This is a Request for Quotations (RFQ) for utility building exterior and interior wall repairs at the U.S. Consulate General in Dubai, United Arab Emirates. The solicitation number is 19TC1226Q0007, issued July 7, 2026, with quotations due by 3:00 PM UAE time on July 27, 2026. A mandatory site survey will be held on July 13, 2026 at 9:00 AM UAE time at the Consulate in Bur Dubai, with bidder representatives required to register by July 9, 2026. Questions must be submitted by 3:00 PM UAE time on July 15, 2026.

The work consists of three line items: repair and paint interior walls of the Utility Building (890 m²), repair and paint exterior walls of the Utility Building (950 m² plus 9 metal doors and 200 m² parking garage wall), and repair and paint exterior dry wall ceilings of the SCAC and CCAC facilities and concrete ceilings of MCAC and SCAC Sally Port (450 m² total). The contract is firm fixed-price with a 90-calendar-day completion period. The contractor must begin work within seven calendar days of receiving the Notice to Proceed and provide all labor, materials, equipment, insurance, and overhead. A one-year warranty is required. Pricing must include Defense Base Act (DBA) insurance, Value Added Tax (VAT) at 5% shown separately, and be quoted in AED. The Government will award to the lowest-priced, acceptable, responsible offeror. Submissions must be electronic in MS-Word, Excel, or PDF format (maximum 30MB) to DubaiGSOProcurement@state.gov. Required submissions include completed SF-1449, pricing, representations and certifications, work plan, quality plan, equipment list, financial statements, personnel list, DBA insurance certificate (within 10 days of award), general liability insurance, and NDAA 889 compliance certification. The acquisition is unrestricted and not set aside for small business.

View the file

Other files

File Type Posted
SF30 QA - 00002.pdf PDF
SF30 - Amendment of Solicitation-AA.pdf PDF
NDAA 889 Compliance form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBU - CONTRACTING AND ACQUISITIONS

U.S. Consulate General

Dubai - UAE

Date: July 7, 2026

Dear Prospective Quoter:

Subject: Request for Quotations number 19TC1226Q0007 for Utility Building Exterior &

Interior Wall Repairs at US Consulate, Dubai.

Enclosed is a Request for Quotations (RFQ) for Utility Building Exterior & Interior Wall Repairs at US Consulate, Dubai

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

A site survey will be held at US Consulate, Bur Dubai, Dubai at 09:00 AM (UAE time) on 13

July 2026. Interested bidders shall provide following details of their representatives by 03:00 PM

(UAE time) on 9 July 2026.

• Emirates ID / (Copy)

• Name of the Company

• Trade License of Company – as described in Section 3

Attendance is limited to only one (1) person per company

Last date for receipt of the questions is 03:00 PM (UAE time) on 15 July 2026. Quotations are due at 03:00 PM (UAE time) on 27 July 2026. No quotations will be accepted after this time.

Proposals must be in English and incomplete proposals will not be accepted.

Your quotation must be submitted electronically to DubaiGSOProcurement@state.gov . It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB.

If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each. Hard copies of quotations and links to quotations are not acceptable and shall not be considered for the evaluation process.

In order for a quotation to be considered, you must also complete and submit the following:

mailto:DubaiGSOProcurement@state.gov

1. SF-1449

2. Section 1, Pricing

3. Section 5, Representations and Certifications

4. Additional information as required in Section 3

5. NDAA 889 compliance certification

Sincerely, Nathan Austin

Contracting Officer

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19TC1226Q0007, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19TC1226Q0007, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. PR16086207 3 | 63

19TC1226Q0007

Nathan Austin +971 4 309 4000

19TC12

Email quotations to:

DUBAIGSOProcurement@State.gov

19TC12

AMERICAN CONSULATE GENERAL DUBAI

FIRST STREET, UMM HURRAIR 1 PO BOX 121777

ATTN: GSO

AMERICAN CONSULATE GENERAL DUBAI

FIRST STREET, UMM HURRAIR 1 PO BOX 121777

ATTN: GSO

DUBAI, UNITED ARAB EMIRATES

1 Repair and paint the interior walls of the Utility Building 1 LS in accordance with the attached SOW

2 Repair and paint the exterior walls of the Utility Building 1 LS in accordance with the attached SOW

3 Repair and paint the exterior dry wall ceilings of the SCAC 1 LS and CCAC, as well as the concrete ceiling of the MCAC and SCAC Sally Port in accordance with attached SOW

VAT 5% 1 LS

Nathan Austin 7/07/2026

7/07/2026

7/27/2026

03:00PM

19TC12

AMERICAN CONSULATE GENERAL DUBAI

FIRST STREET, UMM HURRAIR 1 PO BOX 121777

ATTN: GSO

DUBAI, UNITED ARAB EMIRATES

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER 19TC1226Q0007

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

The purpose of this firm fixed price contract is to provide the repairing and repainting services of Utility building walls and SCAC, MCAC, CCAC Exterior Ceiling at the U.S Consulate, Dubai - United Arab Emirates. The price listed below shall include all labor, materials, insurance (see FAR 52.228-3 and 52.228-5), overhead, and profit. The Government will pay the Contractor the fixed price for standard services that have been satisfactorily performed.

After contract award and submission of acceptable insurance certificates, the Contracting Officer shall issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten

(10) days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.

The time frame for completion of the project is 90 calendar days. The contractor shall begin work within 7 calendar days from the Notice to Proceed.

II. PRICING

A. VALUE ADDED TAX

VAT VERSION A

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:

B. PRICES

No. Description Total Price (AED)

1 Repair and paint the interior walls of the Utility Building

2 Repair and paint the exterior walls of the Utility Building

Repair and paint the exterior dry wall ceilings of the SCAC and CCAC, as well as the concrete ceilings of the MCAC and SCAC Sally Port

4 VAT 5%

3 Grand Total Price Including VAT

C. DBA INSURANCE

This Contract requires a DBA Insurance to be provided.

Cost of DBA Insurance: AED

The Offeror shall include Defense Base Act (DBA) insurance premium costs covering employees. The offeror may obtain DBA insurance directly from any Department of Labor approved providers at the DOL website at http://www.dol.gov/owcp/dlhwc/lscarrier.htm ] http://www.dol.gov/owcp/dlhwc/lscarrier.htm

CONTINUATION TO SF-1449,

RFQ NUMBER 19TC1226Q0007

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK

1 INTRODUCTION

The US Consulate in Dubai, United Arab Emirates requires professional service of a qualified and experienced contractor to perform the following tasks

1.1 Task 01 - Repair and paint the interior walls of the Utility Building

1.2 Task 02 - Repair and paint the exterior walls of the Utility Building

1.3 Task 03 - Repair and paint the exterior dry wall ceilings of the SCAC and CCAC, as well as the concrete ceilings of the MCAC and SCAC Sally Port

Any other additional works that is not explicitly listed herein but are required to be performed for the successful completion of the project shall identified and included in the quotation by the Contractor. Such additional works must be clearly specified in the quotation.

All the services mentioned in this scope of work (SOW) shall be performed at the US Consulate General Dubai, UAE. The Government reserves the right to place an order for the three tasks listed above or for individual tasks based on the availability of funding.

2 EQUIPMENT AND PERFORMANCE REQUIREMENTS

The Contractor shall provide all necessary managerial, administrative, and direct labor personnel, as well as all transportation, equipment, tools, supplies and materials required to perform the tasks in accordance with this work statement. Under this Contract, the Contractor shall provide the services of trained and qualified and experienced technicians to perform construction activities.

3 SAFETY BRIEF

The Consulate safety program coordinator (APOSHO) will brief all the Contractors personnel, working on site, about Consulate Safety, Health and Environmental Management (SHEM) program before start of work. Any safely related issues such as mishap shall be reported to the APOSHO immediately.

4 SCOPE OF WORK

4.1 GENERAL

The contractor shall provide all materials, direct supervision, direct labor, tools, and equipment to perform the work. All personnel working in the vicinity shall wear applicable PPE while work is performed. Any questions or injuries shall be brought to the attention of the Post

Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the contractor for all HAZMAT materials to the COR for approval.

