About this file
This is a detailed architectural and mechanical drawing for a chiller installation project at the Naval Research Laboratory (NRL), Building A69, under project number PW 6860. The drawing presents a new chiller piping plan with comprehensive specifications for equipment installation and system connections.
The project requires installation of a new chiller system for a furnace with associated piping, mechanical components, and supporting infrastructure. Key components include a pump room with designated equipment layout, concrete pad installation, vibration hose connections using 1-1/2" copper piping with threaded progress elbows and fittings, temperature thermostats and pressure gauges on each supply and return line, ball valves, electronically controlled inlet and outlet water valves, boiler drain, air vent, and rain leader discharge connections. The plan specifies the location of ice accumulation drainage, exhaust arm hood installation, compressed air supply and return connections on the furnace, existing compressed air connection modifications, strainer installation on the return line, and elbow placement over existing heat lines. The drawing includes 24 detailed general notes addressing work scope, existing condition verification, plan intent for new conditions, contractor responsibilities for validation and survey, and specific installation requirements including minimum 40-inch clearance distances and component positioning. The document is marked as controlled unclassified information for official use only.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C ontrol cabinet doors
C onnections:
W ater, process gases and com pressed air
M-101
NEW CHILLER PIPING PLAN1
M-101
N R
L D
C , B
U
IL
D
IN
G A
P
W
O
IN
S
TA
LL
C H
IL
LE
R F
O R
F U
R N
A C
E
N A
V A
L R
E S
E A
R C
H L
A B
O R
A
TO
R Y
GENERAL NOTES:
NEW CHILLER PLAN:
AutoCAD SHX Text
FUME
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
TYPE-1
AutoCAD SHX Text
AutoCAD SHX Text
%%UPUMP ROOM
AutoCAD SHX Text
AutoCAD SHX Text 43'-10"±
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text 15'-4"
AutoCAD SHX Text 31'-8"±
AutoCAD SHX Text
AutoCAD SHX Text 111A
AutoCAD SHX Text 111B
AutoCAD SHX Text 111C
AutoCAD SHX Text 3'-4"
AutoCAD SHX Text 4'-8"
AutoCAD SHX Text 4'-8"
AutoCAD SHX Text 4'-8"
AutoCAD SHX Text
4"X4" DOWNSPOUT
AutoCAD SHX Text 4"X4"
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text
FUME
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
TYPE-2
AutoCAD SHX Text P1
AutoCAD SHX Text
1HR
AutoCAD SHX Text
FE
AutoCAD SHX Text
FEC
AutoCAD SHX Text 39'-5"±
AutoCAD SHX Text 111D
AutoCAD SHX Text
DN
AutoCAD SHX Text 7R
AutoCAD SHX Text
RAIN LEADER DISCHARGE
AutoCAD SHX Text
(FROM DOWNSPOUT)
AutoCAD SHX Text
IN
AutoCAD SHX Text
OUT
AutoCAD SHX Text 01 03
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 3/16" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text
NAVAL RESEARCH LABORATORY
AutoCAD SHX Text
DISTRICT OF COLUMBIA
AutoCAD SHX Text
PW 6860
AutoCAD SHX Text
NRL CODE 3531
AutoCAD SHX Text 02/11/2025
AutoCAD SHX Text
WASHINGTON DC
AutoCAD SHX Text
PROJECT TEAM LEAD - EBERT
AutoCAD SHX Text
CODE 3531 ENGINEERING - G. BAEZ
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHOP NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NRL PW NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES:
AutoCAD SHX Text
DRW:
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
CHK:
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTROLLED UNCLASSIFIED INFORMATION, FOR OFFICIAL USE ONLY
AutoCAD SHX Text
CONTROLLED UNCLASSIFIED INFORMATION, FOR OFFICIAL USE ONLY
AutoCAD SHX Text 316" = 1'
AutoCAD SHX Text xx
AutoCAD SHX Text xx
AutoCAD SHX Text xx
AutoCAD SHX Text
INSTALL CHILLER, NRL BLDG.A-69
AutoCAD SHX Text G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFICALLY MARKED EXISTING, EXIST., OR (E). G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION. G3. PLANS ARE INTENT TO PROVIDE NEW CONDITIONS, CLARIFY REQUIREMENTS AND FOR INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE FOR VALIDATION, SURVEY DETAILED DESIGN, PLANNING, CONSTRUCTABILITY, COORDINATION AND APPROVAL TO IMPLEMENT THE PROJECT WITHIN THE FRAMEWORK OF THE RFP.
