitude: 37.696667 Decimal Degrees Longitude: -97.503056

AUTHORIZED:Submission Received: 3/10/2023 Submission Number:

HPS-0TKD-BENTX YES X NO

Reviewer: Is Authorization Conditional

YES NO X

(if yes, see Section V for conditions)

Larry Hook Are there any Considerations

YES X NO

(if yes, see Section V for considerationsAuthorized By:

Secretary, Kansas Department of Health and Environment KS Permit No.: S-AR94-1834

Issued: April 05,2023 Federal Permit No.: KSR121392

KEIMS Watermark KSR121392 v1.0

Approved Issued On:04/05/2023

Expires On:07/31/2027

Project Name: Courtyards at Jacob's Farm Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 2 of 4

B. Existing Conditions/Uses

1) Is any part of the project located on Indian Country Land?

No

2) If stormwater runoff drains to or through a Municipal Separate Storm sewer System (MS4): MS4 Name:

City of Wichita

3) Name of the first receiving water, stream, or lake Unnamed Tributary, River Basin AR - LOWER

ARKANSAS

4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?

No

5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?

No

6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points?

No

7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within 1000 feet of the project site?

No

Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination

8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?

No

Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.

9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?

No

10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within ½ mile of the facility boundary?

No

C. Project Description

1) Project Description:

Residential development with public infrastructure.

Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development? Yes

2) Anticipated project Start Date: May 1, 2023 and Completion Date: May 31, 2028

3) Estimated total area to be disturbed: 120.00 Acres

4) Total area of the site: 153.00 Acres

5) Do you plan to disturb ten or more acres that are within a common drainage area? Yes

Will a sedimentation basin be installed in that drainage area? Yes

(Attach design calculations for each sedimentation basin.) If a sediment basin is not feasible, on a separate sheet describe similarly effective erosion and sediment control measures to be implemented in lieu of a sedimentation basin.

KEIMS Watermark KSR121392 v1.0

Approved

Project Name: Courtyards at Jacob's Farm Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 3 of 4

E. Maps

Include an area map showing the outline of the construction site and the topographic features of the area at least one mile beyond the project site.

F. Erosion Control Plan and Best Management Practices

1) Provide a summary of the sequence of major soil disturbing activities including installation of the corresponding stormwater management and pollution control features.

1. Construct a temporary construction entrance/exit.

2. Install silt fence and other BMPs around the perimeter.

3. Perform Grading.

4. Water disturbed areas frequently to minimize dust.

5. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be stabilized.

6. Install BMPs at the locations of all grate inlets, curb inlets, and at the ends of all exposed storm sewer pipes.

7. Carry out final grading and gravel and/or asphalt placement.

8. Remove BMPs only after all paving is complete and exposed surfaces are stabilized. Exposed surfaces are stabilized when 75% vegetative cover has been established.

9. Remove temporary construction entrances/exits.

2) Provide one or more site plans covering the anticipated soil disturbing activities showing the limits of disturbance, the existing and proposed elevation contours, the types and locations of erosion/sediment control measures and stormwater management/pollution control features during each phase of construction and the locations where stormwater runoff leaves the construction site.

3) Provide a description of the best management practices to be utilized to control erosion and the discharge of sediment and other pollutants in stormwater runoff throughout construction and the design calculations for each sediment basin including total drainage area and storage capacity below the elevation of the mass volume flow outlet device.

• Inlet protection and outlet protection using silt fences, sandbags, etc.

• Perimeter protection using silt fences.

• Stabilized construction exit points and sufficient staging area for construction materials.

• Containment of the on-site sanitation facility to prevent uncontrolled waste discharges during pumping and cleaning activities. The sanitation facility shall be placed a reasonable distance from all inlets and drainage ways.

• Silt Fences will be installed around the downstream side of the perimeter of all disturbed areas.

• Vegetated filter strips

• Other structural BMPs installed and maintained by the contractor, as warranted by site conditions.

4) Provide the name and License or Certification Number of the engineer, geologist, architect, landscape architect, or Certified Professional in Erosion and Sediment Control (CPESC) under which the construction stormwater pollution prevention plan has been developed.

Kara Anderson 18596 Engineer Name License or Certification Number Profession or Field

III. ANNUAL FEES

The first year of the annual permit fee specified in K.A.R 28-16-56 et seq. as amended is currently $60.00 and can be paid through the KEIMS system at time of submittal. The fee must be paid before this NOI will be processed. An invoice for the annual permit fee will be sent to the contact person requesting a permit until such time as the permittee submits a Notice of Termination (NOT).

Failure to pay the annual fee timely may result in termination of the construction stormwater discharge Authorization.

KEIMS Watermark KSR121392 v1.0

Approved

Project Name: Courtyards at Jacob's Farm Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 4 of 4

IV. OWNER OR OPERATOR CERTIFICATIONS

I, the undersigned, certify that a Stormwater Pollution Prevention Plan (SWP2 Plan) will be or has been developed for the construction site described in this NOI and supporting documentation. I further certify that the plan will be implemented at the time construction begins, and, as required by the NPDES general permit for Stormwater Runoff from Construction Activity, will revise the SWP2 plan if necessary.

I understand that continued coverage under the NPDES general permit for Stormwater Runoff from Construction Activities is contingent upon maintaining eligibility as provided for in the requirements and conditions of the general permit, and paying the annual fee.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Scott Lehner 3/10/2023 3:19:33 PM Signature (owner or operator) Date

Official Title

V. CONDITIONS AND/OR CONSIDERATIONS OF APPROVAL

Conditions of Authorization - For Official Use Only:

When indicated, Conditions of Authorization are as follows:

NONE

Notes on Consideration – For Official Use Only:

Authorization applies only to construction areas shown on Sheet 1 “Erosion Control Plan” and not to the “Future Phase” areas.