The Contractor shall not conduct any work that is beyond this SOW (Scope of Work) unless directed in writing by the Contracting Officer. Any work done by the Contractor beyond the

SOW without direction and approval from the Contracting Officer (CO), will be at the

Contactors risk and at NO Cost to the Consulate.

The Contractor shall survey the property and verify the work required against the order before beginning work, to determine if any discrepancies exist. The Contractor shall be responsible for any errors that might have been avoided by such a survey/review. The Contractor shall immediately report any discrepancies to the COR or the Contracting Officer and shall not begin work until such matters are resolved.

The Contractor shall keep the work area clean and tidy. The Contractor shall remove leftovers, debris, and garbage from premises by end of every day.

The Contractor is responsible for any damage of premises in the course of this contract, and restoration of the damage is required to be completed within the 20 calendar days. Damages shall be repaired at the Contractor's expense.

Contractor to submit method statement within 5 days of award, for approval, prior to start of work.

The Contractor shall remove wall hanging, hardware and hardware accessories, plates, and items in place that are not to be painted, or provide protection such as taping, prior to surface preparation and painting. Taping includes windows, door jams, sign boards, wall hangings, wall base etc.

After the paint is dry, the contractor shall reinstall the hardware and hardware accessories, plates, wall hangings, and sign board etc.

4.2 TASK 01 - REPAIR AND PAINT THE INTERIOR WALLS OF THE

UTILITY BUILDING

The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments. This preparation includes removal of oil, dust, and direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc. All surfaces must be clean and dry. The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces.

The Contractor shall apply paint following the manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

All holes, cracks and marks should be repaired with recommended fillers, sealant, putties or grouting cements as appropriate for the finishing system and substrate and treat to achieve the required finish in accordance with industry standards before painting.

Apply paint and related material with an undercoat plus two coats of selected finish color matt paint. Allow each coat to harden for the drying time recommended by the manufacturer.

Ensure each coat of paint is uniform in color, finish, thickness, and texture and free of runs, sags, blisters, or other discontinuities.

Ensure that primers, sealers, and undercoats are suitable for the substrate and compatible with the finish coat and each other. Also, the Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats.

The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried.

The Contractor shall apply materials at the manufacturer's recommended spreading rate. The

Contractor shall provide a total dry film thickness of the system as recommended by the manufacturer.

Upon completion of painting, the Contractor shall clean the paint-spattered surfaces on floor and walls. The Contractor shall remove spattered paint by washing, scraping or other proper methods, using care not to scratch or damage adjacent finished surfaces.

Before painting in any section of the building, use plastic sheeting to protect adjacent finishes.

Use masking tape wherever necessary to protect finished work or other surfaces liable to damage during painting. The Contractor shall remove temporary protective wrappings at end of each day’s painting operations.

4.2.1 Area details of

Utility Building Interior Walls,

• Paint details : Jotun NCS1003- Y45 R -

Jotashield Tex Medium

• Waterproofing - Planiseal 88 by Mapei (Only for effected Areas along with perimeter).

• Primer - Jotun, PVA primer / equivalent

• Putty / filler – Jotun-stucoo / equivalent m2

890.00

4.3 TASK-02 REPAIR AND PAINT THE EXTERIOR WALLS OF THE

UTILITY BUILDING

4.3.1 Preparation of substrate

All areas of the existing surfaces shall be thoroughly prepared to receive new paint. Surface preparation is the most critical procedural requirement in paint applied coating systems.

Inspect the existing condition of the painted exterior walls, surfaces and metal components to determine the areas, which require special cleaning to remove excessive loose plaster, stains, flaked paint, rust, scratches, and cracks. Facade walls require high pressure washing to be applied before repainting.

Mask/protect areas where plaster removal and paint stripping are not desired, including adjoining surfaces (floor, ceiling, etc) where overspray may travel. Polyethylene (plastic sheets) and masking tape create an effective barrier. Plants and other foliage should be covered or rinsed thoroughly before and during application.

Fire extinguishers shall always be kept on-site during repair operations. Repairs shall be applied in temperatures as recommended by manufacturer.

4.3.2 Removals

Contractor shall determine the condition of the existing substrate. All defects in the substrate shall be corrected painting work commences.

Areas of deteriorated substrate, porous or other affected materials must be removed and replaced with new to match existing.

Remove all loose stucco plaster particles, delaminated paint, efflorescence, mold, mildew, and other foreign materials. Areas shall be first sounded, scraped, swept clean, and then thoroughly power washed.

Remove softened/lifted paint using a scraper. Agitate tough to remove residue with a stiff nylon brush or scouring pad, paying particular attention to cracks, crevices, and grooves.

Remove corroded metal control/reveal joints and corner beads. Saw-cut end sections to prepare for new metal repair sections.

Remove loose paint, where the plaster is peeled off from the substrate, remove plaster down to stable state or concrete substrate. Cut "V" shaped incisions following hairline plaster cracks.

Rake out joints to depths equal to 2-1/2 times their widths, but not less than 25 mm (1-inch), nor less than that required to expose sound, weathered plaster. Route out cracks to a depth of a minimum of 6 mm by 6 mm (1/4-inch by 1/4-inch).

4.3.3 Power Washing

The stripped surface must be thoroughly rinsed with clean water. Exterior surfaces should be rinsed with a power washer.

Spray Equipment: Use high power adjustable pressure washer with a minimum 3500 PSI

(Pounds per Square Inch) mechanical spray device. Use spray equipment that provides controlled application at volume and pressure measured at nozzle. Adjust pressure and volume to ensure that cleaning methods do not damage surfaces, including joints.

Brushes: Use only natural-fiber or plastic-bristle brushes, as recommended by cleaning and finishing product manufacturers, that will not damage existing finishes. Use soft cloth for cleaning aluminum or steel. Only use processes recommended by the glazing manufacturer for cleaning the existing glazing. Do not use wire brushes.

Proceed with cleaning in an orderly manner; work from bottom to top of facade width and from one end of each elevation to the other. Ensure that dirty residues and rinse water do not wash over dry, cleaned surfaces.

Perform each cleaning method in a manner that results in uniform coverage of all surfaces, including corners, moldings, and interstices, and that produces an even effect without streaking or damaging surfaces. Keep wall wet below area being cleaned to prevent streaking from runoff.

4.3.4 Plaster Repair

Repair cracks, holes and surface defects on stucco plaster walls surfaces. Patch, plaster and restore damaged wall’s areas and prepare surfaces for painting. Repaired areas shall be blended into surrounding areas.

Control/Reveal Joints and Corner Bead Repair: Attach metal flanges with expanded mesh directly to the concrete substructure, butt ends to existing sections and fasten at 200mm on center and minimum 25mm from end of metal.

4.3.5 Proportion Mix

• Accurately measure plaster and mechanically mix plasters to comply with recommendations of plaster manufacturer.

• Batches for base coats shall not exceed an amount that can be used entirely within two hours.

• Batches for finishing coats shall not exceed amounts that can be used entirely within thirty minutes.

• Clean mixers and tools for each batch. Do not use lumped, caked, frozen, or re-tempered materials. Discard plaster mixes have begun to stiffen.

Prepare surfaces by water misting existing plaster and substrates adjacent to repair area.

Sequence plaster application with the installation and protection of other work so that neither will be damaged by the installation of the other.

Completely fill panel area between control joints to receive new plaster with material in a minimum of two lifts. Ensure all voids and entrapped air are eliminated.

Apply finish coat of plaster over repair materials to provide finished appearance to match existing. To ensure that the repaired area blends into the surrounding surface, provide sufficient crest over the opening to allow for shrinkage. The patch shall be feathered to zero at the edges using a brush, knife, or trowel, to prevent the repaired opening from telegraphing through the subsequent finishes.

Tolerances: Do not deviate more than 3mm (1/8-inch) in 3M (10 feet) from a true plane in finished plaster surfaces, as measured by a 3M (10 foot) straightedge placed at any location on surface.

Cure repaired and existing plaster surfaces by spray misting for three consecutive days. Allow plaster surfaces to dry thoroughly before painting.

4.3.6 Painting

The external wall painting texture shall match the existing installation. Apply paint in accordance with manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied.

Provide finish coats which are compatible with prime paints used:

Brush: Use a nylon/polyester brush. Avoid over-brushing which causes air bubbles.

Roller: Use a 12mm to 30mm (½" to 1½") nap synthetic roller cover. Avoid rapid rolling which causes bubbling. The substrate and its condition will determine the application procedure.

Spray: Use of spray equipment shall be reviewed and approved in advance.

Apply a two-coat application with overnight drying between coats to minimize pinholes.

Apply additional coats when undercoats, stains, or other conditions show through final coat of paint, until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces.

4.3.7 Scheduling Painting

Apply primer coat material to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

Apply undercoat sealer and filler paint to conceal localized hairline cracks after primer inspection. Apply finish coat as final surface.

Allow sufficient time between successive coats to permit proper drying.

Do not recoat until paint has dried to where it feels firms, does not deform, or feel sticky under moderate thumb pressure, and application of another coat of paint does not cause lifting or loss of adhesion of the undercoat.

4.3.8 Metal Painting

Perform appropriate repair of rusted surfaces of metal components, remove rust and stains, remove loose paint, remove dirt. Make sure the metal surfaces are brushed up properly, cleaned and prepared for painting.

Apply one coat of rust inhibitive primer to the metal surfaces to prevent rust expansion in the future.

Apply two finish coats of paint to match existing finish.

4.3.9 Joint Sealant Repair

During repainting work, existing conditions maybe encountered which are not known or are unforeseen, these conditions may consist of damage or deterioration of the door and window substrate or surrounding materials.

Use a knife or razor scraper to cut away thick portions of sealant beads on surfaces and in joints, leaving a 1/16 inch of sealant on the substrate surface. Do not cut through depth of sealant. Do not contact knife with substrate.

Use a plastic scraper or wooded pallet to scrape paint form substrate to remove sealant. Use a damp cotton rag to scrub the surface to remove remaining remnants of sealant. Wipe area where sealant was present with cotton rag soaked in denatured alcohol.

Remove excess and migrating joint sealing compounds, dirt, and foreign substances. Repair damaged areas of factory-applied finishes to match existing.

Sealant Joint Backing: Three-sided adhesion of sealant is not permitted to achieve required joint depths, restrict depth of joints by use of joint backer rod. Where joint backing material is not feasible due to insufficient clearance or depth, install bond preventive material in joint.

Sealant Application: Apply sealant in uniform continuous bead without gaps or air pockets, following manufacturer's instructions for type of sealant.

Provide uniform cross-sectional shapes and depths relative to joint widths which allow optimum sealant movement capability.

Sealant Tooling: Immediately after sealant application and prior to time skinning or curing begins, tool sealants to form smooth, uniform to eliminate air pockets and ensure contact and adhesion of sealant with sides of joint. Remove excess sealant from surfaces adjacent to joint.

4.3.10 Area and paint details

Item DESCRIPTION Unit QTY

External and Parapet wall

Paint details - Jotun NCS1003- Y45 R

(Jotashield Tex Medium) Waterproofing -

Planiseal 88 by Mapei (Only for effected Areas along with perimeter).

m2

950.00

Metal Doors

Paint details - Command Waterborne acrylic

GLOSS V390-1X-HC-180.

Base coat / primer -Lechler or equivalent

No.

9.00

3 Parking Garage wall repair and painting.

Paint details: Jotun NCS1003- Y45 R and

Jotun, S1510-Y40R m2 200.00

4.4 TASK 03 - REPAIR AND PAINT THE EXTERIOR DRY WALL CEILINGS OF

THE SCAC AND CCAC, AS WELL AS THE CONCRETE CEILINGS OF THE

MCAC AND SCAC SALLY PORT

The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments.

This preparation includes removal of oil, dust, and direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc. All surfaces must be clean and dry.

The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted surfaces.

The Contractor shall apply paint following the manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

All holes, cracks and marks should be repaired with recommended fillers, sealant, putties or grouting cements as appropriate for the finishing system and substrate and treat to achieve the required finish in accordance with industry standards before painting.

Apply paint and related material with an undercoat plus two coats of selected finish color matt paint. Allow each coat to harden for the drying time recommended by the manufacturer.

Ensure each coat of paint is uniform in color, finish, thickness, and texture and free of runs, sags, blisters, or other discontinuities.

Ensure that primers, sealers, and undercoats are suitable for the substrate and compatible with the finish coat and each other. Also, the Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats.

The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable, and before subsequent surface deterioration. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried.

The Contractor shall apply materials at the manufacturer's recommended spreading rate. The

Contractor shall provide a total dry film thickness of the system as recommended by the manufacturer.

Upon completion of painting, the Contractor shall clean the paint-spattered surfaces on floor and Ceilings. The Contractor shall remove spattered paint by washing, scraping or other proper methods, using care not to scratch or damage adjacent finished surfaces.

Before painting in any section of the building, use plastic sheeting to protect adjacent finishes.

Use masking tape wherever necessary to protect finished work or other surfaces liable to damage during painting. The Contractor shall remove temporary protective wrappings at end of each day’s painting operations.

4.4.1 Area details of

SI.

No

Description of area Area (sqm)

1 SCAC exterior drywall 100

2 CCAC exterior drywall 80

3 SCAC Sally port 120

4 MCAC Sally port 150

4.4.2 Recommended Materials for SCAC & CCAC exterior drywall ceiling

The materials specifications are as follows

1) Paint - Jotun, milky white matt / equivalent

2) Primer - Jotun, PVA primer / equivalent

3) Putty / filler – USG Boral joint filling compound / equivalent

4.4.3 Recommended Materials for MCAC & SCAC sally port concrete ceiling

The materials specifications are as follows

1) Paint - Jotun, NCS 1003-Y45R, Jotashield Tex medium / equivalent

2) Primer - Jotun, PVA primer / equivalent

3) Putty / filler – USG Boral joint filling compound / equivalent

5 WARRANTY

The warranty shall be valid for 1 year after the final inspection. During the warranty period, the Contractor shall repair or replace, free of charge, any occurring defects or ensuing damages. If the Contractor fails to do so after receipt of a written request to that effect, the

Government may have such discrepancies remedied at the Contractor's expense.

6 TIME FRAME:

The time frame for completion of each task is as follows. The contractor shall begin work within

7 calendar days from the Notice to Proceed.

6.1 Task 01 - 30 calendar days.

6.2 Task 02 - 30 calendar days.

6.3 Task 03 - 30 calendar days.

NOTE: The Government reserves the right to place an order for the three tasks listed above or for individual tasks based on the availability of funding.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor

Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the

Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Para Performance Threshold Services.

Performs all roof waterproofing replacement services set forth in the scope of work.

1.0 thru 6.3

All required services are performed and no more than one

(1) customer complaint is received per month.

(b) SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

(c) STANDARD. The performance standard is that the Government receives no more than one

(1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

(d) PROCEDURES.

(1) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(2) The COR will complete appropriate documentation to record the complaint.

(3) The COR determines the complaint is invalid, the COR will advise the complainant. The

COR will retain the annotated copy of the written complaint for his/her files.

(4) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(5) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(6) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(7) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(8) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the

Contracting Officer for appropriate action under the Inspection clause.

(9) Deliverables

Description Quantity Delivery Date Deliver to:

DBA Insurance 1 10 days after award Contracting Officer Method of Statement 1 5 days after award COR List of Personnel 1 5 days after award COR

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or

Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further

Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31

U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and

108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting

Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun

2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American

Recovery and Reinvestment Act of 2009.)

X (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

X (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun

2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

_X (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14

__X(8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of

Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply

Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec

2023) ( Pub. L. 115–390, title II).

_X (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec

2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

_X (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025)

( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022)

( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

(Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)

(15 U.S.C. 657a).

__ (17) [Reserved]

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and

(3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep

2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-

Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024)

(15 U.S.C. 657f).

__ (26) https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27

(i) 52.219-28, Postaward Small Business Program Representation (Jan

2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically

Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small

Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022)

(15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar

2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__ (34)

(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35)

(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

_X (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496).

__ (39)

(i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items

(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim

_X _ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter

29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-

169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the

Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United

States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal

Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov

2007) (42 U.S.C. 5150).

_X (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While

Driving (May 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

_X (57) 52.232-29, Terms for Financing of Purchases of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .