2-ATT B Scope of Work BD26-76 Helicopter Guzzler Flights.pdf
PDF 828 KB Posted
- Solicitation number
- BD26-76
- Issued by
- Utah County, Utah
About this file
This Scope of Work document outlines helicopter transportation services required by the Utah Division of Wildlife Resources (UDWR) to support guzzler repair work at seven remote sites in Uintah and Daggett Counties, Utah. The project requires approximately eight hours of on-site helicopter flight time to transport personnel and repair materials to designated drop sites with elevations ranging from 6,900 to 8,500 feet. Two staging areas will be utilized: Landing Zone A (LZA) at 7,630 feet elevation with six associated drop sites located 3 to 7 miles away, and Landing Zone B (LZB) at 7,600 feet elevation with one associated drop site 1 mile away. The work must be completed during the June 8-19, 2026 window, anticipated to require one work day. No site tour will be provided; bidders are responsible for evaluating logistics including fuel truck delivery, helicopter staging area location, and flight paths using attached maps and available documentation. The contractor must begin work within seven calendar days of receiving the notice to proceed and complete all contracted services without delay or interruption except for causes beyond the contractor's control.
The contract will be bid on an average per-hour and total project cost basis, with per-hour and total bid prices including all mobilization and operation costs; no fuel surcharges or adjustments will be negotiated. Payment will be made in one lump sum upon completion and government acceptance of all work as of June 19, 2026. The helicopter must be capable of lifting 800 to 2,000 pounds, be certified for external loads and long-line operations, and have a fuel truck available at the staging area at all times. The contractor must furnish all labor, equipment, supervision, transportation, operating supplies, and incidentals, including all long lines, netting, and sling load equipment. Award will be made at the government's sole discretion based on bid price and prior performance references. Bidders must submit references from their last three related projects including employer contact information, work type, helicopter type used, completion timeline, and crew size.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Landing Zone B.jpg | JPG image | |
| 3-LZA.jpg | JPG image | |
| 1-Vendor Prerequisites - Quotes Part 8 PS SP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATT B: Scope of Work BD26-76
NER Diamond Mountain Guzzler Repair Component Helicopter Flights
Introduction: Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to provide 8 hours of on-site helicopter time to transport personnel and various guzzler repair supplies to 7 sites in Uintah and Daggett counties, Utah. Bids should be submitted on a per/hour basis. Attach references of the last 3 previous related jobs. At a minimum, it should include: employer, contact number, type of work, type of helicopter used, days to complete job, and size of crew.
THIS CONTRACT WILL BE BID ON AN AVERAGE PER HOUR AND TOTAL
PROJECT COST BASIS. PER HOUR AND TOTAL BID PRICES WILL INCLUDE
ALL MOBILIZATION AND OPERATION COSTS. THERE WILL BE NO FUEL
SURCHARGES OR ADJUSTMENTS NEGOTIATED. BIDDERS MUST PROVIDE
REFERENCES OF PRIOR EXPERIENCE ON SIMILAR PROJECTS. THE
CONTRACT WILL BE AWARDED BASED ON BID PRICE, PRIOR PERFORMANCE
REFERENCES AS PROVIDED BY THE BIDDER OR OBTAINED INDEPENDENTLY
BY THE GOVERNMENT, AND WILL BE EVALUATED AND AWARDED AT THE
SOLE DISCRETION OF THE GOVERNMENT.
SITE SPECIFICS
Location and Description: The project area consists of two different staging areas and 7 drop sites in Daggett and Uintah counties, Utah (See attached maps and reference shapefiles).
LZA(12T 643481 mE 4515414 mN): Elevation of Staging Area 1/Fuel staging area is 7630 feet and the six drop-sites associated with Landing Zone A range from 6,900 to 8,500 feet elevation with a flight distance ranging from 3 to 7 miles to each drop site. 3 of the drop-sites will have personnel flown to them. 3 loads of materials will be flown to 3 sites, 1 load will be flown to the other 3. There will be a safety officer and two members of the DWR onsite to help with the loading and drop off of materials. Once construction is completed by personnel flown into the sites, the helicopter will pick up the personnel. It is anticipated that the time between drop-off and pick-up will be 5-6 hours.
