This is a toll cost model comparison analysis prepared by the Utah Department of Transportation (UDOT) evaluating three procurement approaches for roadside toll system (RTS) and back office system (BOS) equipment and services. The document presents detailed financial projections spanning a 12-year period from 2025 through 2036, comparing Model 1 (sole source for both RTS and BOS), Model 1b (RFP for both systems), and Model 1c (sole source for RTS with RFP for BOS). All three models utilize transponder-based tolling technology without license plate recognition (LPR) operating on a 24/7 basis across 16 toll zones. The project assumes an average annual daily traffic (AADT) of 11,718 vehicles per zone with a 55% HOV participation rate, and projects toll revenues of $37.3 million over the 10-year operational period.

Model 1 requires UDOT CAPEX contributions of $8 million (2025-2027) and annual OPEX contributions of $14 million (2028-2035), with total 10-year costs of $46.2 million against revenues of $37.3 million, resulting in a net investment requirement of $8.9 million. Model 1b presents the highest cost scenario at $59.7 million in total costs with a $22.5 million net investment, while Model 1c offers a middle-ground approach at $49.2 million in total costs and $11.9 million net investment. Key cost drivers include roadside toll equipment ($2.2-7 million annually), back office system development ($1.1-1.9 million), labor costs for customer billing operations (CBO), and ongoing RTS transaction fees. The analysis incorporates assumptions regarding registered user growth from 20,000 to 31,000 monthly active accounts, $0.75 average toll per zone transaction, and a 40% leakage rate for unidentified vehicles, with infrastructure maintenance beginning in 2027 at $300,000 annually.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Model Comparison Summary

Model 1Model 1bModel 1c
Procurement ApproachSole Source for RTS /
Sole Source for BOSRFP for RTS /
RFP for BOSSole Source for RTS /

RFP for BOS

Toll Solution TypeTransponder-Based (no LPR)
Existing systemTransponder-Based (no LPR)
Existing systemTransponder-Based (no LPR)

Existing system

Toll Solution Operational Configuration24x7 Tolling24x7 Tolling24x7 Tolling
10 YR AADT Per Zone11,71811,71811,718
10 YR Average %HOV55.00%55.00%55.00%
10 YR Average %SOV - Registered5.00%5.00%5.00%
10 YR Average %SOV - Unregistered0.00%0.00%0.00%
10 YR Average %SOV - Unpaid/Leakage40.00%40.00%40.00%
Average Per Zone Toll Transaction (10 Year)$ 0.75$ 0.75$ 0.75
10 Year Toll Revenue$ 37,255,438$ 37,255,438$ 37,255,438
10 YR CAPEX$ 21,168,000$ 34,718,000$ 24,150,000
10 YR OPEX$ 25,012,927$ 25,012,927$ 25,012,927
10 Year TCO (CAPEX + OPEX)$ 46,180,927$ 59,730,927$ 49,162,927
10 Year NET Investment$ (8,925,488)$ (22,475,488)$ (11,907,488)
UDOT Capital Investment (2025-2027)$ 8,000,000$ 23,200,000$ 11,000,000
UDOT OPEX Contributions (2028-2035)$ 14,000,000$ 14,000,000$ 14,000,000

Model 1

202520262027202820292030203120322033203420352036
SectionInputs & OutputsYear 0 - ImplementationYear 1 - ImplementationYear 2 - Go LiveYear 3 - Ramp UpYear 4 - Steady StateYear 5 - Steady StateYear 6 - Steady StateYear 7 - Steady StateYear 8 - Steady StateYear 9 - Steady StateYear 10 - Steady StateYear 11 - Steady State10 Year Totals
Model InputsAADT Per Zone (Average)8450887393169782102711078511324118901248413109137641445211718
Number of Toll Zones161616161616161616161616
Growth1.05
% Annual Toll SOV User Transactions (Registered Users)5%5%5%5%5%5%5%5%5%5%5%5%5%
% Annual HOV Transactions55%55%55%55%55%55%55%55%55%55%55%55%55%
% Total Annual Pay By Mail (Recovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Pay By Mail (Unrecovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Leakage Rate (Vehicle Transactions Not Identified)40%40%40%40%40%40%40%40%40%40%40%40%40%
Average Number of Zone Transactions User Per Trip2.702.702.702.702.702.702.702.702.702.702.702.70
Average Number of Trips Per Statement2.502.502.502.502.502.502.502.502.502.502.502.50
Average Number of Trips Per User Account Per Month8.808.808.808.808.808.808.808.808.808.808.808.80
Average Zone Toll Price (Registered User)$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75
Average Zone Toll Price (Pay by Mail)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Camera Unit Annual Fee (Per Zone)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Toll System Video Transaction Fee (Per Vehicle)$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10
HOV - Per HOV Zone Transaction Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO/DPS - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TIP - Per Registered SOV/HOV Zone Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Total Number of Monhtly Active Registered Users20,00021,00022,00023,00024,00025,00026,00027,00028,00029,00030,00031,000
CBO - Total Number of Registration Hold Accounts- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
CBO - Cost Per Active Registered User Per Year$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
CBO - Pay By Mail Statement Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Fee$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00
CBO - Pay By Mail Processing Fee Percentage20%20%20%20%20%20%20%20%20%20%20%20%
CBO - Registered User Per Trip Fee Percentage35%35%35%35%35%35%35%35%35%35%35%35%
Traffic & Revenue EstimateProjected Total Annual Vehicle Zone Transactions49,348,00051,815,40054,406,17057,126,47959,982,80262,981,94366,131,04069,437,59272,909,47176,554,94580,382,69284,401,827
Projected Annual SOV Zone Toll Transactions2,467,4002,590,7702,720,3092,856,3242,999,1403,149,0973,306,5523,471,8803,645,4743,827,7474,019,1354,220,091
Projected Annual HOV Zone Transactions27,141,40028,498,47029,923,39431,419,56332,990,54134,640,06836,372,07238,190,67540,100,20942,105,22044,210,48146,421,005
Projected Annual Pay By Mail Zone Transactions000000000000
Project Annual Pay By Mail Zone Transactions (Unrecoverable)00000000000
Projected Annual Uncollectable Zone Transactions19,739,20020,726,16021,762,46822,850,59123,993,12125,192,77726,452,41627,775,03729,163,78930,621,97832,153,07733,760,731
Projected Total Annual Zone Trips18,277,03719,190,88920,150,43321,157,95522,215,85323,326,64524,492,97825,717,62727,003,50828,353,68329,771,36731,259,936
Projected Annual Registered SOV Zone Toll Trips913,852959,5441,007,5221,057,8981,110,7931,166,3321,224,6491,285,8811,350,1751,417,6841,488,5681,562,997
Projected Annual Registered HOV Zone Trips10,052,37010,554,98911,082,73811,636,87512,218,71912,829,65513,471,13814,144,69514,851,92915,594,52616,374,25217,192,965
Projected Annual Pay By Mail Zone Trips000000000000
Projected Annual Pay By Mail Trips (Unrecoveable)00000000000
Projected Annual Uncollectable Zone Trips7,310,8157,676,3568,060,1738,463,1828,886,3419,330,6589,797,19110,287,05110,801,40311,341,47311,908,54712,503,974
Projected Average Per Trip Toll Fee (Registered User)2.032.032.032.032.032.032.032.032.032.032.032.03
Projected Average Per Trip Toll Fee (Pay by Mail User)0.000.000.000.000.000.000.000.000.000.000.000.00
Projected Annual Toll Revenue (Registered User)$ 1,850,550$ 1,943,078$ 2,040,231$ 2,142,243$ 2,249,355$ 2,361,823$ 2,479,914$ 2,603,910$ 2,734,105$ 2,870,810$ 3,014,351$ 3,165,068
Projected Annual Pay By Mail Toll Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Projected Annual Registration Hold Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Sources of Revenue$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00
Total Projected Revenues$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
CAPEXProject Management & Consultant Fees (Through GoLive & Hyper Care)$ 1,000,000$ 1,000,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000
Project Transition & Migration Costs$ 500,000$ 500,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Markting & Engagement$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000
Operational Oversight Consultants & UDOT Staff Augmentation$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Decomissioning Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Structures$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Roadside Toll Equipment$ 2,200,000$ 2,200,000$ 2,200,000$ 2,200,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,00020% reduction due to reconstruction replacement on I-15
Infrastructure - ITS Cabinets$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - ITS Network & Power$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Back Office System$ 1,134,000$ 1,134,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CAPEX$ 4,884,000$ 4,884,000$ 2,500,000$ 2,500,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 21,168,000.00
OPEXRTS - Transaction Costs (not based on video) Current monthly is $17.1K$ 205,212$ 211,368$ 217,709$ 224,241$ 230,968$ 237,897$ 245,034$ 252,385$ 259,956$ 267,755$ 275,788$ 284,061
RTS - Unit Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Labor Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO & DPS - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registered Users Costs
CBO - Registered User Trip Costs
CBO - Pay by Mail Statement Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Pay by Mail Processing Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Labor Costs$ 1,200,000$ 1,260,000$ 1,323,000$ 1,389,150$ 1,458,608$ 1,531,538$ 1,608,115$ 1,688,521$ 1,772,947$ 1,861,594$ 1,954,674$ 2,052,407
TIP - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
HOV App - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - Clean Vehicle Pass$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - UDOT Website$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure Maintenance$ - 0$ - 0$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000
Total OPEX$ 1,405,212$ 1,471,368$ 1,840,709$ 1,913,391$ 1,989,575$ 2,069,435$ 2,153,149$ 2,240,905$ 2,332,903$ 2,429,349$ 2,530,461$ 2,636,469$ 25,012,926.59
Model OutputsTotal Revenue$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
Total Costs (CAPEX + OPEX)$ (6,289,212)$ (6,355,368)$ (4,340,709)$ (4,413,391)$ (2,789,575)$ (2,869,435)$ (2,953,149)$ (3,040,905)$ (3,132,903)$ (3,229,349)$ (3,330,461)$ (3,436,469)$ (46,180,927)
UDOT CAPEX Contribution$ 4,000,000$ 4,000,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 8,000,000
UDOT Annual Opex Contribution$ - 0$ - 0$ 2,000,000$ 2,000,000$ - 0$ - 0$ - 0$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 14,000,000
Net Balance (Revenue + Contribution - Costs)$ 211,338$ 237,709$ 349,522$ 378,852$ 109,780$ 142,388$ 176,765$ 2,213,004$ 2,251,202$ 2,291,461$ 2,333,890$ 2,378,600$ 13,074,512

Model 1b

202520262027202820292030203120322033203420352036
SectionInputs & OutputsYear 0 - ImplementationYear 1 - ImplementationYear 2 - Go LiveYear 3 - Ramp UpYear 4 - Steady StateYear 5 - Steady StateYear 6 - Steady StateYear 7 - Steady StateYear 8 - Steady StateYear 9 - Steady StateYear 10 - Steady StateYear 11 - Steady State10 Year Totals
Model InputsAADT Per Zone (Average)8450887393169782102711078511324118901248413109137641445211718
Number of Toll Zones161616161616161616161616
Growth

ID#AAABopK8MyA Grant Farnsworth (2025-07-24 17:01:17)

Added growth factor as current year's revenue is $2.7M and recent months have been 20% higher than previous year's.1.05
% Annual Toll SOV User Transactions (Registered Users)5%5%5%5%5%5%5%5%5%5%5%5%5%
% Annual HOV Transactions55%55%55%55%55%55%55%55%55%55%55%55%55%
% Total Annual Pay By Mail (Recovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Pay By Mail (Unrecovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Leakage Rate (Vehicle Transactions Not Identified)40%40%40%40%40%40%40%40%40%40%40%40%40%
Average Number of Zone Transactions User Per Trip2.702.702.702.702.702.702.702.702.702.702.702.70
Average Number of Trips Per Statement2.502.502.502.502.502.502.502.502.502.502.502.50
Average Number of Trips Per User Account Per Month8.808.808.808.808.808.808.808.808.808.808.808.80
Average Zone Toll Price (Registered User)$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75
Average Zone Toll Price (Pay by Mail)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Camera Unit Annual Fee (Per Zone)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Toll System Video Transaction Fee (Per Vehicle)$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10
HOV - Per HOV Zone Transaction Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO/DPS - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TIP - Per Registered SOV/HOV Zone Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Total Number of Monhtly Active Registered Users20,00021,00022,00023,00024,00025,00026,00027,00028,00029,00030,00031,000
CBO - Total Number of Registration Hold Accounts- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
CBO - Cost Per Active Registered User Per Year$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00

CBO - Pay By Mail Statement Fee ID#AAABm5AmJ6M Taylor Bullough (2025-07-02 18:31:45)

Pass-through, estimate about $2.50$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Fee$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00
CBO - Pay By Mail Processing Fee Percentage20%20%20%20%20%20%20%20%20%20%20%20%
CBO - Registered User Per Trip Fee Percentage35%35%35%35%35%35%35%35%35%35%35%35%
Traffic & Revenue EstimateProjected Total Annual Vehicle Zone Transactions49,348,00051,815,40054,406,17057,126,47959,982,80262,981,94366,131,04069,437,59272,909,47176,554,94580,382,69284,401,827
Projected Annual SOV Zone Toll Transactions2,467,4002,590,7702,720,3092,856,3242,999,1403,149,0973,306,5523,471,8803,645,4743,827,7474,019,1354,220,091
Projected Annual HOV Zone Transactions27,141,40028,498,47029,923,39431,419,56332,990,54134,640,06836,372,07238,190,67540,100,20942,105,22044,210,48146,421,005
Projected Annual Pay By Mail Zone Transactions000000000000
Project Annual Pay By Mail Zone Transactions (Unrecoverable)00000000000
Projected Annual Uncollectable Zone Transactions19,739,20020,726,16021,762,46822,850,59123,993,12125,192,77726,452,41627,775,03729,163,78930,621,97832,153,07733,760,731
Projected Total Annual Zone Trips18,277,03719,190,88920,150,43321,157,95522,215,85323,326,64524,492,97825,717,62727,003,50828,353,68329,771,36731,259,936
Projected Annual Registered SOV Zone Toll Trips913,852959,5441,007,5221,057,8981,110,7931,166,3321,224,6491,285,8811,350,1751,417,6841,488,5681,562,997
Projected Annual Registered HOV Zone Trips10,052,37010,554,98911,082,73811,636,87512,218,71912,829,65513,471,13814,144,69514,851,92915,594,52616,374,25217,192,965
Projected Annual Pay By Mail Zone Trips000000000000
Projected Annual Pay By Mail Trips (Unrecoveable)00000000000
Projected Annual Uncollectable Zone Trips7,310,8157,676,3568,060,1738,463,1828,886,3419,330,6589,797,19110,287,05110,801,40311,341,47311,908,54712,503,974
Projected Average Per Trip Toll Fee (Registered User)2.032.032.032.032.032.032.032.032.032.032.032.03
Projected Average Per Trip Toll Fee (Pay by Mail User)0.000.000.000.000.000.000.000.000.000.000.000.00
Projected Annual Toll Revenue (Registered User)$ 1,850,550$ 1,943,078$ 2,040,231$ 2,142,243$ 2,249,355$ 2,361,823$ 2,479,914$ 2,603,910$ 2,734,105$ 2,870,810$ 3,014,351$ 3,165,068
Projected Annual Pay By Mail Toll Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Projected Annual Registration Hold Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Sources of Revenue$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00
Total Projected Revenues$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
CAPEXProject Management & Consultant Fees (Through GoLive & Hyper Care)$ 3,000,000$ 3,000,000$ 2,000,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000
Project Transition & Migration Costs$ 500,000$ 500,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Markting & Engagement$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000
Operational Oversight Consultants & UDOT Staff Augmentation$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Decomissioning Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Structures$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Roadside Toll Equipment$ 7,000,000$ 7,000,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,00020% reduction due to reconstruction replacement on I-15
Infrastructure - ITS Cabinets$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - ITS Network & Power$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Back Office System$ 1,934,000$ 1,934,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CAPEX$ 12,484,000$ 12,484,000$ 2,550,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 34,718,000.00
OPEXRTS - Transaction Costs (not based on video) Current monthly is $17.1K$ 205,212$ 211,368$ 217,709$ 224,241$ 230,968$ 237,897$ 245,034$ 252,385$ 259,956$ 267,755$ 275,788$ 284,061
RTS - Unit Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Labor Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO & DPS - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registered Users Costs
CBO - Registered User Trip Costs
CBO - Pay by Mail Statement Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Pay by Mail Processing Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Labor Costs$ 1,200,000$ 1,260,000$ 1,323,000$ 1,389,150$ 1,458,608$ 1,531,538$ 1,608,115$ 1,688,521$ 1,772,947$ 1,861,594$ 1,954,674$ 2,052,407
TIP - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
HOV App - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - Clean Vehicle Pass$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - UDOT Website$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure Maintenance$ - 0$ - 0$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000
Total OPEX$ 1,405,212$ 1,471,368$ 1,840,709$ 1,913,391$ 1,989,575$ 2,069,435$ 2,153,149$ 2,240,905$ 2,332,903$ 2,429,349$ 2,530,461$ 2,636,469$ 25,012,926.59
Model OutputsTotal Revenue$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
Total Costs (CAPEX + OPEX)$ (13,889,212)$ (13,955,368)$ (4,390,709)$ (2,713,391)$ (2,789,575)$ (2,869,435)$ (2,953,149)$ (3,040,905)$ (3,132,903)$ (3,229,349)$ (3,330,461)$ (3,436,469)$ (59,730,927)
UDOT CAPEX Contribution$ 11,600,000$ 11,600,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 23,200,000
UDOT Annual Opex Contribution$ - 0$ - 0$ 2,000,000$ 2,000,000$ - 0$ - 0$ - 0$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 14,000,000
Net Balance (Revenue + Contribution - Costs)$ 211,338$ 237,709$ 299,522$ 2,078,852$ 109,780$ 142,388$ 176,765$ 2,213,004$ 2,251,202$ 2,291,461$ 2,333,890$ 2,378,600$ 14,724,512

Model 1c

202520262027202820292030203120322033203420352036
SectionInputs & OutputsYear 0 - ImplementationYear 1 - ImplementationYear 2 - Go LiveYear 3 - Ramp UpYear 4 - Steady StateYear 5 - Steady StateYear 6 - Steady StateYear 7 - Steady StateYear 8 - Steady StateYear 9 - Steady StateYear 10 - Steady StateYear 11 - Steady State10 Year Totals
Model InputsAADT Per Zone (Average)8450887393169782102711078511324118901248413109137641445211718
Number of Toll Zones161616161616161616161616
Growth1.05
% Annual Toll SOV User Transactions (Registered Users)5%5%5%5%5%5%5%5%5%5%5%5%5%
% Annual HOV Transactions55%55%55%55%55%55%55%55%55%55%55%55%55%
% Total Annual Pay By Mail (Recovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Pay By Mail (Unrecovered)0%0%0%0%0%0%0%0%0%0%0%0%0%
% Total Annual Leakage Rate (Vehicle Transactions Not Identified)40%40%40%40%40%40%40%40%40%40%40%40%40%
Average Number of Zone Transactions User Per Trip2.702.702.702.702.702.702.702.702.702.702.702.70
Average Number of Trips Per Statement2.502.502.502.502.502.502.502.502.502.502.502.50
Average Number of Trips Per User Account Per Month8.808.808.808.808.808.808.808.808.808.808.808.80
Average Zone Toll Price (Registered User)$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75$ 0.75
Average Zone Toll Price (Pay by Mail)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Camera Unit Annual Fee (Per Zone)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Roadside Toll System Video Transaction Fee (Per Vehicle)$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10$ 0.10
HOV - Per HOV Zone Transaction Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO/DPS - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Per Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TIP - Per Registered SOV/HOV Zone Transaction Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Total Number of Monhtly Active Registered Users20,00021,00022,00023,00024,00025,00026,00027,00028,00029,00030,00031,000
CBO - Total Number of Registration Hold Accounts- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
CBO - Cost Per Active Registered User Per Year$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
CBO - Pay By Mail Statement Fee$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Fee$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00$ 20.00
CBO - Pay By Mail Processing Fee Percentage20%20%20%20%20%20%20%20%20%20%20%20%
CBO - Registered User Per Trip Fee Percentage35%35%35%35%35%35%35%35%35%35%35%35%
Traffic & Revenue EstimateProjected Total Annual Vehicle Zone Transactions49,348,00051,815,40054,406,17057,126,47959,982,80262,981,94366,131,04069,437,59272,909,47176,554,94580,382,69284,401,827
Projected Annual SOV Zone Toll Transactions2,467,4002,590,7702,720,3092,856,3242,999,1403,149,0973,306,5523,471,8803,645,4743,827,7474,019,1354,220,091
Projected Annual HOV Zone Transactions27,141,40028,498,47029,923,39431,419,56332,990,54134,640,06836,372,07238,190,67540,100,20942,105,22044,210,48146,421,005
Projected Annual Pay By Mail Zone Transactions000000000000
Project Annual Pay By Mail Zone Transactions (Unrecoverable)00000000000
Projected Annual Uncollectable Zone Transactions19,739,20020,726,16021,762,46822,850,59123,993,12125,192,77726,452,41627,775,03729,163,78930,621,97832,153,07733,760,731
Projected Total Annual Zone Trips18,277,03719,190,88920,150,43321,157,95522,215,85323,326,64524,492,97825,717,62727,003,50828,353,68329,771,36731,259,936
Projected Annual Registered SOV Zone Toll Trips913,852959,5441,007,5221,057,8981,110,7931,166,3321,224,6491,285,8811,350,1751,417,6841,488,5681,562,997
Projected Annual Registered HOV Zone Trips10,052,37010,554,98911,082,73811,636,87512,218,71912,829,65513,471,13814,144,69514,851,92915,594,52616,374,25217,192,965
Projected Annual Pay By Mail Zone Trips000000000000
Projected Annual Pay By Mail Trips (Unrecoveable)00000000000
Projected Annual Uncollectable Zone Trips7,310,8157,676,3568,060,1738,463,1828,886,3419,330,6589,797,19110,287,05110,801,40311,341,47311,908,54712,503,974
Projected Average Per Trip Toll Fee (Registered User)2.032.032.032.032.032.032.032.032.032.032.032.03
Projected Average Per Trip Toll Fee (Pay by Mail User)0.000.000.000.000.000.000.000.000.000.000.000.00
Projected Annual Toll Revenue (Registered User)$ 1,850,550$ 1,943,078$ 2,040,231$ 2,142,243$ 2,249,355$ 2,361,823$ 2,479,914$ 2,603,910$ 2,734,105$ 2,870,810$ 3,014,351$ 3,165,068
Projected Annual Pay By Mail Toll Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Projected Annual Registration Hold Revenue$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Sources of Revenue$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00$ 650,000.00
Total Projected Revenues$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
CAPEXProject Management & Consultant Fees (Through GoLive & Hyper Care)$ 1,500,000$ 1,500,000$ 500,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000
Project Transition & Migration Costs$ 500,000$ 500,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Markting & Engagement$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000
Operational Oversight Consultants & UDOT Staff Augmentation$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Decomissioning Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Structures$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Roadside Toll Equipment$ 2,200,000$ 2,200,000$ 2,200,000$ 2,200,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,00020% reduction due to reconstruction replacement on I-15
Infrastructure - ITS Cabinets$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - ITS Network & Power$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure - Back Office System$ 2,000,000$ 2,000,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CAPEX$ 6,250,000$ 6,250,000$ 2,750,000$ 2,500,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 800,000$ 24,150,000.00
OPEXRTS - Transaction Costs (not based on video) Current monthly is $17.1K$ 205,212$ 211,368$ 217,709$ 224,241$ 230,968$ 237,897$ 245,034$ 252,385$ 259,956$ 267,755$ 275,788$ 284,061
RTS - Unit Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
RTS - Labor Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XBO & DPS - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registered Users Costs
CBO - Registered User Trip Costs
CBO - Pay by Mail Statement Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Pay by Mail Processing Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Registration Hold Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CBO - Labor Costs$ 1,200,000$ 1,260,000$ 1,323,000$ 1,389,150$ 1,458,608$ 1,531,538$ 1,608,115$ 1,688,521$ 1,772,947$ 1,861,594$ 1,954,674$ 2,052,407
TIP - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SMART - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
HOV App - Transaction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - Clean Vehicle Pass$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
UDOT - BOS - UDOT Website$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Infrastructure Maintenance$ - 0$ - 0$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000
Total OPEX$ 1,405,212$ 1,471,368$ 1,840,709$ 1,913,391$ 1,989,575$ 2,069,435$ 2,153,149$ 2,240,905$ 2,332,903$ 2,429,349$ 2,530,461$ 2,636,469$ 25,012,926.59
Model OutputsTotal Revenue$ 2,500,550$ 2,593,078$ 2,690,231$ 2,792,243$ 2,899,355$ 3,011,823$ 3,129,914$ 3,253,910$ 3,384,105$ 3,520,810$ 3,664,351$ 3,815,068$ 37,255,438
Total Costs (CAPEX + OPEX)$ (7,655,212)$ (7,721,368)$ (4,590,709)$ (4,413,391)$ (2,789,575)$ (2,869,435)$ (2,953,149)$ (3,040,905)$ (3,132,903)$ (3,229,349)$ (3,330,461)$ (3,436,469)$ (49,162,927)
UDOT CAPEX Contribution$ 5,500,000$ 5,500,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 11,000,000
UDOT Annual Opex Contribution$ - 0$ - 0$ 2,000,000$ 2,000,000$ - 0$ - 0$ - 0$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 14,000,000
Net Balance (Revenue + Contribution - Costs)$ 345,338$ 371,709$ 99,522$ 378,852$ 109,780$ 142,388$ 176,765$ 2,213,004$ 2,251,202$ 2,291,461$ 2,333,890$ 2,378,600$ 13,092,512

Transcore Pricing

Inputs & Outputs Implementation Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10

CPS$217,704.00$224,244.00$230,964.00$237,900.00$245,028.00$252,384.00$259,956.00$267,756.00$275,784.00$284,064.00
Server Hardware$376,486.57
Server Migration$579,067.80
BOS Migration$20,000.00
Roadside Replacement
In lane testing and set up$93,393.09
Lane Controllers w/new Cabinets (5 per year)$164,995.00$168,294.90$171,660.80$175,094.01$178,595.89$182,167.81$185,811.17$189,527.39$193,317.94$197,184.30
Lane Controllers w/Retrofit Cabinets (5 per year)$98,615.00$100,587.30$102,599.05$104,651.03$106,744.05$108,878.93$111,056.51$113,277.64$115,543.19$117,854.05

Anntual Total $1,068,947.46 $481,314.00 $493,126.20 $505,223.85 $517,645.04 $530,367.94 $543,430.74 $556,823.68 $570,561.03 $584,645.13 $599,102.35

Grand Total $6,451,187.42

KAC

FY2024 Statistics Express Lanes Sanity Check EXISTING

Projected Total Annual Vehicle Zone Transactions61,248,808.65
Projected Annual SOV Zone Toll Transactions (AVI)3,302,075.00
Projected Annual HOV Zone Transactions57,946,733.65
Projected Annual Pay By Mail Zone Transactions
Project Annual Pay By Mail Zone Transactions (Unrecoverable)
Projected Annual Uncollectable Zone Transactions
Projected Total Annual Zone Trips22,684,743.94
Projected Annual Registered SOV Zone Toll Trips1,222,990.74
Projected Annual Registered HOV Zone Trips21,461,753.20
Projected Annual Pay By Mail Zone Trips
Projected Annual Pay By Mail Trips (Unrecoveable)
Projected Annual Uncollectable Zone Trips

FY24 Traffic (By Zone) KAC Basi

plaza_idzone_idavg_passavg_no_passavg_%passavg_%nopasssystem_weighttotal_vehDaily weighted.average (system, traffic by plaza)FYTransactions
13513016867692.42%97.58%0.01089606256937wavg_%pass5.39%siTollToChargerevenuetransactions
14013015560062.52%97.48%0.00967718636161wavg_pass48100161
14513020266922.93%97.07%0.01082852176894wavg_nopass813125392569.251570277
15013021265163.15%96.85%0.01056778276728wavg_traffic86123082843.8276146
15513022664893.37%96.63%0.010547363467153558223.55166353
16013025869483.58%96.42%0.01131858547206Daily Average Transactions (adjusted for multiple plaza reads)4046284.8115712
16513523867403.41%96.59%0.01096046196978All (Unadjusted)636,652.004533777.4575061
17013528671123.87%96.13%0.0116201637398AVI (Unadjusted)34,328.005029184.558369
17513529778273.66%96.34%0.01276050348124All167,804.965526260.347746
18013541386694.55%95.45%0.01426525019082AVI9,047.97602644844080
18513542088304.54%95.46%0.01452913059250Average Plazas Per Transaction = 3.7946524314.5537407
19013543689094.67%95.33%0.014678348693457027236.338909
20114038185844.25%95.75%0.01408147628965Expected Annual Transactions752121028280
21014048087675.19%94.81%0.01452441849247All61,248,808.658026246.432808
21214062093816.20%93.80%0.015708738810001AVI3,302,509.2312,529,720.008521841.625696
21514065896556.38%93.62%0.0161988025103139026214.329127
22014570199196.60%93.40%0.016681012510620Actual Annual Transactions9525215.8526543
22514561195985.98%94.02%0.016035447910209AVI3,302,075.001002479324793
23014548795024.88%95.12%0.0156898902998910520169.4519209
24014573986767.85%92.15%0.01478829889415Average Toll Transactions Per Trip = 2.7111026629.924209
24515081795727.86%92.14%0.0163181771038911520599.9517913
25015089699948.23%91.77%0.01710510611089012023294.419412
25515086099357.97%92.03%0.016955888107951252656521252
26015076192257.62%92.38%0.0156851781998613019375.214904
26515057784416.40%93.60%0.0141647242901813524127.217872
30015563288076.70%93.30%0.014825996943914025975.618554
30515561585866.68%93.32%0.0144521654920114525828.8517813
31015557081556.53%93.47%0.01370450428725150144549636
31515552876036.49%93.51%0.0127714984813115528791.2518575
27016047171006.22%93.78%0.011891897757116026374.416484
27516038366395.45%94.55%0.0110295735702216519814.8512009
28016035569214.88%95.12%0.011428535572761702912117130
33516036766425.24%94.76%0.01100915417009175137277844
34016535065025.11%94.89%0.0107625516685218033589.818661
34516531261024.86%95.14%0.0100745776641418514474.47824
35016525161183.94%96.06%0.0100038954636919028653.915081
35516527364734.05%95.95%0.0105960556674619519847.110178
43523515847743.20%96.80%0.00774677534932200800416400208
44023525663213.89%96.11%0.01033060456577
44523529970954.04%95.96%0.01161388017394
45023531464204.66%95.34%0.0105772076734
45523534466744.90%95.10%0.01102329067018
50023540974765.19%94.81%0.01238510217885
47524047883335.43%94.57%0.01383958588811
48524054093125.48%94.52%0.0154747029852
50524036966465.26%94.74%0.01101857847015
51024050989315.39%94.61%0.01482756679440
49024545969196.22%93.78%0.01158874867378
49524533974944.33%95.67%0.01230342487833
51524549767786.83%93.17%0.01142696487275
52024552571766.82%93.18%0.01209609027701
52524554679756.41%93.59%0.0133840788521
53025062794266.24%93.76%0.015790416110053
53525062380827.16%92.84%0.01367308998705
54025070985147.69%92.31%0.01448672129223
54525058078256.90%93.10%0.01320187488405
55025067095766.54%93.46%0.016093564510246
555255825101327.53%92.47%0.017210344110957
560255685106476.04%93.96%0.017799362911332
56525565495686.40%93.60%0.016055867310222
570255669102096.15%93.85%0.017086257510878
575255603102385.56%94.44%0.01702814110841
580255625102035.77%94.23%0.017007721610828
585260580101885.39%94.61%0.016913478610768
59026045790584.80%95.20%0.01494537059515
60026037477404.61%95.39%0.01274479628114
61026540380574.76%95.24%0.01328826428460
61526536979494.44%95.56%0.01306522248318
62026534079054.12%95.88%0.01295056018245
62526524162833.69%96.31%0.01024735656524
63026522060703.50%96.50%0.00987980876290
63526520159453.27%96.73%0.00965362556146
64027018952923.45%96.55%0.00860909885481
64527019057233.21%96.79%0.00928764855913
65027018354303.26%96.74%0.00881643355613
65527014047702.85%97.15%0.00771221954910