10) Technical Compliance Matrix - HBEND Production Magnet.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Federal contract opportunity
Solicitation number
MG-03042024
Issued by
Department of Energy

About this file

This request for proposal and related documents seek proposals for the production of hard bend magnets for the Advanced Light Source Upgrade storage ring at Lawrence Berkeley National Laboratory. Offerors must meet technical specifications for the magnets as well as requirements for past performance, manufacturing capabilities, quality management, and delivery schedules. Proposals are due by March 29, 2024 with the Department of Energy and Lawrence Berkeley National Laboratory evaluating responses. The selected supplier will be responsible for magnet production along with factory acceptance testing, shipping, and other deliverables on a schedule to meet the laboratory's project timelines.

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets, newest first.
File Type Posted
14) Response to Questions 1 - RFP MG 03042024 Rev. 2.pdf PDF
AL 1615 8572A.pdf PDF
1) RFP-BVSS MG 03042024 HBend Magnets Rev. 2.pdf PDF
1) RFP-BVSS MG 03042024 HBend Magnets Rev. 1.pdf PDF
AL-1615-8572A.pdf PDF
2) AL-1685-4598_SOW_ALS-U Storage Ring HBEND Magnets.pdf PDF
5) AL-1697-5417_SOW_HBEND Production Drawing List.pdf PDF
6) GP-Commercial Supplies and Services.pdf PDF
9) Price Proposal Schedule Attachment A.xlsx XLSX spreadsheet
4) AL-1685-4599_TS HBEND Magnets.pdf PDF
3) Sample SubK - RFP MG-03042024.pdf PDF
7) GP-Commercial Foreign.pdf PDF
11) Final PropertyCertification.docx DOCX document
Applicable Drawings.zip ZIP file
8) Rep Cert Form - RFP MG 03042024.docx DOCX document
1) RFP-BVSS MG 03042024 HBend Magnets.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FactorDescriptionOfferor:
ComplianceComments - Please provide a narrative of each of your responses
Factor 1: Ability to meet technical requirements.
ALS-U HBEND Production Magnet SOW, AL-1506-8859
Section 3Deliverables
Section 4Project Administration
Section 5Shipping, Handling & Storage
Section 6Quality Assurance
ALS-U HBEND Production Magnet Technical Specification, AL-1685-4599
Section 2Magnetic Specifications
Section 3HBEND Component and Assembly
Section 4HBEND Magnet Assembly Alignment & Positioning Requirements
Section 5LBNL HBEND Assembly Tooling
Section 6Certifications, Inspections, Testing, & Reporting
FactorDescriptionOfferor:
ComplianceComments - Please provide a narrative of each of your responses
Factor 2: Past performance
Submit documentation for up to two similar/comparable projects within the last 5 years of successful performance of similar work demonstrating that the offeror has experience performing similar work in a quality manner.
Information on problems encountered on the identified contracts and any corrective actions that were taken.
Provide details of experience with handling of comparable or larger sized permanent magnets.
Provide details of experience with epoxied systems for accelerators.
Supply the resumes/vitae of all key project personnel such as the project manager, project engineer, lead production managers, and lead quality assurance personnel who will be assigned for the life of the program. This nust also include key personnel of subcontractor.
FactorDescriptionOfferor:
ComplianceComments - Please provide a narrative of each of your responses
Factor 3: Manufacturing capabilities
Identifies all subcontracted scope of work and also provide a synopsis of its experience in working together with its lower-tier-subcontractors.
Outlines of equipment, space, and processes and whether they are sufficient to produce the ALS-U HBEND Production Magnets.
Identification of assembly space that will be employed for the project. The assembly space should be of sufficient size and cleanliness, temperature controlled and with access control.
A summary of, the software and/or other tools that are used for internal tracking, ERP (Enterprise Resource Planning) and MRP (Material Requirement Planning). Include in the summary the length of time the software or other tools have been in use.
Description of any specialized production areas.
A list of measurement equipment that will be utilized to verify mechanical tolerances of components as well as the equipment that will be employed to align and/or verify tolerance of assemblies. Measurement accuracy must be 10 percent or better compared to requirements as specified on drawings or specifications.

The following information must be included on the measurement equipment list:

o Data on the advertised accuracy and actual measured accuracy.

o The measurement envelope for the equipment.

o An indication of which of the equipment is owned versus leased.

o The approximate age of the equipment.

Identification of measurements or verifications that would require additional equipment or sub-contracting.
A list of equipment for magnetic mapping that will be utilized for the magnet measurement and verification. The following information should be included on the magnetic measurement equipment list:

ᴏ Equipment for magnetic mapping currently in use and length of time in use.

ᴏ Sample magnetic mapping report demonstrating that the listed equipment is capable of measuring the HBEND production magnets.

A list of measurement equipment that will be used for spactial fiducialization OR measurement equipment to be used if an alternate alignment process is planned. The following information should be included on the fiducialization/alignment equipment list:

ᴏ Data on the advertised accuracy and actual measured accuracy.

ᴏ An indication of which of the equipment is owned versus leased.

ᴏ The approximate age of the equipment.

ᴏ A copy of the most recent calibration certificate.

Descriptions of limitations of access to the University staff, if any, to the assembly and measurement areas where University work is being performed for inspection and documentation, including the ability to take photograph during the inspections.

FactorDescriptionOfferor:
ComplianceComments - Please provide a narrative of each of your responses
Factor 4: Delivery and Schedule
Submit a schedule and unit deliveries which addresses all requirements contained in the SOW of this RFP including but not limited to Manufacturing Readiness Review, Assembly Readiness Review, Factory acceptance test (FAT) procedures review, shipping plan review, hold points, testing, inspections, evaluation, & delivery of all deliverables that meets the University’s project schedule requirements.
Proposed lead times and the ability to meet the projected delivery schedules.
Proposed carrier and estimate of total shipping costs
(Optional) The offeror may also propose an alternate delivery schedule with justification for additional lead time or would result in a cost avoidance and ultimately a better overall value to the Laboratory.
FactorDescriptionOfferor:
ComplianceComments - Please provide a narrative of each of your responses
Factor 5: Quality Management System
Completion of the ALS-U Supplier Quality Evaluation Survey, AL-1208-0209.
Indication of all current certifications for production standards such as ISO programs.
A quality manual or quality plan that outlines the processes that will be utilized to ensure ALS-U QC standards are satisfied.
Identify whether the project manager or if a separate individual will be responsible for managing QA data and feedback with LBNL.
Provide example of a standard non-conformance report and the change approval process.
Example of a material and assembly shop work instruction/traveler.
Describe the calibration system for measuring and test equipment, including equipment identification, calibration procedure, traceability of standards to national standards, calibration intervals, and recall system.
If the Offeror intends is to utilize sub-contractors, provide a list of potential subcontractors.

[END OF DOCUMENT]

LC-1006-2670 Compliance Matrix for HE-SXR Undulator Mechanical System RFP Page &P of &N

Sheet2

Comply
Not Comply
Partial Comply