This is a proposal form for the Midland International Air & Space Port Beautification Signage Concepts and Design Project (Project Number 900476-505) submitted to the City of Midland, Texas. The project encompasses landscape and signage improvements at the airport, including removal and installation of concrete landscape elements, monument bases, retaining walls, and associated infrastructure. The work involves 18 line items with quantities ranging from single installations to 142 linear feet of concrete retaining wall construction. Specific tasks include mobilization, landscape fill installation, removal of existing concrete ribbons and walls, landscape lighting removal, monument base construction and installation, gas main relocation, stormwater prevention measures, and tree protection. The contractor must substantially complete all work within 180 calendar days after receipt of notice to proceed. The proposal requires submission of a cashier's check, cash, or bid bond with the proposal, to be retained as liquidated damages if the bidder fails to execute the contract and required bonds within 15 days of proposal acceptance.
Pricing for the project is submitted on a lump sum and unit price basis across the 18 line items, with individual unit prices for linear foot, square foot, and per-each measurements, and lump sum pricing for mobilization, landscape fill, tree protection, stormwater prevention, and landscape bed preparation. The proposal form includes detailed pay notes defining the scope of work and measurement standards for each line item, ensuring clear pricing alignment with specific construction deliverables and material requirements outlined in the construction drawings and contract documents.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.0 PROPOSAL
TO: Honorable Mayor and City Council City of Midland Midland, Texas
Gentlemen: The undersigned bidder, having examined the drawings, specifications and contract documents, the location of the proposed work, and being fully advised as to the extent and character of the work, proposes to furnish all material, equipment, and to perform all labor and work necessary for the completion of the construction of the work described by and in accordance with the attached drawings, specifications, and contract, for the following prices, to wit:
Project Name: Midland International Air & Space Port Beautification Signage Concepts and Design
Project Number: - 900476-505
Base Bid Paving Improvements
Item No. Quantity Description Unit Price Total Amount
1) 1
LS
Mobilization for the sum of:
______________________________________ dollars and ____________________________________ cents per lump sum. (Pay Note #P1) $_________ $____________
2) 1
LS
Classified monument landscape fill (to nominal depth) for the sum of:
______________________________________ dollars and ____________________________________ cents per Lump sum. (Pay Note #P2) $_________ $____________
3) 17
LF
Removal of Existing Concrete landscape ribbon for the sum of:
______________________________________ dollars and ____________________________________ cents per linear foot. (Pay Note #P3) $_________ $____________
4) 15
LF
Removal and reconstruction of existing Concrete landscape block wall per sheet C130 & sheet C210 for the sum of:
______________________________________ dollars and ____________________________________ cents per linear foot. (Pay Note #P4) $_________ $____________
5) 65
SF
Removal and replacement of existing landscape rock for the sum of:
______________________________________ dollars and ____________________________________ cents per square foot. (Pay Note #P5) $_________ $____________
Item No. Quantity Description Unit Price Total Amount
6) 3
EA
Removal of Existing Landscape light (C130) for the sum of:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P6) $_________ $____________
7) 2
EA
Removal of existing monument base for the sum of:
______________________________________ dollars and ____________________________________ cents per EA. (Pay Note #P7) $_________ $____________
8) 1
LS
Construct tree protection for the sum of:
______________________________________ dollars and ____________________________________ cents per lump sum. (Pay Note #P8) $_________ $____________
9) 1
LS
Construct storm water prevention measures for the sum of:
______________________________________ dollars and ____________________________________ cents per lump sum. (Pay Note #P9) $_________ $____________
10) 77
LF
Coordination and relocation of Atmos gas main for the sum of:
______________________________________ dollars and ____________________________________ cents per linear foot. (Pay Note #P10) $_________ $____________
11) 142
LF
Construct concrete landscape retaining wall with Austin Rock facade for the sum of:
______________________________________ dollars and ____________________________________ cents per linear foot. (Pay Note #P11) $_________ $____________
12) 1
EA
Construct La Force Blvd. Midland International Air & Space port monument base for the sum of:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P12) $_________ $____________
13) 2
EA
Construct State Loop 40 Midland International Air & Space port monument base for the sum of:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P12) $_________ $____________
Item No. Quantity Description Unit Price Total Amount
14) 1
EA
Construct and install La Force Blvd. MIDLAND INTERNATIONAL AIR & SPACE PORT monument and all associated fittings:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P13) $_________ $____________
15) 2
EA
Construct and install State Loop 40 MIDLAND INTERNATIONAL AIR & SPACE PORT monument and all associated fittings:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P13) $_________ $____________
16) 11
EA
Construct Pipe passing below footing per detail 5 sheet C221:
______________________________________ dollars and ____________________________________ cents per each. (Pay Note #P14) $_________ $____________
17) 1
LS
Prepare landscape beds for future landscaping:
______________________________________ dollars and ____________________________________ cents per Lump Sum. (Pay Note #P15) $_________ $____________
18) 17
LF
Install concrete landscape ribbon:
______________________________________ dollars and ____________________________________ cents per linear foot. (Pay Note #P16) $_________ $_________
Total Base Bid Paving Improvements, Items 1-18 $________________________________________________________
Price For:
1. Base Bid $________________________________________________________
Total Price $________________________________________________________
In addition to providing the individual prices for the items above, Contract shall write the total bid amount in the sum of
_________________________________________________________________________________dollars and _______________________________________________ cents total.
The undersigned bidder hereby declares that he has visited the site of the work and has carefully examined the contract documents pertaining to the work covered by the above bid. The selected contractor will receive written notice to proceed.
Bidder agrees to substantially complete all work within _180_ calendar days after receipt of notice to proceed.
Enclosed herewith in this proposal is a cashier's check, cash or bid bond on a form approved by the City Attorney, for
_________________________________________________________________________________dollars and _______________________________________________ cents total. ($_______________________) which it is agreed shall be collected and retained by the owner as liquidated damages in the event this proposal is accepted by the Owner within thirty days (30) after the date advertised for the reception of bids and the undersigned fails to execute the contract and required bonds with the owner, under the conditions thereof, within (15) days after the date said proposal is accepted; otherwise said check or bond shall be returned to the undersigned on demand.
Name of Contractor
Submitted By Print Name and Title
Mailing Address
City State Zip
PAY NOTES
Project Name: Midland International Air & Space Port Beautification Signage Concepts and Design
Project Number: - 900476-505
PAVING PAY NOTES
P1. Shall include all labor, materials, equipment, and incidentals necessary for mobilization to the project site. Measurement and payment shall be made on a lump sum basis.
P2. Shall include all labor, materials, equipment, and incidentals necessary to install classified landscape topsoil and dispose of existing excess soil and subgrade material as indicated in the construction drawings. Topsoil shall be placed in maximum 3-inch lifts. Measurement and payment shall be made on a lump sum basis.
P3. Shall include all labor, materials, equipment, and incidentals necessary to remove existing concrete landscape ribbon as indicated in the construction drawings. Measurement and payment shall be made per linear foot along the face of the concrete landscape ribbon.
P4. Shall include all labor, materials, equipment, and incidentals necessary to removal and rebuilding of a portion of the existing concrete landscape block wall as indicated in the construction drawings. Measurement and payment shall be made per linear foot along the face of the wall.
P5. Shall include all labor, materials, equipment, and incidentals necessary for the removal and replacement of existing landscape rock as indicated in the construction drawings. Measurement and payment shall be made per square foot.
P6. Shall include all labor, materials, equipment, and incidentals necessary for the removal of existing landscape lights as indicated in the construction drawings. Measurement and payment shall be made per each.
P7. Shall include all labor, materials, equipment, and incidentals necessary for the removal of the existing concrete monument base as indicated in the construction drawings. Measurement and payment shall be made per each.
P8. Shall include all labor, materials, equipment, and incidentals necessary for the installation of tree protection measures as indicated in the construction drawings. Measurement and payment shall be made on a lump sum basis.
P9. Shall include all labor, materials, equipment, and incidentals necessary for the installation and maintenance of stormwater pollution prevention items as indicated in the construction drawings. Measurement and payment shall be made on a lump sum basis.
P10. Shall include coordination and relocation of the Atmos gas main, including all labor, materials, equipment, and incidentals required for relocation as indicated in the construction drawings.
Measurement and payment shall be made per linear foot.
P11. Shall include all labor, materials, equipment, and incidentals necessary for the installation of the concrete landscape retaining wall with Austin Rock facade as shown in the construction drawings. Measurement and payment shall be made per linear foot.
P12. Shall include all labor, materials, equipment, and incidentals necessary for the placement and finishing of the concrete MIDLAND INTERNATIONAL AIR & SPACE PORT monument base, including barrier, engineered backfill, and compaction, as shown in the construction drawings.
Measurement and payment shall be made per each.
P13. Shall include all labor, materials, equipment, and incidentals necessary for the installation of the MIDLAND INTERNATIONAL AIR & SPACE PORT monument on the concrete base, including structural, electrical, and lighting components, as shown in the construction drawings.
Measurement and payment shall be made per each.
P14. Shall include all labor, materials, equipment, and incidentals necessary for the installation of the concrete monument footing pipe pass-through as shown in the construction drawings.
Measurement and payment shall be made per each.
P15. Shall include all labor, materials, equipment, and incidentals necessary for cleanup, removal of waste materials, and fine grading in and around the monument beds. Measurement and payment shall be made on a lump sum basis.
P16. Shall include all labor, materials, equipment, and incidentals necessary for the placement and finishing of the concrete landscape ribbon curb as shown in the construction drawings.
Measurement and payment shall be made per linear foot along the face of the curb