LZB(12T 601699 m E 4497692 m N): The second LZ is 17 miles southeast of LZA. Elevation of LZB is 7,600 feet and the drop site associated with LZB is 7000 feet elevation with a flight distance of 1 mile to the drop site. There will be a safety officer and BLM personnel onsite to help with the loading of materials.
June 8-19th, 2026 is the work period for this contract during which all work must be completed. It is anticipated that 1 work day will be required.
Vicinity maps showing the project sites are attached.
Access to the sites: LZA is accessed from Vernal by taking N Vernal Ave to 500 N, and turning east. Continue on Diamon Mountain Rd for 19.4 miles and turn left on Bull Shit Ridge Rd.
Continue for 4.5 miles, and then turn left to stay on Bull Shit Ridge Rd. Continue for .3 miles and turn right onto Jackson Draw Rd. Continue for 1.8 miles and then turn right to stay on
Jackson Draw Rd for 3.4 Miles. Turn Right into the LZ.
LZB is accessed from Vernal by heading north on N. Vernal Ave and turning right on 500 N.
Continue onto Diamond Mountain Rd for 15 Miles and turn right on Diamond Rim Rd. Continue on Diamond Rim Rd to the LZ.
SPECIFIC TASKS
Utah Division of Wildlife (UDWR) staff will have a pre-work conference with contractor to review and agree on a workday plan that maximizes use of helicopter and UDWR personnel time. Work shall be performed in an organized systematic manner as determined in the pre-work conference.
UDWR will provide experienced ground crews at all staging areas. UDWR staff have been involved in multiple projects similar to this one and will help the contractor streamline work in any way that helps maximize safety while minimizing loss of time.
Helicopter must be capable of lifting personnel, wildlife guzzlers, and supplies (800-2,000lbs) in a timely manner to remote work sites. Must be carded for external loads / long line. Must have a fuel truck available at staging area at all times. Job must be completed in one day. Project date(s) may be re-scheduled due to poor weather conditions, breakdowns, etc.
Helicopter must be able to sling loads that are a minimum of 800 pounds, not to exceed 2,000 pounds. Materials to be transported include UDWR personnel, various size lumber, sheeting, and roofing materials, and assorted supplies. All loads will be bundled and secured by UDWR personnel in a way that is acceptable to the contractor. Weight of loads will not exceed 2,000 pounds.
A fuel truck and all long lines, netting, and other equipment for sling loads must be provided by the helicopter company. Project staging areas that are clear, flat, and away from obstructions have been selected to minimize distances flown while hauling materials.
Records and Notification: The Contractor shall maintain adequate records to allow the UDWR to monitor contract progress and for the Contractor to be accountable for work quality.
CONTRACTOR FURNISHED PROPERTY AND SERVICES
The Contractor shall furnish all labor, equipment, supervision, transportation, operating supplies and incidentals to perform all work as set forth in the specifications.
Equipment Requirements:
The Contractor shall furnish all equipment needed for the project as set forth in the contract specifications with competent, fully-qualified operators.
GOVERNMENT FURNISHED PROPERTY
There is no Government furnished property.
EQUIPMENT AND WORKMANSHIP
All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner.
The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.
Environmental Considerations:
1. Project sites shall be cleaned up, and all refuse removed by the Contractor. The
Contractor shall be responsible for disposal of materials in a manner consistent with
State, Federal and local laws and for all expenses incurred with disposal. Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work.
2. Use of 2-wheel and 4-wheel vehicles is only permitted on existing dirt roads, power lines, and fence-lines. Off-road driving is strictly prohibited.
Hazardous Materials:
1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety
Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.
3. Incidental (de minimus) leaks from fittings, gaskets or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance required.
4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on site only if the fluids are captured, containerized, and removed from public lands for proper disposal.
Public Access: Access into and through the project site shall remain open to the public at all times. The Contractor shall maintain roadways free of vehicles, tools and debris.
Security of Equipment and Property: The Contractor may leave equipment at the work site.
The Contractor shall be fully responsible for equipment if it should be lost, stolen or damaged.
Crew Supervision
1. Contractor shall designate one English literate supervisor whom will be on-site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours prior to the change taking effect.
2. Person designated by the Contractor, as supervisor must remain with and effectively directs the crew by (1) making periodic inspections of the crew’s work, (2) advising them as to improper work methods, (3) providing instructions for correcting any improper work methods encountered.
3. Emergency transportation will be provided by the Contractor at all times.
Work Camps: Hotels are available in Duchesne, Roosevelt, and Vernal, Utah.
Work Hours: Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset.
Work Schedule: The work schedule shall be submitted at the pre-work conference.
SITE VISIT
Due to the remote project location, there will be no site tour. It is the responsibility of the bidder to take into account logistics for fuel truck delivery, helicopter staging area location, flight paths, distances, etc. when placing a bid. Attached maps detail all this information and additional information can be provided at the bidder’s request through Sciquest question submission.
All questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing in Sciquest. THERE ARE NO EXCEPTIONS TO THIS. Questions asked, and subsequent answers will be recorded and posted on Sciquest so that all potential bidders can review questions and answers.
CONTRACT TIME
The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed. The Contractor shall continue performance of the work under the contract without delay or interruption except by causes beyond his/her control. The Contractor shall complete all work required within the time specified in the work schedule.
PERFORMANCE TIME:
Helicopter slinging/delivery of materials: One day, 8 hours of on-site flight time, to occur
June 8-19, 2026.
Delays
The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other work load, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the
Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires, (4) floods,
(5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.
Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State’s contract termination rights under the contract.
PROJECT MEETINGS
Pre-work Conference
1. Location: Meetings shall be held at the project site, or as determined by the Project
Manager
2. Notification: A pre-work conference will be held prior to the start of work. The
Contractor will be notified in advance of the meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.
3. Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
4. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for each project and present the work schedule requested in the specifications.
Progress Meetings
1. Location: Meetings shall be held at the project site, or as determined by the Project
Manager
2. Notification: Either the Project Manager or the Contractor may call meetings. Request shall state who should attend.
INSPECTION
Surveillance Plan: The Contractor is responsible for providing quality control to assure that work complies with the contract specifications.
Final Inspection:
1. Location: Meeting shall be held at the project sites, or as determined by the Project
Manager
2. Notification: The Contractor shall notify the Project Manager at least three (3) working days before completing date so the UDWR can schedule the final inspection.
3. Deficiencies: The Contractor shall correct deficiencies and project areas will be re-inspected by the Project Manager.
ACCEPTANCE
Based on inspection results, if the quality level falls below contract specifications, the Project
Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspend work order to resolve the problem, during which time contract time will continue to run.
PAYMENT
Payments will be made for the actual hours of on-site flight time completed as of Thursday, June
19, 2026, inspected and accepted by the government as agreed to during the Pre-work
Conference. Payment will be made in one lump sum at completion of the entire project.
FIRE DANGER SEASON
If the Project Manager allows the Contractor to continue work during the periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the Project Manager
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
1. The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.
2. Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.
3. The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.
Protection of Cultural Resources
Location of known historic or prehistoric sites, buildings, objects, and properties related to
American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic
Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of
1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.
Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's operations. Contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the
Contractor to proceed. Contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.
NOTICE TO PROCEED
After the award of the contract, the Project Manager will issue a notice to proceed to the contractor. Issuance of such notice may be delayed for a reasonable time if adverse soil, vegetative, or climatologic conditions exist