AutoCAD SHX Text
1. NEW CONCRETE PAD (REFER TO STRUCTURAL DETAIL SHEET) 2. NEW CHILLER. CHILLER WAS PLACED HERE TO AVOID THE DOWNSPOUT TO THE LEFT OF THE UNIT. NOT SURE HOW MUCH WATER COMES OUT OR ACCUMULATES. 3. VIBRATION HOSE. 4. 1-1/2" COPPER WILL BE USED TO MAKE CONNECTIONS. ASSOCIATED PROPRESS ELBOWS AND FITTINGS PROVIDED. 5. TEMPERATURE THERMOMETER. ONE IN EACH LINE. 6. PRESSURE GAUGE. ONE IN EACH LINE 7. PIPE SUPPORT MOUNTED ON CONCRETE PAD. USE IN CONJUNCTION WITH ALL THREAD AND SPLIT RING HANGERS. 8. BOILER DRAIN. 9. 1-1/2" BALL VALVES. 10. UNISTRUT SUPPORT MOUNTED ON SIDE OF BUILDING. 11. AIR VENT. ONE IN EACH LINE. 12. LOCATION FOR PENETRATION TO RUN THE LINES INSIDE. 13. LOCATION WHERE SUPPLY AND RETURN MANIFOLD WILL GO TO CONNECT HOSES FROM UNIT. 14. EXISTING EXHAUST DROPS 15. LOCATION WHERE THE EXHAUST ARM HOOD WILL BE DRAWING AIR FROM. 16. INSTALL ELECTRONICALLY CONTROLLED VALVE AT WATER INLET AND NON-RETURN VALVE AT WATER OUTLET (CUSTOMER IS IN POSSESSION OF BOTH VALVES). 17. LOCATION OF PIPE SUPPORTS THAT WILL BE IN THE GRASS AREA BETWEEN UNIT AND BUILDING. 18. CHW SUPPLY AND RETURN CONNECTION ON FURNACE. 19. LOCATION WHERE EXHAUST ARM WILL BE MOUNTED. 20. LOCATION WHERE AIR REGULATOR WILL BE MOUNTED. 21. LOCATION OF EXISTING COMPRESSED AIR CONNECTION. YOU WILL TAP OFF OF THIS CONNECTION TO FEED EQUIPMENT. 22. STRAINER THAT WILL BE PLACED ON RETURN LINE. 23. ELBOW UP OVER THE EXISTING HEAT LINE. 24. ENSURE A MINIMUM 40 INCH DISTANCE BETWEEN CHILLER AND ELECTRICAL DISCONNECT ENCLOSURE. CHILLER INSTALLATION GUIDELINE IS 40 INCH CLEARANCE ON ALL FOUR SIDES.
AutoCAD SHX Text 1'
AutoCAD SHX Text 16'
AutoCAD SHX Text 10'
AutoCAD SHX Text 6'
AutoCAD SHX Text
SCALE: 3/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
EX EXHAUST DROP
AutoCAD SHX Text
EX NEW FURNACE
AutoCAD SHX Text
EX
AutoCAD SHX Text
EX
AutoCAD SHX Text
EX
AutoCAD SHX Text
EX
AutoCAD SHX Text
EX UNDERGROUND WATER LINE
AutoCAD SHX Text
LOCATION OF NEW ELECTRICAL DISCONNECT AND ENCLOSURE
AutoCAD SHX Text
EX SNOW FENCE
AutoCAD SHX Text
EX HEAT LINE
daniel.ebert Callout NE corner of pad to be 24' 4" south and 22' west of the SE corner of building. Minor modifications to location can be coordinated with end user.
daniel.ebert Line