2-26103 - York City Hall Interiors Renovation - Bid Documents.pdf
PDF 29 MB Posted
- Solicitation number
- Not on record
- Issued by
- York County, Pennsylvania
About this file
This is a bid document package for the York City Hall Interiors Renovation project issued by the City of York, York County, Pennsylvania. The project encompasses interior renovation work at York City Hall, located at 101 South George Street, York, Pennsylvania, divided into three separate prime contracts covering Architectural, Electrical, and Plumbing work. The construction documents were prepared by Murphy & Dittenhafer Architects and are available at no cost through the PennBid Program. Sealed bids will be received online via PennBid from 2:00 PM on July 29th through 2:00 PM on August 21st, with public opening and electronic posting of results occurring on the PennBid website immediately following the deadline. A non-mandatory pre-bid meeting is scheduled for August 3rd at 10:00 AM at York City Hall. The anticipated construction duration is approximately 120 calendar days, with the contractor required to submit a proposed construction schedule and phasing plan with its bid for owner review and evaluation. Contract award will be made by the City of York following bid opening.
Each bid must be accompanied by a certified check, cashier's check, or bid bond equal to 10 percent of the total bid amount, made payable to the City of York. All work must include required labor, materials, equipment, and incidentals as indicated in the construction documents. The City of York is an Equal Opportunity Employer and reserves the right to reject any or all bids, reject portions thereof, or waive any informalities or irregularities in the bidding process. Proposals must be submitted electronically through PennBid and include the bid proposal, all required forms, bid security, and all other documents specified in the bidding documents. No specific budget range or award value is disclosed in the procurement documents.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING #
SHEET #
SHEET #
DRAWING #
DRAWING #
DRAWING #
SHEET #
SHEET #
DOOR NUMBER
(SEE DOOR
SCHEDULE)
EXISTING
DOOR
FINISHED WOOD
WINDOW TYPE
(SEE WINDOW
SCHEDULE)
NEW PARTITION
RIGID INSULATION
BRICK
BUILDING
ELEVATION
DETAIL
PLYWOOD
ROUGH WOOD
C.M.U.
CONCRETE
COMPACTED
SUBGRADE
INTERIOR
ELEVATIONS
EXISTING
DOOR
PAINTED
EXISTING WALLS
(TO BE REMOVED)
EXISTING
DOOR (TO BE
REMOVED)
NEW SUSP.
A.C.T.
CEILING &
GRID
BUILDING
SECTION
DRAWING #
SHEET #
WALL
SECTION
BATT INSULATION
PARTITION TYPE
EXISTING PARTITION
ABBREVIATIONS
SYMBOLS
CITY HALL FINISH
RENOVATION
101 S. GEORGE ST,
YORK, PA, 17401
7/27/2026 100% PERMIT DRAWINGS
VICINITY MAP LOCATION MAP
ACT ACOUSTICAL CEILING TILE
A/C AIR CONDITIONING
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
A.B.E. ABOVE BENCHMARK
ELEVATION
A.H.U. AIR HANDLING UNIT
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
@ AT
B.C. BASE CABINET
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKD. BULKHEAD
BLKG. BLOCKING
C CENTER LINE
C.B. CHALK BOARD
CL. CLOSET
CLG. CEILING
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
C.J. CONTROL JOINT
CPT. CARPET
C.T. CERAMIC TILE
D. DEEP
DEMO DEMOLITION
D.F. DRINKING FOUNTAIN
DIM. DIMENSION
DN. DOWN
DTL DETAIL
DIA DIAMETER
DS DOWN SPOUT
DWG. DRAWING
E.J. EXPANSION JOINT
EL. ELEVATOR
ELEC. ELECTRICAL
ELEV. ELEVATION
ETC ETCETERA
E.T.R. EXISTING TO REMAIN
EQUIP. EQUIPMENT
EXIST. EXISTING
EXT EXTERIOR
F.E.C. FIRE EXTINGUISHER
CABINET
F.D. FLOOR DRAIN
F.F.E. FINISH FLOOR ELEVATION
FIN FINISH
FL. OR FLR. FLOOR
FOM FACE OF MASONRY
FT FOOT, FEET
F.V.W.A. FIELD VERIFY WITH
ARCHITECT
GA GAUGE
GALV GALVINIZED
GYP. BD. GYSUM BOARD
GSF GROSS SQUARE FEET
GWB GYSUM WALL BOARD
GT GLAZING TYPE
H OR HT HEIGHT
HC HANDICAPPED
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HR HOUR
HVAC HEATING/VENTILATION, AIR
CONDITIONING
IN INCH
INSUL. INSULATION
INT. INTERIOR
JAN. JANITOR
JT JOINT
L LENGTH
LAV. LAVATORY
L.H. LEFT HAND
MACH. MACHINE
MAT'L MATERIAL
MAX. MAXIMUM
M.E. MATCH EXISTING
MECH. MECHANICAL
MEP MECHANICAL/ELECTRICAL/
PLUMBING
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTD MOUNTED
MTL METAL
NO. OR # NUMBER
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
NSF NET SQUARE FEET
N.T.S. NOT TO SCALE
O.C. ON CENTER
OPNG. OPENING
P-LAM PLASTIC LAMINATE
PLYWD PLYWOOD
P.T. PORCELAIN TILE
PTD. PAINTED
SITE LOCATION
ARCHITECT
MURPHY & DITTENHAFER ARCHITECTS
226 WEST MARKET ST.
YORK, PENNSYLVANIA 17401
TEL. 717.848.8627
SHEET LIST
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
CS-1 COVER SHEET
CS-2 CODE SUMMARY
ARCHITECTURAL
AD-100 FIRST FLOOR DEMOLITION PLAN
AD-101 2ND FLOOR DEMOLITION PLAN
A-100 OVERALL FIRST FLOOR PLAN
A-101 OVERALL SECOND FLOOR PLAN
A-112 RECEPTION DESK PLAN & DETAILS
A-401 ENLARGED RESTROOM PLANS & ELEV.
A-402 ENLARGED RESTROOM PLANS & ELEV.
A-405 INT. DETAILS, ELEVATIONS & DOORS
A-600 1ST FLOOR FINISH SCOPE
A-601 2ND FLOOR FINISH SCOPE
A-700 PHOTO REFERENCE
PLUMBING
P-101 PLUMBING PLANS & DETAILS
ELECTRICAL
E-101 ELECTRICAL PLANS & DETAILS
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
COVER SHEET
CS-1
C
IT
Y O
F Y
O R
K
SITE LOCATION
REF. REFRIDGERATOR
REQ'D REQUIRED
R.H. RIGHT HAND
RM ROOM
SF SQUARE FEET
SHT. SHEET
SIM. SIMILAR
S.O.G. SLAB ON GRADE
SNT. SEALANT
SPEC. SPECIFICATION
STD. STANDARD
STL. STEEL
S.S. STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
STOR. STORAGE
STRUCT. STRUCTURE
SQ. SQUARE
SUSP. SUSPENDED
T & G TONGUE & GROOVE
TEMP TEMPORARY
TH. THICK
T.O.S. TOP OF SLAB
T.O.J. TOP OF JOIST
TLT. TOILET
TYP. TYPICAL
U.N.O. UNLESS NOTED
OTHERWISE
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
V.I.F.W.A. VERIFY IN FIELD WITH
ARCHITECT
W/ WITH
W. WIDTH
W.B. WALL BOARD
W.C. WATER CLOSET
WD. WOOD
W/O WITHOUT
LIST OF ALTERNATES
1. EPOXY FLOOR AND INTEGRAL BASE IN RESTROOMS 108, 118, 152, 153, 211, 214, 260,
263.
2. ZURN Z6000 AQUAFLUSH FLUSH VALVE IN LIEU OF SLOAN URINAL AUTOMATIC FLUSH
VALVE. SLOAN ROYAL 1.28 GPF MANUAL FLUSHOMETER IN LIEU OF SLOAN WATER
CLOSET AUTOMATIC FLUSH VALVE.
3. REPLACE ALL STAIR TREADS IN STAIRWELL EAST IN LIEU OF (2) STAIR TREADS.
SCOPE OF WORK
THE PROJECT CONSISTS OF THE RENOVATION OF EXISTING INTERIOR FINISHES
THROUGHOUT YORK CITY HALL, LOCATED AT 101 S. GEORGE ST., INCLUDING THE
REPLACEMENT OF ENTRY DOORS, PLUMBING FIXTURES IN THE FIRST- AND SECOND-FLOOR
RESTROOMS, INSTALLATION OF NEW RESTROOM PARTITIONS, REPLACEMENT OF LIGHTING
FIXTURES IN THE RESTROOMS AND MAIN LOBBY, AND INSTALLATION OF PROTECTIVE
GLASS AT THE PAYMENT CENTER. THE WORK ALSO INCLUDES ALL ASSOCIATED
DEMOLITION, PREPARATION, PATCHING, FINISHING, AND RELATED CONSTRUCTION
ACTIVITIES NECESSARY TO COMPLETE THE IMPROVEMENTS AND PROVIDE A FULLY
FUNCTIONAL, CODE-COMPLIANT RENOVATED FACILITY.
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
75'
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
75'
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
74'
68'
88'
LEGEND:
EGRESS PATH
FEC
= FIRE EXTINGUISHER CABINET
FE
= FIRE EXTINGUISHER ON WALL BRACKET
EXIST. 1 HOUR
BUILDING CODE STUDY DATA
1/16" = 1'-0"
FIRST FLOOR - CODE PLAN (NO ALTERATIONS)
1/16" = 1'-0"
SECOND FLOOR - CODE PLAN (NO ALTERATIONS)N N
GENERAL NOTES
1. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK FOR THIS PROJECT WITH ALL
TRADES AND/OR WITH SUBCONTRACTORS AS TO ASSURE THE PROPER EXECUTION OF WORK.
2. THE BUILDING OWNER SHALL APPLY AND PAY FOR THE BUILDING PERMIT. A COPY OF THE
APPROVED PERMIT PLANS WILL REMAIN ON JOB SITE AT ALL TIMES.
3. THE GENERAL CONTRACTOR SHALL SCHEDULE ALL NECESSARY INSPECTIONS AND ACQUIRE
FINAL CERTIFICATE OF OCCUPANCY
4. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIALS, AND ALL OTHER RESOURCES REQUIRED TO COMPLETE THE PROJECT.
5. UNLESS OTHERWISE NOTED, ALL NEW MATERIALS SHALL MATCH EXISTING MATERIALS IN
QUALITY, SIZE AND DESIGN.
6. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL EXAMINE THE DRAWINGS AND
CHECK ALL MEASUREMENTS AND DETAILS. CONTRACTOR AND SUBCONTRACTOR SHALL ALSO
COMPARE THE PLANS WITH THE SPECIFICATIONS, AS ANY ITEM REQUIRED IN ONE OR THE
OTHER, IF NOT DUPLICATED, SHALL IN ANY EVENT BE CONSTRUED TO BE PART OF BOTH.
7. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS AT THE
BUILDING AS SHOWN ON THE DRAWINGS, AND THEY SHALL REPORT ANY INCONSISTENCIES IN
THE ABOVE TO THE ARCHITECT BEFORE COMMENCING WORK. NO EXTRA CHARGE OR
COMPENSATION WILL BE ALLOWED ON ACCOUNT OF DIFFERENCES BETWEEN ACTUAL
DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS. ANY DIFFERENCES SHALL BE
SUBMITTED TO THE ARCHITECT FOR DISCUSSION BEFORE PROCEEDING WITH THE WORK.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEAN-UP OF THE WORK AND DISPOSAL
OF TRASH AND DEBRIS OFF THE PREMISES. ALL DEBRIS AND WASTE MATERIAL SHALL BE
REMOVED FROM THE SITE AT THE END OF EACH WORKING DAY, UNLESS OTHERWISE
DIRECTED BY THE ARCHITECT.
9. THE GENERAL CONTRACTOR SHALL PERFORM A FINAL CLEANUP OF ALL NEW WORK PRIOR TO
TURNING THE COMPLETED PROJECT OVER TO THE OWNER FOR OPERATIONAL USE, INCLUDING
REMOVAL OF ALL MARKS, STAINS AND SOILS FROM SURFACES, REMOVAL OF ALL TEMPORARY
PROTECTIONS, SCAFFOLDING, ETC., CLEAN ALL GLASS, MIRRORS, TILE AND FLOORS.
10. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY
REGULATIONS GOVERNING DEMOLITION AND CONSTRUCTION OF THIS PROJECT.
11. IT SHALL BE UNDERSTOOD THAT THE ARCHITECT'S DRAWINGS ARE PARTIALLY DIAGRAMMATIC
AND THE MECHANICAL AND ELECTRICAL SUBCONTRACTORS SHALL WORK IN COOPERATION
WITH THE GENERAL CONTRACTOR IN DETERMINING THE RUNNING OF PIPE LINES AND
LOCATING EQUIPMENT. ANY NECESSARY VARIATIONS SHALL BE MADE TO CONFORM TO THE
INTENT OF THE DIAGRAMMATIC DRAWINGS WITHOUT ADDITIONAL COSTS. WHERE THERE ARE
INTERSECTIONS INVOLVING VARIOUS DUCTS, PIPING AND EQUIPMENT, PARTICULAR
CONSIDERATION SHALL BE GIVEN TO CLEARANCES.
12. THE OWNER RESERVES THE RIGHT TO LET OTHER CONTRACTS AND TO INSTALL CERTAIN
EQUIPMENT IN THE BUILDING AT ANY TIME DURING CONSTRUCTION. THIS RIGHT SHALL NOT
INTERFERE IN ANY WAY WITH THE CONTINUITY OF BUILDING CONSTRUCTION OR COMPLETION.
THE OWNER SHALL INFORM THE CONTRACTOR PRIOR TO ANY WORK AND/OR INSTALLATION OF
EQUIPMENT.
13. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH ALL GUARANTEES, WARRANTIES,
OPERATION AND MAINTENANCE INSTRUCTIONS AND OTHER LITERATURE PROVIDED WITH ALL
EQUIPMENT USED IN THE PROJECT.
14. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BIDDING AND
INSTALLATION. EXISTING PLUMBING CONFIGURATION, PIPE SIZES, ROUGH-IN LOCATIONS, AND
CONNECTION POINTS ARE NOT GUARANTEED AND MAY DIFFER FROM ASSUMED CONDITIONS.
CONTRACTOR SHALL MODIFY, RELOCATE, OR EXTEND EXISTING PLUMBING AS REQUIRED TO
ACCOMMODATE NEW FIXTURES AND TO COMPLY WITH ALL APPLICABLE CODES AND
MANUFACTURER INSTALLATION REQUIREMENTS. ALL WORK SHALL COMPLY WITH THE LOCAL
PLUMBING CODE AND AUTHORITY HAVING JURISDICTION (AHJ). WHERE EXISTING CONDITIONS
CONFLICT WITH NEW WORK, CONTRACTOR SHALL NOTIFY ARCHITECT/OWNER PRIOR TO
PROCEEDING. NO ADDITIONAL COMPENSATION SHALL BE GRANTED FOR MINOR FIELD
ADJUSTMENTS REQUIRED FOR PROPER INSTALLATION.
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
CODE
SUMMARY
CS-2
C
IT
Y O
F Y
O R
K
101 SOUTH GEORGE STREET
YORK CITY MUNICIPAL OFFICES
YORK, PENNSYLVANIA
CODE SUMMARY
AUTHORITY HAVING JURISDICTION: CITY OF YORK
APPLICABLE CODES:
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
• 2021 INTERNATIONAL BUILDING CODE (IBC)
• 2021 INTERNATIONAL MECHANICAL CODE (IMC)
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• ACCESSIBILITY: BASED ON CURRENTLY ENFORCED PENNSYLVANIA ACCESSIBILITY PROVISIONS
PROJECT DESCRIPTION:
THE EXISTING STRUCTURE IS A TWO-STORY OFFICE BUILDING WITH BASEMENT AND MULTIPLE TENANTS.
THE PRIMARY STRUCTURE IS MASONRY BEARING WALLS SUPPORTING STEEL FLOOR TRUSSES WITH CONCRETE FLOORS ON METAL DECKING, AND A WOOD TRUSS FRAMED AND DECKED SLATE SHINGLED ROOF. EXTERIOR WALLS ARE MASONRY WITH PUNCHED WINDOW OPENINGS. THE PROJECT RENOVATION
INCLUDES UPDATED INTERIOR FINISHES, PLUMBING FIXTURES, & CASEWORK.
CLASSIFICATION OF WORK (IEBC 101.5.2):
ALTERATION - LEVEL 1, BUSINESS OCCUPANCY
EXISTING BUILDING CLASSIFICATION (PER IBC)
CONSTRUCTION TYPE: 3B NON-SPRINKLERED
USE AND OCCUPANCY: ALL OCCUPANCIES IN THE BUILDING ARE "B" BUSINESS CLASSIFICATION, WITH AT
LEAST ONE ACCESSORY (A3) ASSEMBLY.
GENERAL COMPLIANCE
• BUILDING SHALL NOT BE MADE LESS COMPLIANT THAN EXISTING CONDITIONS
• NEW WORK SHALL COMPLY WITH APPLICABLE PROVISIONS OF THE IBC
• EXISTING BUILDING IS NOT REQUIRED TO BE FULLY UPGRADED TO CURRENT CODE
FIRE PROTECTION (IEBC 701 / 703)
• EXISTING FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED
• NO AUTOMATIC SPRINKLER SYSTEM IS REQUIRED DUE TO LEVEL 1 WORK
• ANY NEW OR REPLACED MATERIALS SHALL MEET CURRENT FIRE-RESISTANCE REQUIREMENTS
MEANS OF EGRESS (IEBC 704)
• EXISTING MEANS OF EGRESS SHALL BE MAINTAINED
• EGRESS CAPACITY AND SAFETY SHALL NOT BE REDUCED
• NO REQUIREMENT TO UPGRADE STAIRS, CORRIDORS, OR EXITS UNLESS ALTERED
ACCESSIBILITY (IEBC 705)
• ACCESSIBILITY IMPROVEMENTS ARE REQUIRED ONLY FOR ALTERED ELEMENTS
• NO REQUIREMENT TO PROVIDE FULL BUILDING ACCESSIBILITY
• ALTERED ELEMENTS SHALL COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS
STRUCTURAL (IEBC 706)
• EXISTING STRUCTURAL ELEMENTS SHALL NOT BE REQUIRED TO BE UPGRADED
• UNLESS LOADS ARE INCREASED OR ELEMENTS ARE ALTERED
• NEW STRUCTURAL WORK SHALL COMPLY WITH IBC REQUIREMENTS
ENERGY CONSERVATION (IEBC 707 / IECC 2021)
• ONLY ALTERED COMPONENTS SHALL COMPLY WITH IECC
• THE ENTIRE BUILDING IS NOT REQUIRED TO BE BROUGHT INTO FULL ENERGY
COMPLIANCE
EXAMPLES:
• REPLACEMENT LIGHTING SHALL MEET CURRENT ENERGY REQUIREMENTS
• REPLACED ENVELOPE COMPONENTS SHALL MEET INSULATION REQUIREMENTS
MECHANICAL / ELECTRICAL / PLUMBING
• NEW OR REPLACED SYSTEMS SHALL COMPLY WITH:
• IMC 2021
• IPC 2021
• NEC 2020
• EXISTING SYSTEMS MAY REMAIN IF NOT ALTERED BEYOND CAPACITY
M A
R K
D A
T E
D E
S C
R
IP
T
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
137 VESTIBULE S
MEP
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
147 OFFICE
OFFICE
OPEN OFFICE
MEN
WOMEN
OFFICE
S. STAIR VEST
VS
STAIR SOUTH
ST-2
STORAGE
STORAGE
134A
RECEPTION
PERMITS
ZONING
PMI
PP&Z
HEALTH
STAIR NORTH
ST-3
N. STIAR VEST
NV
PLAN REVIEW
TREASURER
STAFF
WOMEN'S
MEN'S
TOILET
CAUCUS ROOM
A/V STOR.
DEPUTY BA
FINANCE
FINANCE
REVENUE
SECURE FILES
CORRIDOR
CORRIDOR
CORRIDOR
WAITING AREA
COUNCIL
CHAMBERS
STAIR EAST
ST-1
WEST VESTIBULE
LOBBY
EAST VESTIBULE
AD.1
AD.1
AD.2
AD.2
AD.4
AD.4
AD.4
AD.3
AD.5
AD.5
AD.7
AD.5
AD.7
AD.5
AD.7
AD.5
AD.7
AD.4
AD.4
AD.4
AD.6
AD.3
AD.15
TYP. ALL WINDOWS
AD.1
AD.1
AD.16.1
AD.17
AD.17
AD.18
TYP. IN ST-1
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16 AD.19
AD.19
AD.19
AD.19
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16.1
AD.16
AD.16
CORR.
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
FIRST FLOOR
DEMOLITION
PLAN
AD-100
C
IT
Y O
F Y
O R
K
N
0' 4' 8' 16' 1/8" = 1'-0"
FIRST FLOOR DEMO PLAN
KEYNOTE LEGEND
TAG DESCRIPTION
AD.1 REMOVE EXISTING DOOR AND HARDWARE. PREP OPENING
FOR NEW DOOR, RETAIN HARDWARE FOR RE-USE.
AD.2 REMOVE EXISTING TRANSACTION WINDOW AND COUNTER IN
IT'S ENTIRETY.
AD.3 REMOVE EXISTING TOILET PARTITIONS IN THEIR
ENTIRETYTY. PREP ADJACENT WALLS FOR NEW TOILET
PARTITIONS.
AD.4 PLUMBING CONTRACTOR TO REMOVE EXISTING PLUMBING
FIXTURE. COORDINATE.
AD.5 REPLACE ANY DAMAGED FLOOR TILE, PREP SURFACE FOR
CLEANING.
