About this file

This document is the Instructions to Bidders for the City of Midland, Texas, regarding municipal public works projects associated with the Midland International Air and Space Port Beautification Project (Project #900476-505). The work is located in Midland, Texas, and is based on plan sets dated March 16, 2026. Sealed bids must be submitted to the City Secretary at City Hall (300 N. Loraine Street, Midland, Texas) by the date and time specified in the Notice to Bidders. Bidders are required to examine the site, drawings, and specifications prior to submitting bids, and submission of a bid constitutes prima facie evidence of such examination. Work must commence within 15 days of receiving notice to proceed from the City and must be completed without delay. The successful bidder will be required to provide Performance and Payment Bonds equal to 100 percent of the total contract price, executed in five original counterparts by a corporate surety authorized in Texas.

Bid submissions must be made only on the provided Proposal form in ink with both script and figures; any deviations may result in rejection. A Bid Guaranty of five percent of the largest possible lump sum bid, in the form of a certified check, bank money order, or approved Bidder's Bond, must accompany all proposals, and proposals lacking this guaranty will not be considered. All proposals remain valid for 30 days after bid opening. The Owner reserves the right to reject any or all bids and awards contracts to either the lowest responsible bidder or the bidder providing the best value to the City of Midland as determined under Texas Local Government Code Section 252.043. Payment to the contractor will be based on prices stated in the proposal and actual work performed as determined by the Engineer, with final payment due between 30 and 35 days after issuance of the Certificate of Completion. Questions regarding contract documents must be submitted to Maverick Engineering at amellen@maverick-eng.com and must be received no later than three days prior to the bid date.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1909 West Wall Street, Suite K Midland, Texas 79701

P.O. Box 6040 Midland, Texas 79704 (Mailing Address) Office 432.262.0999 Fax 432.262.1475 www.maverick-eng.com

Project # 900476-505

M A

V E

R

IC

K E

N G

IN

E

E R

IN

G

3.0 INSTRUCTIONS TO BIDDERS

LOCATION AND EXTENT OF WORK:

The work and construction contemplated to be accomplished under this Contract is located in the City of Midland, Texas, and consists of municipal public works projects as set forth in the proposal.

The location and details for the construction and related work are shown upon the associated plan set of drawings dated 3- 16-26. These drawings and plans, together with the specifications, form a part of the Contract. Where figures are shown on the drawings, they shall take precedence over scaled distances and dimensions.

TIME AND PLACE OF RECEIVING BIDS:

All bids shall be sealed, addressed to the Mayor and City Council of the City of Midland, Texas, and will be received by the City Secretary in her office at City Hall, 300 N. Loraine Street, Midland, Texas, mailing address is P.O. Box 1152, Midland, Texas 79702, until time stated on the Notice to Bidders.

PREPARATION OF BID FORM:

Bids shall be submitted only on the forms provided therefore in the Contract Documents, and must not be submitted in letter form or in any other form. They shall be filled out in ink in both script and figures. The Proposal form provided in the Contract Documents sets forth in detail the various items and approximate quantities thereof contained in the Project. Bids submitted in any other form will be considered irregular and will be returned to the Bidder without receiving consideration by the Owner.

All bids must be submitted in sealed envelopes bearing on the outside the name of the Bidder, his address, and the name of the Project for which the bid is submitted. It is the sole responsibility of the Bidder to see that his bid is received in proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the Bidder unopened.

The bid must be signed in the name of the Bidder and must bear the signature in longhand of the persons duly authorized to sign the bid.

Changes in or additions to the bid form, recapitulations of the work bid upon, alternative proposals, or any other modification of the bid form which is not specifically called for in the Contract Documents may result in the Owner's rejection of the bid as not being responsive to the invitation. No oral or telephonic modification of any bid submitted will be considered and a telegraphic modification may be considered only if the postmark evidences that a confirmation of the telegram duly signed by the Bidder was placed in the mail prior to the opening of bids.

The bid submitted must not contain any erasures, interlineations or other corrections unless each such correction is suitably authenticated by affixing in the margin immediately opposite the correction the surnames of the person or persons signing the bid.

EXAMINATION OF SITE, DRAWINGS, PROJECT:

Each Bidder shall visit the site of the proposed work and fully acquaint themselves with the conditions relating to the construction and labor so that they may fully understand the facilities, difficulties and restrictions attending the execution of the work under the Contract. Bidders shall thoroughly examine and be familiar with the Plans and the Specifications. The failure or omission of any Bidder to receive or examine any form, instrument, addendum or other document or to visit the site and acquaint himself with conditions there existing shall in no way relieve any Bidder from obligations with respect to his bid or to the Contract. The submission of a bid shall be taken as prima-facie evidence of compliance with this section.

A

V E

R

IC

K E

N G

IN

E

E R

WASTE / SALVAGE MATERIALS:

If prices bid are contingent on the Contractor claiming or salvaging materials that are to be removed, those materials should be specifically identified as items that the Contractor wishes to retain. All excess materials generally become the property of the Contractor, but the Owner reserves the right to claim salvage materials that have not been specifically identified as the Contractor’s property. Such items will be listed by addenda as items that the Owner will waive their claim to. See section

5.0 GENERAL CONDITIONS, subsection WASTE MATERIALS.

WITHDRAWAL OF BIDS:

Any Bidder may withdraw his bid, either personally, by written request, or by telegraphic request confirmed in the manner specified above, at any time prior to the scheduled closing time for receipt of bids.

AGREEMENT AND BONDS:

The successful Bidder will be required to furnish a Performance Bond, and a Payment Bond, in an amount equal to one hundred percent (100%) of the total Contract price, such bond to be executed in five (5) original counterparts by a Corporate Surety authorized to do business in the State of Texas, and acceptable to the City of Midland. All Bonds must be executed on forms contained in these Contract Documents. The form of Agreement which the successful Bidder, and Contractor will be required to execute is also included herewith. The form of Agreement and the form of the Bonds should be carefully examined by the Bidder.

INTERPRETATION OF PLANS AND DOCUMENTS:

Any Contractor contemplating submitting a bid for the proposed Contract who is in doubt as to the true meaning of any part of the Plans, Specifications, or other Contract Documents or finds discrepancies in, or omissions from the Plans or Specifications, may submit to the Maverick Engineering an email request for an interpretation or correction thereof at the following address;

amellen@maverick-eng.com

The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will be made only by Addendum duly issued and a copy of such addendum will be mailed or delivered to each person receiving a set of such Contract Documents. The Owner will not be responsible for any other explanations or interpretations of the Contract Documents. No oral interpretations of any provision in the Contract Documents will be made to any Bidder. Questions shall no longer be accepted after 3 days prior to the bid date.

MULTIPLE BIDS:

No person, firm or corporation shall be allowed to make, or file more than one bid for the same work unless alternate bids are specifically called for. A person, firm or corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials to a Bidder is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or making a prime proposal.

AWARD OF CONTRACT:

The Owner reserves the right to reject any or all bids submitted and not make an award. The Owner also reserves the privilege of accepting any item as a separate contract or the combination of items of a contract. The Owner and Bidder agree that, if the Contract is awarded, that it will be awarded to either the lowest responsible bidder/proposer, or to the bidder/proposer who provides goods or services at the best value for the City of Midland. In determining the best value for the City of Midland, the City of Midland may consider the criteria enumerated in Section 252.043 of the Texas Local

A

V E

R

IC

K E

N G

IN

E

E R

Government Code. Further, the Owner reserves all rights granted by Section 271.027 of the Texas Local Government Code.

The Owner reserves the right to award the bid to the lowest responsible bidder.

OPENING OF BIDS:

Bidders are invited to be present at the opening of the Proposals. All Proposals shall be made and received with the understanding that the Bidder accepts the terms and conditions contained in the Contract Documents.

COMPARISON OF BIDS:

All bids will be compared on the basis of the Proposal.

BID GUARANTY:

A Certified Check, Bank Money Order, issued by a bank satisfactory to the Owner, or a Bidder's Bond on the form provided and approved by the City Attorney, in the amount of five percent (5%) of the largest possible lump sum bid submitted, payable without recourse to the Owner, must accompany the Bidder's Proposal, as a guaranty that the Bidder will enter into a Contract and execute the required Performance Bond and Guaranty in the forms provided within fifteen (15) days after notice of award of Contract to him. Bids or Proposals without the required Bid Guaranty will not be considered. All Proposals shall remain in effect for a period of thirty (30) days after date of bid opening.

CONTRACT DOCUMENTS:

The complete Contract Documents may include the following: (1) Notice to Bidders, (2) Instructions and Information for Bidders, (3) Proposal, (4) Experience Record, (5) Bid Bond, (6) Contract Agreement, (7) Performance Bond, (8) Payment Bond,

(9) Insurance Certificate, (10) General Conditions, (11) Special Conditions, (12) Detailed Specifications all of which are bound together, and/or (13) Certificate of Payment. The Contract Documents shall also include Drawings or Detailed Plans for the proposed work. A complete set of the Contract Documents and the detailed plans are on file with Maverick Engineering.

TIME ELEMENT:

The work to be done under this Contract shall be commenced within fifteen (15) days from the date of the notice from the City to the Contractor to commence work. The Contractor shall commence performance of the Contract on the date stated in the City's notice to the Contractor to proceed and shall complete the performance of the Contract without delay.

PAYMENTS:

Payments to the Contractor will be based upon the prices stated in the proposal and upon basis of the work performed as determined by the Engineer. The Engineer's determination shall be considered as final unless changes are authorized by the Owner in writing which shall affect the work. Upon issuance of the Certificate of Completion, the Engineer shall proceed to take final measurements and prepare a final statement of the value of all work performed and materials furnished under the terms of the agreement and shall certify same to the Owner who shall pay to the Contractor on or after the 30th day, and before the 35th day, after the date of the Certificate of Completion, the balance due the Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this Contract, and said payment shall become due in any event upon said performance by the Contractor. Notwithstanding any provision of these Contract documents to the contrary, it is expressly understood and agreed by the parties hereto that neither the Certificate of Acceptance, nor the final or any other payment hereunder, nor any partial or total occupancy or possession of the project by the Owner, shall relieve the Contractor of his responsibility for completion of the entire project in a good workmanlike manner and in full compliance with the plans and specifications and the fulfillment of any warranties which may be required in the Contract documents.