This is a detailed architectural and mechanical drawing for a chiller installation project at the Naval Research Laboratory (NRL), Building A69, under project number PW 6860. The drawing presents a new chiller piping plan with comprehensive specifications for equipment installation and system connections.

The project requires installation of a new chiller system for a furnace with associated piping, mechanical components, and supporting infrastructure. Key components include a pump room with designated equipment layout, concrete pad installation, vibration hose connections using 1-1/2" copper piping with threaded progress elbows and fittings, temperature thermostats and pressure gauges on each supply and return line, ball valves, electronically controlled inlet and outlet water valves, boiler drain, air vent, and rain leader discharge connections. The plan specifies the location of ice accumulation drainage, exhaust arm hood installation, compressed air supply and return connections on the furnace, existing compressed air connection modifications, strainer installation on the return line, and elbow placement over existing heat lines. The drawing includes 24 detailed general notes addressing work scope, existing condition verification, plan intent for new conditions, contractor responsibilities for validation and survey, and specific installation requirements including minimum 40-inch clearance distances and component positioning. The document is marked as controlled unclassified information for official use only.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C ontrol cabinet doors

C onnections:

W ater, process gases and com pressed air

M-101

NEW CHILLER PIPING PLAN1

M-101

N R

L D

C , B

U

IL

D

IN

G A

P

W

O

IN

S

TA

LL

C H

IL

LE

R F

O R

F U

R N

A C

E

N A

V A

L R

E S

E A

R C

H L

A B

O R

A

TO

R Y

GENERAL NOTES:

NEW CHILLER PLAN:

AutoCAD SHX Text

FUME

AutoCAD SHX Text

HOOD

AutoCAD SHX Text

TYPE-1

AutoCAD SHX Text

AutoCAD SHX Text

%%UPUMP ROOM

AutoCAD SHX Text

AutoCAD SHX Text 43'-10"±

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 15'-4"

AutoCAD SHX Text 31'-8"±

AutoCAD SHX Text

AutoCAD SHX Text 111A

AutoCAD SHX Text 111B

AutoCAD SHX Text 111C

AutoCAD SHX Text 3'-4"

AutoCAD SHX Text 4'-8"

AutoCAD SHX Text 4'-8"

AutoCAD SHX Text 4'-8"

AutoCAD SHX Text

4"X4" DOWNSPOUT

AutoCAD SHX Text 4"X4"

AutoCAD SHX Text

DOWNSPOUT

AutoCAD SHX Text

FUME

AutoCAD SHX Text

HOOD

AutoCAD SHX Text

TYPE-2

AutoCAD SHX Text P1

AutoCAD SHX Text

1HR

AutoCAD SHX Text

FE

AutoCAD SHX Text

FEC

AutoCAD SHX Text 39'-5"±

AutoCAD SHX Text 111D

AutoCAD SHX Text

DN

AutoCAD SHX Text 7R

AutoCAD SHX Text

RAIN LEADER DISCHARGE

AutoCAD SHX Text

(FROM DOWNSPOUT)

AutoCAD SHX Text

IN

AutoCAD SHX Text

OUT

AutoCAD SHX Text 01 03

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SCALE: 3/16" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

NAVAL RESEARCH LABORATORY

AutoCAD SHX Text

DISTRICT OF COLUMBIA

AutoCAD SHX Text

PW 6860

AutoCAD SHX Text

NRL CODE 3531

AutoCAD SHX Text 02/11/2025

AutoCAD SHX Text

WASHINGTON DC

AutoCAD SHX Text

PROJECT TEAM LEAD - EBERT

AutoCAD SHX Text

CODE 3531 ENGINEERING - G. BAEZ

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHOP NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NRL PW NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES:

AutoCAD SHX Text

DRW:

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

CHK:

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTROLLED UNCLASSIFIED INFORMATION, FOR OFFICIAL USE ONLY

AutoCAD SHX Text

CONTROLLED UNCLASSIFIED INFORMATION, FOR OFFICIAL USE ONLY

AutoCAD SHX Text 316" = 1'

AutoCAD SHX Text xx

AutoCAD SHX Text xx

AutoCAD SHX Text xx

AutoCAD SHX Text

INSTALL CHILLER, NRL BLDG.A-69

AutoCAD SHX Text G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFICALLY MARKED EXISTING, EXIST., OR (E). G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION. G3. PLANS ARE INTENT TO PROVIDE NEW CONDITIONS, CLARIFY REQUIREMENTS AND FOR INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE FOR VALIDATION, SURVEY DETAILED DESIGN, PLANNING, CONSTRUCTABILITY, COORDINATION AND APPROVAL TO IMPLEMENT THE PROJECT WITHIN THE FRAMEWORK OF THE RFP.

AutoCAD SHX Text

1. NEW CONCRETE PAD (REFER TO STRUCTURAL DETAIL SHEET) 2. NEW CHILLER. CHILLER WAS PLACED HERE TO AVOID THE DOWNSPOUT TO THE LEFT OF THE UNIT. NOT SURE HOW MUCH WATER COMES OUT OR ACCUMULATES. 3. VIBRATION HOSE. 4. 1-1/2" COPPER WILL BE USED TO MAKE CONNECTIONS. ASSOCIATED PROPRESS ELBOWS AND FITTINGS PROVIDED. 5. TEMPERATURE THERMOMETER. ONE IN EACH LINE. 6. PRESSURE GAUGE. ONE IN EACH LINE 7. PIPE SUPPORT MOUNTED ON CONCRETE PAD. USE IN CONJUNCTION WITH ALL THREAD AND SPLIT RING HANGERS. 8. BOILER DRAIN. 9. 1-1/2" BALL VALVES. 10. UNISTRUT SUPPORT MOUNTED ON SIDE OF BUILDING. 11. AIR VENT. ONE IN EACH LINE. 12. LOCATION FOR PENETRATION TO RUN THE LINES INSIDE. 13. LOCATION WHERE SUPPLY AND RETURN MANIFOLD WILL GO TO CONNECT HOSES FROM UNIT. 14. EXISTING EXHAUST DROPS 15. LOCATION WHERE THE EXHAUST ARM HOOD WILL BE DRAWING AIR FROM. 16. INSTALL ELECTRONICALLY CONTROLLED VALVE AT WATER INLET AND NON-RETURN VALVE AT WATER OUTLET (CUSTOMER IS IN POSSESSION OF BOTH VALVES). 17. LOCATION OF PIPE SUPPORTS THAT WILL BE IN THE GRASS AREA BETWEEN UNIT AND BUILDING. 18. CHW SUPPLY AND RETURN CONNECTION ON FURNACE. 19. LOCATION WHERE EXHAUST ARM WILL BE MOUNTED. 20. LOCATION WHERE AIR REGULATOR WILL BE MOUNTED. 21. LOCATION OF EXISTING COMPRESSED AIR CONNECTION. YOU WILL TAP OFF OF THIS CONNECTION TO FEED EQUIPMENT. 22. STRAINER THAT WILL BE PLACED ON RETURN LINE. 23. ELBOW UP OVER THE EXISTING HEAT LINE. 24. ENSURE A MINIMUM 40 INCH DISTANCE BETWEEN CHILLER AND ELECTRICAL DISCONNECT ENCLOSURE. CHILLER INSTALLATION GUIDELINE IS 40 INCH CLEARANCE ON ALL FOUR SIDES.

AutoCAD SHX Text 1'

AutoCAD SHX Text 16'

AutoCAD SHX Text 10'

AutoCAD SHX Text 6'

AutoCAD SHX Text

SCALE: 3/16" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text

EX EXHAUST DROP

AutoCAD SHX Text

EX NEW FURNACE

AutoCAD SHX Text

EX

AutoCAD SHX Text

EX

AutoCAD SHX Text

EX

AutoCAD SHX Text

EX

AutoCAD SHX Text

EX UNDERGROUND WATER LINE

AutoCAD SHX Text

LOCATION OF NEW ELECTRICAL DISCONNECT AND ENCLOSURE

AutoCAD SHX Text

EX SNOW FENCE

AutoCAD SHX Text

EX HEAT LINE

daniel.ebert Callout NE corner of pad to be 24' 4" south and 22' west of the SE corner of building. Minor modifications to location can be coordinated with end user.

daniel.ebert Line

Sheets and Views
BLDG. A69 UPDATED