AD.6 REMOVE EXISTING VANITY. PLUMBING CONTRACTOR TO
REMOVE SINK, DISCONNECT PLUMBING (COORDINATE). PREP
FOR NEW SSM COUNTERTOP & SINK.
AD.7 REMOVE EXISTING TOILET ACCESSORIES. RETAIN FOR
RE-USE.
AD.15 REMOVE EXISTING WINDOW TREATMENT. PREP FOR NEW
WINDOW TREATMENT. TYP. AT ALL EXTERIOR WINDOWS.
AD.16 REMOVE EXISTING CARPET & BASE. PREP FLOOR FOR NEW
CARPET.
AD.16.1 REMOVE EXISTING CARPET. PREP FLOOR SURFACE FOR
NEW CARPET.
AD.17 REMOVE EXISTING WALK OFF MAT.
AD.18 REMOVE (2) EXISTING STAIR TREADS. ADD ALT. #3. REMOVE
ALL STAIR TREADS IN ST-1 STAIRWELL EAST.
AD.19 REMOVE ALL WALL MOUNTED TOILET ACCESSORIES. RETAIN
FOR RE-USE & REINSTALLATION IN SAME LOCATIONS.
M A
R K
D A
T E
D E
S C
R
IP
T
ENV. SERV.
PW DIR.
203 CONFERENCE
REC. SUPT.
YOUTH COORD.
ATHLETIC DIR.
OP. MAN.
COPY/FILE
WOMEN'S
MEN'S
CITY CLERK
OPEN OFFICE
PUBLIC WORKS
RECEPTION
CORR.
CORR.
BREAK ROOM
CONFERENCE
PP&Z
CORR.
HOUSING WS
COPY/FILE
OFFICE
CORRIDOR
EC DEV WS
CORR.
OFFICE
DEPUTY DIR.
ECON. DEV.
PLANNING
MARKETING
HOUSING
DEPUTY DIR.
HOUSING
CORRIDOR
HOUSING
RECEPTION
LARGE MEETING
ROOM
MEETING
VESTIBULE
HOUSING OFF.
ELEC.
LOBBY
POLICE INT.
AFFAIRS
RECEPTION
OFFICE
241 OFFICE
HR RECEPTION
CORRIDOR
HR OFFICE
HR OFFICE
HR OFFICE
HR FILE
HR/SHARED
CONF
OFFICE
CONTROLLER
OFFICE
CORRIDOR
CLOSET
CORRIDOR
CONFERENCE
ASST. BUS.
ADMIN OFFICE
BUS. ADMIN
OFFICE
CORR.
JANITOR
MEN'S
CORR.
SOLICITOR
CLERK
CORR.
SOLICITOR
OFFICE
CONFERENCE
WOMEN'S
SOLICITOR
OFFICE
KITCHEN
TOILET
MAYOR'S OFFICE
MAYOR'S STAFF
STOR. (N.I.C.)
STAIR NORTH
ST-3
STAIR EAST
ST-1
STAIR SOUTH
ST-2
AD.6.1
AD.4
AD.6
AD.8
AD.4
AD.3
AD.6
AD.7
AD.5
AD.7
AD.5
AD.5
AD.7
AD.5
AD.5
AD.4
AD.4
AD.6
AD.4
AD.3
AD.10
AD.11
AD.12
AD.13
AD.14
AD.14
AD.14AD.14
AD.14
AD.15
TYP. ALL WINDOWS
AD.14.1 AD.14 AD.14.1
AD.14.1AD.14.1 AD.14.1
AD.14.1
AD.14.1
AD.14.1
AD.14.1 AD.14.1
AD.14.2
AD.16.1 AD.16.1AD.16.1
AD.16.1
AD.16.1
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16
AD.16 AD.16
AD.16
AD.16
AD.16
AD.16
AD.19
AD.19
AD.19
AD.19
AD.18
AD.16.1
AD.21
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
2ND FLOOR
DEMOLITION
PLAN
AD-101
C
IT
Y O
F Y
O R
K
N
0' 4' 8' 16' 1/8" = 1'-0"
SECOND FLOOR DEMO PLAN
KEYNOTE LEGEND
TAG DESCRIPTION
AD.3 REMOVE EXISTING TOILET PARTITIONS IN THEIR
ENTIRETYTY. PREP ADJACENT WALLS FOR NEW TOILET
PARTITIONS.
AD.4 PLUMBING CONTRACTOR TO REMOVE EXISTING PLUMBING
FIXTURE. COORDINATE.
AD.5 REPLACE ANY DAMAGED FLOOR TILE, PREP SURFACE FOR
CLEANING.
AD.6 REMOVE EXISTING VANITY. PLUMBING CONTRACTOR TO
REMOVE SINK, DISCONNECT PLUMBING (COORDINATE). PREP
FOR NEW SSM COUNTERTOP & SINK.
AD.6.1 REMOVE EXISTING VANITY. PREP FOR NEW SSM
COUNTERTOP.
AD.7 REMOVE EXISTING TOILET ACCESSORIES. RETAIN FOR
RE-USE.
AD.8 REMOVE EXISTING GRAB BARS. RETAIN FOR RE-USE.
AD.10 REMOVE EXISTING COUNTERTOP & CASEWORK.
AD.11 REMOVE EXISTING REFRIGERATOR.
AD.12 REMOVE EXISTING SINK FIXTURE. RETAIN PIPING FOR
RE-USE.
AD.13 REMOVE EXISTING COUNTERTOP RANGE. CAP ALL UTLITIES.
AD.14 REMOVE EXISTING WALL PAPER. PATCH & REPAIR SURFACE.
PROVIDE A FLUSH LEVEL SURFACE PREPPED TO RECIEVE
NEW PAINT.
AD.14.1 REMOVE EXISTING WALL PAPER ABOVE CHAIR RAIL. PATCH &
REPAIR SURFACE. PROVIDE A FLUSH LEVEL SURFACE
PREPPED TO RECIEVE NEW PAINT.
AD.14.2 REMOVE EXISTING WALL PAPER. PATCH & REPAIR SURFACE.
PROVIDE A FLUSH LEVEL SURFACE PREPPED TO RECIEVE
NEW WALL PAPER.
AD.15 REMOVE EXISTING WINDOW TREATMENT. PREP FOR NEW
WINDOW TREATMENT. TYP. AT ALL EXTERIOR WINDOWS.
AD.16 REMOVE EXISTING CARPET & BASE. PREP FLOOR FOR NEW
CARPET.
AD.16.1 REMOVE EXISTING CARPET. PREP FLOOR SURFACE FOR
NEW CARPET.
AD.18 REMOVE (2) EXISTING STAIR TREADS. ADD ALT. #3. REMOVE
ALL STAIR TREADS IN ST-1 STAIRWELL EAST.
AD.19 REMOVE ALL WALL MOUNTED TOILET ACCESSORIES. RETAIN
FOR RE-USE & REINSTALLATION IN SAME LOCATIONS.
AD.21 REMOVE EXISTING MAKE SHIFT FIRE PLACE AND FAKE TILE
HEARTH.
M A
R K
D A
T E
D E
S C
R
IP
T
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
137 VESTIBULE S
MEP
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
147 OFFICE
OFFICE
OPEN OFFICE
MEN
WOMEN
OFFICE
S. STAIR VEST
VS
STAIR SOUTH
ST-2
STORAGE
STORAGE
134A
RECEPTION
PERMITS
ZONING
PMI
PP&Z
HEALTH
STAIR NORTH
ST-3
N. STIAR VEST
NV
PLAN REVIEW
TREASURER
STAFF
WOMEN'S
MEN'S
TOILET
CAUCUS ROOM
A/V STOR.
DEPUTY BA
FINANCE
FINANCE
REVENUE
SECURE FILES
CORRIDOR
CORRIDOR
CORRIDOR
WAITING AREA
127COUNCIL
CHAMBERS
STAIR EAST
ST-1
WEST VESTIBULE
LOBBY
EAST VESTIBULE
A-4054
A-401
PT-5
A-401
A-112
+/- 16' - 0"
PT-5
ELEV.
EV
RR25
RR25
RR25
RR25
RR13
RR13
RR13
RR13
RR13
RR13
RR13RR13RR13RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13 RR13 RR13
RR13 RR13 RR13 RR13
A-405
A-405
A
E-101
E-101
P-101
P-101
P-101
P-101
E-101
E-101
Room
211.2
CORR.
1/8" = 1'-0"
FIRST FLOOR
N
0' 4' 8' 16'
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
OVERALL
FIRST FLOOR
PLAN
A-100
C
IT
Y O
F Y
O R
K
KEYNOTE LEGEND
TAG DESCRIPTION
01 INFILL TRANSACTION WINDOW OPENING.
WALL CONSTRUCTION & FINISH TO MATCH
EXISTING. REFER TO DETAILS 9-12/A-405.
02 TOUCH-UP EXISTING PAINT. REFER TO
FINISH SCHEDULE FOR DETAILS.
06 ACRYLIC GLASS PARTITION INSTALLED ON
EXISTING COUNTERTOP. REFER TO A-112
FOR DETAILS.
10 EXISTING DOOR AND FRAME TO RECEIVE
NEW PAINT PT-2.
11 NEW CARPET. REFER TO A-600 & A-601 FOR
FINISH DETAILS.
12 PAINT EXISTING DOOR PT-2, FRAME TO
REMAIN UNTOUCHED.
13 PAINT EXISTING FRAME PT-2, DOOR TO
REMAIN UNTOUCHED.
14 MODIFY EXISTING SEALED WINDOW TO
PROVIDE FULL OPERABILITY FOR
EMERGENCY ESCAPE EGRESS. WORK IS
LIMITED TO REMOVAL OF FIXED CONDITIONS
AND INSTALLATION/ADJUSTMENT OF SASH,
HARDWARE, AND RELATED COMPONENTS
NECESSARY TO ACHIEVE FULL,
UNOBSTRUCTED OPERATION. VERIFY FIELD
CONDITIONS PRIOR TO BIDDING. RESTORE
ADJACENT FINISHES DISTURBED BY WORK
TO MATCH EXISTING CONDITIONS. PROVIDE
COMPLETE, CODE-COMPLIANT OPERABLE
WINDOW.
15 REPLACE EXISTING WALK-OFF MAT (WOM-1).
REFER TO A-600 FOR DETAILS.
17 INSTALL (2) NEW STAIR TREADS IN ST-1.
REFER TO A-601 FOR DETAILS. ADD ALT #3.
REPLACE ALL STAIR TREADS IN STAIRWELL
EAST IN LIEU OF (2) STAIR TREADS.
RR13 PAINT EXISTING WINDOW FRAME (WHERE
APPLICABLE) & SILL PT-2.
RR25 CLEAN EXISTING FLOOR TILE. ALTERNATE 1:
REMOVE EXISTING FLOOR TILE & 4" TILE
BASE AND ALL ASSOCIATED SETTING
MATERIALS DOWN TO SOUND SUBSTRATE.
PREPARE SUBSTRATE PER
MANUFACTURER'S REQUIREMENTS,
INCLUDING CLEANING, PATCHING, AND
PROFILING AS REQUIRED TO ACHIEVE
PROPER BOND. MAINTAIN EXISTING FLOOR
SLOPES TO DRAINS; DO NOT ALTER DRAIN
LOCATIONS OR ELEVATIONS. PROVIDE AND
INSTALL SLIP-RESISTANT,
CHEMICAL-RESISTANT EPOXY FLOORING
SYSTEM WITH INTEGRAL BASE (EP-1),
INCLUDING PRIMER, BASE COAT, AND
TOPCOAT, SUITABLE FOR RESTROOM/WET
ENVIRONMENTS. FEATHER AND TRANSITION
SMOOTHLY AT PERIMETERS, DOOR
THRESHOLDS, AND FLOOR PENETRATIONS.
VERIFY COMPATIBILITY WITH EXISTING
SUBSTRATE CONDITIONS. ALL WORK SHALL
COMPLY WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS AND APPLICABLE CODES.
A PATCH & REPAIR ALL HOLES
IN DRYWALL PRIOR TO
PAINTING
EAST VESTIBULE 124 INTERIOR NORTH
WALL IMAGE
M A
R K
D A
T E
D E
S C
R
IP
T
ENV. SERV.
PW DIR.
203 CONFERENCE
REC. SUPT.
YOUTH COORD.
ATHLETIC DIR.
OP. MAN.
COPY/FILE
WOMEN'S
MEN'S
CITY CLERK
OPEN OFFICE
PUBLIC WORKS
RECEPTION
CORR.
CORR.
BREAK ROOM
CONFERENCE
PP&Z
CORR.
HOUSING WS
COPY/FILE
OFFICE
CORRIDOR
EC DEV WS
CORR.
OFFICE
DEPUTY DIR.
ECON. DEV.
PLANNING
MARKETING
HOUSING
DEPUTY DIR.
HOUSING
CORRIDOR
HOUSING
RECEPTION
LARGE MEETING
ROOM
MEETING
VESTIBULE
HOUSING OFF.
ELEC.
LOBBY
POLICE INT.
AFFAIRS
RECEPTION
OFFICE
241 OFFICE
HR RECEPTION
CORRIDOR
HR OFFICE
HR OFFICE
HR OFFICE
HR FILE
HR/SHARED
CONF
OFFICE
CONTROLLER
OFFICE
CORRIDOR
CLOSET
CORRIDOR
CONFERENCE
ASST. BUS.
ADMIN OFFICE
BUS. ADMIN
OFFICE
CORR.
JANITOR
MEN'S
CORR.
SOLICITOR
CLERK
CORR.
SOLICITOR
OFFICE
CONFERENCE
WOMEN'S
SOLICITOR
OFFICE
KITCHEN
TOILET
MAYOR'S OFFICE
MAYOR'S STAFF
STOR. (N.I.C.)
STAIR NORTH
ST-3
STAIR EAST
ST-1
STAIR SOUTH
ST-2
A-402
A-402
A-405
RR25
RR25
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13
RR13 RR13 RR13 RR13 RR13 RR13
RR13 RR13 RR13 RR13
13 13
13 13
RR13 RR13 RR13 RR13
RR13 RR13
RR25
RR25
E-101
E-101
P-101
P-101
P-101
P-101
P-101
P-101
13.1
13.113.1
E-101
E-101
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
OVERALL
SECOND
FLOOR PLAN
A-101
C
IT
Y O
F Y
O R
K
KEYNOTE LEGEND
TAG DESCRIPTION
07 NEW SSM-2 COUNTERTOP & 4" BACKSPLASH/SIDESPLASH
WHERE APPLICABLE.
08 NEW P-LAM-2 BASE & WALL CABINETS.
09 NEW LAVATORY. REFER TO P-101 FOR FIXTURE DETAILS.
10 EXISTING DOOR AND FRAME TO RECEIVE NEW PAINT PT-2.
12 PAINT EXISTING DOOR PT-2, FRAME TO REMAIN
UNTOUCHED.
13 PAINT EXISTING FRAME PT-2, DOOR TO REMAIN
UNTOUCHED.
13.1 PAINT EXISTING FRAME PT-3, DOOR TO REMAIN
UNTOUCHED.
16 PROVIDE & INSTALL NEW WALL PAPER (LIN-1) TYP. ALL 4
WALLS.
17 INSTALL (2) NEW STAIR TREADS IN ST-1. REFER TO A-601
FOR DETAILS. ADD ALT #3. REPLACE ALL STAIR TREADS IN
STAIRWELL EAST IN LIEU OF (2) STAIR TREADS.
18 DELAMINATE EXISTING WALLPAPER ABOVE CHAIR RAIL. IF
CLEAN FINISH IS UNACHEIVABLE, REMOVE, PREP
SURFACE, AND PAINT PT-4.
RR13 PAINT EXISTING WINDOW FRAME (WHERE APPLICABLE) &
SILL PT-2.
RR25 CLEAN EXISTING FLOOR TILE. ALTERNATE 1: REMOVE
EXISTING FLOOR TILE & 4" TILE BASE AND ALL ASSOCIATED
SETTING MATERIALS DOWN TO SOUND SUBSTRATE.
PREPARE SUBSTRATE PER MANUFACTURER'S
REQUIREMENTS, INCLUDING CLEANING, PATCHING, AND
PROFILING AS REQUIRED TO ACHIEVE PROPER BOND.
MAINTAIN EXISTING FLOOR SLOPES TO DRAINS; DO NOT
ALTER DRAIN LOCATIONS OR ELEVATIONS. PROVIDE AND
INSTALL SLIP-RESISTANT, CHEMICAL-RESISTANT EPOXY
FLOORING SYSTEM WITH INTEGRAL BASE (EP-1),
INCLUDING PRIMER, BASE COAT, AND TOPCOAT, SUITABLE
FOR RESTROOM/WET ENVIRONMENTS. FEATHER AND
TRANSITION SMOOTHLY AT PERIMETERS, DOOR
THRESHOLDS, AND FLOOR PENETRATIONS. VERIFY
COMPATIBILITY WITH EXISTING SUBSTRATE CONDITIONS.
ALL WORK SHALL COMPLY WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS AND APPLICABLE CODES.
1/8" = 1'-0"
SECOND FLOOR
N
0' 4' 8' 16'
M A
R K
D A
T E
D E
S C
R
IP
T
A-112
A-112
RECEPTION
BAFFLE
TRANSACTION
A-112
A-112
5' - 1 1/2"
3' - 6".
3' - 6".
/2
/4
/8
/8
/4
A-112
RD01 RD03
RD02
RD02
RD02
RD05
RD04
RD03
RECEPTION
/2
/2
RD05
RD06
RD04
RD03
RD01
RD06
EXISTING COUNTER
/2
RD03
RD06
RD02
RD01 RD04
RD05
BEYOND
A-112
A-112
5"
/2
/2
/2
/2
/2
RD02
RD06RD01
RD03
EXISTING COUNTER
RD01
RD03
RD02
RD05
RD06
RD01
RD01
EXISTING COUNTER
RD03
RD01
3/4" = 1'-0"
SECTION @ RECEPTION
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
RECEPTION
DESK PLAN &
DETAILS
A-112
C
IT
Y O
F Y
O R
K
1/2" = 1'-0"
RECEPTION 133 ENLARGED PLAN
3/8" = 1'-0"
RECEPTION 133 ELEVATION B
1 1/2" = 1'-0"
TYPICAL TRANSACTION WINDOW ENLARGED PLAN 3/4" = 1'-0"
Section 1
BASIS OF DESIGN - 1 1/4" ACRYLIC LEVEL 1 BALLISTIC GLAZING - NON- RATED ALUMINUM TWO-PIECE U CHANNEL, BAFFLE WINDOW TRANSACTION LINE SYSTEM
KEYNOTE LEGEND
TAG DESCRIPTION
RD01 TSS LEVEL 1 BULLET RESISTANT ACRYLIC OR ACRYLIC/POLYCARBONATE
COMPOSITE - BASIS OF DESIGN.
RD02 TSS 18 GUAGE BRUSHED STAINLESS STEEL DEAL TRAYS SURFACE
MOUNTED - BASIS OF DESIGN.
RD03 TSS EXTRUDED ALUMINUM CHANNEL. SIZED TO MATCH LEVEL 1 ACRYLIC
GLAZING CLEAR ANODIZED ALUMINUM - BASIS OF DESIGN.
RD04 TSS ACRYLIC DOWEL SPACERS - BASIS OF DESIGN.
RD05 TSS SUPPORT BUTTRESS TO SUPPLY RIGID VERTICAL SUPPORT,
COMPOSED OF LEVEL 1 BULLET RESISTANT GLAZING - BASIS OF DESIGN.
RD06 TSS MK-1 VOICE PORT - BASIS OF DESIGN.
3" = 1'-0"
SECTION @ TYPICAL WINDOW BASE
EXISTING RECEPTION COUNTERTOP IMAGES
NOTE:
1. TSS = TOTAL SECURITY SOLUTIONS
2. CONTRACTOR TO FIELD MEASURE AND PROVIDE SHOP DRAWINGS FOR
REVIEW PRIOR TO ORDERING & INSTALLING ACRYLIC GLAZING SYSTEM.
M A
R K
D A
T E
D E
S C
R
IP
T
RR01
RR05
RR16RR08
RR09
RR14
RR04
RR11
RR02
RR03
RR17
RR15
1' - 7"3' - 1"
RR13
RR16
RR01
RR05
RR03
RR02
RR04
RR11
RR07
RR11
RR04
RR08
RR05
RR19
RR18
RR11RR11
RR12
RR04
RR01
RR09
RR08
RR03
RR17
A-4015
4WOMEN'S
MEN'S
A-401
RR06
RR08
RR14
RR07
RR05
RR01
RR15
RR12
RR13
RR16
RR09
RR16
RR01
RR08
RR09
RR09
RR05
RR13
RR25
RR14
RR14
RR15
RR25
RR17RR18
RR18
RR07
RR19
RR12
RR06
RR04
RR05
RR11 RR11
RR12
RR04
RR07
RR01
RR05
RR03
RR02
RR11
RR13
RR04
RR11
RR13
RR07
RR16
RR03
RR02
RR05
RR15
RR08
RR06
RR09
3' - 1"1' - 7"
RR08
RR15
RR01
RR09
RR06
RR04
RR11
RR11
RR04
RR11
RR04
RR11
RR04
RR13
RR05
RR01
RR16
RR07
RR07
RR05
RR01
RR02
RR02
RR03
RR16
RR08
RR06
RR09
RR04
RR11
2' - 6"2' - 0"
RR11
RR11
RR12
RR08
RR09
RR06
RR04
RR08
RR17
RR02
RR07
RR11
RR04
RR14
RR09
RR02
RR03
RR03
RR16
RR20
RR21
+/- 5' - 10"
RR05
RR07
RR16
RR02
RR03
RR13
RR04
RR11
RR20
RR21
RR18
RR09
RR08
RR04
RR11
RR04
RR05
RR07
RR08
RR17
RR09
RR12
RR11
RR11
RR04
RR09
UNFRAMED MIRROR,
SURFACE MOUNTED
NOTE: MIRROR TO BE FLUSH TO
ATTACHED WALL. REMOVE TILE AS
NEEDED FOR A LEVEL SURFACE
INSTALLATION
VARIES
V A
R
IE
S
M A
X
NOTE: MOUNTING HEIGHTS SHOWN ARE TYPICAL. ANY VARIATIONS FOR
SPECIFIC CONDITIONS WILL BE SHOWN ON TOILET ROOM ELEVATIONS.
FINISHED
FLOOR
PEPER TOWEL
DISPENSER
TOILET TISSUE
DISPENSER
SURFACE MOUNTED
7"
M
IN
M A
X
TOILET SEAT
COVER DISPENSER
SANITAIRY NAPKIN
DISPENSER
A C
T D
E V
IC
E
SANITAIRY NAPKIN
DISPOSAL
24" 12"
MAX
12"
40"
GRAB BARS - SIDE WALL
IN ACCESSIBLE RESTROOMS
GRAB BAR - REAR WALL
MEN
WOMEN
A-401
A-401
RR01
RR01
RR16
RR05
RR07
RR06
RR08
RR14
RR09
RR16
RR07
RR05
RR18
RR09
RR09
RR08
RR18
RR17
RR14
RR08
RR12
RR12
RR11
RR11
RR25
RR25
RR20
RR21
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
ENLARGED
RESTROOM
PLANS & ELEV.
A-401
C
IT
Y O
F Y
O R
K
1/4" = 1'-0"
RESTROOM 108 NORTH ELEVATION
1/4" = 1'-0"
RESTROOM 108 EAST ELEVATION
1/4" = 1'-0"
RESTROOM 108 SOUTH ELEVATION
1/4" = 1'-0"
RESTROOM 108 WEST ELEVATION
1/4" = 1'-0"
RESTROOM 108 FLOOR PLAN
1/4" = 1'-0"
RESTROOM 118 NORTH ELEVATION
1/4" = 1'-0"
RESTROOM 118 EAST ELEVATION
1/4" = 1'-0"
RESTROOM 118 SOUTH ELEVATION
1/4" = 1'-0"
RESTROOM 118 WEST ELEVATION
1/4" = 1'-0"
WOMEN 152 & MEN'S 153 ENLARGED PLAN
1/4" = 1'-0"
RESTROOM 153 NORTH ELEVATION
1/4" = 1'-0"
RESTROOM 153 EAST ELEVATION
1/4" = 1'-0"
RESTROOM 153 SOUTH ELEVATION
1/4" = 1'-0"
RESTROOM 153 WEST ELEVATION
1/4" = 1'-0"
RESTROOM 152 NORTH ELEVATION
1/4" = 1'-0"
RESTROOM 152 EAST ELEVATION
1/4" = 1'-0"
RESTROOM 152 SOUTH ELEVATION
1/4" = 1'-0"
RESTROOM 152 WEST ELEVATION
KEYNOTE LEGEND
TAG DESCRIPTION
RR01 PLUMBING CONTRACTOR TO REPLACE EXISTING
WALL MOUNTED SINK & FAUCET, COORDINATE.
REFER TO P-101 FOR DETAILS. PROVIDE & INSTALL
PIPE PROTECTION (BASIS OF DESIGN - IPS LAV
GUARD 2 P-TRAP COVER OR APPROVED EQUAL).
RR02 NEW MIRROR, REFER TO ELEVATIONS FOR
DIMENSIONS. PRODUCT BASIS OF DESIGN -
MANUFACTURER: BRADLEY MODEL: 781-020360 (SIZE
VARIES) CHANNEL FRAME MIRROR OR APPROVED
EQUAL. PROVIDE SPACERS AS NEEDED FOR
INSTALLATION.
RR03 ELECTRICAL CONTRACTOR TO INSTALL NEW VANITY
LIGHT FIXTURE ABOVE MIRROR, COORDINATE. REFER
TO E-101 FOR DETAILS.
RR04 CLEAN EXISTING WALL TILE. TYP.
RR05 PTD. RADIATOR (PT-1).
RR06 REPLACE EXISTING URINAL FIXTURE IN KIND. REFER
TO P-101 FOR DETAILS.
RR07 INSTALL SALVAGED PAPER TOWEL DISPENSER.
RR08 PROVIDE & INSTALL NEW TOILET PARTITIONS.
PRODUCT BASIS OF DESIGN: SOLID PLASTIC (HDPE)
TOILET PARTITIONS - SCRANTON PRODUCTS 'HINY
HIDERS' OR APPROVED EQUAL. VERIFY EXISTING
DIMENSIONS PRIOR TO ORDERING MATERIAL.
RR09 PLUMBING CONTRACTOR TO REPLACE EXISTING
WATER CLOSET FIXTURE IN KIND, COORDINATE.
REFER TO P-101 FOR DETAILS.
RR11 PATCH AND REPAIR GWB SURFACE PRIOR TO
PAINTING PT-1.
RR12 PAINT EXISTING DOOR AND FRAME PT-2.
RR13 PAINT EXISTING WINDOW FRAME (WHERE
APPLICABLE) & SILL PT-2.
KEYNOTE LEGEND
TAG DESCRIPTION
RR14 INSTALL SALVAGED TOILET PAPER DISPENSER.
RR15 INSTALL SALVAGED TOILET SEAT COVER DISPENSER.
RR16 INSTALL SALVAGED SOAP DISPENSER.
RR17 INSTALL SALVAGED SANITARY PRODUCT DISPENSER.
RR18 INSTALL SALVAGED SANITARY NAPKIN DISPENSER.
RR19 INSTALL SALVAGED GRAB BARS.
RR20 SSM-1 COUNTERTOP AND SKIRT. PROVIDE AND
INSTALL PIPE COVERINGS AS NEEDED. (BASIS OF
DESIGN - IPS LAV GUARD 2 P-TRAP COVER OR
APPROVED EQUAL).
RR21 PLUMBING CONTRACTOR TO REPLACE EXISTING
DROP IN SINK & FAUCET, COORDINATE. REFER TO
P-101 FOR DETAILS. PROVIDE & INSTALL PIPE
PROTECTION (BASIS OF DESIGN - IPS LAV GUARD 2
P-TRAP COVER OR APPROVED EQUAL).
RR25 CLEAN EXISTING FLOOR TILE. ALTERNATE 1: REMOVE
EXISTING FLOOR TILE & 4" TILE BASE AND ALL
ASSOCIATED SETTING MATERIALS DOWN TO SOUND
SUBSTRATE. PREPARE SUBSTRATE PER
MANUFACTURER'S REQUIREMENTS, INCLUDING
CLEANING, PATCHING, AND PROFILING AS REQUIRED
TO ACHIEVE PROPER BOND. MAINTAIN EXISTING
FLOOR SLOPES TO DRAINS; DO NOT ALTER DRAIN
LOCATIONS OR ELEVATIONS. PROVIDE AND INSTALL
SLIP-RESISTANT, CHEMICAL-RESISTANT EPOXY
FLOORING SYSTEM WITH INTEGRAL BASE (EP-1),
INCLUDING PRIMER, BASE COAT, AND TOPCOAT,
SUITABLE FOR RESTROOM/WET ENVIRONMENTS.
FEATHER AND TRANSITION SMOOTHLY AT
PERIMETERS, DOOR THRESHOLDS, AND FLOOR
PENETRATIONS. VERIFY COMPATIBILITY WITH
EXISTING SUBSTRATE CONDITIONS. ALL WORK SHALL
COMPLY WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS AND APPLICABLE CODES.
M A
R K
D A
T E
D E
S C
R
IP
T
MEN'S
WOMEN'S
A-402
A-402
RR07
RR05
RR13
RR01
RR03
RR21
RR20
RR07
RR05
RR05
RR13
RR16
RR21
RR17
RR15
RR18
RR22
RR14
RR18
RR14
RR08
RR03
RR03
RR16
RR06
RR14
RR08
RR25
RR25
VEST.
211.1
RR09
RR09
RR09
MEN'S
WOMEN'S
A-40211
A-402
RR21
RR21
RR20
RR15
RR18
RR14
RR08
RR14
RR08
RR09
RR18
RR23
RR24
RR03
RR02
RR07
RR16
RR07
RR20
RR07
RR21
RR07
RR06
RR14
RR23
RR08
RR15
RR25
RR25
CL.
260.1
RR09
RR09
RR03
RR02
RR11
RR04
RR11
RR04
RR05
RR01
RR16
RR03
RR07
RR13
RR02
RR05
RR07
RR02
RR03
RR01
RR08
RR06
RR04
RR11
RR16
RR02
RR03
RR09
2' - 6"2' - 0"
RR11
RR04
RR12
RR06
RR08
RR02
RR03
RR01
RR09
RR11
RR04
RR05
RR22 RR08
RR02
RR03
RR17
RR04
RR11RR11
RR09 RR09
RR04
RR11
RR07
RR02
RR17
RR15
RR08
RR14
RR03
RR16
RR20
RR21
RR09
+/- 5' - 10"
RR13
RR07
RR03
RR16
RR05
RR04
RR11
RR04
RR11
RR13
RR03
RR07
RR02
RR06
RR05
RR20
RR21
RR11
RR08
RR06
RR11
RR04
RR04
RR05
RR09
RR08
RR15
RR23
RR14
RR03
RR02
RR07
RR11
RR11
RR11
RR04
RR04
RR04RR09
4' - 0"
RR11
RR04
RR03
RR02
RR07
RR20
RR21
RR21
RR16
RR07
RR02
RR04
RR11
+/- 10' - 8"
RR22
RR24
RR04
RR07
A-402
RR21
RR20
1' - 9" 2' - 3" 1' - 9"
1 1/2" FILLER
5' - 10 1/2"
RR03
RR02
4' - 0"PT-1
RR26RR27
RR24
RR05
RR18
RR08
RR11
RR04
RR13
A-402
RR09
RR16
RR08
RR09
RR05
RR11
RR03
RR04
RR09
RR21
RR20
A-402
RR02
RR27 3
RR02
RR03
RR22
RR20
RR21
RR21
RR11 RR11
RR11
RR04
RR07
RR16
RR07
+/- 5' - 11 1/2"
1/2" TH. SOLID SURFACE COUNTER
SSM-1 TOP W/EASED EDGE OVER
3/4" TH. PLYWOOD W/ 4 1/2" SOLID
SURFACE BACKSPLASH,
SIDESPLASH (WHERE APPLICABLE),
& APRON
L 1-1/2" X 1-1/2"X1/4"
CONTINUOUS ANGLE
UNDER MOUNT SINK
PIPE COVERING. BASIS OF
DESIGN - IPS LAV GUARD 2 P-
TRAP COVER OR APPROVED
EQUAL
CONT. CLEAT
PLAM-1 SUPPORT FIN. ON
3/4" TH. PLYWOOD
1' - 11"
REFER TO
ELEVATION FOR
WALL FINISH
PLAM-1 DOOR
SS PULL TYP.
