This document is an amendment to a solicitation for the provision of gates, a door entry system, and a path for the U.S. Embassy London's warehouse. The amendment makes several changes to the original statement of work, including requiring the contractor to submit details of personnel and vehicles needing access to the warehouse at least two business days in advance, and requiring the contractor to conduct an asbestos survey and provide a quote for its removal if necessary. The amendment also adds several new requirements, such as using galvanized surface-mounted conduits, installing a push exit button, and providing an outdoor LED floodlight with a PIR sensor. The original solicitation number is 19UK5624Q0049, and the contracting officer is Meara Ryan. The amended statement of work is provided as an attachment to this amendment. The closing date for offers is August 27, 2024 at 17:00 GMT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGESAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT l l
4. REQUISmON/PURCHASE REQ. NO.
PR 1268285
5. PROJECT NO. Of applicable)3. EFFECTIVE DATE
8/16/2024
2. AMENDMENT/MODIFICATION NO.
Amendment No. 1
7. ADMINISTERED BY (^To/Ae/-//fan//em 6)
CODE
CODE6. ISSUED BY
Department of State American Embassy, London 33 Nine Elms Lane
London SWll 7US
9a. AMENDMENT OF SOLICITATION NO.
19UK5624Q0049
8. NAME AND ADDRESS OF CONTRACTOR {NO., street,city,county,State.and ZIP Code)
9b. DATED (SEE ITEM 11)
July 10*2024 lOa. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF
OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.or
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) copies to the issuing office.E. IMPORTANT; Contractor [X1 is not, f 1 is required to sign this document and return 1
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment no. 1 is to make the following changes to the Government original statement of work. The following text shall be included:
Item 1.7.2: The contractor must submit details of personnel and vehicles requiring access into the warehouse facility at least two full business days in advance of the date and time requiring access.
Item 2 Asbestos Survey:
Undertake a complete Refurbishment and Demolition asbestos survey to all areas of the property and submit to COR the
SURVEY REPORT.
The survey report shall enable the Embassy to comply with the Control of Asbestos. Regulations 2012, the Defective
Premises Act 1972, the Health and Safety at Work Act 1974, the Management of Health and Safety at Work Regulations
1999 and the Construction Design and Management Regulations 2015.
Should asbestos be encountered, the Contractor is to submit to the Embassy a quote for its safe and complete removal, for approval.
2.1
2.1.1
2.1.2
Addition to Item 7:
7.1.13 All conduits to be galvanized and surface mounted as required.
7.1.14 Include for a push exit button to installed adjacent to exit door of the building, the exact location to be determined on site.
7.1.15 The Contractor is to supply and install a wall mounted LAP Weyburn Outdoor LED floodlight with PIR sensor black 30W
30001m IP65 rated Flood light, or similar, mounted onto the existing building shinning down onto the new pedestrian gate.
All the above changes are included within the amended statement of work ref: Amendment 1 - Attachment 2 -Statement of Work
2024 Rev - Warehouse.
All other terms and conditions remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or lOA, as heretofore changed, remains unchanged and in fiill force and effect.
16A. NAME OF CONTRACTING OFFICER
Meara Ryan 15 A. NAME AND TITLE OF SIGNER {Type or print)
ES OF AlVfERICA 16C.DATE SIGNED15B. NAME OF CONTRACTOR/OFFEROR 15C.DATE
SIGNED
16B. UNITE]
8/16/2024BYBY
(SignatuMof Contracting Officer)(Signature of person authorized to sign)
NSN 7540-01-152-8070
Previous edition unusable
Standard Form 30 (revised 10/83) Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .