2-01- INFORMATION FOR BIDDERS.pdf

PDF 264 KB Posted

Attached to
IFB - GEORGE WASHINGTON BLVD PEDESTRIAN BRIDGE
Solicitation number
26-291
Issued by
Washington County, Utah

About this file

This is an Information for Bidders document from the City of St. George, Utah, for a prefabricated pedestrian bridge project (Project 26-291). The City seeks bids for a 95-foot span, 10-foot wide pedestrian bridge for the Virgin River Trail crossing over George Washington Boulevard at approximately 900 East. The bid opening is scheduled for June 11, 2026, with questions due by June 18, 2026 at 2:00 PM MST and submission closing at June 24, 2026 at 2:00 PM MST. All bids must be submitted via sgcity-utah.bonfirehub.com. The City intends to have the pedestrian bridge delivered by March 1, 2027, and bidders unable to meet this deadline must provide their estimated lead time with their bid submission. Bidders must include a construction schedule showing anticipated fabrication start and end dates, as well as delivery date. The contract will be awarded to the lowest responsible bidder meeting specified requirements, and the awarded contractor must execute the Agreement, obtain performance and payment bonds, Certificate of Legal Work Status, and insurance certificates within ten calendar days of receiving the Notice of Award.

Bidders must be certified bridge fabricators and possess the proper contractor's license for this project type prior to submission. The bid shall be based on unit prices in the Bid Schedule and must cover all work called for in the plans and specifications. The City reserves the right to add or remove bid items at its sole discretion, and the low bid will be determined by the lowest total cost on items selected by the City for inclusion in the final Agreement. Bidders are responsible for inspecting the site and reviewing all contract documents including addenda, and any misunderstandings about quantities or work scope cannot be asserted after bid submission. All bidders and their subcontractors must meet or exceed specified project experience and insurance requirements, and failure to provide required documentation prior to Notice to Proceed issuance constitutes default, allowing the City to award the contract to the next lowest responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information for Bidders

George Washington Blvd Pedestrian Bridge, 26-291

INFORMATION FOR BIDDERS

The City of St. George, hereinafter called “CITY,” shall receive BIDS for the following:

Project: 26-291 George Washington Blvd Pedestrian Bridge

Project Addresses:

Virgin River South Trail at the future crossing over George Washington Blvd

(George Washington Blvd at approximately 900 East)

1. BID TIMELINE:

BID OPENING DATE: June 11, 2026

QUESTIONS DUE DATE: June 18, 2026, by 2:00PM MST

SUBMISSION CLOSE DATE: June 24, 2026, by 2:00PM MST

2. All BIDS must be submitted via sgcity-utah.bonfirehub.com. Any BID may be edited or withdrawn prior to the above scheduled time for the opening of BIDS. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the CITY and the BIDDER.

3. BIDS shall be based on the BID SCHEDULE UNIT PRICES and shall include all work called for by the plans and specifications and bidding documents. In the case of a discrepancy in the extension of a line item, the unit price shall govern. In the case of a difference between the amount written in words and the amount written in figures, the written words shall govern. BIDDERS must satisfy themselves of the accuracy of the estimated quantities, where given, by examination of the site and a review of the drawings and specifications including

ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done. UNIT PRICES as called for in the BID Schedule shall be submitted to cover all additions and deductions in the scope of the WORK. CITY has the right to reduce or remove items from the project.

4. A Bid Schedule is included in the Requested Information. It is the CITY'S intent to award this contract based upon the Bid Schedule. The CITY, in consultation with the ENGINEER, shall add or remove bid items at the City’s sole discretion. The low bid shall be considered to be the bid which has the lowest total cost on the bid items selected by the CITY for inclusion in the final Agreement.

5. The CONSTRUCTION SCHEDULE is particularly important to the CITY. The BID shall include a construction schedule showing anticipated fabrication start date for the pedestrian bridge, fabrication end date for the pedestrian bridge, and delivery for the pedestrian bridge.

6. It is the CITY'S intention to have the pedestrian bridges delivered to the project site by the following date:

Virgin River Trail: March 1, 2027

If BIDDERS are not able to meet the date requested above, the BIDDERS are to provide the estimated lead time for each pedestrian bridge with their BID. If the BIDDERS provide a lead time that is unreasonable, the CITY has the right to reject their BID.

7. The CITY shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned, and rights-of-way acquired or to be acquired.

8. BIDDERS must be a certified bridge fabricator. If the BIDDER is not a certified bridge fabricator, the CITY has the right to reject their BID.

CONTRACT DOCUMENTS AND AWARDING CONTRACT:

1. The CONTRACT DOCUMENTS contain the provisions required for the construction of the project. Information obtained from an officer, agent, or employee of the CITY or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve him from fulfilling any of the conditions of the contract.

2. The CITY may waive any informalities, minor defects, or reject any and all BIDS.

3. The CITY may make such investigations as it deems necessary to determine the ability of the

BIDDER to perform the WORK, and the BIDDER shall furnish to the CITY all such information and data for this purpose as the CITY may request. The CITY reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the CITY that such BIDDER is properly qualified to carry out the obligations of the

Agreement and to complete the Agreement and to complete the WORK contemplated therein.

4. The BIDDER, by evidence of the submission of the BID, acknowledges that BIDDER and

BIDDER’S subcontractors meet or exceed the specified requirements for related project experience and insurances, and that should the CITY discover at any time evidence to the contrary, BIDDER agrees to withdraw BIDDER’S BID and to allow the CITY to award the

CONTRACT to the next lowest responsible BIDDER. BIDDER must have the proper contractor’s license for this type of project prior to bidding on the project. It is solely

BIDDER’S responsibility to comply with all applicable federal, state, and local laws, regulations, and ordinances that affect this project.

5. Award will be made to the lowest responsible BIDDER as determined by the City using the criteria contained in City ordinances governing the award of contracts. The BID shall be awarded on the condition that the BIDDER provides all required documents prior to the

NOTICE TO PROCEED being issued. Failure to provide the required documents shall be considered a default on the Contract and may result in the CITY awarding the Contract to another BIDDER in addition to other legal remedies.

6. The party to whom the contract is awarded will be required to execute the Agreement and obtain the performance BOND, the payment BOND, the Certificate of Legal Work Status for the BIDDER and all Subcontractors and the certificate of insurance within ten (10) calendar days from the date when NOTICE OF AWARD is delivered to the BIDDER. The

NOTICE OF AWARD shall be accompanied by the necessary Agreement and BOND forms.

The bid shall be awarded on the condition that the BIDDER provides all required documents prior to the NOTICE TO PROCEED being issued. Failure to provide the required documents shall be considered a default on the Contract and may result in the City

Awarding the CONTRACT to another BIDDER in addition to other legal remedies.

7. In case of failure of the BIDDER to execute the Agreement or is found to be ineligible or becomes ineligible to meet all the requirements for the project, the CITY may at its option consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the CITY.

8. Upon receipt of acceptable performance BOND, payment BOND, insurance certificates and

Agreement signed by the party to whom the Agreement was awarded, the CITY shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the

CITY not execute the Agreement, the BIDDER may by WRITTEN NOTICE withdraw the

BIDDER’S signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the CITY.

9. The NOTICE TO PROCEED shall be issued immediately upon the following occurring:

providing the executed Agreement to the CITY, providing the performance and payment

BONDS to City, and providing the insurance certificates to City. Should there be reasons why the City wants to delay and the NOTICE TO PROCEED cannot be issued within such period the time may be extended by mutual agreement between the CITY and

CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten (10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the

Agreement without further liability on the part of either party.

10. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout.

11. Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. Failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to his BID.

File details come from the government source that posted it. Updated .