BLOCKING WITH P-LAM-1
COVER
4" TALL 3/4" THICK SSM-1
BACKSPLASH &
SIDESPLASH
P-LAM-1 DRAWER
SOLID SURFACE
COUNTERTOP (SSM-1)
1/2"
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
ENLARGED
RESTROOM
PLANS & ELEV.
A-402
C
IT
Y O
F Y
O R
K
1/4" = 1'-0"
WOMEN'S 211 & MEN'S 214 ENLARGED PLAN
1/4" = 1'-0"
MEN'S 260 & WOMEN'S 263
1/4" = 1'-0"
MEN'S 214 ELEVATION A
1/4" = 1'-0"
MEN'S 214 ELEVATION B
1/4" = 1'-0"
MEN'S 214 ELEVATION C
1/4" = 1'-0"
MEN'S 214 ELEVATION D
1/4" = 1'-0"
WOMEN'S 211 ELEVATION C
1/4" = 1'-0"
WOMEN'S 211 ELEVATION D
1/4" = 1'-0"
WOMEN'S 211 ELEVATION A
1/4" = 1'-0"
WOMEN'S 211 ELEVATION B
1/4" = 1'-0"
MEN'S 260 ELEVATION D
1/4" = 1'-0"
MEN'S 260 ELEVATION A
1/4" = 1'-0"
MEN'S 260 ELEVATION B
1/4" = 1'-0"
MEN'S 260 ELEVATION C
1/4" = 1'-0"
WOMEN'S 263 ELEVATION D
1/4" = 1'-0"
WOMEN'S 263 ELEVATION C
1/4" = 1'-0"
WOMEN'S 263 ELEVATION A
1/4" = 1'-0"
WOMEN'S 263 ELEVATION B
KEYNOTE LEGEND
TAG DESCRIPTION
10 EXISTING DOOR AND FRAME TO RECEIVE NEW PAINT PT-2.
RR01 PLUMBING CONTRACTOR TO REPLACE EXISTING WALL MOUNTED
SINK & FAUCET, COORDINATE. REFER TO P-101 FOR DETAILS.
PROVIDE & INSTALL PIPE PROTECTION (BASIS OF DESIGN - IPS LAV
GUARD 2 P-TRAP COVER OR APPROVED EQUAL).
RR02 NEW MIRROR, REFER TO ELEVATIONS FOR DIMENSIONS. PRODUCT
BASIS OF DESIGN - MANUFACTURER: BRADLEY MODEL: 781-020360
(SIZE VARIES) CHANNEL FRAME MIRROR OR APPROVED EQUAL.
PROVIDE SPACERS AS NEEDED FOR INSTALLATION.
RR03 ELECTRICAL CONTRACTOR TO INSTALL NEW VANITY LIGHT FIXTURE
ABOVE MIRROR, COORDINATE. REFER TO E-101 FOR DETAILS.
RR04 CLEAN EXISTING WALL TILE. TYP.
RR05 PTD. RADIATOR (PT-1).
RR06 REPLACE EXISTING URINAL FIXTURE IN KIND. REFER TO P-101 FOR
DETAILS.
RR07 INSTALL SALVAGED PAPER TOWEL DISPENSER.
RR08 PROVIDE & INSTALL NEW TOILET PARTITIONS. PRODUCT BASIS OF
DESIGN: SOLID PLASTIC (HDPE) TOILET PARTITIONS - SCRANTON
PRODUCTS 'HINY HIDERS' OR APPROVED EQUAL. VERIFY EXISTING
DIMENSIONS PRIOR TO ORDERING MATERIAL.
RR09 PLUMBING CONTRACTOR TO REPLACE EXISTING WATER CLOSET
FIXTURE IN KIND, COORDINATE. REFER TO P-101 FOR DETAILS.
RR11 PATCH AND REPAIR GWB SURFACE PRIOR TO PAINTING PT-1.
RR12 PAINT EXISTING DOOR AND FRAME PT-2.
RR13 PAINT EXISTING WINDOW FRAME (WHERE APPLICABLE) & SILL PT-2.
RR14 INSTALL SALVAGED TOILET PAPER DISPENSER.
KEYNOTE LEGEND
TAG DESCRIPTION
RR15 INSTALL SALVAGED TOILET SEAT COVER DISPENSER.
RR16 INSTALL SALVAGED SOAP DISPENSER.
RR17 INSTALL SALVAGED SANITARY PRODUCT DISPENSER.
RR18 INSTALL SALVAGED SANITARY NAPKIN DISPENSER.
RR20 SSM-1 COUNTERTOP AND SKIRT. PROVIDE AND INSTALL PIPE
COVERINGS AS NEEDED. (BASIS OF DESIGN - IPS LAV GUARD 2
P-TRAP COVER OR APPROVED EQUAL).
RR21 PLUMBING CONTRACTOR TO REPLACE EXISTING DROP IN SINK &
FAUCET, COORDINATE. REFER TO P-101 FOR DETAILS. PROVIDE &
INSTALL PIPE PROTECTION (BASIS OF DESIGN - IPS LAV GUARD 2
P-TRAP COVER OR APPROVED EQUAL).
RR22 INSTALL SALVAGED MIRROR IN EXISTING LOCATION.
RR23 INSTALL SALVAGED GRAB BARS.
RR24 NEW SSM-1 COUNTERTOP & 4" BACKSPLASH/SIDESPLASH WHERE
APPLICABLE. PLAM-2 BASE CABINETS BELOW.
RR25 CLEAN EXISTING FLOOR TILE. ALTERNATE 1: REMOVE EXISTING
FLOOR TILE & 4" TILE BASE AND ALL ASSOCIATED SETTING
MATERIALS DOWN TO SOUND SUBSTRATE. PREPARE SUBSTRATE
PER MANUFACTURER'S REQUIREMENTS, INCLUDING CLEANING,
PATCHING, AND PROFILING AS REQUIRED TO ACHIEVE PROPER
BOND. MAINTAIN EXISTING FLOOR SLOPES TO DRAINS; DO NOT
ALTER DRAIN LOCATIONS OR ELEVATIONS. PROVIDE AND INSTALL
SLIP-RESISTANT, CHEMICAL-RESISTANT EPOXY FLOORING SYSTEM
WITH INTEGRAL BASE (EP-1), INCLUDING PRIMER, BASE COAT, AND
TOPCOAT, SUITABLE FOR RESTROOM/WET ENVIRONMENTS.
FEATHER AND TRANSITION SMOOTHLY AT PERIMETERS, DOOR
THRESHOLDS, AND FLOOR PENETRATIONS. VERIFY COMPATIBILITY
WITH EXISTING SUBSTRATE CONDITIONS. ALL WORK SHALL COMPLY
WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE
CODES.
RR26 PROVIDE & INSTALL P-LAM-1 CABINETS.
RR27 PROVIDE & INSTALL P-LAM-1 SIDE PANEL.
3/4" = 1'-0"
TYP. SECTION @ RESTROOM SINK CASEWORK
3/4" = 1'-0"
RESTROOM 263 CASEWORK
M A
R K
D A
T E
D E
S C
R
IP
T
RELOCATED
MAILBOX
PT-1
PT-3
PT-3 PT-3
PT-3
PT-1
PT-3PT-3
C H
A
IR
R A
IL
P T
-3 B
E L
O W
PT-2
PT-1PT-1
PT-1
PT-3
PT-3PT-3
PT-3
PT-3
PT-3PT-3 PT-3
C H
A
IR
R A
IL
P T
-3 B
E L
O W
EXIST. TV
PT-1
PT-3
C H
A
IR
R A
IL
P T
-3 B
E L
O W
PT-1
A-4056
A-405
A-405
2' - 8"
REF.
N.I.C.
3' - 0" 3' - 0" 3' - 0" 1 1/2"
A-405
A-405
VB-1
RR11
RR11
S E
E S
C H
E D
U L E
SEE SCHEDULE
FW
FINISH FLOOR
F1
2"
SCHED.
SEE 2"
S E
E S
C H
E D
U L E
G
MATCH EXIST.
3' - 4"
M A
T C
H E
X
IS
T
2' - 0"
P-LAM-2 REMOVABLE PANEL
SSM-2 COUNTERTOP & APRON
SCHEDULED BASE BEYOND
P-LAM-2 CABINET BEYOND
ELKAY ECTSRS33229TFGB OR
APPROVED EQUAL. ELKAY LKD232SBH5C
FAUCET OR APPROVED EQUAL4
PLAM SCRIBE
1' - 1 1/2"
SS PULL
ADJUSTABLE SHELF
PLAM-1 DOORS
SOFT CLOSE CONCEALED
HINGES
A-405
TREASURER
STAFF
CORRIDOR
10612
A-405
CORRIDOR
PERMITS
/2
EDGE OF WALL BEYOND
2 1/2" METAL STUD
5/8" GWB - PNT TO MATCH ADJACENT
WALL FINSIH
EXIST. 2 1/2" METAL STUD
EXIST. 5/8" GWB
EXIST. BASE TO REMAIN
2 1/2" METAL STUD TOP TRACK
/2
PERMITS
CORRIDOR
/2
/2
2 1/2" METAL STUD
5/8" GWB - PNT TO MATCH
ADJACENT WALL FINSIH
EXIST. BASE TO REMAIN
3 5/8" METAL STUD TOP TRACK
NEW BASE, SEE SCHEDULE
TREASURER
STAFF
CORRIDOR
PLAM COUNTER ON EXIST. WALL
BRACKERTS TO REMAIN
PLAM-2 DOOR
SS PULL
SS PULL TYP.
BLOCKING W/ VB AS
SCHEDULED
ADJUSTABLE SHELF
PLAM-1 DOORS
4" TALL 3/4" THICK SSM-2
BACKSPLASH
SOFT CLOSE CONCEALED
HINGES
P-LAM-2 DRAWER
SOLID SURFACE
COUNTERTOP (SSM-2)
S E
E E
L E
V A
T
IO
N S
E E
E L E
V A
T
IO
N
2' - 0" MAX
PLAM SCRIBE
1/4" = 1'-0"
LOBBY 123 WEST ELEVATION
1/4" = 1'-0"
LOBBY 123 NORTH ELEVATION
1/4" = 1'-0"
LOBBY 123 EAST ELEVATION
1/4" = 1'-0"
LOBBY 123 SOUTH ELEVATION
1/4" = 1'-0"
RM. 267 - KITCHEN
1/4" = 1'-0"
KITCHEN 267 CASEWORK ELEVATION
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
INT. DETAILS,
ELEVATIONS &
DOORS
A-405
C
IT
Y O
F Y
O R
K
1/4" = 1'-0"
DOOR PANEL TYPES
DOOR SCHEDULE
MARK
DIMENSIONS DOOR FRAME CONSTRUCTION DETAILS
HARDWARE SET COMMENTSWIDTH HEIGHT THICKNESS TYPE MATERIAL TYPE MATERIAL Finish HEAD JAMB SILL
101 3' - 0" 7' - 0" 1 3/4" FW WOOD EXIST EXIST PT-2 EXIST EXIST EXIST RE-USE EXISTING
109 3' - 0" 7' - 0" 1 3/4" FW WOOD EXIST EXIST PT-2 EXIST EXIST EXIST RE-USE EXISTING
113 3' - 0" 7' - 0" 1 3/4" FW WOOD EXIST EXIST PT-2 EXIST EXIST EXIST RE-USE EXISTING
125 6' - 8" 8' - 8" 1 3/4" G WOOD EXIST EXIST PT-2 EXIST EXIST EXIST RE-USE EXISTING DOOR TO BE PAINTED WHITE TO MATCH
EXISTING
1/2" = 1'-0"
SECTION @ ADA SKIRT & SINK
3/4" = 1'-0"
COUNTER INFILL A
3/4" = 1'-0"
COUNTER INFILL B
3/4" = 1'-0"
SECTION @ PERMITS WINDOW INFILL
3/4" = 1'-0"
TREASURER STAFF WINDOW INFILL
1/2" = 1'-0"
SECTION @ TYPICAL CASEWORK
KEYNOTE LEGEND
TAG DESCRIPTION
07 NEW SSM-2 COUNTERTOP & 4" BACKSPLASH/SIDESPLASH
WHERE APPLICABLE.
08 NEW P-LAM-2 BASE & WALL CABINETS.
09 NEW LAVATORY. REFER TO P-101 FOR FIXTURE DETAILS.
19 PROVIDE VIDEO DOOR INTERCOM SYSTEM AT ENTRY;
COORDINATE ROUGH-IN, POWER, AND BACKBOXES W/ DESIGN
BUILD ELECTRICAL CONTRACTOR & CLIENTS SECURITY
PROVIDER. BASIS OF DESIGN: AIPHONE SYSTEM.
20 ACOUSTIC FELT WALL PANEL SYSTEM TB-1. REFER TO A-600
FOR DETAILS.
RR11 PATCH AND REPAIR GWB SURFACE PRIOR TO PAINTING PT-1.
WOOD DOORS 081416
AVAILABLE MANUFACTURER'S
A. ALGOMA HARDWOODS INC.
B. EGGERS INDUSTRIES; ARCHITECTURAL DOOR DIVISION
C. GRAHAM MANUFACTURING CORP.
D. MOHAWK, INC.
SOLID-CORE DOORS
INTERIOR VENEER-FACED DOORS:
1. CONSTRUCTION: FIVE OR SEVEN PILES WITH STILES AND RAILS BONDED TO
CORE, THEN ENTIRE UNIT ABRASIVE PLANED BEFORE VENEERING.
FACTORY FINISHING
A. GENERAL: COMPLY WITH AWI'S "ARCHITECTURAL WOODWORK QUALITY
STANDARDS ILLUSTRATED FOR FACTORY FINISHING.
B. FINISH DOORS AT FACTORY
C. TRANSPARENT FINISH
1. GRADE: PREMIUM
2. FINISH: STAIN AND CONVERSIONS VARNISH FINISH AS SELECTED
BY ARCHITECT FROM MANUFACTURER'S STANDARDS TO MATCH
EXISTING DOOR FINISHES IN BUILDING (WALNUT STAINED FINISH).
3. EFFECT: OPEN-GRAIN FINISH
4. SHEEN: SATIN
TEMPERED GLASS
PROVIDE
WEATHERSTRIPPING TO
MAKE WEATHER TIGHT
TYP.
PAINTING (EXTERIOR AND INTERIOR) 09 91 00
EXTERIOR PRIMERS:
EXTERIOR WOOD DOORS
1. SHERWIN-WILLIAMS EXTERIOR LATEX WOOD PRIMER B42W8041: APPLIED
AT A FILM THICKNESS OF NOT LESS THAN 3.0 MILS., BASIS OF DESIGN
2. FINISH: MATCH EXISTING EXTERIOR DOOR COLOR
EXTERIOR FINISH COATS
A. EXTERIOR WOOD DOORS: FACTORY FORMULATED SATIN WATERBORNE
LATEX FOR EXTERIOR APPLICATION
1. SHERWIN-WILLIAMS: EXTERIOR SUPER PAINT A89 SERIES: APPLIED AT A
DRY FILM THICKNESS OF NOT LESS THAN 2.5-4.0 MILS., BASIS OF DESIGN..
MOCKUP:
PROVIDE MOCKUP OF EXTERIOR DOOR PAINT & INTERIOR STAIN (WALNUT STAINE
FINISH) TO BE REVIEWED BY OWNER & ARCHITECT.
M A
R K
D A
T E
D E
S C
R
IP
T
130 131 132
140 139 138 137 136
147 148 149
VS
ST-2
134A
ST-3
NV
121 122116
127120
ST-1
1 1 1 1 1 1
1 1
1 1 1 1
ROOM FLOOR FINISH LEGEND
CLEAN EXIST. TILE
CPT-1
CPT-3
ETR
CPT-3
16' - 0"
ELEV.
EV
WOM-1
WOM-1
ST-1
SSM-1
1 1 1
EXISTING
DOOR
NEW DOOR
(SEE
SCHEDULE)
1 WINDOW TREATMENT 1
WINDOW TREATMENT 2
(MAYORS SUITE)2
NOTE: TAGGED DOORS TO BE
NEW DOORS
WINDOW TAGS
TAG MANUFACTURER STYLE/TYPEFINISH SIZE
FINISH TYPE SCHEDULE
CPT-1 BENTLEYCARPET 24"X24"
CPT-3 BENTLEYCARPET
SSM-1
PLAM-1
VB-1
PT-1
EP-1
PLASTIC LAMINATE WILSONART N/A
SOLID SURFACE WILSONART KIMBERLITE 9215CE N/A
VINYL COVE BASE TARKETT COLOR: 264 GROUNDED 4"
COMMENTS
EPOXY SIKA DECOFLAKE COLOR: PUMICITE N/A ALTERNATE #1 - REPLACE TILE FLOORS IN RR
PAINT PPG CREAM PUFF N/A
STYLE: WANDERLUST 4WNT5 - FIREFLY
400338 - MODULAR TILE
CARBON BEACH - COLOR ROCKY CLIFF
400822 - MODULAR 4CX26022OT
TITANIUM ALLOY 5058K-18
TYPICAL WALL & CEILING PAINT - SPEC PAGE 171
PT-2 PAINT PPG DESERT DUNE N/A DOOR FRAMES, WINDOW SILL, PTD. WD DOORS
PT-3 PAINT PPG MOSSY GOLD N/A ACCENT COLOR - LOBBIES
FIBER: ANTRON LEGACY NYLON - BACKING: AFIRMA HARDBACK -
INSTALLATION METHOD: MONOLITHIC
FIBER: SOLUTION DIED 6, 6 NYLON - BACKING: NEXSTEP CUSHION BACK
LIN-1 WALL PAPER VINYL WALLCOVERING TOWER - GO GILDED - GOLDEN ESSENCE
T2-GD-07
N/A
SSM-2 SOLID SURFACE WILSONART SEA STONE 9202CS N/A
WOM-1 WALK-OFF MATT J+J STYLE: INCOGNITO 7069 COLOR: 1837
OPERATIVE MODULAR TILE
N/A
TYPICAL VINYL COVE BASE
MAYOR'S KITCHEN
COUNTERTOP IN RESTROOMS
RESTROOM P-LAM
WT-1 WINDOW TREATMENT MECHO SOLOR SHADE
OR EQUAL
EUROTWILL 6000 SERIES 3% COLOR
STONE 6018
N/A
WT-2 WINDOW TREATMENT N/A ADD INSIDE MOUNT SEMI TRANSPARENT SHEER DRAPERY PANELS.
CONTRACTOR TO PROVIDE DRAPERY MATERIAL OPTIONS FOR
SELECTION BY OWNER. QUAKER BRONZE METAL FASCIA VALENCE
W2 - WINDOW SOFT TREATMENT. TRAVERSING PLEATED DRAPERY
PANELS, FABRIC DISTRIBUTOR: SHEER CAROLE FABRICS, COLOR:
"HIGH WINDS DOVE" - # D/-6-15, 55" WIDE, PLEAT STYLE: EURO DOBULE
PINCH PLEAT, ONE PAIR IN EACH WINDOW, BOTTOM HEM, MOUNTING
HARDWARE: KIRSCH DESIGNER METALS COLLECTION, FINISH: BRONZE
TYPICAL EXTERIOR WINDOW, QUAKER BRONZE METAL FASCIA VALENCE
EPT-1 EXTERIOR DOOR PAINT PPG WHITE N/A REFER TO SPECIFICATIONS (DOOR 125) MACH EXISTING -
CONTRACTOR TO PROVIDE DRAWDOWN FOR APPROVAL.
ST-1 STAIR TREAD TARKETT COLOR: VJ6 DOUGLASS FIR - MULTI
COLOR WITH 49 BEIGE VISUAL
IMPAIRED STRIP
N/A (2) STAIR TREADS IN STAIR ST-1 TYP. ANGLE FIT RUBBER STAIR TREADS
COLOR VJ6 DOUGLASS FIR - MULTI COLOR. PROFILE AND PATTERN:
HAMMERED WITH BEIGE VISUAL IMPAIRED STRIP. ADD ALT #3, REPLACE
ALL STAIR TREADS IN STAIRWELL EAST IN LIEU OF (2) STAIR TREADS.
TP-1 TOILET PARTITION FINISH SCRANTON PRODUCTS -
HINY HIDER
COLOR: CONCRETE - FINISH ORANGE
PEEL
N/A 1ST & 2ND FLOOR GANG RESTROOMS
DS-1 INTERIOR DOOR STAIN MATCH EXISTING BLEND TO MATCH EXISTING N/A CONTRACTOR TO PROVIDE MOCKUP FOR APPROVAL
PLAM-2 PLASTIC LAMINATE WILSONART N/AHAMPTON WALNUT 7959 MAYOR'S KITCHEN
MAYOR'S SUITE RESTROOM
BACKING: NEXUS INSTALLATION QTR TURNED BRICK - FIBER 29 OZ
CPT-2
PT-4 PAINT PPG DISTANT VALLEY PPG11-19 N/A ACCENT COLOR CONFERENCE 257 AND MAYOR'S SUITE LOBBY
PT-5 PAINT PPG LOOK AT ME N/A CORRIDOR 117 PAINT TOUCH UP
18"X36"
J+JCARPET 12'STYLE: 9144 BROADLOOM - COLOR: 920
OYSTER - TYPE: TIP SHEARED LOOP
FIBER: NYLON 6, 6, 32 OZ - BACKING: PREMIER BACK PLUS - STYLE:
TUSSAH
MECHO SOLOR SHADE
OR EQUAL
EUROTWILL 6000 SERIES 3% COLOR
STONE 6018 -
TB-1 TACKBOARD ARMSTRONG FELTWORKS COLOR: BEIGE N/A 1ST FLOOR LOBBY
FIRST FLOOR FINISHES SCOPE OF WORK
ROOM
NUMB
ER ROOM NAME
FLOOR BASE WALLS CEILINGS
REMARKSACTION ACTION
NORTH EAST SOUTH WEST
MATERIAL ACTION MATERIAL ACTION MATERIAL ACTION MATERIAL ACTION ACTION
101 PMI ETR ETR GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR CABLE MANAGEMENT @ WALL
102 PP&Z CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
103 HEALTH CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
104 ZONING CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
105 PERMITS ETR ETR GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR INFILL GWB PTD TO MATCH
ADJACENT
106 CORRIDOR ETR ETR GWB ETR GWB ETR GWB ETR GWB ETR ETR
107 PLAN REVIEW CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
108 WOMEN'S CLEAN EXIST. TILE CLEAN TILE BASE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB - NEW PAINT PT-1 FLOOR ALTERNATE #1 EPOXY
FLOOR AND BASE
109 TREASURER
STAFF
CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
111 TOILET ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
112 CORRIDOR ETR ETR GWB ETR GWB ETR GWB ETR GWB ETR ETR PAINT TOUCH UP - SEE PLAN
113 REVENUE ETR ETR GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
114 SECURE FILES ETR ETR GWB ETR GWB ETR GWB ETR GWB ETR ETR
115 FINANCE ETR ETR GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
116 DEPUTY BA
FINANCE
CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
117 CORRIDOR ETR ETR GWB PAINT TU (MATCH EXIST) GWB PAINT TU (MATCH EXIST) GWB PAINT TU (MATCH EXIST) GWB ETR ETR PAINT TOUCH UP - SEE PLAN
118 MEN'S CLEAN EXIST. TILE CLEAN TILE BASE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB/TILE PT-1 ABOVE TILE GWB - NEW PAINT PT-1 FLOOR ALTERNATE #1 EPOXY
FLOOR AND BASE
120 COUNCIL
CHAMBERS
ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
121 CAUCUS ROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
122 A/V STOR. ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
123 LOBBY ETR ETR EXIST.
GWB
PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
EXIST.
GWB
PT-1 EXIST.
GWB
PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
EXIST.
GWB
PT-1 ABOVE CHAIR RAIL
- PT-3 TRIM & BELOW
CHAIR RAIL
EXIST GWB - PT-1 FLOOR SIGN MANAGEMENT - MOVE
TO WALLS
124 EAST VESTIBULE ETR ETR GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW CHAIR
RAIL
GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
GWB PT-1 ABOVE CHAIR RAIL
- PT-3 TRIM & BELOW
CHAIR RAIL
ETR
125 WEST VESTIBULE ETR ETR GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW CHAIR
RAIL
GWB PT-1 ABOVE CHAIR RAIL -
PT-3 TRIM & BELOW
CHAIR RAIL
GWB PT-1 ABOVE CHAIR RAIL
- PT-3 TRIM & BELOW
CHAIR RAIL
ETR
127 WAITING AREA CPT-3 & EXIST VCT ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
128 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
129 CONFERENCE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
130 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
131 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
132 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
133 RECEPTION ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
134 STORAGE CPT-3 VB-1 ETR ETR ETR ETR ETR ETR ETR ETR ETR
134A STORAGE CPT-3 VB-1 ETR ETR ETR ETR ETR ETR ETR ETR ETR
136 VESTIBULE S ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
137 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
138 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
139 OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
140 STORAGE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR
141 MEP ETR ETR GWB ETR GWB ETR GWB ETR GWB ETR ETR
142 STORAGE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
143 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
144 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
145 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
146 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
147 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
148 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
149 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
150 OPEN OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
151 OFFICE CPT-1 VB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ETR
152 WOMEN CLEAN EXIST. TILE CLEAN TILE BASE TILE/WP REMOVE WALL PAPER,
NEW PAINT
TILE/WP REMOVE WALL PAPER,
NEW PAINT
TILE/WP REMOVE WALL PAPER,
NEW PAINT
TILE/WP REMOVE WALL PAPER,
NEW PAINT
GWB - NEW PAINT PT-1 FLOOR ALTERNATE #1 EPOXY
FLOOR AND BASE
153 MEN CLEAN EXIST. TILE CLEAN TILE BASE TILE/WP REMOVE WALL PAPER,
NEW PAINT PT-1
TILE/WP REMOVE WALL PAPER,
NEW PAINT PT-1
TILE/WP REMOVE WALL PAPER,
NEW PAINT PT-1
TILE/WP REMOVE WALL PAPER,
NEW PAINT PT-1
GWB - NEW PAINT PT-1 FLOOR ALTERNATE #1 EPOXY
FLOOR AND BASE
154 CORR. CPT-1 VB-1 GWB PT-1 GWB/TILE PT-1 GWB PT-1 GWB PT-1 ETR
PROJECT NO:
DRAWN BY:
CHECKED BY:
SHEET
S
G E
O R
G E
S T
Y
O R
K P
A
C
IT
Y H
A L
L F
IN
IS
H R
E N
O V
A T
IO
N
26103
ND
PC
1ST FLOOR
FINISH SCOPE
A-600
C
IT
Y O
F Y
O R
K
1/16" = 1'-0"
FIRST FLOOR FINISH PLAN
GENERAL NOTES:
1. WHERE EXISTING WALL COVERINGS ARE INDICATED TO BE REMOVED, COMPLETELY REMOVE
WALLPAPER AND ALL ASSOCIATED ADHESIVES. PREPARE SUBSTRATES BY PATCHING, SKIMMING, AND
REPAIRING ANY SURFACE IMPERFECTIONS TO ACHIEVE A SMOOTH, UNIFORM FINISH. ENSURE SURFACES
ARE PROPERLY CLEANED AND PRIMED AS REQUIRED TO RECEIVE NEW PAINT OR WALL COVERING IN
ACCORDANCE WITH PROJECT DOCUMENTS.
2. NORTH, EAST, SOUTH, AND WEST REFERENCES IN THE WALL FINISH SCHEDULE ARE BASED ON PLAN
ORIENTATION AND DO NOT CORRESPOND TO TRUE NORTH.
3. CONTRACTOR TO PROVIDE PAINT DRAWDOWNS FOR APPROVAL WITH PRODUCT SUBMITTALS.
FINISH KEY
WP = WALL PAPER
DL = DELAMINATED
ETR = EXISTING TO REMAIN
CPT = CARPET
GWB = GYPSUM WALL BOARD
TU = TOUCH UP
MISC. FINISHES SCOPE OF WORK
ROOM
NUMBER ROOM NAME
FLOOR BASE WALLS CEILING
REMARKSACTION ACTION
NORTH EAST SOUTH WEST
ACTIONACTION ACTION ACTION ACTION
ST-1 STAIR EAST NEW TREADS ETR ETR ETR ETR ETR ETR REPLACE ALL STAIR TREADS
ST-2 STAIR SOUTH ETR ETR ETR ETR ETR ETR ETR
ST-3 STAIR NORTH ETR ETR ETR ETR ETR ETR ETR
N
SEE GEN. NOTE 2 FOR FINISH SCHEDULE PLAN ORIETNATION
M A
R K
D A
T E
D E
S C
R
IP
T
203 204
230227224223222
245 246 247
ST-3
ST-1
ST-2
111111111111
22221 1 1 1
1111111
ROOM FLOOR FINISH LEGEND
CLEAN EXIST. TILE
CPT-1
CPT-2
ETR
SSM-1
SSM-1
SSM-2
ST-1
211.1
260.1
PLAN EAST WALL:
PT-4 ABOVE CHAIR RAIL
PT-3 BELOW CHAIR RAIL
EXISTING
DOOR
EXISTING
DOOR
PAINTED
1 WINDOW TREATMENT 1 (WT-1)
WINDOW TREATMENT 2
(MAYORS SUITE) (WT-2)2
NOTE: TAGGED DOORS TO BE
NEW DOORS
WINDOW TAGS
TAG MANUFACTURER STYLE/TYPEFINISH SIZE
FINISH TYPE SCHEDULE
CPT-1 BENTLEYCARPET 24"X24"
CPT-3 BENTLEYCARPET
SSM-1
PLAM-1
VB-1
PT-1
EP-1
PLASTIC LAMINATE WILSONART N/A
SOLID SURFACE WILSONART KIMBERLITE 9215CE N/A
VINYL COVE BASE TARKETT COLOR: 264 GROUNDED 4"
COMMENTS
EPOXY SIKA DECOFLAKE COLOR: PUMICITE N/A ALTERNATE #1 - REPLACE TILE FLOORS IN RR
PAINT PPG CREAM PUFF N/A
STYLE: WANDERLUST 4WNT5 - FIREFLY
400338 - MODULAR TILE
CARBON BEACH - COLOR ROCKY CLIFF
400822 - MODULAR 4CX26022OT
TITANIUM ALLOY 5058K-18
TYPICAL WALL & CEILING PAINT - SPEC PAGE 171
PT-2 PAINT PPG DESERT DUNE N/A DOOR FRAMES, WINDOW SILL, PTD. WD DOORS
PT-3 PAINT PPG MOSSY GOLD N/A ACCENT COLOR - LOBBIES
FIBER: ANTRON LEGACY NYLON - BACKING: AFIRMA HARDBACK -
INSTALLATION METHOD: MONOLITHIC
FIBER: SOLUTION DIED 6, 6 NYLON - BACKING: NEXSTEP CUSHION BACK
LIN-1 WALL PAPER VINYL WALLCOVERING TOWER - GO GILDED - GOLDEN ESSENCE
T2-GD-07
N/A
SSM-2 SOLID SURFACE WILSONART SEA STONE 9202CS N/A
WOM-1 WALK-OFF MATT J+J STYLE: INCOGNITO 7069 COLOR: 1837
OPERATIVE MODULAR TILE
N/A
TYPICAL VINYL COVE BASE
MAYOR'S KITCHEN
COUNTERTOP IN RESTROOMS
RESTROOM P-LAM
WT-1 WINDOW TREATMENT MECHO SOLOR SHADE
OR EQUAL
EUROTWILL 6000 SERIES 3% COLOR
STONE 6018
N/A
WT-2 WINDOW TREATMENT N/A ADD INSIDE MOUNT SEMI TRANSPARENT SHEER DRAPERY PANELS.
CONTRACTOR TO PROVIDE DRAPERY MATERIAL OPTIONS FOR
SELECTION BY OWNER. QUAKER BRONZE METAL FASCIA VALENCE
W2 - WINDOW SOFT TREATMENT. TRAVERSING PLEATED DRAPERY
PANELS, FABRIC DISTRIBUTOR: SHEER CAROLE FABRICS, COLOR:
"HIGH WINDS DOVE" - # D/-6-15, 55" WIDE, PLEAT STYLE: EURO DOBULE
PINCH PLEAT, ONE PAIR IN EACH WINDOW, BOTTOM HEM, MOUNTING
HARDWARE: KIRSCH DESIGNER METALS COLLECTION, FINISH: BRONZE
TYPICAL EXTERIOR WINDOW, QUAKER BRONZE METAL FASCIA VALENCE
EPT-1 EXTERIOR DOOR PAINT PPG WHITE N/A REFER TO SPECIFICATIONS (DOOR 125) MACH EXISTING -
CONTRACTOR TO PROVIDE DRAWDOWN FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .