2) AL-1685-4598_SOW_ALS-U Storage Ring HBEND Magnets.pdf

PDF 2 MB Posted

Attached to
Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Federal contract opportunity
Solicitation number
MG-03042024
Issued by
Department of Energy

About this file

This is a request for proposal for the manufacture of "Hard Bend" permanent magnet dipole bending magnets for the Advanced Light Source Upgrade storage ring. The solicitation seeks proposals for the production of eight magnet assemblies, with associated documentation and testing deliverables. Prospective offerors must confirm receipt of the solicitation documents by March 4, 2024 and submit any questions by March 18, 2024. Final proposals are due by March 29, 2024. The Department of Energy's Lawrence Berkeley National Laboratory will administer the contract on behalf of the University of California. The attached statement of work outlines manufacturing, inspection, shipping and quality assurance requirements for the magnets.

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets, newest first.
File Type Posted
14) Response to Questions 1 - RFP MG 03042024 Rev. 2.pdf PDF
AL 1615 8572A.pdf PDF
1) RFP-BVSS MG 03042024 HBend Magnets Rev. 2.pdf PDF
1) RFP-BVSS MG 03042024 HBend Magnets Rev. 1.pdf PDF
AL-1615-8572A.pdf PDF
4) AL-1685-4599_TS HBEND Magnets.pdf PDF
3) Sample SubK - RFP MG-03042024.pdf PDF
7) GP-Commercial Foreign.pdf PDF
11) Final PropertyCertification.docx DOCX document
5) AL-1697-5417_SOW_HBEND Production Drawing List.pdf PDF
6) GP-Commercial Supplies and Services.pdf PDF
9) Price Proposal Schedule Attachment A.xlsx XLSX spreadsheet
Applicable Drawings.zip ZIP file
8) Rep Cert Form - RFP MG 03042024.docx DOCX document
10) Technical Compliance Matrix - HBEND Production Magnet.xlsx XLSX spreadsheet
1) RFP-BVSS MG 03042024 HBend Magnets.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for the ALS-U Storage Ring HBEND

Magnets

D. Munson, P. Wehle

Release Date: Jan 26 2024 2:48:42 PM PST

Document Number: AL-1685-4598 Revision: A

Document Status: Released

Document Type: NOTE

Category Code: AL7510

ALS-U - STORAGE RING

MAGNETS - GENERAL

O ffi ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

1U

Downloaded by: Martha Gamarano Grausz at January 29, 2024 09:58:11

AL-1685-4598 Rev. A Doc. Status: Released Page 2 of 26

Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory

All officially released LBNL documents are watermarked and contain LBNL Document

Control Center release information in the lower-left corner of the document's pages.

Printed hard copies of this document are for reference only.

Table of Contents

Revision History

Approvals

Abbreviations and Acronyms

1 Introduction

1.1 Project overview

1.2 Description of items

2 Scope of Work

3 Deliverables

3.1 List of items

3.2 Production series

3.3 Closeout checklist

4 Project Administration

4.1 Roles and responsibilities

4.2 Reporting / communication requirements

4.3 Documentation requirements

4.4 Reviews

4.5 Hold points and what is required

5 Shipping, Handling, and Storage

5.1 Containers

5.2 Packaging

5.3 Storage and shipping

6 Quality Assurance

6.1 Subcontractor quality program

6.2 Standard QA forms

6.2.1 Deviation requests

6.2.2 Nonconformance reports

6.3 Required QA Data

6.3.1 Calibration data

6.3.2 Certifications

6.3.3 Mechanical inspection reports

6.4 Required inspections and testing

6.4.1 Plans

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 3 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

6.4.2 Reports

6.5 Magnet blocks and poles QA data

6.5.1 Magnet blocks QA data package

6.5.2 Poles QA data package

6.5.3 Magnetic measurement requirements

6.6 Acceptance criteria

7 Applicable Documents

Appendix A: Closeout Checklist

Appendix B: Storage Ring Multibend Achromat Sectors

Appendix C: Subcontractor Data Requirements List

REVISION HISTORY

Rev. CM Number Description of Change A Initial Release

APPROVALS

Approver Project Role

Ken Chow ALS-U Chief Engineer

Bertrand Nicquevert ALS-U Mechanical Systems Lead

Michael Lerche ALS-U Magnets Control Account Manager

Charles Swenson ALS-U Magnet Design Technical Lead

Dawn Munson ALS-U Lead Technical Representative

Windchill Approved / Concurred By

CASwenson,KPChow,mlerche,bnicquevert ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 4 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

ABBREVIATIONS AND ACRONYMS

ACL Acceptance Criteria List

ALS Advanced Light Source

ALS-U Advanced Light Source Upgrade

ARO After Receipt of Order

ARR Assembly Readiness Review

CoFe Cobalt iron

FAT Factory Acceptance Test

HBEND “Hard Bend” Permanent Magnet Dipole Bending Magnet

LBNL* Lawrence Berkeley National Laboratory

MRR Manufacturing Readiness Review

NCR Nonconformance Report

NdFeB Neodymium Iron Boron

PM Permanent Magnet

QA Quality Assurance

QC Quality Control

SOW Statement of Work

University* The Regents of the University of California

*For the purposes of this SOW, the terms University and LBNL are used interchangeably.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 5 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

1 INTRODUCTION

1.1 Project overview

Lawrence Berkeley National Laboratory’s (LBNL’s) Advanced Light Source (ALS) is an electron storage ring-based synchrotron radiation facility that generates extremely bright beams of light – ranging from infrared through x-rays – that are used to conduct basic, applied, and industrial research. The ALS has been in operation since the early 1990s, and its present-day capability is the result of a series of modernization projects. In its current configuration, the ALS complex can support an array of up to 40 simultaneously operating beamlines and associated instrumentation, and includes an experimental hall, computing resources, and ancillary laboratories.

The objective of the current ALS Upgrade Project (ALS-U) is to achieve an increase in the brightness and coherent flux of soft x-rays by at least two orders of magnitude by replacing the storage ring and installing new arrays of much more powerful magnets. The resulting more sharply focused light will enable entirely new ways of conducting research in such areas as materials science, biology, chemistry, physics, and environmental sciences. Once completed, the upgrade will position the ALS at the forefront of this type of particle accelerator capability.

1.2 Description of items

The purpose of this statement of work (SOW) is to define the manufacturing, assembly, inspection, and testing work required to produce the “Hard Bend” (HBEND) permanent magnet (PM) dipole bending magnets, which will be manufactured under a build-to-print subcontract.

The HBEND magnet type is designed to provide a nominal 3.76-degree bend angle to the electron beam at energies between 1.9 and 2.0 giga electron volts (GeV) in the new ALS-U storage ring configuration. The HBEND design allows the magnetic field strength to be adjusted by varying the amount of magnetic flux entering the magnet poles. This is accomplished mechanically by moving axial neodymium iron boron (NdFeB) permanent magnets (PM) with respect to the stationary upper and lower magnet core assemblies by means of a drive system. The stationary magnet core assemblies are composed of a tapered cobalt iron (CoFe) magnet pole piece around which an array of NdFeB core PM blocks is epoxy bonded.

Figure 1-1 shows the HBEND magnet in the 2.0 GeV position, in which the axial magnets are in close proximity to the upper and lower magnet core assemblies. Figure 1-2 shows the location of the upper and lower core assemblies, which are behind field clamps that shield surrounding magnets from their magnetic field. The figures in Appendix B show where the HBEND magnets will be located in Sectors 4, 8, and 12 of the new ALS-U storage ring configuration.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 6 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Figure 1-1 HBEND magnet with field clamps in place.

The drive system moves the axial magnets to adjust the magnetic flux.

Figure 1-2 Vertical mid-line cross-section of the upper and lower magnet core assemblies (circled in red). Each is composed of a central CoFe pole piece and three different shapes of NdFeB PM blocks.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 7 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

2 SCOPE OF WORK

The scope of work includes all processes required to manufacture, assemble, inspect, and test each HBEND magnet, including the mapping of magnetic properties once each magnet is fully assembled. The work is to be completed as specified in this SOW and the technical specification and applicable documents listed in Section 7. Documentation requirements are summarized in Appendix C.

The deliverables listed in Table 3-1 are due for delivery no later than 20 months after receipt of order (ARO).

The use of tooling to manage magnetic forces is required in the manufacture, assembly, and magnetic testing of the HBEND magnets. LBNL will provide items LBNL.A through

LBNL.D in Table 2-1 for this purpose. This tooling cannot be modified without written approval from LBNL and must be returned to LBNL for the successful closeout of the subcontract. Item LBNL.E will be used to test the drives in the HBEND assembly.

Table 2-1 LBNL-owned hardware that will be supplied and is required to be used to produce HBEND magnets

Label Name Description LBNL Identifier

LBNL.A HBEND splitting tooling AL-1473-5582

LBNL.B Field harmonic adjustment tooling Part number TBD

LBNL.C Field shunt tooling Part number TBD

LBNL.D Tuning magnet installation tooling Part number TBD

LBNL.E

Complete motor controls chassis, cables, and software

Part number TBD

3 DELIVERABLES

3.1 List of items

The required deliverables consist of the items in Table 3-1 and the associated documentation described in this section, Appendix C, and Section 7, Applicable

Documents.

Table 3-1 List of deliverables.

Item No. Name Qty Description

001 HBEND MAIN PRODUCTION ASSY 8 AL-1615-8572

002 Closeout Checklist 1 per Appendix A ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 8 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

3.2 Production series

The production series may be split into delivery batches as agreed in the subcontract.

Each production series delivery requires:

1. Completely assembled and tested HBEND magnet(s)

2. The complete FAT report package for each unit

3. All applicable certificates and product data

4. All applicable nonconformance or deviation documentation, if any

5. Written approval from LBNL to proceed with shipping

3.3 Closeout checklist

At the time of the final delivery, the Subcontractor must submit the closeout checklist in

Appendix A to verify that all required deliverables have been provided and that all hardware supplied by LBNL has been successfully returned.

4 PROJECT ADMINISTRATION

4.1 Roles and responsibilities

The subcontract will name two University specialists to oversee the contractual and technical aspects of the procurement:

The University Procurement Specialist is responsible for contract administration from solicitation to subcontract award, and any contractual issues that arise thereafter.

The University Technical Representative is responsible for the technical aspects, beginning with the subcontract award through receipt and acceptance of deliverables.

The Subcontractor must identify a project manager who will act as the single point of contact for the University representatives. The project manager must be available for the duration of the subcontract to resolve issues and provide technical, programmatic, and schedule updates as specified in this SOW and in the subcontract.

4.2 Reporting / communication requirements

1. Upon award of the subcontract, the University Technical Representative will contact the Subcontractor to set up a project kick-off meeting to establish communication requirements, including the use of the project portal that will be used for data exchange.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 9 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

2. Project meetings are required to be held twice per month once production has begun, but the frequency of required meetings may be higher during the period leading up to production.

3. Written monthly schedule updates are required. The schedule must include lead times for components and materials, high-level production sequences of key components (e.g. actuators, magnetic core parts) and planned dates for shipment to LBNL.

4. Written monthly status reports are required and must include an explanation for schedule changes as well as a list of completed quantities of key components throughout the production sequence.

5. Site visits by LBNL personnel or a selected designee will be at the discretion of

LBNL and must include access to the factory where the manufacturing and assembly work is performed.

6. Action item tracking is required. The Subcontractor must document action items in written form for all project meetings.

7. Other reports or data may be required as requested in writing.

4.3 Documentation requirements

Upon award of the subcontract, LBNL will establish a Windchill project portal to be used by the Subcontractor to both gain access to applicable documents and submit – in electronic format – all documentation required in this SOW, including Quality Assurance

(QA) data, certificates of conformance, test results, models, and drawings, as applicable.

Subcontractors performing work in a non-English speaking country: all documents must include an English translation and provide data that is represented in U.S. customary formats for dates (month/day/year) and numbers.

Acceptable document formats include .docx, .xlsx, and other editable Microsoft Office file formats, pdf format, image formats, and .txt or .csv for measurement data, as applicable.

4.4 Reviews

The University Technical Representative will work with the Subcontractor to establish a timeline and location for reviews. Reviews may be conducted onsite (University or

Subcontractor facilities) or via web/video conferencing. External (non-University) reviewers may be included at LBNL’s discretion.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 10 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

The review types required for the HBEND magnet scope of work are:

1. Manufacturing readiness review (MRR). The Subcontractor must provide an MRR package for LBNL review and approval before any fabrication or manufacture of HBEND magnet components can begin. At minimum, the MRR package must include:

o Manufacturing schedule. The schedule should include all reviews and hold points identified in this SOW and any other milestone events.

o Manufacturing plan. This plan must cover each phase of the work process.

o Inspection and testing plan(s). Plans must include provisions for inspecting HBEND components as described in Section 6.4.

o Draft magnetic measurement plan. This plan must provide a description of the equipment that will be used for magnetic measurements and an outline of the measurements that will be taken for magnets:

1. At the component level (core PM blocks, axial PM blocks, pole pieces, and tuning magnets);

2. At specific hold points during the production process; and

3. At the subassembly and final assembly level.

o Paint sample with markings. A paint sample of the yoke material painted in accordance with LBNL paint specification 10068 1 must be presented at this review. The paint sample must also include the type of markings required in the drawings.

o Epoxy glue line sample. A glue line sample representative of the final result must be presented, along with a description of the QA process in place to ensure that glue lines are within the specified tolerance.

2. Assembly readiness review (ARR). This review occurs prior to integration of the first magnet core assembly into a yoke assembly and must include the following:

o Updated project schedule o Proposed changes or modifications to LBNL-supplied work instructions, if any o Proposed changes or modifications to assembly tooling, if any o Proposed lubricants and locking agents o Shimming plan

1 LBNL paint specification 10068 is listed in the technical specification document.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 11 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

3. Factory acceptance test (FAT) procedures review. This review will be conducted at the Subcontractor’s site for the 1st article. The Subcontractor must demonstrate their test and inspection procedures and present, for LBNL review and approval, the report formats corresponding to the FAT report package.2

4. Shipping plan review. The Subcontractor must present, for LBNL review and approval, how their proposed container design, packaging, and shipping procedures meet the requirements in Section 5.

4.5 Hold points and what is required

Each hold point requires LBNL’s written approval and notice to proceed.3 Multiple hold points may be combined into one approval at LBNL’s discretion. Requirements and specifications are defined in the Technical Specifications document AL-1685-4599, QA requirements are listed in Section 6, and document deliverables are summarized in

Appendix C.

1. Hold for raw material acceptance. Before ingots are made into magnets (pole pieces, core PM blocks, axial PM blocks, and tuning magnets), the Subcontractor must provide the following to LBNL for review and approval:

o CoFe – for each ingot – a material test report, ring sample performance data, and traceability / assurance that the upper and lower pole pieces for each individual HBEND magnet will be made from the same ingot to ensure uniform magnetic characteristics.

o NdFeB – for each lot – a material test report and representative data in the form of graphs showing remanence (Br) and coercivity (HC) to demonstrate the material characteristics conform to the specifications in AL-1685-4599.

2. Hold for pole piece acceptance. Prior to beginning fabrication of a magnet core assembly (upper or lower), the Subcontractor must provide, for LBNL review and approval, a data package for each pole piece that includes:

o Magnetic data, including a B-H curve o Verification of fiducialization points location o Mechanical inspection data per drawings o Verification that the upper and lower pole pieces are from same ingot o Heat cycle / annealing information

2 Test and inspection demonstrations may be conducted over multiple site visits to accommodate different timelines for components.

3 The Subcontractor may propose long lead purchases and/or fabrication ahead of hold points, subject to LBNL approval.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 12 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

3. Hold for core PM block selection. Prior to beginning fabrication of a magnet core assembly (upper or lower), the Subcontractor must provide to LBNL mechanical inspection data per drawings for all core PM blocks (vertical, transfer, and trans pole) and magnetic measurements for each. Based on this data:

o LBNL will specify which core PM blocks are to be used and may also specify the position of each core PM block within the magnet core assembly configuration.

o LBNL will provide height specifications for the spacer block and vertical core PM blocks.

4. Hold for epoxy glue line thickness verification. For the 1st article, the

Subcontractor must provide photo evidence of all glue lines after the epoxy fully cures to demonstrate that the thickness of the epoxy glue lines falls within the specified tolerance for that item. After the 1st article, further verification will be at

LBNL’s discretion.

5. Hold for axial PM block selection and configuration. Prior to bonding any axial PM block into an axial adjuster plate, the Subcontractor must provide the following QA/QC parameters for each axial PM block for LBNL review and approval:

o Identification numbers o Mechanical inspection data per drawings o Remanence (Br) and magnetization vector

Based on this data, LBNL will provide the axial PM block configuration for the axial adjustment plates.

6. Hold for tooling modification approval (if needed). No modifications can be made to any LBNL-provided tooling without prior LBNL review and approval of proposed changes. If alternative tooling is proposed, the design must first be reviewed and approved by LBNL.

7. Hold for final mid-plane block height approval – 1st article. Prior to the final grinding of the mid-plane block thickness (yoke midblock-1 and -2), the

Subcontractor must provide, for LBNL review and approval, mechanical inspection data for the 1st article core-yoke assembly, along with a proposal for the final mid-plane block height thickness. Based on these measurements and the proposal, LBNL will provide direction and/or approval for the 1st article. Approvals for subsequent units will be at LBNL’s discretion.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 13 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

8. Hold for validation of magnet core assembly alignment within the yoke. Prior to test integrating the upper and lower HBEND assemblies, the

Subcontractor must provide, for LBNL for review and approval, fiducialization / alignment data to validate the mechanical position of each magnet core assembly with respect to its assigned yoke assembly.

9. Hold for magnetic field performance validation (after magnet core assembly-yoke integration). Prior to installing any tuning blocks into a carrier assembly, the Subcontractor must provide field harmonic measurements to allow final adjustment of the B1 dipole harmonic and the A2 skew quadrupole harmonic.

Once the values are provided, required adjustments will be made via the tuning block or ferromagnetic shimming.

10. Hold for on-site magnetic measurement verification – 1st article. Once the 1st article HBEND magnet is fully assembled, the Subcontractor must provide an on-site verification and demonstration of the magnetic field harmonics measurement. Subsequent on-site magnetic measurement verification will be at

LBNL’s discretion.

11. Hold for 1st article shipment approval. Shipment of the 1st article can only commence after LBNL has reviewed and approved the shipping plan and the FAT report and documentation package for the 1st article.

12. Hold for production batch shipment approval. Shipment of any items may only occur after the Subcontractor has submitted the FAT report and documentation packages for all batch deliverables and LBNL has reviewed them and approved shipment.

13. Hold for subcontract closeout. Closeout requires that the Subcontractor complete and submit the Closeout Checklist in Appendix A.

5 SHIPPING, HANDLING, AND STORAGE

LBNL requires that the design of all packaging materials, containers, crates, as well as the shipping plan for each shipment be submitted to the University for review and approval.

Specific requirements are listed in this section.

5.1 Containers

The design for any container that will be used to package or ship items must be submitted to LBNL for review and approval before fabrication of the container may begin. The level of design detail provided must be sufficient to recreate or repurchase additional containers of the same type, if needed.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 14 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Container requirements are:

1. The container must be constructed of materials that meet or exceed the quality standards for Wood Groups II, III, or IV per ASTM D6199 – Standard Practice for

Quality of Wood Members of Containers and Pallets.

2. The design and construction must allow for air shipment.

3. All containers must consist of a base structure that is capable of being transported with a standard forklift on at least two sides of the container.

4. Containers are to be reusable with sides that attach using clips or other standard attachments that allow for ease of disassembly and/or reuse.

5. Each container must be constructed so that it fully supports and protects each item throughout storage and shipping, and the container must fully enclose the item.

6. The item must be secured to the base pallet or skid in a manner that will prevent shifting during transport.

7. An appropriate shock detection device – such as Shockwatch® – must be affixed to each container.

The design for the exterior of all containers must include the following markings and information:

a. A label with all required identifying information, including the subcontract number, LBNL point-of-contact, and delivery address;

b. Arrows indicating the appropriate container orientation;

c. Markings that clearly identify tie-down points, lifting points, and the container’s center of gravity;

d. Clear and obvious labels that indicate the contents are fragile and, if the container includes monitoring equipment, that must be noted;

e. Serial or identification numbers of the components contained therein.

f. Shipments that originate from a country with an official language other than

English: include pictorial instructions or labels written in both English and the language from the point of the shipment’s origin.

5.2 Packaging

All packaging design must be submitted to LBNL for review and approval before items are packaged. Each assembly must be blocked/cribbed/supported to prevent movement or overstressing components during transport.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 15 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Packaging requirements include:

The use of desiccant in magnet packaging is strictly forbidden.

Foam packing material must be placed between the magnet / pole components to ensure there is no interaction between the cores or other hardware during shipment.

Cribbing must be placed between the magnet and the sides of the container to minimize movement during transportation.

The shipping container should incorporate a moisture barrier to prevent condensation during air shipment.

5.3 Storage and shipping

Should items require storage, the storage location must be a temperature and moisture controlled, secured storage facility. Acceptable ambient air temperature during storage is between 5◦ and 40◦ C, with the humidity level remaining below 85%. Items must be stored in such a way as to be fully sheltered from any natural or manmade conditions that may cause damage. This shelter requirement also applies for shipping containers should items require storage once they have been packaged.

When transported by road, fragile items must be transported on air ride trailers with the air ride feature engaged.

The shipping container must be secured in the transportation vehicle at a minimum of two mounting locations in such a way that prevents the container’s movement or tilting.

Mishandling of a magnet assembly can result in excessive loading that may be catastrophic to the shipping container and/or magnet assembly. The worst hypothetical accident condition (HAC) is anticipated to be a 0.3 meter drop onto an unyielding surface.

6 QUALITY ASSURANCE

6.1 Subcontractor quality program

As part of the Request for Proposal (RFP) process, Subcontractors must complete the

ALS-U Supplier Quality Evaluation Survey (AL-1208-0209) to establish the extent of their QA process.

The Subcontractor must maintain and apply the QA program that the University has deemed effective for this procurement based on the Subcontractor’s response to the

ALS-U Supplier Quality Evaluation Survey.

If requested, the Subcontractor must provide additional information regarding aspects of their QA program relevant to this SOW. Upon review, the University may deem that ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 16 of 26

All officially released LBNL documents are watermarked and contain LBNL Document reasonable additions or modifications to certain QA processes are necessary, and post-award surveys may be required and must be supported by the Subcontractor.

6.2 Standard QA forms

6.2.1 Deviation requests

A deviation request applies to any request that seeks to modify a process, document, or drawing. A deviation request does NOT apply to components that the Subcontractor manufactured that do not conform to the specifications provided by the University; see

Section 6.2.2 for nonconformance reporting.

To submit a deviation request, the Subcontractor must provide a written request that can only be implemented after review and approval by the University. If needed, the

University can provide a deviation request form, or – with University approval – the

Subcontractor can submit their own customary deviation request documentation.

6.2.2 Nonconformance reports

A nonconformance report (NCR) provides a written summary that describes how a particular product does not conform to defined specifications or how a procedure does not conform to defined requirements. A nonconformance may be determined and reported by either the Subcontractor or the University.

Once a nonconformance is identified, an NCR must be submitted to the University within three business days. The University uses their standard NCR form that the Subcontractor can request. Or, with prior University approval, the Subcontractor can use their own customary NCR documentation.

The University will provide a written dispensation establishing a path forward for each nonconformance. However, once a nonconformance has been identified, no further operation may be performed on the nonconforming item without the University’s written approval to proceed. Additionally, if any process is found to produce nonconforming components, all work utilizing that process must immediately cease upon discovery until the process can be reviewed with input from the University. Leave to resume the process is at the discretion of the University.

6.3 Required QA Data

6.3.1 Calibration data

All inspections and testing must be performed with calibrated instruments, and the

Subcontractor must provide LBNL with calibration certifications upon request to validate traceability of measurements.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 17 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

6.3.2 Certifications

The components for which certification is required are itemized in Appendix C. The type of certifications required are:

Material certifications.

Certificates of conformance. In addition to the certificates required in Appendix C, note that certificates of conformance are required for all hardware integrated into the assembly (e.g. pins, nuts, fasteners, screws).

Weldment and stress relief certification.

6.3.3 Mechanical inspection reports

Appendix C lists the components for which a mechanical inspection report is required.

6.4 Required inspections and testing

The inspection and test plans described below must be submitted to LBNL for ALS-U QA review and approval and presented at the indicated review. The submittal must include any instructions, test and inspection procedures, or report templates needed to ensure that units are produced according to the technical specifications and drawings provided by LBNL. Submittals must also identify any documents that are provided to or developed by lower-tier subcontractors, and include a sourcing plan that identifies which manufacturing, inspection, and testing activities are performed in-house vs. by lower-tier subcontractors, if applicable.

6.4.1 Plans

The required plans are:

In-process inspection and test plan(s). These documents are presented at the MRR and must describe all in-process inspection and testing that will occur during HBEND fabrication. The plans must address all requirements outlined in

Sections 6.2, 6.4, and 6.5 of this SOW, and the relevant sections of the HBEND

Technical Specification AL-1685-4599.

FAT plan. This plan is presented at the ARR and must describe the plan for factory acceptance inspections and testing once an HBEND magnet is fully assembled. The FAT plan must address the relevant sections of the HBEND

Technical Specification AL-1685-4599.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 18 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Each inspection and test plan must include the components, subassembly, and assembly to be inspected or tested and a description of each QA/QC activity that will be carried out.

Plans must also include a description of how data will be recorded, analyzed, and summarized. An outline of planned reports must be included in the relevant inspection and test plan.

6.4.2 Reports

All in-process inspection and testing and FAT reports must be submitted to LBNL for review and approval.

6.5 Magnet blocks and poles QA data

Specifications for the HBEND magnet blocks and pole pieces are in the Technical

Specification document AL-1685-4599.

6.5.1 Magnet blocks QA data package

The required data package to validate the material quality and production dimensions of each axial and core PM block consists of:

Documents delineating the representative magnetization of each material;

The data file for each block measurement must be in the form of an industry standard graph and, as applicable, also in ASCII format (such formats as .csv, .txt, .dat, or .xml may be accepted at LBNL’s discretion);

Surface voids or chips must be fully documented as specified;

Mechanical inspection data per drawing dimensions and tolerances.

The magnetic and mechanical properties of all PM blocks are subject to verification by

LBNL or its representatives at any point in the process and upon delivery.

6.5.2 Poles QA data package

The required data package to validate material quality and production dimensions consists of:

Certification of material chemistry (material test report) and ingot traceability: the two poles in each magnet must be from the same ingot to ensure uniform magnetic properties (i.e. the materials are from a common heat and ingot);

Documentation of the magnetic anneal used for the pole pieces, e.g. a log of the heat treatment time and temperature curve; and

Mechanical inspection data per drawings ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 19 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

6.5.3 Magnetic measurement requirements

The magnetic measurements data package deliverable consists of the following elements:

Magnetic measurement raw test data in one of the following editable formats: .asc, .csv, .txt, .dat, or .xml format; and

Summary report of the magnetic measurement results and documentation of the magnetic measurement process (e.g. magnet test parameters and equipment set-up).

6.6 Acceptance criteria

Items will be accepted upon receipt of:

1. The complete FAT report package;

2. All applicable certificates and product data;

3. All applicable nonconformance or deviation documentation, if any;

4. and verification of compliance with the technical specifications (items 1 and 2) or with non-conformances and deviations being approved (item 3).

In addition, upon delivery LBNL will conduct receiving inspection and testing, including measurements for each item to verify the functional acceptance criteria list (ACL) for each item type. ACLs will be made available to the Subcontractor upon request. In case an item does not meet functional acceptance criteria and the cause is traced to a non-conformance for which the Subcontractor is responsible but remained undetected, the Subcontractor is responsible for correcting the non-conformance.

7 APPLICABLE DOCUMENTS

The documents listed in this section are considered to be a part of this document. All information contained in an applicable document will be valid to the fullest extent, unless specifically noted within this document. Applicable documents must originate from the

LBNL Document Control Center (DCC) and will be made available by LBNL as needed.

Document Number Title

AL-1685-4599 Technical Specification for the ALS-U Storage Ring HBEND Magnets

AL-1208-0209 ALS-U Supplier Quality Evaluation Survey ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 20 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

APPENDIX A: CLOSEOUT CHECKLIST

The closeout checklist summarizes all Subcontractor deliverables. Submitting this completed checklist is required to close out the contract.

For each item, the Subcontractor must indicate yes or no (Y/N) that the item was delivered according to requirements. For any “N” (no) response, an explanation must be provided in the comments below the table as to why that deliverable is not complete. It is up to LBNL to accept the deliverable as is through a waiver or work with the Subcontractor for completion of the task before closeout.

Item Section Item Complete?

(Y/N)

1 3.1 Qty: 8 HBEND Magnets, fully assembled

2 3.2 Qty. 8 HBEND FAT report packages

3 4.4 All review presentations (MRR, ARR, FAT procedures, Shipping Plan)

4 Appendix C Complete data package to include the documentation outlined in Appendix C: Certifications, data sheets, measurement data, and inspection and testing reports

5 6.2 All applicable nonconformance or deviation documentation, if any

6 2 All tooling and/or materials provided or purchased by LBNL for this project have been returned to and received by LBNL

Item number and comments:

Attachments:

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 21 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

APPENDIX B: STORAGE RING MULTIBEND ACHROMAT SECTORS

The HBEND magnets will be installed in the new ALS-U storage ring locations indicated in the CAD drawings in Figures B-1 and B-2. These arc sectors require additional custom quadrupole magnets to integrate the high-field dipoles into a workable arc sector.

Figure B-1 Sectors 4 and 8 HBEND magnet locations.

Figure B-2 Sector 12 HBEND magnet locations.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

APPENDIX C: SUBCONTRACTOR DATA REQUIREMENTS LIST

The following tables summarize the types of documents the Subcontractor must provide and lists where the requirement is described: SOW section, hold point, or the Technical Specification (TS) for the ALS-U Storage Ring HBEND Magnets (AL-

1685-4599). Table C-1 summarizes mechanical data requirements; Table C-2 summarizes magnetic data requirements;

and Table C-3 summarizes project administration requirements.

Table C-1 Summary of Subcontractor-provided documentation as required per SOW section or applicable document.

Document Type For Item/Component Qty Standard or

Form Purpose

SOW

Section Hold point

TS

Section

FAT report AL-1615-8572 HBEND Main Production Assy 8 As approved Acceptance § 3.2, 6.4.2

11, 12 § 6.4

Mechanical inspection data

– components

Al-1207-7003 – Magnet Pole Piece

1/every

Initial and Final Per drawings Acceptance § 4.5

§ 6.3

Al-1185-9693 Lower Trans Pole PM Block 3

Al-1185-9695 Vertical PM Block 3

Al-1185-9698 Axial PM Block 5

Al-1153-6580 Upper Trans Pole PM Block 3

Al-1153-6582 Upper Transfer PM Block 3

AL-1210-1763 Yoke Mid Block-1

1st article

AL-1210-3968 Yoke Mid Block-2 7

Mechanical inspection data

– assemblies

AL-1208-2802 Upper Magnet Core Assembly

1/each Per drawings Acceptance § 6.3 8 § 6.3

AL-1195-4932 Lower Magnet Core Assembly

AL-1195-5051 Lower Yoke-Core Assembly

AL-1210-1565 Upper Yoke-Core Assembly ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 23 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Document Type For Item/Component Qty Standard or

Form Purpose

SOW

Section Hold point

TS

Section

Fiducialization verification

Al-1207-7003 Magnet Pole Piece

1/each

Per drawings4 Acceptance § 4.5 8 § 6.3

Al-1208-2802 Upper Magnet Core Assembly

Al-1195-4932 Lower Magnet Core Assembly

Al-1195-5051 Lower Yoke-Core Assembly

Al-1210-1565 Upper Yoke-Core Assembly

Material Certification

AL-1339-0493 Interface Spacer

1/each Standard Acceptance § 6.3.2 13 § 6.1

AL-1335-8644 Interface Shoe with Dowel

AL-1392-8785 Side Interface Shoe

AL-1337-3958 Upper Yoke with Inserts

AL-1341-4107 Lower Yoke with Inserts

AL-1210-1763 Yoke Mid Block-1

AL-1210-3968 Yoke Mid Block-2

AL-1461-5104 Adjuster Plate

AL-1220-7585 Field Clamp Plate

AL-1518-8743 Splitting Tooling Lift Plate

Certificate of Conformance

All hardware integrated into the main assembly (e.g. pins, nuts, fasteners, screws)

1/each Standard Acceptance § 6.3.2 13 § 6.1

Weld certification AL-1404-9506 Support Weldment Assy 1/each Standard Acceptance § 6.3.2 13 § 6.1

4 These measurements are taken in conjunction with Hold Point #8, which are to verity that the magnet core assembly is properly aligned with respect to the yoke assembly within which it is installed.

ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 24 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Document Type For Item/Component Qty Standard or

Form Purpose

SOW

Section Hold point

TS

Section

Verification photos Epoxy glue line thickness 1st article 1 / each

Photos Acceptance § 4.5 4 § 6.2

Calibration report Equipment used for measuring mechanical inspection and magnetic data

1/unit Standard Validate traceability of measurements

§ 6.3.1 13 § 6.4

Mechanical inspection reports

AL-1339-0493 Interface Spacers

1/each Standard Acceptance § 6.3.3 13 § 6.3

AL-1335-8644 Interface Shoes with Dowel

AL-1392-8785 Side Interface Shoes

AL-1337-3958 Upper Yoke with Inserts

AL-1341-4107 Lower Yoke with Inserts

AL-1210-1763 Yoke Mid Block-1

AL-1210-3968 Yoke Mid Block-2

AL-1461-5104 Axial Adjuster Plates ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 25 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Table C-2 Magnetic data requirements summary

Document Type For Item/Component Qty Standard or Form Purpose

SOW

Section Hold point

TS

Section

Material test report

CoFe ingots to be used to manufacture pole pieces AL-1207-7003

1/lot ASTM 801 Raw material acceptance

§ 4.5, 6.5

§ 2.4 Magnetic performance report 1/ingot Ring sample Acceptance 1

Heat cycle report 1/ingot Traveler Acceptance 2

Material test report NdFeB to be used to manufacture PM magnet blocks

1/lot Standard Raw material acceptance

§ 2.1, 2.2

Magnetic performance report 1/lot Graph

(Br and Hc) Acceptance 1

Surface void or chips report PM magnet blocks 1/lot As specified in TS QA § 2.3

Magnetic measurement AL-1207-7003 Pole Piece 8 B-H curve Acceptance 2

Magnetic field mapping measurements

– PM magnet blocks

Al-1185-9693 Lower Trans Pole PM Block

6/assy Graph

(Br and Hc) Acceptance 3

§ 2.1, 2.2, 6.4.3

Al-1185-9697 Lower Transfer Block

Al-1185-9695 Vertical PM Block

Al-1153-6580 Upper Trans Pole PM Block

Al-1153-6582 Upper Transfer PM Block

Al-1185-9698 Axial PM Block 4/assy Graph (Br and Hc), magnetization vector

Acceptance 5

Magnetic field mapping measurements

– assemblies

Upper Magnet Core Assembly

1/assy

Before tuning PM install and after:

Graph (Br and Hc)

Acceptance N/A § 6.4.3, 6.4.4

Lower Magnet Core Assembly

Upper Magnet Core-Yoke

Lower Magnet Core-Yoke ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

AL-1685-4598 Rev. A Doc. Status: Released Page 26 of 26

All officially released LBNL documents are watermarked and contain LBNL Document

Document Type For Item/Component Qty Standard or Form Purpose

SOW

Section Hold point

TS

Section

Continued:

Magnetic field mapping measurements

– assemblies

After Magnet Core Assembly-Yoke Integration

1/assy Field harmonics Tuning § 4.5, 6.5

§ 6.4.3, 6.4.4

Effective Multipole Measurement Data 1/assy Data Measurement 10

Table C-3 Summary of Subcontractor-provided project administration documentation as required per SOW section or applicable document.

Document Type Event / Item Qty Item No. Hold Point # SOW ref

Meeting minutes

Project

1/meeting

001 N/A

§ 4.2 Schedule

1/month

Status report

Presentation Manufacturing readiness review (MRR)

1/subcontract

§ 4.4

Presentation Assembly readiness review (ARR)

Presentation Factory acceptance test (FAT) procedures review

Presentation Shipping plan review

Closeout Checklist Subcontract closeout 002 13 § 3.3, Appendix A ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: J an ua ry

6t h, D C

C A ut h

K ey

: J L3

PO

M

LI

File details come from the government source that posted it. Updated .