2-004164 00 P400 Bid Form Procurement 2019.docx

DOCX document 33 KB Posted

Attached to
Ferron City - Agricultural Center PEMB
Solicitation number
NS26-30
Issued by
Cache County, Utah

About this file

This document is a Bid Form for a Procurement Contract issued by Ferron City, Utah for an Agricultural Center Pre-Engineered Metal Building (PEMB) project. The bid solicitation is being managed by Jones & DeMille Engineering, Inc., with bids due electronically on Thursday, September 16th, 2025 at 5:00 PM local time. The project includes a base bid for an Arena PEMB with two potential alternates: an Attached Office PEMB and an Attached Stock Pen PEMB. There is no pre-bid conference scheduled, and bidders are required to submit questions in writing to the Project Manager, Wyatt Hansen, by September 9th, 2025 at 5:00 PM.

The bid form allows for a lump sum bidding approach, with bidders required to provide pricing for the base bid and optional alternates. Bidders must submit bid security, evidence of business authority in Utah, and complete various representations and certifications regarding their bid. The bid will remain valid for 60 days after the opening, and bidders must certify that their submission is genuine, not collusive, and complies with all bidding requirements. The document emphasizes the need for bidders to carefully examine procurement documents, understand local conditions, and disclose any conflicts or discrepancies in the contract documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 41 64

BID FORM FOR PROCUREMENT CONTRACT

TABLE OF CONTENTS

Page

Article 1— Buyer and Bidder1
Article 2— Basis of Bid1
Article 3— Time of Completion3
Article 4— Attachments to this Bid3
Article 5— Bidder’s Acknowledgments4
Article 6— Bidder’s Representations and Certifications5

EJCDC® P‑400, Bid Form for Procurement Contract.

Copyright© 2019 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

TOC Page 3 of 1

BID FORM FOR PROCUREMENT CONTRACT

PROJECT: Ferron City – Agricultural Center PEMB The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

Buyer and Bidder This Bid is submitted to:

Ferron City, 20 E Main Street Ferron, UT 84523.

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Procurement Contract with Buyer in the form included in the Procurement Bidding Documents, and to furnish the Goods and Special Services as specified or indicated in the Procurement Bidding Documents, for the prices and within the times indicated in this Bid, and in accordance with the other terms and conditions of the Procurement Bidding Documents.

Basis of Bid Lump Sum Bids Bidder will furnish the Goods and Special Services in accordance with the Procurement Contract Documents for the following Procurement Contract Price(s):

Lump Sum Bid Price (Base Bid and Alternates)

Lump Sum Base Bid Price for Arena PEMB
$
Alternate A – Attached Office PEMB (Add – Lump Sum)
$
Alternate B – Attached Stock Pen PEMB (Add – Lump Sum)
$

Total Bid Price The following Total Bid Price is the sum of the Lump Sum Bid Price. The Total Bid Price, if accepted and incorporated in the Procurement Contract to be awarded, will be subject to any Buyer-accepted Alternates and to final Unit Price and Buyer’s Contingency Allowance adjustments.

Total Bid Price
$

Time of Completion Bidder agrees that the furnishing of Goods and Special Services will conform to the schedule of Procurement Contract Times set forth in Article 2 of the Procurement Agreement.

Bidder accepts the provisions of the Procurement Agreement as to liquidated damages.

Attachments to this Bid The following documents are attached to and made a condition of this Bid:

Required Bid security in the form prescribed in the Instructions to Bidders.

Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids.

Bidder’s Acknowledgments Bidder accepts all terms and conditions of the Instructions to Bidders. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period that Bidder may agree to in writing upon request of Buyer.

Bidder has examined and carefully studied the Procurement Bidding Documents, the related data identified in the Procurement Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:

Addendum No.
Addendum Date

Bidder’s Representations and Certifications Bidder’s Representations In submitting this Bid, Bidder represents that:

Bidder has examined and carefully studied the Procurement Contract Documents.

If required by the Instructions to Bidders to visit the Point of Destination and the site where the Goods are to be installed or Special Services will be provided, or if, in Bidder’s judgment, any observable local or site conditions may affect the delivery, cost, progress, or furnishing of the Goods and Special Services, then Bidder has visited the Point of Destination and site where the Goods are to be installed or Special Services will be provided (as applicable) and become familiar with and is satisfied as to the observable local and site conditions that may affect delivery, cost, progress, and furnishing of the Goods and Special Services.

Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect the cost, progress, and performance of Seller's obligations under the Procurement Contract.

Bidder has carefully studied, considered, and correlated the information known to Bidder with respect to the effect of such information on the cost, progress, and performance of Seller's obligations under the Procurement Contract.

Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Procurement Contract Documents, and the written resolution (if any) thereof by Engineer is acceptable to Bidder.

The Procurement Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance of Seller's obligations under the Procurement Contract.

The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of the Bidding Requirements, that without exception the Bid (including all Bid prices) is premised upon furnishing the Goods and Special Services as required by the Procurement Contract Documents.

Bidder’s Certifications Bidder certifies that:

This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Procurement Contract. For the purposes of this Paragraph 6.02.A.4:

“corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

“fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Buyer, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Buyer of the benefits of free and open competition;

“collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Buyer, a purpose of which is to establish bid prices at artificial, non-competitive levels; and “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process.

(Remainder of page intentionally left blank.)

This Bid is offered by:

Bidder:

(typed or printed name of organization)

By:

(individual’s signature)

Date:

(date signed)

Name:

(typed or printed)

Title:

(typed or printed)

(If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

(individual’s signature)

Title:

(typed or printed)

Address for giving notices:

Designated Representative:

Name:

(typed or printed)

Title:

(typed or printed)

Address:

Phone:

Email:

License No.:

Classification:

Limitation:

EJCDC® P‑400, Bid Form for Procurement Contract.

Copyright© 2019 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

File details come from the government source that posted it. Updated .