2-202-22054 Deseret Peaks Restroom Building Bid Package 2 Alt 2 Construction Documents 27Apr2026.pdf
PDF 36 MB Posted
- Attached to
- The Peak Complex - Phase IV Construction
- Solicitation number
- DF26-21
- Issued by
- Tooele County, Utah
About this file
This file contains construction documents for Bid Package 2, Alternate Bid #2 of the Deseret Peaks Sports and Entertainment Complex Restroom Building, a public facility project located at 2930 UT-112, Grantsville, Utah 84029. The project is being developed by Tooele County as Phase IV of the Peak Complex expansion. The construction documents include comprehensive architectural, structural, mechanical, plumbing, and electrical designs for an approximately 1,185 square-foot single-story restroom building containing eight individual restroom units, storage, and mechanical/lighting control spaces. The building will be constructed with 8-inch concrete masonry unit (CMU) walls, a standing seam metal roof with a 4/12 pitch, cast-in-place concrete slab-on-grade foundation, and pre-engineered roof trusses with R-30 insulation. The building incorporates full accessibility compliance per ADA and ANSI 117.1 standards, including accessible water closets, lavatories, grab bars, and appropriate clearances throughout. All work shall comply with the 2021 International Building Code, 2021 International Plumbing Code, 2020 National Electrical Code, and applicable local ordinances.
The construction documents specify that the contractor shall provide complete permits, perform all necessary trades coordination, conduct field verification of existing conditions, provide shop drawings within 90 days of permit issuance, and complete final punch list items at no additional cost to the owner. Mechanical systems include ceiling-mounted electric radiant heaters in each restroom (Roberts Gordon NEL-15, 1500W each), exhaust fans (Greenheck SQ-75-VG, 250 CFM), and supply/return air systems. Plumbing includes wall-mounted lavatories (Acorn ELPS1 with sensor-operated faucets), floor-mounted water closets (Acorn 2100-W-1-CN), a commercial mop sink (Stern-Williams CRS 2200), and a 50-gallon electric water heater (Bradford White LE350s3-3). Electrical service consists of a 400-ampere main service with associated panelboards, lighting controlled via occupancy sensors and time clock, and dedicated circuits for equipment and receptacles throughout. The contractor is responsible for all costs associated with materials, labor, testing, inspections, insurance, warranties, and system balancing upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR OR POINT ELEVATION
KEY NOTE
WALL TYPE
DOOR NUMBER
WINDOW NUMBER
FIXTURE TAG
REVISION TAG
DETAIL
BUILDING SECTION
ROOM NAME & NUMBER
WALL SECTION
X-XX
XXX
A101
SIM
Room name
A101
SIM
XXX
INTERIOR ELEVATIONA101
1Ref
R e f
R e f
1Ref
A101
Ref
Re f
Re f
Ref
BUILDING ELEVATION
BUILDING GRID LINES
A
X
CONCRETE MASONRY UNIT
BRICK VENEER
STONE VENEER
CONCRETE
GYPSUM BOARD OR GROUT
MORTAR
BATT INSULATION
RIGID INSULATION
PLYWOOD
ROUGH WOOD-CONTINUOUS
ROUGH WOOD-BLOCKING
WOOD TRIM
STEEL
GRAVEL
EARTH
E.I.F.S.
B1
A101
SIM
@ AT
A.B. ANCHOR BOLT
ABV. ABOVE
ADJ. ADJUSTABLE
A.F.F. ABOVE FINISHED FLOOR
A.I.A. AMERICAN INSTITUTE OF
ARCHITECTS
ALUM. ALUMINUM
APPROX. APPROXIMATE
ARCH. ARCHITECT / ARCHITECTURAL
A.S.T.M. AMERICAN SOCIETY FOR
TESTING MATERIALS
BD BOARD
BLDG. BUILDING
B.M. BENCHMARK
BITUM. BITUMINOUS
B.O. BOTTOM OF
BOT. BOTTOM
B.P. BASE PLATE
BRG. BEARING
BTWN. BETWEEN
C.J. CONSTRUCTION JOINT
CENTER LINE
CLG. CEILING
CLR. CLEAR
CMU CONCRETE MASONRY UNIT
COL. COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
CONST. CONSTRUCTION
COORD. COORDINATE
CER. CERAMIC
C.P. CAP PLATE
C.T.J. CONTRACTION JOINT
DBL. DOUBLE
D.B.A. DEFORMED BAR ANCHOR
DEPT. DEPARTMENT
DFT./DTL. DETAIL
DIA. / Ø DIAMETER
DTL. DETAIL
DWGS. DRAWINGS
EA. EACH
E.F. EACH FACE
E.J. EXPANSION JOINT
ELECT. ELECTRICAL
EL/ELEV. ELEVATION
EQ. EQUAL
E.S. EACH SIDE
E.W. EACH WAY
EXIST. EXISTING
EXPAN. EXPANSION
EXT. EXTERIOR
E.W.C. ELECTRIC WATER COOLER
F.D. FLOOR DRAIN
FDN./FDTN FOUNDATION
O.H. OVERHEAD
O.H.D. OVERHEAD DOOR
OPP. OPPOSITE
O.W.S.J. OPEN WEB STEEL JOIST
OZ. OUNCE
PART. PARTITION
PERP PERPENDICULAR
PDR. CT. POWDER COAT/COATED
P.C.F. POUNDS PER CUBIC FOOT
P.L.F. POUNDS PER LINEAR FOOT
PL PLATE
PLUMB. PLUMBING
PROT. PROTECT/PROTECTION
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
PTD. PAINTED
QTY. QUANTITY
R.D. ROOF DRAIN
RAD. RADIUS
RFINF. REINFORCED
REQ'D. REQUIRED
RM ROOM
R.O. ROUGH OPENING
SCHED SCHEDULE
SHR. SHOWER
SHT. SHEET
SIM. SIMILAR
SPEC. SPECIFICATION
STC SOUND TRANSMISSION COEFFICIENT
S.D.I. STEEL DECK INSTITUTE
S.J.I. STEEL JOIST INSTITUTE
STIFF. STIFFENER
STRUCT. STRUCTURAL
STD. STANDARD
SUPER. SUPERVISOR
SUSP. SUSPENDED
THRU. THROUGH
T.O. TOP OF
T.O.A. TOP OF ASPHALT
T.O.C. TOP OF CURB
T.O.F. TOP OF FOOTING
T.O.S. TOP OF SLAB OR SIDEWALK
T.O.W. TOP OF WALL
T.P.O. THERMO
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
VEST. VESTIBULE.
VNR. VENEER
W/ WITH
WD. WOOD
W.W.F. WELDED WIRE FABRIC
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN. FINISH
FLR. FLOOR
FT. FEET
FTG. FOOTING
GA. GAGE/GAUGE
GAL. GALLON
GALV. GALVANIZED
GPM GALLONS PER MINUTE
GND. GROUND
GOVT. GOVERNMENT
GWB GYPSUM WALL BOARD
GYP. BD. GYPSUM WALL BOARD
H.C. HANDICAPPED
HDW. HARDWARE
HR. HOUR
H.S.A. HEADED STUD ANCHOR
H.M. HOLLOW METAL
HORIZ. HORIZON
HT. HEIGHT
HVAC HEATING/VENTIALTION/AIR
CONDITIONING
HYD HYDRANT
I.D. INSIDE DIAMETER
I.F. INSIDE FACE
IN. INCHES
INFO. INFORMATION
INSUL. INSULATION
LAV LAVATORY
LT. LIGHT
LT WT LIGHT WEIGHT
MAINT. MAINTENANCE
MANUF. MANUFACTURER
MAX. MAXIMUM
MAT MATERIAL
M.C.J. MASONRY CONTROL JOINT
MECH. MECHANICAL
MFGR. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTL. METAL
NO. NUMBER
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
# NUMBER
O.F.C.I. OWNER FURNISHED,
CONTRACTOR INSTALLED
O.F.O.I. OWNER FURNISHED,
OWNER INSTALLED
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2026 THINK ARCHITECTURE INC.
/2
/2
:3
:2
P
M
D
ES
ER
ET
P
EA
K C
O M
PL
EX
RE
ST
RO
O M
B U
IL
D
IN
G
U T-
2, G
RA
N
TS
V
IL
LE
, U T
APRIL 27, 2026
22-054
COVER SHEET
G000
-0 4-
-R
ES
TR
O O
M B
UI
LD
IN
G
B
ID
S
ET
BI
D
P A
C
KA
G E
2- A
LT
ER
N A
TE
B
ID
ARCHITECT:
7927 SOUTH HIGH POINT WAY, SUITE 300
SANDY, UT 84094
801.269.0055
THINK ARCHITECTURE
CIVIL ENGINEER:
MECHANICAL ENGINEER:
ELECTRICAL ENGINEER:
PROJECT TEAM
BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE
PLUMBING CODE: 2021 INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE
ACCESSIBILITY: 2021 ANSI A117.1
STRUCTURAL ENGINEER:
1295 N STATE ST
OREM, UT 84057
801.222.0922
CKR ENGINEERS
560 S 100 W ST#1,
PROVO, UT 84601
(435).554.7771
BRENKMAN & COMPANY
2332 W. 12600 S., SUITE F
RIVERTON, UT 84065
801.566.0503
ROCKY MOUNTAIN CONSULTING ENGINEERS, INC.
556 WEST JACK FROST WAY
SARATOGA SPRINGS, UT 84045
801.884.6010
ADVANCED CIVIL ENGINEERING, PLLC
NORTH
VICINITY MAPGOVERNING BUILDING CODES & INFORMATION
BUILDING: RESTROOM BUILDING
USE: PUBLIC RESTROOM USE
OCCUPANCY TYPE: U
BUILDING TYPE: V-B
FIRE SPRINKLERS: NO
ALLOWABLE AREA: 5,500 SF
ALLOWABLE HEIGHT: 40 FEET (1 STORY)
ACTUAL AREA: LEVEL 1: 1,185 SF
ACTUAL HEIGHT: 15'-7"
DRAWING INDEX
OCCUPANT LOAD: SEE G002
EXIT REQUIREMENTS: SEE G002
EXITS PROVIDED: SEE G002
MATERIALS: CMU, WOOD TRUSSES
ABBREVIATIONS GRAPHIC SYMBOLS/ MATERIAL LEGENDS
DESERET PEAKS SPORTS AND ENTERTAINMENT
COMPLEX
RESTROOM BUILDING
BID PACKAGE #2- ALTERNATE BID #2
DEFERRED SUBMITTALS ARE THOSE PORTIONS OF DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE PERMIT APPLICATION AND HAVE RECEIVED PRIOR APPROVAL FROM THE BUILDING
OFFICIAL TO BE DEFERRED.
THE DEFERRED SUBMITTALS SHALL BE SUBMITTED TO THE ARCHITECT AND GENERAL CONTRACTOR WITHIN SIX WEEKS TO COMMMENCEMENT OF CONSTRUCTION TO THIS PORTION OF
WORK.
DEFERRED SUBMITTAL PROCESS:
1. THE DEFERRED SUBMITTAL SHALL FIRST BE REVIEWED BY THE GENERAL CONTRACTOR FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. THE SUBMITTAL MUST BE REVIEWED, APPROVED, STAMPED AND SIGNED BY THE GENERAL CONTRACTOR BEFORE BEING SUBMITTED TO THE ARCHITECT.
2. THE GENERAL CONTRACTOR SHALL DIGITALLY SUBMIT DEFERRED SUBMITTALS TO THE ARCHITECT.
3. THE DEFERRED SUBMITTAL ITEMS WILL BE REVIEWED BY THE ENGINEER OR ARCHITECT IN RESPONSIBLE CHARGE. THE ENGINEER OR ARCHITECT WILL ATTACH A LETTER TO THE SUBMITTAL
STATING THAT THE DEFERRED ITEM IS IN CONFORMANCE WITH THE DESIGN OF THE STRUCTURE.
4. THE APPROVED SUBMITTALS WILL BE RETURNED TO THE GENERAL CONTRACTOR. TWO SETS OF THE DEFERRED SUBMITTAL ARE THEN SUBMITTED TO THE CITY FOR REVIEW.
5. THE GENERAL CONTRACTOR SHALL MAINTAIN ONE SET OF THE APPROVED SUBMITTAL ON SITE FOR REFERENCE BY THE CITY INSPECTOR.
6. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.
7. SEE STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS FOR STRUCTURAL DEFERRED SUBMITTALS.
DEFERRED SUBMITTAL ITEMS
1. PRE-FABRICATED STRUCTURAL TRUSSES, INCLUDING DESIGN DRAWINGS AND CALCULATIONS.
DEFERRED SUBMITTAL REQUIREMENTS
OWNER & MUNICIPAL DRAWING APPROVALS
OWNER:
CITY PLANNING & ZONING DEPARTMENT:
DATE:
DATE:
CITY BUILDING DEPARTMENT: DATE:
CITY ENGINEER:
CITY FIRE DEPARTMENT:
DATE:
DATE:
CITY POLICE DEPARTMENT: DATE:
PROJECT SITE
GENERAL
SHEET # SHEET NAME # DATE
G000 COVER SHEET
G001 GENERAL NOTES
G002 LIFE SAFETY PLAN AND AREA PLAN
G004 ACCESSIBILITY DETAILS
G005 ACCESSIBILITY DETAILS
ARCHITECTURAL
SHEET # SHEET NAME # DATE
A100 SLAB PLAN & ISOMETRIC
A101 FLOOR PLAN AND REFLECTED CEILING PLAN
A102 ROOF PLAN
A201 ELEVATIONS
A301 SECTIONS
A401 INTERIOR ELEVATIONS
A601 DOOR AND WINDOW SCHEDULE
STRUCTURAL
SHEET # SHEET NAME # DATE
S101 FOUNDATION AND FRAMING PLANS
S501 DETAILS
S601 STRUCTURAL SCHEDULES
S602 STRUCTURAL NOTES
MECHANICAL
SHEET # SHEET NAME # DATE
M100 MECHANICAL OVERVIEW
M101 MECHANICAL CONSTRUCTION
M102 MECHANICAL ISOMETRICS
PLUMBING
SHEET # SHEET NAME # DATE
P100 PLUMBING OVERVIEW
P101 PLUMBING CONSTRUCTION
P102 DCW/DHW ISOMETRICS
P103 SANITARY ISOMETRICS
P104 PLUMBING SCHEDULES
ELECTRICAL
SHEET # SHEET NAME # DATE
E002 ELECTRICAL GENERAL SHEET
E102 RESTROOM LIGHTING PLAN
E202 RESTROOM POWER PLAN
E502 ELECTRICAL DETAILS
E602 ELECTRICAL SCHEDULES
SPECIAL INSPECTIONS REQUIREMENTS
SPECIAL INSPECTIONS ARE REQUIRED IN ACCORDANCE WITH IBC 2021 CHAPTER 17, SECTION 1704.
SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, AND TO THE REGISTERED
DESIGN PROFESSIONALS IN RESPONSIBLE CHARGE. (2021 IBC SECTION 1704.2.4).
SEE PROJECT MANUAL / SPECIFICATIONS, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL GENERAL NOTES FOR ADDITIONAL SPECIAL INSPECTION REQUIREMENTS.
OWNER:
47 S. MAIN STREET
TOOELE, UT 84074
435.843.4000
TOOELE COUNTY
LANDSCAPE ARCHITECT:
7927 SOUTH HIGH POINT WAY, SUITE 300
SANDY, UT 84094
801.269.0055
THINK ARCHITECTURE
MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE
FIRE CODE: 2021 INTERNATIONAL FIRE CODE
ENERGY CONSERVATION: 2021 INTERNATIONAL ENERGY CONSERVATION CODE
BUILDING AREAS
BUILDING AREA - FINISHED
AREA FINISHED
BUILDING AREA - UNFINISHED
AREA UNFINISHED
CITY APPROVAL STAMP
2930 UT-112 GRANTSVILLE, UTAH 84029
SEAL
SEE SITE DEVELOPMENT PACKAGE FOR ALL CIVIL,
LANDSCAPE CONSTRUCTION DOCUMENTS.
APRIL 27, 2026
C43. CONTRACTOR SHALL SEAL ALL GAPS, HOLES, AND CRACKS IN BUILDING CONSTRUCTION AS REQUIRED TO
CONTROL INFILTRATION OF INSECTS.
PROJECT GENERAL NOTES
1. DEFINITIONS
a. PROVIDE:
MEANS TO PROVIDE, FURNISH AND INSTALL, A COMPLETE SYSTEM AND READY FOR OPERATIONS AND USE
FOR PURPOSE INTENDED INCLUDES THOSE ITEMS SPECIFIED WITHIN THE DRAWINGS AND SPECIFICATIONS AS
WELL AS THOSE ITEMS THAT ARE REQUIRED TO PROVIDE A COMPLETE SYSTEM. THE CONTRACTOR AND SUB
CONTRACTORS ARE REQUIRED TO PROVIDE THE FULL AND COMPLETE SYSTEM.
b. FURNISH:
MEANS TO SUPPLY, PURCHASE, PROCURE AND DELIVER COMPLETE WITH RELATED ACCESSORIES, READY FOR
ASSEMBLY, APPLICATION, INSTALLATION, AND SIMILAR OPERATIONS, AS APPLICABLE IN EACH INSTANCE.
c. INSTALL:
MEANS TO CONSTRUCT, ASSEMBLE, ERECT, MOUNT, ANCHOR, PLACE, CONNECT, APPLY AND SIMILAR
OPERATIONS, COMPLETE WITH RELATED ACCESSORIES, AS APPLICABLE IN EACH INSTANCE.
d. EQUIVALENT:
MEANS "EQUIVALENT AS ACCEPTED BY THE ARCHITECT." WITH RESPECT TO PRODUCTS, EQUIVALENT MEANS A
LIKE DEGREE OF FEATURES, ATTRIBUTES, PERFORMANCES, OR QUALITIES DEEMED ESSENTIAL TO THE DESIGN
INDICATED INSTEAD, THE TERM INTENDED TO MEAN ARCHITECT WILL CONSIDER SUBSTITUTION PROPOSALS
FOR THE PRODUCT. DO NOT ASSUME THAT SUBSTITUTE PRODUCTS ARE ACCEPTABLE. SUBSTITUTIONS MADE
BY THE CONTRACTOR WITHOUT FULL AND FINAL APPROVAL, MAY REQUIRE TO BE REMOVED IF NOT DEEMED
ACCEPTABLE BY THE ARCHITECT. ALL COSTS ASSOCIATED TO REMOVAL OF SUBSTITUTION NOT APPROVED, AND INSTALLATION OF ACCEPTED PRODUCTS WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
GENERAL NOTES
G1. INTENT OF THE DOCUMENTS:
DRAWINGS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE BASIS FOR THE PROPER COMPLETION OF
THE PROJECT, SUITABLE FOR THE INTENDED USE OF THE OWNER. ITEMS NOT EXPRESSLY SET FORTH WITHIN THE
DRAWINGS AND SPECS , BUT WHICH ARE REASONABLY IMPLIED FOR COMPLETION OF A COMPLETE SYSTEM, OR NECESSARY, FOR THE PROPER PERFORMANCE OF THE WORK SHALL BE INCLUDED.
G2. DRAWINGS AND SPECIFICATIONS:
SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY AND SUPPLEMENTAL TO THE DRAWINGS. NO
RELATIVE IMPORTANCE OF DRAWINGS VERSUS SPECIFICATIONS HAS BEEN ESTABLISHED AND NONE SHOULD
BE ASSUMED, BUT THE MOST STRINGENT CONDITIONS SHOULD BE ASSUMED FOR ALL BIDDING AND
CONSTRUCTION REQUIREMENTS. IN THE EVENT OF DISCREPANCIES OR CONFLICTS, THE ARCHITECT SHALL BE
CONSULTED IN ORDER TO RENDER AN INTERPRETATION.
BIDDING, PRICING OR CONSTRUCTION DONE PRIOR TO RECEIVING FINAL BUILDING DEPARTMENT PERMITS IS
AT THE CONTRACTORS OWN RISK. CHANGES TO THE DRAWINGS MAY BE REQUIRED AS PART OF THE PLAN
CHECK AND/ OR OWNER REVIEW PROCESS. THINK ARCHITECTURE INC. AND ITS CONSULTING ENGINEERS
WILL NOT BE HELD LIABLE FOR, NOR COMPENSATE FOR, CHANGES TO THESE DRAWINGS BEFORE FINAL
JURISDICTION AND OWNER APPROVAL IS OBTAINED.
DRAWINGS FOR THIS PROJECT IS COMPILED INTO 2 VOLUMES, AND BOTH VOLUMES SHALL BE USED FOR THE
CONSTRUCTION OF THIS PROJECT. THE DRAWINGS ARE INTENDED AS AN ENTIRE GROUP, AND NO SET OF
DRAWINGS TAKE PRECEDENCE. ALL CONTRACTORS WORKING ARE RESPONSIBLE FOR ALL ITEMS WITHIN
THIS SET OF DRAWINGS, AND NOT INDIVIDUAL AREA. FAILURE TO REVIEW AND PROVIDE COSTS FOR ALL
ITEMS WITHIN THEIR RESPECTIVE SCOPE OF WORK WHEREVER SHOWN WITHIN THE DRAWINGS IS THE BURDEN
OF THE GENERAL CONTRACTOR AND SUB -CONTRACTORS FOR THOSE ITEMS MISSED, AND SHALL NOT BE
AVAILABLE FOR CHANGE ORDERS FROM THE OWNER FOR MISSED SCOPE OF WORK IN THE BIDDING PROCESS.
G3. WORK NOT INCLUDED:
ANY ITEM INDICATED ON THE DRAWINGS AS “N.I.C.” (NOT IN CONTRACT), OR OTHERWISE DESIGNATED TO BE
DONE BY OTHERS IS NOT A PART OF THE CONTRACT. INSTALLATION AND/OR BACKING MAY BE REQUIRED
FOR SOME EQUIPMENT FURNISHED BY OWNER OR OWNER’S SUBCONTRACTOR. REFER TO DRAWINGS FOR
SPECIFIC REQUIREMENTS.
G4. CONTRACT DOCUMENTS AT SITE:
THE CONTRACTOR SHALL MAINTAIN CURRENT PERMIT DRAWINGS; SHOP DRAWINGS; REVISED DRAWINGS;
AND CLARIFICATION DRAWINGS, ADDENDA; CHANGE ORDERS; BULLETINS; INSPECTIONS; TEST
CERTIFICATIONS AND RECORDS; PRODUCT SUBMITTAL DATA AND SAMPLES. FIELD OFFICE SHALL CONTAIN A
CURRENT COPY OF ALL GOVERNING BUILDING CODE(S). MAKE DOCUMENTS AVAILABLE AT ALL TIMES FOR
ARCHITECT’S REVIEW. ALL DRAWINGS MUST BE CLEARLY MARKED AS TO THE FINAL APPROVED DRAWINGS.
G5. RECORD DRAWINGS:
THE MAINTAIN ACCURATELY DIMENSIONED RECORDS OF ALL UNDERGROUND LINES, SERVICES, AND UTILITIES, AS WELL AS ANY DISCREPANCIES OR REQUIRED CHANGES IN THE CONTRACT DOCUMENTS. AT THE END OF
THE PROJECT, FORWARD TO ARCHITECT FOR FUTURE RECORDS. ONE (1) CD OF COMPLETE RECORD
DRAWINGS TO OWNER IN PDF FORMAT AFTER COMPLETING FINAL PUNCH LIST.
G6. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES; DO NOT SCALE DRAWINGS TO DETERMINE ANY
LOCATIONS. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES, PRIOR TO CONTINUING WITH WORK.
G7. FIELD CONFIRMATION OF DISCREPANCIES SHALL BE RECORDED ON REPRODUCIBLE DOCUMENT AND
IMMEDIATELY TRANSMITTED TO ARCHITECT FOR PROJECT RECORD, COORDINATION, AND NECESSARY
RESOLUTION PRIOR TO CONTINUING WITH WORK.
G8. FIELD MEASUREMENTS:
VERIFY FIELD MEASUREMENTS BEFORE ORDERING MATERIALS AND PREFABRICATED ITEMS. ANY NECESSARY
ADJUSTMENTS BETWEEN FIELD MEASUREMENTS AND DRAWINGS SHALL BE MADE IN CONSULTATION WITH THE
ARCHITECT.
G9. ALL WORK SHALL CONFORM TO THE LATEST ADOPTED EDITIONS OF ALL APPLICABLE BUILDING CODES, THE
AMERICANS WITH DISABILITIES ACT, AS WELL AS ALL OTHER LOCAL GOVERNING CODES AND ORDINANCES.
G10. REFERENCE STANDARDS:
COMPLY WITH ASSOCIATION, TRADE, FEDERAL, COMMERCIAL, ASTM, AND OTHER SIMILAR STANDARDS
REFERENCED WITHIN INDIVIDUAL SECTIONS, EXCEPT WHERE MORE EXPLICIT OR STRINGENT REQUIREMENTS
ARE INDICATED, OR REQUIRED BY APPLICABLE CODES. REFERENCE STANDARDS HAVE SAME FORCE AND
EFFECT AS IF BOUND INTO CONTRACT DOCUMENTS. SHOULD SPECIFIED REFERENCE STANDARDS CONFLICT
WITH CONTACT DOCUMENTS, REQUEST CLARIFICATION FROM ARCHITECT BEFORE PROCEEDING.
CONTRACTOR
C1. THE CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY ALL EXISTING SITE CONDITIONS, UTILITIES, CONNECTIONS, LOCATIONS, ETC, AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION.
C2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES, WHETHER SHOWN HEREIN
OR NOT, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR THE REPAIR
OR REPLACEMENT OF UTILITIES AND ALL OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH
EXECUTION OF WORK.
C3. CONTRACTOR SHALL, PRIOR TO COMMENCEMENT OF WORK, FIELD VERIFY ALL EXISTING PROJECT CONDITIONS, INCLUDING DIMENSIONS, UTILITY LOCATIONS, AND UTILITY SIZES.
C4. THE CONTRACTOR SHALL BE REQUIRED TO MEET ALL NATIONAL, STATE AND LOCAL, AND RELATED CODES FOR
STANDARD CONSTRUCTION PRACTICES.
C5. INSTALLATION STANDARDS:
ALL MANUFACTURED MATERIALS AND PRODUCTS SHALL BE APPLIED, INSTALLED, CONNECTED, CLEANED AND
CONDITIONED IN ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTRUCTIONS. ALL REFERENCES TO
STANDARDS OR TO MANUFACTURER’S SPECIFICATIONS SHALL BE TO THE LATEST EDITIONS OR LATEST
AMENDMENTS.
C6. HOURS OF WORK:
ALL DEMOLITION, GRADING, AND CONSTRUCTION WORK SHALL BE LIMITED TO THE FOLLOWING HOURS:
MONDAY THROUGH SATURDAY 7:00 AM TO 7:00 PM, OR AS REQUIRED BY THE HERRIMAN
PLANNING AND ZONING. NO ACTIVITIES ON SUNDAY. AFTER-HOURS WORK WILL NOT BE PERMITTED
WITHOUT PRIOR WRITTEN APPROVAL FROM THE PERSONS/AGENCIES THAT HAVE JURISDICTION.
C7. TESTING AGENCIES:
THE CONTRACTOR SHALL PROVIDE AND PAY FOR INSPECTIONS, TESTS, AND OTHER SERVICES SPECIFIED.
REFER TO INDIVIDUAL SELECTIONS FOR ADDITIONAL REQUIREMENTS. EMPLOYMENT OF TESTING
LABORATORY SHALL IN NO WAY RELIVE CONTRACTOR OF OBLIGATION TO PERFORM WORK IN
ACCORDANCE WITH REQUIREMENTS OF CONTRACT DOCUMENTS.
C8. PROJECT LOG:
MAINTAIN DAILY LOG CONTAINING ALL INFORMATION REGARDING CONSTRUCTION OPERATIONS AND
OTHER OCCURRENCES PERTAINING TO THE PROJECT. MAKE LOG AVAILABLE FOR ARCHITECT’S REVIEW.
C9. WORK PROGRESS SCHEDULE:
MAINTAIN AN UPDATED WORK PROGRESS SCHEDULE POSTED IN A VISIBLE PLACE LOCATED IN FIELD OFFICE.
UPDATE SCHEDULE DAILY TO REFLECT WORK PROGRESS.
C10. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY THE OWNER AND SECURED BY THE GENERAL
CONTRACTOR. ALL OTHER REQUIRED PERMITS SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR OR
SUBCONTRACTOR DIRECTLY RESPONSIBLE.
C11. CONTRACTOR SHALL ASSIST OWNER IN OBTAINING FINAL APPROVAL OF LOCAL HEALTH DEPARTMENT AND THE
TEMPORARY AND FINAL CERTIFICATES OF OCCUPANCY.
C12. ADDITIONAL REQUIRED CITY AND COUNTY LICENSES SHALL BE ACQUIRED AND PAID FOR BY THE INDIVIDUAL
TRADES.
C13. ALL CONTRACTORS SHALL HAVE VALID CERTIFICATES OF WORKMAN'S COMPENSATION OF FILE WITH THE
APPROPRIATE AGENCIES.
C14. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND
WORKERS AT ALL TIMES.
C15. CONTRACTOR’S FIELD OFFICE:
PROVIDE AND MAINTAIN A FIELD OFFICE ON THE PREMISES WHERE DIRECTED. OFFICE SHALL BE OF NEAT, SUBSTANTIAL CONSTRUCTION. PROVIDE HANGING PLAN FILES AND MAINTAIN WITH ALL CURRENT
DRAWINGS.
a. STORAGE STRUCTURE:
PROVIDE AND MAINTAIN, WHERE DIRECTED, A WATERTIGHT STORAGE STRUCTURE FOR ALL
MATERIALS WHICH MIGHT BE DAMAGED BY WEATHER, INCLUDING STORAGE FACILITIES FOR
CONCRETE TEST SAMPLES, OR OTHER MATERIAL SAMPLES REQUIRED FOR WORK.
b. COSTS:
PAY COSTS FOR A LOCAL BUSINESS TELEPHONE FOR USE BY CONTRACTOR, OWNER AND
ARCHITECT THROUGHOUT CONTRACT PERIOD.
c. COMMUNICATION EQUIPMENT:
PROVIDE A TELEPHONE ON SITE. ASSIGN A RESPONSIBLE PERSON TO ANSWER ALL TELEPHONE CALLS
IN EVENT THE SUPERINTENDENT IS ABSENT FROM THE PREMISES. PROVIDE APPROVED MEANS TO
ESTABLISH URGENT COMMUNICATIONS (CELLULAR TELEPHONE OR PAGER).
C16. TEMPORARY FACILITIES:
PROVIDE TEMPORARY FACILITIES AND CONNECTIONS AS REQUIRED FOR THE PROPER COMPLETION OF THE
PROJECT. PROVIDE AND MAINTAIN TEMPORARY UTILITY SERVICES. PROVIDE SUITABLE WASTE DISPOSAL UNITS
AND EMPTY REGULARLY. DO NOT PERMIT ACCUMULATION OF TRASH AND WASTE MATERIALS. PROVIDE
TEMPORARY SANITARY FACILITIES AS REQUIRED.
C17. STORAGE AND PROTECTION:
STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS WITH LABELS
INTACT AND LEGIBLE. STORE SENSITIVE PRODUCTS IN WEATHERTIGHT, CLIMATE CONTROLLED ENCLOSURES.
PROVIDE OFFSITE STORAGE AND PROTECTION WHEN SITE DOES NOT PERMIT ON SITE STORAGE.
C18. FIELD QUALITY CONTROL:
EMPLOY ONLY EXPERIENCED INSTALLERS AND FURNISH EVIDENCE OF EXPERIENCE IF REQUESTED. USE OF ANY
SUBCONTRACTOR OR INSTALLER IS SUBJECT TO OWNER’S APPROVAL. EMPLOY FULL-TIME, COMPETENT
SUPERINTENDENT AS WELL AS NECESSARY ASSISTANTS. SUPERINTENDENT SHALL REPRESENT THE CONTRACTOR
AND ALL COMMUNICATIONS GIVEN TO THE SUPERINTENDENT SHALL BE AS BINDING AS IF GIVEN TO THE
CONTRACTOR.
S4. SOURCE QUALITY CONTROL:
PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS, UNLESS MORE STRINGENT CRITERIA ARE SPECIFIED IN INDIVIDUAL
SECTIONS. USE OF ANY SUPPLIER IS SUBJECT TO OWNER’S APPROVAL.
C19. PRODUCT HANDLING:
TRANSPORT AND HANDLE PRODUCTS IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS. DELIVER
PRODUCTS IN UNDAMAGED CONDITION, IN MANUFACTURER’S ORIGINAL UNOPENED CONTAINER’S OR
PACKING, WITH IDENTIFYING LABELS INTACT AND LEGIBLE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT
PRODUCTS COMPLY WITH REQUIREMENTS OF CONTRACT DOCUMENTS, QUANTITIES ARE CORRECT, AND
PRODUCTS ARE UNDAMAGED.
C20. COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS:
HANDLE, INSTALL, ERECT, CONNECT, CONDITION, USE, ADJUST, AND CLEAN PRODUCTS IN STRICT
ACCORDANCE WITH MANUFACTURER’S INSTRUCTION AND IN CONFORMITY WITH SPECIFIED REQUIREMENTS, INCLUDING EACH STEP IN SEQUENCE. DO NOT OMIT PREPARATORY STEPS OR INSTALLATION PROCEDURES
UNLESS SPECIFICALLY MODIFIED OR EXEMPTED BY CONTRACT DOCUMENTS. SHOULD JOB CONDITIONS OR
SPECIFIED REQUIREMENTS CONFLICT WITH MANUFACTURER’S INSTRUCTIONS, REQUEST CLARIFICATION IN
WRITING FROM ARCHITECT BEFORE PROCEEDING. INSTALL MATERIALS IN PROPER RELATION WITH ADJACENT
CONSTRUCTION AND WITH PROPER APPEARANCE.
C21. MANUFACTURER'S FIELD SERVICES:
WHEN SPECIFIED IN INDIVIDUAL SECTIONS, REQUIRE MATERIAL OR PRODUCT SUPPLIERS OR MANUFACTURERS
TO PROVIDE QUALIFIED STAFF PERSONNEL TO OBSERVE SITE CONDITIONS, CONDITIONS OF SURFACES, QUALITY OF WORKMANSHIP, AND CONDITIONS OF INSTALLATION AS APPLICABLE AND TO INITIATE
ADDITIONAL INSTRUCTIONS WHEN NECESSARY.
S5. SUBSTITUTIONS:
PROPOSALS FOR SUBSTITUTION OF MATERIALS, EQUIPMENT, AND METHODS WILL ONLY BE CONSIDERED WHEN
ACCOMPANIED BY FULL AND COMPLETE TECHNICAL DATA AS WELL AS ANY OTHER INFORMATION REQUIRED
TO EVALUATE THE PROPOSED SUBSTITUTION. SUBSTITUTIONS ARE UNACCEPTABLE UNLESS SPECIFICALLY
APPROVED BY THE ARCHITECT. IN THE EVENT OF SUBSTITUTION PROPOSALS AFTER THE CONTRACT HAS BEEN
AWARDED, ALL SUCH PROPOSALS SHALL BE ACCOMPANIED BY SUBSTANTIAL COST SAVINGS FOR THE OWNER.
S6. AVAILABILITY OF PRODUCTS:
VERIFY PRIOR TO CONSTRUCTION START THAT ALL SPECIFIED ITEMS WILL BE AVAILABLE IN TIME FOR
INSTALLATION DURING ORDERLY AND TIMELY PROGRESS OF THE WORK. IN THE EVENT SPECIFIED ITEM OR
ITEMS WILL NOT BE SO AVAILABLE, NOTIFY THE ARCHITECT PRIOR TO START OF CONSTRUCTION. COST OF
DELAYS BECAUSE OF NON-AVAILABILITY OF SPECIFIED ITEMS OR SUBSTITUTED ITEMS, WHEN THE
CONTRACTOR COULD HAVE AVOIDED SUCH DELAYS, WILL BE BORNE BY THE CONTRACTOR.
S7. PRODUCTS AND MATERIALS:
PROVIDE PRODUCTS AND MATERIALS SPECIFIED. REQUEST ARCHITECTS SELECTION OF COLORS AND
ACCESSORIES IN SUFFICIENT TIME TO AVOID DELAYING PROGRESS OF THE WORK.
C22. CONTRACTOR SHALL VERIFY, AND BE RESPONSIBLE FOR, ALL WORK AND MATERIALS - INCLUDING THOSE
FURNISHED BY SUBCONTRACTORS.
C23. NON-CONFORMING WORK:
REMOVE AND REPLACE WORK THAT DOES NOT CONFORM TO THE CONTRACT DOCUMENTS AT NO
ADDITIONAL EXPENSE TO THE OWNER.
C24. PRODUCT IDENTIFICATIONS:
NAMEPLATES, TRADEMARKS, LOGOS, AND OTHER IDENTIFYING MARKS ON PRODUCTS ARE NOT PERMITTED ON
SURFACES EXPOSED TO VIEW IN PUBLIC AREAS, INTERIOR OR EXTERIOR. PLUMBING, MECHANICAL, AND
ELECTRICAL EQUIPMENT NOT EXPOSED TO PUBLIC VIEW ARE EXECUTED FROM FOREGOING LIMITATION.
REQUIRED UL OR FM LABELS ARE ALSO EXCLUDED.
C25. PROTECTION OF ADJACENT WORK:
PROVIDE TEMPORARY PROTECTION FOR ADJACENT AREAS TO PREVENT DAMAGE BY INSTALLATION OF NEW
WORK OR DEMOLITION OF EXISTING CONSTRUCTION. PROMPTLY REPAIR ANY DAMAGE AT NO ADDITIONAL
COST TO THE OWNER. PROTECT ADJACENT AREAS FROM CONTAMINATION BY CONSTRUCTION DUST AND
DEBRIS. PROVIDE TEMPORARY BARRICADES AS NECESSARY TO ENSURE PROTECTION OF THE PUBLIC. MAINTAIN
EGRESS WITHIN AND AROUND CONSTRUCTION AREAS.
C26. DAMAGED PRODUCTS:
DO NOT USE PRODUCTS IN WORK, WHICH HAVE DETERIORATED, BECOME DAMAGED, OR ARE OTHERWISE
UNFIT FOR USE. RESTORE UNITS DAMAGED DURING INSTALLATION. REPLACE UNITS, WHICH CANNOT BE
RESTORED AT NO ADDITIONAL EXPENSE TO THE OWNER.
C27. SECURITY:
PROVIDE FACILITIES TO PROTECT WORK FROM UNAUTHORIZED ENTRY, VANDALISM, AND THEFT. CONDUCT
OPERATIONS IN MANNER TO AVOID RISK OF LOSS, THEFT, OR DAMAGE BY VANDALISM.
C28. TEMPORARY CONTROLS:
a. HEAT:
PRIOR TO ENCLOSURE, PROVIDE HEATING AS NECESSARY TO PROTECT MATERIALS, PRODUCTS, AND
FINISHES FROM DAMAGE DUE TO TEMPERATURE OR HUMIDITY. ENCLOSURE IS DEFINED AS STATE OF
CONSTRUCTION WHEN EXTERIOR WALLS ARE ERECTED, DOORS AND WINDOWS ARE INSTALLED AND
GLAZED, ROOF DECK AND ROOFING ARE COMPLETE, AND WHEN OTHER OPENINGS IN EXTERIOR
ENVELOPE ARE EQUIPPED WITH TEMPORARY CLOSURES. EXCEPT WHERE INDICATED OTHERWISE IN
INDIVIDUAL SPECIFICATION SECTIONS, MAINTAIN MINIMUM AMBIENT TEMPERATURE OF 50 DEGREES F. IN
AREAS WHERE CONSTRUCTION IS IN PROGRESS.
b. VENTILATION:
VENTILATE ENCLOSED AREAS TO ASSIST CURE OF MATERIALS, TO DISSIPATE HUMIDITY, AND TO PREVENT
ACCUMULATION OF DUST, FUMES, VAPORS, OR GASES.
c. BARRIERS AND CLOSURES:
PROVIDE BARRIERS TO PREVENT UNAUTHORIZED ENTRY TO CONSTRUCTION AREAS AND TO PROTECT
EXISTING FACILITIES AND ADJACENT PROPERTIES FROM DAMAGE FROM CONSTRUCTION OPERATIONS.
d. FIRE PROTECTION:
COMPLY WITH LOCAL FIRE PROTECTION CODE AND GOVERNING AUTHORITIES. PROVIDE AND MAINTAIN
ADEQUATE FIRE PROTECTION INCLUDING, WITHOUT LIMITATION, FIRE EXTINGUISHERS AND OTHER
APPROPRIATE EQUIPMENT FOR FIRE EXTINGUISHING READY FOR IMMEDIATE USE. MAINTAIN ANY
REQUIRED FIRE ALARM SYSTEMS IN OPERATION DURING CONSTRUCTION. DISTRIBUTE EQUIPMENT
AROUND SITE AND PARTICULARLY IN IMMEDIATE VICINITY OF PERFORMANCE OF WELDING OR SIMILAR
HAZARDOUS WORK.
C29. INTERRUPTION OF SERVICES:
INTERRUPTIONS TO ANY SERVICE FOR THE PURPOSE OF MAKING OR BREAKING A CONNECTION SHALL BE
MADE ONLY AFTER CONSULTATION WITH THE OWNER AND SHALL BE AT SUCH TIME AND OF SUCH DURATION
AS MAY BE DIRECTED.
C30. EXCAVATIONS OR TRENCHING:
KEEP THE INTERVALS BETWEEN EXCAVATION OR TRENCHING, INSTALLATION OF CONDUIT OR PIPING, AND
BACK FILLING OPERATIONS TO AN ABSOLUTE MINIMUM. PROVIDE SUITABLE TEMPORARY COVERS FOR
EXCAVATIONS OR TRENCHING CROSSING ROADWAYS, WALKS, OR OTHER TRAFFIC WAYS AS REQUIRED BY
GOVERNING AGENCIES.
C31. CUTTING AND PATCHING:
DO NOT CUT AND PATCH IN A MANNER THAT WOULD RESULT IN A FAILURE OF THE WORK TO PERFORM AS
INTENDED, DECREASE FIRE PERFORMANCE, DECREASE ACOUSTICAL PERFORMANCE, DECREASE ENERGY
PERFORMANCE, DECREASE OPERATIONAL LIFE, OR DECREASE SAFETY FACTORS. DO NOT REMOVE OR ALTER
STRUCTURAL COMPONENTS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT. CUT WITH TOOLS
APPROPRIATE FOR MATERIALS TO BE CUT. PATCH WITH MATERIALS AND METHODS TO PRODUCE PATCH THAT IS
NOT VISIBLE FROM A DISTANCE OF THREE FEET.
C32. COORDINATION AND CLEARANCES:
VERIFY AND COORDINATE CLEARANCES, DIMENSIONS, AND INSTALLATION OF ADJOINING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, CONDUITS, OR OTHER MECHANICAL OR ELECTRICAL ITEMS OR APPARATUS. VERIFY
DIMENSIONS FOR PRODUCTS TO BE FITTED INTO WORK.
a. ATTACHMENTS AND CONNECTIONS:
PROVIDE ATTACHMENT AND CONNECTION DEVICES METHODS FOR SECURING AND ANCHORING
WORK. SECURE IN PLACE WITH DEVICES DESIGNATED AND SIZED TO WITHSTAND STRESSES, VIBRATION, PHYSICAL DISTORTION, OR DISFIGUREMENT.
b. EXPANSION AND MOVEMENT:
ALLOW FOR EXPANSION OF MATERIALS AND BUILDING MOVEMENT.
c. ISOLATION OF DISSIMILAR ITEMS:
ISOLATE EACH UNIT OF WORK FROM INCOMPATIBLE WORK AS NECESSARY TO PREVENT DETERIORATION
AND ELECTROLYTIC ACTION.
d. MAINTENANCE:
CLEAN AND PERFORM MAINTENANCE ON INSTALLED WORK AS FREQUENTLY AS NECESSARY THROUGH
REMAINDER OF CONSTRUCTION PERIOD. LUBRICATE OPERABLE COMPONENTS TO ENSURE OPERABILITY
WITHOUT DAMAGING EFFECTS.
e. ADJUSTMENTS:
ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND UNHINDERED OPERATION.
C33. EXAMINATION OF CONDITIONS:
EXAMINE SUBSTRATES AND CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. DO NOT COMMENCE
WORK OVER UNSATISFACTORY CONDITIONS DETRIMENTAL TO PROPER AND TIMELY EXECUTION OF WORK. DO
NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. COMMENCEMENT
OF INSTALLATION CONSTITUTES ACCEPTANCE OF CONDITIONS AND COSTS OF ANY CORRECTIVE MEASURES
ARE RESPONSIBILITY OF CONTRACTOR.
C34. CONTRACTOR SHALL PROVIDE BACKING SUPPORT OF ALL WALL, CEILING, AND PARTITION MOUNTED ITEMS
SUCH AS TABLE BRACKETS, LIGHT FIXTURES, ARTIFACTS, SHELVING, EQUIPMENT, AND TELEVISIONS.
COORDINATE LOCATIONS AND REQUIREMENTS WITH THE PLUMBING, MECHANICAL, ELECTRICAL DRAWINGS.
C35. EXTERIOR OPENINGS SHALL COMPLY WITH ALL SECURITY REQUIREMENTS AS OUTLINED IN ALL LOCAL BUILDING
CODES AND ORDINANCES.
C36. GLASS AND GLAZING FOR ALL WINDOWS SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. IN
ADDITION ALL WINDOWS MUST MEET THE "AAMA" WINDOW STANDARDS FOR INSTALLATION. THE
CONTRACTOR SHALL OBTAIN, AND SHALL FOLLOW ALL REQUIREMENTS OF THE "AAMA" STANDARDS IN
ADDITION TO THE MANUFACTURER SPECIFICATIONS AND ARCHITECTURAL DETAILS INCLUDED WITHIN THE
DRAWINGS.
C37. ROOFING WORK SHALL BE PERFORMED AND ALL PENETRATIONS THROUGH THE ROOFING MEMBRANE SHALL BE
PATCHED OR FLASHED AS PER THE MANUFACTURER'S STANDARDS.
C38. ROOF OBSTRUCTIONS SUCH AS TELEVISION ANTENNAE, SOLAR PANELS, AND GUY WIRES SHALL NOT BE LOCATED
OR INSTALLED IN SUCH A WAY AS TO PREVENT FIRE DEPARTMENT ACCESS OR EGRESS IN THE EVENT OF A FIRE.
C44. DISPOSAL OF TRASH AND EXCESS EXCAVATION:
DISPOSE OF TRASH, AND DEBRIS AT DESIGNATED AREAS OFF THE PREMISES AT NO ADDITIONAL COST TO THE
OWNER. BURNING OF TRASH AND DEBRIS ON THE PREMISES IS PROHIBITED. COORDINATE TRASH REMOVAL
WITH LANDLORD WHERE APPLICABLE.
C45. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL WORK TO AVOID CONFLICTS BETWEEN TRADES. THE
CONTRACTOR SHALL PERFORM ALL WORK TO PROVIDE COMPLETE FUNCTIONING SYSTEMS IN ACCORDANCE
WITH THE INTENT INDICATED ON THE PLANS. THE CONTRACTOR SHALL CONFIRM AND PROVIDE ALL ITEMS
WHETHER SPECIFIED ON THE DRAWING OR SPECIFICATION OR NOT TO COMPLETE AND PROVIDE A FULL
OPERATIONAL SYSTEM. ALL SYSTEMS SHALL BE FULLY COORDINATED AND INSTALLED AS PER THE INTENT
ON THE DRAWINGS. ANY AND ALL CHANGES MADE IN THE FIELD SHALL BE VERIFIED AND CONFIRMED WITH
THE ARCHITECT AND DESIGN TEAM PRIOR INSTALLATION TO BEGIN. FAILURE TO CONFIRM CHANGES OR
THOSE ITEMS NEEDED FOR THE COMPLETED SYSTEM SHALL BE THE COST TO THE CONTRACTOR AND SHALL NOT
BE CONSIDERED AS A CHANGE ORDER TO THE OWNER.
C46. CLEANING MATERIALS AND EQUIPMENT:
PROVIDE ALL REQUIRED PERSONNEL, EQUIPMENT, AND MATERIALS NEEDED TO MAINTAIN THE SPECIFIED
STANDARD OF CLEANLINESS. USE ONLY THE CLEANING MATERIALS AND EQUIPMENT WHICH ARE COMPATIBLE
WITH THE SURFACE BEING CLEANED, AS RECOMMENDED BY THE MANUFACTURER OF THE MATERIAL.
TOLERANCES
T1. TOLERANCES:
INSTALL WORK TRUE TO LINE, PLUMB, AND LEVEL. EXCEPT WHERE SPECIFIED OTHERWISE, WORK EXECUTED WITHIN
THE FOLLOWING TOLERANCE WILL BE ACCEPTABLE.
a. TRUE TO LINE:
ALLOWED DEVIATION FROM AN ABSOLUTELY STRAIGHT LINE OF SIGHT WITHIN PLUS OR MINUS 1/8 INCH
IN 10 FT. AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF
CONSTRUCTION OVER 20’-0” IN LENGTH.
b. PLUMB:
ALLOWED DEVIATIONS FROM AN ABSOLUTELY VERTICAL PLANE OF PLUS OR MINUS 1/8 INCH IN 10 FT.
AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF CONSTRUCTION
OVER 20’-0” IN LENGTH.
c. LEVEL:
ALLOWED DEVIATIONS FROM AN ABSOLUTELY HORIZONTAL PLANE OF PLUS OR MINUS 1/8 INCH IN 10 FT.
AND WITHIN PLUS OR MINUS ¼ INCH FOR ENTIRE LENGTH OF A PARTICULAR ELEMENT OF CONSTRUCTION
OVER 20’-0” IN LENGTH.
d. ALLOWED DEVIATIONS FROM AN ABSOLUTELY FLAT IF WITHIN PLUS OR MINUS 1/16 INCH IN ONE SQUARE
FOOT, WITHIN PLUS OR MINUS 1/8 INCH IN AN AREA 10 FEET BY 10 FEET, AND WITHIN PLUS OR MINUS ¼
INCH FOR ENTIRE AREA OF A PARTICULAR ELEMENT OF CONSTRUCTION OVER 20’-0” IN LENGTH.
T2. REFER TO SPECIFICATIONS FOR ADDITIONAL TOLERANCE REQUIREMENTS.
a. SUBSTANTIAL COMPLETION:
AT SUBSTANTIAL COMPLETION OF THE PROJECT, SCHEDULE AND ATTEND A PUNCH LIST WALK
THROUGH OF REMAINING WORK FOR REVIEW WITH THE ARCHITECT AND OWNER. COMPLETE ALL
DEFECTS AND OMISSIONS NOTED IN THE FINAL PUNCHLIST PROMPTLY, IN THE TIME PERIOD
AGREED UPON WITH THE OWNER, AT NO ADDITIONAL EXPENSE TO THE OWNER.
PROJECT CONTRACT CLOSEOUT:
b. CERTIFICATE OF OCCUPANCY:
PROVIDE THE FINAL CERTIFICATE OF OCCUPANCY FROM THE BUILDING DEPARTMENT.
c. PERMITS/INSPECTION CARDS:
FURNISH COPIES OF PERMITS AND SIGNED INSPECTION CARDS FOR EACH OF THE FOLLOWING
AGENCIES: BUILDING DEPARTMENT; PLUMBING/MECHANICAL DEPARTMENT; ELECTRICAL
DEPARTMENT; FIRE DEPARTMENT; HEALTH DEPARTMENT; OTHERS AS REQUIRED.
d. FURNISH COPIES OF PERMITS AND SIGNED INSPECTION CARDS FOR EACH OF THE FOLLOWING
AGENCIES: BUILDING DEPARTMENT; PLUMBING/MECHANICAL DEPARTMENT; ELECTRICAL
DEPARTMENT; FIRE DEPARTMENT; HEALTH DEPARTMENT; OTHERS AS REQUIRED.
e. MAINTENANCE MANUALS AND WARRANTIES:
FURNISH (2) COPIES FOR EACH UNIT OF ALL MANUALS, MAINTENANCE INSTRUCTIONS,
CONTRACTORS AND MANUFACTURER’S PRINTED WARRANTIES, AND INSTRUCTIONS FOR
OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN OR SHOWN ON DRAWINGS, TRAIN OWNER’S
PERSONNEL IN USE OF BUILDING SYSTEMS.
f. TOUCH-UP MATERIAL:
FURNISH OWNER WITH ONE GALLON OF EACH PAINT AND STAIN USED PER UNIT. PROVIDE AN
ADDITIONAL 2 PERCENT OF QUANTITY INSTALLED OF ALL FINISH MATERIAL INCLUDING CEILING
PANELS, TILE, AND SHEET GOODS.
g. SUBCONTRACTORS:
PROVIDE THE OWNER THE NAMES, ADDRESSES, AND PHONE NUMBERS OF ALL SUBCONTRACTORS,
FINAL UNCONDITIONAL LIEN RELEASES, AND WARRANTIES FROM EACH.
h. FINAL CLEANING AND REPAIRS:
REMOVE TEMPORARY FACILITIES AND PROVIDE FINAL CLEANING AND TOUCH-UP. RESTORE
PORTIONS OF BUILDING, SITE IMPROVEMENTS, LANDSCAPING AND OTHER ITEMS DAMAGED BY
CONSTRUCTION OPERATIONS TO THE SATISFACTION OF THE ARCHITECT, AT NO ADDITIONAL
EXPENSE TO THE OWNER.
i. CLOSEOUT DOCUMENTS:
PROVIDE THE OWNER WITH A COMPACT DISK OF ALL RECORD DRAWINGS IN PDF FORMAT, COPY
OF ALL SHOP DRAWINGS AND PRODUCT SUBMITTALS, SERVICE CONTRACTS, HVAC AIR BALANCE
REPORT, AND WASTELINE VIDEO INSPECTION REPORT.
SUBMITTALS/SUBSTITUTIONS
S1. CONTRACTOR SHALL PROVIDE COMPLETE LIST OF SUBMITTALS TO ARCHITECT/OWNER WITHIN 1 WEEK OF
OBTAINING BUILDING PERMIT.
S2. ALL SUBMITTALS SHALL BE COMPLETE AND SUBMITTED WITHIN FIRST 90 DAYS OF WORK.
S3. ALL ITEMS NOTED AS DESIGNED "BY MANUFACTURED" IS A DEFERRED DESIGN AND SHALL BE RESPONSIBILITY OF
THE CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR FINAL DESIGN AND SUBMIT FINAL DESIGN
FOR APPROVAL. CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL FIELD DIMENSIONS.
C47. CAULKING
THE CONTRACTOR SHALL PROVIDE CAULKING AT ALL LOCATIONS OF DIS-SIMILAR MATERIAL BOTH AT
INTERIOR AND EXTERIOR CONDITIONS. CAULKING AT WEATHER CONDITIONS SHALL BE SILICONE BASE
CAULKING. ALL JOINTS SHALL BE PREPARED TO RECEIVE CAULKING AND SHALL HAVE BACKER RODS AS
REQUIRED.
C39. INTERIOR WALL AND CEILING FINISHES SHALL NOT EXCEED FLAME SPREAD CLASSIFICATIONS DICTATED BY ALL
APPLICABLE BUILDING CODES.
C40. GYPSUM BOARD AND SUSPENDED CEILING SYSTEMS SHALL CONFORM TO ALL LOCAL GOVERNING BUILDING
CODES AND ORDINANCES.
C41. PIPES, CONDUITS, OR DUCTS EXCEEDING ONE THIRD OF THE SLAB OR MEMBER THICKNESS SHALL NOT BE PLACED
IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS FOR LOCATION OF SLEEVES AND OTHER ACCESSORIES.
C42. VERIFY FIRE EXTINGUISHER REQUIREMENTS AND LOCATIONS WITH FIRE MARSHAL AND OWNER'S REPRESENTATIVE
PRIOR TO THE FINAL INSTALLATION. FAILURE TO OBTAIN PRELIMINARY APPROVALS WITH LOCAL FIRE
MARSHALL, AND FIRE EXTINGUISHERS ARE REQUIRED TO BE MOVE UPON FINAL INSPECTION, CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COST TO MOVE TO THE DIRECT COSTS.
N/A N/A
LOCATION TYPE THICKNESS "R" VALUE REMARKS
1. SLAB ON GRADE RIGID INSULATION 2" TOTAL THICKNESS R-10 MINIMUM 2" RIGID FOAM INSULATION INSTALLED HORIZONTALLY 4'-0" WIDE DIRECTLY BELOW SLAB AT
PERIMETER - OWENS CORNING FORMULAR 25 PSI.
2. PERIMETER FOUNDATION RIGID INSULATION 2" TOTAL THICKNESS R-10 MINIMUM EXTERIOR, BURIED - PERIMETER - OWENS CORNING FORMULAR 250 INSULATION SHALL BE CONT.
FROM TOP OF FOOTING TO UNDERSIDE OF SLAB. INSULATION TO OCCUR AT PERIMETER OF
OCCUPIED/ HEATED SPACES ONLY. DO NOT PROVIDE INSULATION AT UNHEATED SPACES. REFER
TO DETAILS ON THE DRAWINGS AND THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. WALL - EXTERIOR WALL- MASS WALLS
PER C402.2.2.2
MASS WALL
4. ROOF TRUSSES INSULATION BATTS 10" R-30
5. DUCTWORK/PLUMBING LINES N/A SEE MECHANICAL AND PLUMBING - FOR ALL INSULATION REQUIREMENTS
NOTES:
1. COORDINATE WITH SPECIFICATION FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
2. ALL INSULATION SHALL BE TIGHT, AND NO GAPS SHALL BE LEFT.
3. ALL INSULATION AT PIPES SHALL BE INSTALLED AT COLD SIDE ONLY, NO EXCEPTIONS.
CERTAINTEED CERTA PRO ACOUSTICAL THERM UNFACED FRICTION BATTS or THERMAFIBER SAFE or OWENS CORNING - THERMAL BATT - FILL STUD CAVITY TIGHT AS PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH WALL TYPES AND SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS
INSULATION SCHEDULE
4. WHERE INSULATION IS REQUIRED THE INSULATION SCHEDULE SHALL BE INSTALLED AS SPECIFIED.
5. CONTRACTOR SHALL CAULK ALL ELECTRICAL BOXES AT EXTERIOR WALL AND CEILINGS FOR AIR LEAKAGE.
ENERGY STRATEGY:
PRESCRIPTIVE PER IBC RESCHECK - 2021 IECC RESCHECK - UTAH 2021
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2026 THINK ARCHITECTURE INC.
/2
/2
:3
:2
P
M
D
ES
ER
ET
P
EA
K C
O M
PL
EX
RE
ST
RO
O M
B U
IL
D
IN
G
U T-
N
TS
V
IL
LE
, U T
APRIL 27, 2026
22-054
GENERAL NOTES
G001
-0 4-
-R
ES
TR
O O
M B
UI
LD
IN
G
B
ID
S
ET
BI
D
P A
C
KA
G E
2- A
LT
ER
N A
TE
B
ID
CODE ANALYSIS LEGEND
GENERAL NOTES
MINIMUM REQUIRED STAIR WIDTH
MINIMUM REQUIRED EXIT WIDTH
REQUIRED EXIT LIGHT LOCATIONS. SEE IBC 2015
SECTION 1011. (SHOWN ON ELECTRICAL DRAWINGS)
MAXIMUM OCCUPANT LOAD THRU EXIT
MAXIMUM OCCUPANT LOAD THRU EXIT
FIRE DEPARTMENT CONNECTION (FDC)
EXIT WIDTH PROVIDED
STAIR WIDTH PROVIDED
EXIT
166 OCC.
3'-0"R
4'-0"P
NUMBER OF OCCUPANTS IN EXIT ROUTE
STAIR
166 OCC.
4'-6"R
6'-0"P
ROOMS WITH AN OCCUPANT LOAD OF
50 OR MORE IN GROUP A OCCUPANCY SHALL HAVE
TWO EXITS AND ARE REQUIRED TO HAVE PANIC
HARDWARE (IBC 2015 SECTION 1008.1.10)
(LOCATION SHOWN BY LARGE ARROW)
ACCESSIBLE ELEMENT
NON-ACCESSIBLE ELEMENT
NON-RATED SURFACE MOUNTED FIRE EXTINGUISHER
CABINET AND FIRE EXTINGUISHER
FIRE EXTINGUISHER - 4A: 60BC
FE2
PANIC HARDWARE REQUIRED
CLASS 1 STAND-PIPE (905.3.1 - EXCEPTION #1)
ED
ONE-HOUR FIRE RATED RECESSED FIRE EXTINGUISHER
CABINET AND FIRE EXTINGUISHER
FIRE EXTINGUISHER - 2A: 10BC
FE1
1 HOUR FIRE PARTITION PER IBC 708
2 HOUR FIRE BARRIER PER IBC 707- SEE WALL TYPES
GAS LINE/ METER
ELECTRICAL LINE/ METER
G
E
BUILDING REQUIRED EXIT
KNOX BOX
A2/A3 OCCUPANCY
B OCCUPANCY- WHERE
SHOWN.
CPT
COMMON PATH OF TRAVEL AS PER IBC 1006.2.1
ROOM/AREA REQUIRED EXIT
GENERAL PATH OF EGRESS
EXIT DISCHARGE TO PUBLIC WAY - 2018 IBC 1028
BUILDING OCCUPANCIES
R OCCUPANCY
ACCESSORY
OCCUPANCIES
3 HOUR FIRE WALL- PER IBC 706. SEE WALL TYPES
SF OCC
OLF OL
ROOM/AREA SQUARE FOOTAGE
OCCUPANCY GROUP
OCCUPANT LOAD
OCCUPANCY LOAD FACTOR
(n=NET SF, g=GROSS SF)
VEHICLE CIRCULATION
SOME OCCUPANCIES MAY NOT OCCUR WITHIN THE BUILDING. REFER TO THE CODE ANALYSIS PLANS FOR
OCCUPANCIES WITHIN THE BUILDING.
1 HOUR FIRE BARRIER PER IBC 707
3 HOUR FIRE BARRIER- PE IBC 707 - SEE WALL TYPES
2 HOUR FIRE WALL PER IBC 706- SEE WALL TYPES
S-2 OCCUPANCY
U OCCUPANCY
EXIT TO EGRESS STAIR - 2018 IBC 1023
EATD
SEE G002 FOR COMPLETE WRITTEN CODE ANALYSIS & REVIEW - ALL AREAS SHOWN HERE ARE REFERENCED WITHIN
CODE ANALYSIS.
1. SEE CODE ANALYSIS PLANS FOR THE LOCATION OF FIRE EXTINGUISHERS (FE-1).
2. REFER TO PARTITION AND ASSEMBLY SCHEDULE ON WALL TYPES AND FINISH PLANS.
3. PROVIDE TEMPORARY FIRE PROTECTION DURING CONSTRUCTION AS PER REQUIREMENTS OF THE
INTERNATIONAL FIRE CODE.
4. 2021 IBC SEISMIC DESIGN CATEGORY D - SEE STRUCTURAL DRAWINGS.
5. THE ROOFING ON THIS BUILDING IS REQUIRED TO HAVE A CLASS B FLAME SPREAD INDEX.
6. WALL AND CEILING FINISHES ARE REQUIRED TO HAVE A CLASS B FLAME SPREAD INDEX.
7. CONCEALED INSULATING MATERIALS MUST HAVE A FLAME-SPREAD RATING OF NO MORE THAN 25 AND
A SMOKE DEVELOPED INDEX OF NOT MORE THAN 450. SEE IBC 2021 SECTION 720.2.
8. REFER TO ELECTRICAL DRAWINGS FOR EMERGENCY EXIT SIGNS AND LIGHTS.
9. ALL EXITS ARE TO BE READILY OPERABLE FROM EGRESS SIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE OR EFFORT.
84 SF
LIGHTING CONTROL
Area
LIGHTING
CONTROL
PLUMBING
CHASE
RESTROOM
STORAGE48 SF
RESTROOM 407
48 SF
RESTROOM 403
48 SF
RESTROOM 404
48 SF
RESTROOM 408
33 SF
PLUMBING CHASE
84 SF
STORAGE
48 SF
RESTROOM 406
48 SF
RESTROOM 405
34 SF
PLUMBING CHASE 2
48 SF
RESTROOM 402
48 SF
RESTROOM 401
RESTROOM
U
RESTROOM
U
RESTROOM
U
RESTROOM
U
RESTROOM
U
RESTROOM
U
RESTROOM
U
RESTROOM
U
STORAGE
U
LIGHTING CONTROL
U
CPT = 26' - 10"
CPT = 8' - 8"CPT = 8' - 8"
CPT = 8' - 8"CPT = 8' - 8"
CPT = 8' - 8" CPT = 8' - 8"
CPT = 8' - 8" CPT = 8' - 8"
C
PT
4'
5"
C
PT
1'
6"
CPT = 26' - 10"
NOTE:
TOTAL GROSS SQUARE FOOTAGE OF
BUILDING IS 794.00 SQ. FT. AREAS IS
CALCULATED FROM OUTSIDE FACE OF
WALL.
BUILDING OCCUPANCY SHALL BE A
"U" OCCUPANCY AS DEFINED WITHIN
WRITTEN CODE ANALYSIS.
FIRE
EXTINGUISHER
FIRE
EXTINGUISHER
PROJECT NO.
SHEET TITLE:
Pl o t D a te
Architecture Interior Design Landscape Architecture Land Planning Construction Management
7927 So. Highpoint Parkway, Suite 300
Sandy, Utah 84094
ph. 801.269.0055 fax 801.269.1425 www.thinkaec.com
The designs shown and described herein including all technical drawings, graphic representation & models thereof, are proprietary & can not be copied, duplicated, or commercially exploited in whole or in part without the sole and express written permission from THINK Architecture, inc.
These drawings are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice.
SHEET NUMBER:
REVISIONS:
DATE:
2026 THINK ARCHITECTURE INC.
/2
/2
:3
:3
P
M
D
ES
ER
ET
P
EA
K C
O M
PL
EX
RE
ST
RO
O M
B U
IL
D
IN
G
U T-
N
TS
V
IL
LE
, U T
APRIL 27, 2026
22-054
LIFE SAFETY PLAN AND
AREA PLAN
G002
-0 4-
-R
ES
TR
O O
M B
UI
LD
IN
G
B
ID
S
ET
BI
D
P A
C
KA
G E
2- A
LT
ER
N A
TE
B
ID
1/4" = 1'-0" G002
AREA PLAN- NET SQ. FT. 2
1/4" = 1'-0" G002
RESTROOM BUILDING- LIFE SAFETY CODE ANAYSIS 1
EXIT
ROUTEEXIT
NOTES:
1. ALL TACTILE EXIT SIGNAGE SHALL COMPLY CBC SECTIONS 1013.4, 11B-703.2, 11B-703.2.1 THRU 2.9, AND ALL
OTHER APPLICABLE CODES.
2. SEE PLANS FOR SIGN LOCATIONS.
B
GRADE 2 BRAILLE
+4 8"
M
IN
. A .F
.F
+6 0"
M A
X.
A
.F .F
. 1 1/
6"
M
IN
M
IN
3/ 8"
3/ 8"
M
IN
CONTRASTING BACKGROUND
A
GRADE 2 BRAILLE
+4 8"
M
IN
. A .F
.F
+6 0"
M A
X.
A
.F .F
CONTRASTING BACKGROUND
1/32" RAISED CHARACTERS. 1" HIGH MIN.
CONTRASTING LETTERS
1" M
IN
M
IN
3/ 8"
M
IN
3/ 8"
1/32" RAISED CHARACTERS. 1" HIGH MIN.
CONTRASTING LETTERS
ROOM
NAME
NOTES:
1. ALL TACTILE EXIT SIGNAGE SHALL COMPLY CBC SECTIONS 1013.4,
11B-703.2, 11B-703.2.1 THRU 2.9, AND ALL OTHER APPLICABLE CODES.
2. SEE PLANS FOR SIGN LOCATIONS.
GRADE 2 BRAILLE
PROVIDE CONT. FROSTING BEHIND AT GLAZING
CONTRASTING BACKGROUND
1/32" RAISED CHARACTERS 1" HIGH MIN.
CONTRASTING LETTERS
+48" MIN.
A.F.F.
+60" MAX.
A.F.F.
TYP.
1/2"
1" M
IN
M
IN
3/ 8"
M
IN
7/
" MENWOMEN
6" M
IN
6" M
IN
" M
A X
A
BO
V E
FI
N
IS
H
FL
O
O R
TY
PI
C A
L NOTE:
1. SIGNAGE WHERE INDICATED ON PLANS & REQ'D BY CODE. SUPPLIED AND INSTALLED BY CONTRACTOR
2. SIGNAGE SHALL HAVE EASED EDGES.
3. ALL SIGNAGE SHALL COMPLY WITH CBC 11B-703.7.2.6
4. ALL SIGNAGE SHALL BE INSTALLED ON THE LATCH SIDE OF THE DOOR WITH A MINIMUM OF 18" CLEAR
FLOOR SPACE.
" M
IN
A
BO
V
E
FI
N
IS
H
FL
O
O R
TY
PI
C A
L
" T
O
0" A
BO
V
E
FI
N
IS
H
FL
O
O R
TY
PI
C A
L
UNISEX
ADA SIGN
LOCK HASP
CONCRETE
CURB
2' -1
1/
4" 3'
-0
/4
1/
2"1' -6
/4
6' -5
/2
1'-8 3/4"
2' -1
3/
4" 2'
-3
/4
1' -3
/2
HOOK
ELEVATION PLAN SECTION
ADA SIGN
LOCK HASP
CONCRETE
CURB
1' -8
1'-3"
ELEVATION
MAXIMUM
OCCUPANCY
FOR EACH
ROOM
XX
2019 CBC 1004.9 POSTING OF OCCUPANT LOAD:
EVERY ROOM OR SPACE THAT IS AN ASSEMBLY
OCCUPANCY SHALL HAVE THE OCCUPANT LOAD OF
THE ROOM OR SPACE POSTED IN A CONSPICUOUS
PLACE, NEAR THE MAIN EXIT OR EXIT ACCESS
DOORWAY FROM THE ROOM OR SPACE. POSTED SIGNS
SHALL BE OF AN APPROVED LEGIBLE PERMANENT
DESIGN AND SHALL BE MAINTAINED BY THE OWNER OR
AUTHORIZED AGENT.
NO TACTILE OR BRAILLE CHARACTERS REQUIRED.
6"
6"
SEE G101 FOR SIGN LOCATION AND OCCUPANCY
NUMBER
32" CLR.
18" MIN.
" M
IN
12" MIN.
TYPICAL STAIR TREAD
STRIPING TO ALERT THE VISUAL
IMPAIRED SHALL BE OF CONTRASTING
COLOR FROM STAIR TREAD.
AT INTERIOR STAIRS, PROVIDE STRIPING AT THE UPPER APPROACH AND LOWEST TREAD,
AT EXTERIOR STAIRS, PROVIDE STRIPING AT THE UPPER APPROACH AND AT ALL TREADS
STRIPING SHALL BE AS SLIP RESISTANT AS STAIR TREAD
1" M
A X.
2" M
IN
4" M
A X.
WALL WHERE OCCURS
" M
IN
.CLR. OPENING
32" MIN.
GRAB BAR
7"
9"
CENTERLINE OF
ROLL PAPER
HOLDER
WITHOUT STOPS
" M
IN
. C
LR
" M
IN
. C
LR
WALL, LAVATORY, OR
TOILET PARTITION
(WHERE OCCURS)
CONTROLS FOR
WATER CLOSETS
SHALL BE ON
THE WIDE SIDE
PLAN
60" MIN. CLEARANCE
36" GRAB BAR MIN.
6" MIN.
18" MAX.
17" MIN.
" M
A X.
" M
IN
" M
IN
" M
IN
. C
LE
A
RA
N
C E
SIDE ELEV.
54" MIN.
12" MAX. 42" MIN. GRAB BAR
1 1/2" MIN.
" M
A X.
" M
IN
1/
2" M
IN
" M
IN
24" MAX. 7" - 9"
"-1
9"
" M
IN
NO PROJECTING
OBJECTS THIS AREA
SANITARY NAPKIN DISPOSAL
BACK WALL
" M
A X.
" M
IN
1/
2" M
IN
" M
IN
1 1/2" MIN.12" MIN. 24" MIN.
36" MIN.
TOILET PAPER HOLDER
" M
IN
" M
IN
40" MIN.
SECTION @DOOR / THRESHOLD
1/2" MAX HEIGHT + 1/4" - 1/2" SLOPE =
THRESHOLD
10" KICK PLATE OR SMOOTH FULL
WIDTH OF DOOR
PUSH SIDE
HARDWARE
OPERABLE WITHOUT GRASPING
- MAX. EFFORT FOR EXTERIOR DOORS 5 LBS
- MAX. EFFORT FOR INTERIOR DOORS 5 LBS
- REQ'D FIRE DOOR MAX EFFORT 15 LBS
" M
IN
4"
H A
RD
W
A
RE
H
EI
G H
T
DOOR CLEARANCES
12".
4"
PROVIDE THIS ADDITIONAL
SPACE IF DOOR IS EQUIPPED
W/ LATCH & CLOSER
32" MIN. CLEAR
PULL SIDE
24" MIN. CLEAR @EXTERIOR
18" MIN. CLEAR @INTERIOR
" M
IN
. P
U
LL
S
ID
E
LE
V
EL
A
RE
A
M A
X.
S
LO
PE
:4
" M
IN
. P
U
SH
S
ID
E
(N O
L A
TC
H
-C
LO
SE
R)
" M
IN
. P
U
SH
S
ID
E
PLAN
60" MIN.
36" GRAB BAR MIN.
6" MIN. 18" MIN.
CONTROLS FOR WATER CLOSETS
SHALL BE ON THE WIDE SIDE
18" MAX.
17" MIN.
CLR. OPENING
32" MIN.FRONT APPROACH
18" MIN.
APPROACH
36" MIN. HINGE
" M
IN
. C
LR
60" MIN. DIA. CLR.
" M
IN
7"
9"
CENTERLINE OF ROLL
PAPER HOLDER WITHOUT
STOPS
GRAB BAR
" M
IN
" M
A X.
" M
IN
" M
IN
. C
LE
A
RA
N
C E
KID’S
CLUB
.0
0°
DOOR
ROOM IDENTIFICATION SIGN
WITH BRAILLE, SEE , ,
& CBC 11B-703.4 FOR CRITERIA, DIMENSIONS,
& MOUNTING HEIGHTS.
NOTE: SEE PLANS FOR SIGN LOCATION W/ DIFFERING CONDITIONS
CLEAR SPACE
18" MIN.
CENTER CLEAR SPACE ON
CENTER OF TACTILE CHARACTERS
C
LE
A R
SP
A
C E
" M
IN
PLAN
36" CLR.
42" GRAB BARS
19" MAX.
17" MIN.
" M
IN
" M
IN
TOILET PARTITION
SELF CLOSING
DOOR
SIDE ELEVATION
TOILET
PARTITION
" M
IN
6"
M A
X. 24" MAX. 7" - 9"
9" 1
1/ 2"
M
IN
" M
IN
NO PROJECTING
OBJECTS THIS AREA
12" MAX. 42" MIN. GRAB BAR
TOILET
PAPER
HOLDER
SIDE ELEVATION
PLAN
1'-5" MIN.
MIRROR
LAVATORY
INSULATE WATER
AND DRAIN PIPES
2' -5
" C
LE
A R
2' -1
0" M
A X.
T .O
. L A
V
IT
O
RY
(KNEE CLEARANCE)
8" MIN
(TOE CLEARANCE)
6" MAX.
3' -4
M
A X.
) B .O
. M
IR
RO
R
LAVATORY
LINE OF FIRST OBSTRUCTION
BELOW AT 27" A.F.F.
19" MAX.
48" MIN.
CLEAR
FLOOR
SPACE
" M
IN
ADJACENT WALL
17" MIN.
1' -6
" M
IN
CENTERLINE
APRON WHERE OCCURS
ELEVATION ELEVATION
SCHEDULED BASE1'-4" 1'-4"
M A
X
" T
O S
PO
U
T
SE
E
EL
EV
A
TI
O N
S
FO
R H
EI
G
H T
M A
X
" T
O S
PO
U
T
VARIES SEE PLAN1'-4"
32" MIN.
M A
X
" T
O S
PO
U
T
SE
E
EL
EV
A
TI
O N
S
FO
R H
EI
G
H T
WALL TILE (WT-9)
ON 3 SIDES. SEE
ELEVATIONS
PLAN
32" MIN.
4' -0
4' -0
"2' -6
" M A
X
1' -6
" M
IN
1'-4" 1'-4"
2'-8"
2' -6
" M A
X
1' -6
" M
IN
VARIES1'-4" SEE PLAN
E.W.C.
E.W.C.
PLAN
LEG CLEARANCE
" M
IN
M
IN
9" 36 " M
A X.
KNEE CLEARANCE
8" MIN.
6" MAX TOE CLEARANCE
17" MIN. DEPTH
5" MAX 1'-3" MIN
THERMOSTAT
FIRE ALARM PULL BOX
" M
A X
SWITCH
" M
IN
" M
A X.
RECEPTACLE OUTLET
U .N
.O
" M
IN
DOOR
THRESHOLD
1/ 4"
M A
X.
1/ 2"
M A
X.
FINISH FLOOR
LEVEL
THRESHOLD
COMPRESSED CARPET
1/4" MAX. BELOW
THRESHOLD
4"
" M
IN
8" MIN.
11" MIN.
MAX.
6"
9" M
IN
TOE & KNEE CLEARANCE PER
CBC 11B-306.2 & 11B-306.3
17" - 25" DINING/WORK SURFACE HEIGHT
PER CBC 11B-902.3
DISPLAY CONDITIONS
RAISED SYMBOL
ELEVATION - POOL ONLY PLAN ELEVATION
2'-3" MAX.
5'-0" MIN. CLEAR
VARIES - SEE PLAN
TA-4
GRAB BAR
SLOPE FLOOR
1:48 MAX.
2' -6
" M
IN
. C
LE
A R
V A
RI
ES
SE
E
PL
A N
TA-14
SOAP DISP.
MAX. THRESHOLD
1/2" MAX.
FOLDING SEAT
TA-6
6" MAX.
6" M
A X.
SH-3
SHOWER
HEAD
6' -6
/8
GRAB BAR
TA-14
SOAP DISP.
TA-4
TA-6
FOLDING SEAT
SEE
MOUNT PER MFR.
RECOMMENDATIONS
4' -0
3/
8"
T O
D
IV
ER
TE
R
3' -4
" T O
D
IS
PE
N
SE
R
1' -6
2'-3" MAX.
19"-27"
1'-0"
C
LG
. H
EI
G H
T
PE
R
PL
A N
2' -9
" T
O
1" T
O V
A
LV
E
3' -1
9/
8" T
O H
EA
D
6" MAX.
HAND-HELD &
FIXED SHOWER
HEADS
SH-2
SHOWER HOSE
SHALL BE
59" MIN.
SOAP DISP.
TA-14
GRAB BAR
TA-4
TA-6
FOLDING SEAT
SEE
MOUNT PER MFR.
RECOMMENDATIONS
2' -9
4' -0
"M A
X
TO
B
RA
C
KE
T
C
LG
. H
EI
G H
T
PE
R
PL
A N
1'-0"
19"-27"
2'-3" MAX.
1' -6
3' -4
" T O
D
IS
PE
N
SE
R
" T
O
1" T
O V
A
LV
E
3' -1
5/
8" T
O D
IV
ER
TE
R
6' -6
/8
M
EN
'S
) 6 '-0
W
O M
EN
'S
6" MAX. 40
" M
IN
40" MIN.
" M
IN
" M
IN
" M
A X.
LATCH ROD OR
HOOKS
ACCESSIBLE LOCKER
" M
IN
4' -0
" M A
X.
FO
RW
A
RD
R
EA
C H
VENDING MACHINE
AREA OF CONTROLS, DISPENSER
" M
IN
4' -0
" M A
X.
SI
D
E
RE
A C
H
2' -7
" M
IN
2' -1
0" M
A X.
X
NOTE: VERTICAL CHANGING
STATIONS MAY NOT COMPLY
X
BABY DIAPER
CHANGING STATION
4' -0
/6
4" M
A X.
9"
1' -5
" M
A X.
HAND DRYER
T.
O
. C O
N
TR
O
LS
3' -4
" M
A X.
" M
A X.
TOILET TISSUE &
SEAT COVER
LAVATORY
" M
IN
" M
A
X. INSULATE WATER &
DRAIN LINES
" M
A X.
GRAB BAR
" M
IN
" M
A X.
HIGH DRINKING
FOUNTAIN
" M
A X.
LOW DRINKING
FOUNTAIN
SPOUT
MIRROR
L
A V
S/ C
O U
N
TE
RS
" M
A X.
FINISH FLOOR
NOTE: SEE DETAIL 1/A501 FOR BACKING DETAILS
3' -8
" M A
X
1'-1 1/2"
O
TH
ER
L O
C A
TI
O
N S
" M
A X
DISABLED ACCESS REQUIREMENTS
CLEAR FLOOR SPACE FOR
WHEELCHAIRS
1. MINIMUM CLEAR FLOOR OR GROUND SPACE REQUIRED TO ACCOMODATE
A SINGLE, STATIONARY WHEELCHAIR AND OCCUPANT IS 30 INCHES X 48
INCHES. MINIMUM CLEAR FLOOR OR GROUND SPACE FOR WHEELCHAIRS
MAY BE POSITIONED FOR FORWARD OR PARALLEL APPROACH TO AN
OBJECT. FLOOR OR GROUND SPACE FOR WHEELCHAIRS MAY BE PART OF
THE KNEE SPACE REQUIRED UNDER SOME OBJECTS.
2. PROVIDE AN ADDITIONAL 12 INCHES WIDTH ON ONE SIDE FOR ALCOVES
GREATER THAN 15 INCHES DEEP AND DESIGNED FOR SIDE APPROACH.
3. PROVIDE AN ADDITIONAL 6 INCHES WIDTH ON ONE SIDE FOR ALCOVES
GREATER THAN 24 INCHES DEEP AND DESIGNED FOR FRONT APPROACH.
HAZARDS & PROTRUDING OBJECTS
1. OBJECTS PROJECTING FROM WALLS WITH THEIR LEADING EDGES BETWEEN 27
INCHES AND 80 INCHES ABOVE THE FINISHED FLOOR SHALL PROTRUDE NO
MORE THAN 4 INCHES INTO WALKS, HALLS, CORRIDORS, PASSAGEWAYS, OR
AISLES.
2. OBJECTS MOUNTED WITH THEIR LEADING EDGES AT OR BELOW 27 INCHES
ABOVE THE FINISHED FLOOR MAY PROTRUDE ANY MOUNT.
3. FREE-STANDING OBJECTS MOUNTED ON POSTS/PYLONS MAY OVERHANG 12
INCHES MAXIMUM FROM 27 INCHES TO 80 INCHES ABOVE THE GROUND OR
FINISHED FLOOR.
4. PROTRUDING OBJECTS SHALL NOT REDUCE THE REQUIRED CLEAR WIDTH OF
AN ACCESSIBLE ROUTE OR MANEUVERING SPACE.
5. ANY OBSTRUCTION OVERHANGING A PEDESTRIAN WAY SHALL BE A
MINIMUM OF 80 INCHES ABOVE THE WALKING SURFACE AS MEASURED TO
THE BOTTOM OF THE OBSTRUCTION.
PARKING
1. SURFACE SLOPES OF PARKING SPACES FOR THE PHYSICALLY DISABLED SHALL
NOT EXCEED 1/4 INCH PER FOOT (2% GRADIENT) IN ANY DIRECTION.
2. DISABLED PARKING SPACES SHALL BE LOCATED SO AS NOT TO REQUIRE
USERS TO WHEEL OR WALK BEHIND ANY OTHER NON-DISABLED OR DISABLED
PARKING SPACE.