19TC1026R0003_Solicitation_Make-ready services.pdf
PDF 1 MB Posted
- Solicitation number
- 19TC1026R0003
- Issued by
-
Department of State US Embassy Abu Dhabi
About this file
This is a Solicitation, Offer, and Award document for make-ready services at the U.S. Embassy Abu Dhabi. The Government is seeking a contractor to provide personnel, supplies, and equipment for preparation of residential units for occupancy at short-term lease (STL) properties, with an estimated 158 residences currently requiring services. The contract is structured as a firm-fixed-price, Indefinite-Delivery, Indefinite-Quantity (IDIQ) with economic price adjustment, issued June 9, 2026, with sealed bid offers due by 4:00 PM local time on July 8, 2026. Pricing must be submitted in United Arab Emirates Dirham (AED) and includes Value Added Tax (VAT) as a separate line item.
Services required include plumbing services (water supply connections for appliances, drainage installations, water filtration), electrical maintenance and installation (circuit breaker replacements, receptacle installations, wiring for appliances, bulb replacements), and related materials. The contract includes a 12-month base year plus four one-year option periods, with a minimum guarantee of USD 10,000 per performance period. Task orders will be issued with a 10-day completion requirement per individual housing unit. The contractor must assign an English-speaking Project Coordinator with five years of supervisory experience and qualified technicians with minimum three years' experience in their respective trades. All work must be performed by the prime contractor's employees with no subcontracting without written approval. Performance bonds (20% of contract price) and general liability insurance (AED 1,000,000 cumulative limits) are required within 10 days of award. The Department of State is the contracting agency, with the Contracting Officer located at American Embassy Abu Dhabi.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
19TC1026R0003
2. TYPE OF SOLICITATION
SEALED BID (IFB)
[x] NEGOTIATED (RFP)
3. DATE ISSUED
June 9, 2026
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
PR15848880
6. PROJECT NO.
7. ISSUED BY CODE 19TC10 8. ADDRESS OFFER TO
Contracting Officer American Embassy Abu Dhabi, United Arab Emirates
Contracting Officer American Embassy Abu Dhabi, United Arab Emirates
9. FOR INFORMATION
CALL:
A. NAME
Gregory Stoneberg
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
02-414-2443
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Section B – Supplies or Services and Prices/Costs
Section C – Description/Specifications/Work Statement
Section D – Packaging and Marking
Section E – Inspection and Acceptance
Section F – Deliveries or Performance
Section G – Contract Administration Data
Section H – Special Contract Requirements
Section I – Contract Clauses
Section J – List of Documents, Exhibits
Section K – Representations, Certifications, and Other Statements of Offerors
Section L – Instructions, Conditions, and Notices to Offerors
Section M – Evaluation Factors for Award
11. The Contractor shall begin performance within _10___ calendar days and complete it within _365___ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _______________.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
YES 10 days after award
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and _soft__ copies to perform the work required are due at the place specified in Item 8 by _4pm__ local time _July 8, 2026___. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _90__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within _120____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 19TC10 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _soft_ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work; requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
Gregory Stoneberg
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
Solicitation: Make-ready services
19TC1026R0003 Page 3 of 137
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCOPE OF SERVICES
The Contractor shall provide personnel, supplies and equipment for all make-ready services for residences in the United Arab Emirates as described in Sections B and C of the solicitation, and the exhibits in Section J.
B.2 TYPE OF CONTRACT
This is a firm-fixed price, Indefinite-Delivery, Indefinite-Quantity (IDIQ) type contract with economic price adjustment for make-ready services. Orders will be issued based on FAR
Subpart 16.507-2. The Contractor shall furnish services according to task orders issued by the
Contracting Officer. Oral task orders may be necessary for emergencies; however, awardees will be given a fair opportunity to respond to oral requests for task order proposal requests for which the awardee of the task order will be given a written task order within three days following selection.
B.3 PRICES/COSTS
The prices will include all work, including furnishing all labor, materials, equipment and services, unless otherwise specified in Section B.3. The prices listed below shall include all labor, materials, direct and indirect costs, insurance (see FAR 52.228-4 and 52.228-5), overhead, and profit.
B.3.1 VALUE ADDED TAX
VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the
Invoice and as a separate line item in Section B.
B.3.2 CURRENCY
All prices shall be in local currency, United Arab Emirates Dirham (AED).
JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF
2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS
SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE
TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.
19TC1026R0003 Page 4 of 137
B.3.3 BASE YEAR PRICES (starting on the date stated in the contract award and continue for a period of 12 months)
CLIN
Sub-
CLIN
Description of
Service
NAICS Code:
236118 Addition, alteration and renovation of multifamily and residential building
Unit of
Measure
Estimated
Quantity
Price per
Unit in
AED
Total
Estimated
Price in AED
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Plumbing Standard section C.2.1
001.a Install cold water supply to clothes washer including SS body water filter
Each 25
001.b Install hot water washer including SS body water filter but excluding water heater
001.c Provide PVC pipe drain connection for clothes washer with stand pipe to nearest drain
Each 15
001.d Provide flexible aluminum duct connection from vent port of clothes dryer to back-draft damper in wall
Each 30
001.e Install back draft damper in wall for flexible aluminum duct connection for clothes dryer
19TC1026R0003 Page 5 of 137
001.f Provide cold water supply and drain connection for dish washer
Each 10
001.g Install kitchen sink mounted water filter for drinking water including long neck faucet and water connection from angle valve under sink
001.h Install kitchen wall for drinking water including water connection from angle valve under
001.i Install cold water washer excluding SS body water filter
Each 15
001.j Install hot water supply to clothes washer excluding SS body water filter and water heater
Each 15
001.k Provide only SS body water filter
Each 25
001.l Install duct-in fan for laundry exhaust duct, 4inch diameter connection, single speed, Tempest or approved equal
Each 25
002 Provide electrical maintenance service per Electrical
Standard section
C.2.2
002.a Replace the existing single phase MCB of size range 10Amp to new 40Amp /
240Volt MCB
Each 40
19TC1026R0003 Page 6 of 137
002.b Replace the existing three phase MCB of size range 32Amp to new 100Amp /
415Volt MCB
Each 25
002.c Replace the existing single phase RCBO of size range 16Amp to 45Amp / 240Volt
RCBO
Each 35
002.d Replace the existing three phase RCCB of size range 40Amp to
100Amp / 415Volt
RCCB
Each 25
002.e Replace the existing
13Amp / 240Volt duplex receptacle & switch with new one
Each 50
002.f Replace the existing two-way light switch
& cover plate with new one
Each 15
002.g Replace the existing outdoor type 13Amp
/ 240Volt receptacle
& switch with new one
Each 30
002.h Replace the existing outdoor type 13Amp
/ 240Volt duplex receptacle & switch with new one
Each 30
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.k Replace 18W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
19TC1026R0003 Page 7 of 137
002.l Replace 23W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.m Replace 40W to
100W incandescent bulb, as needed
Each 75
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of KDK make or approved equal
Each 15
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 200
003 Provide electrical services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Electrical Standard section C.2.2
003.a Install a new 13Amp
/ 240Volt RCD receptacle for 10mA trip rating
Each 75
003.b Install a new 13Amp
/ 240Volt RCD duplex receptacle for
10mA trip rating
Each 75
003.c Install a new 20Amp
/ 240Volt RCBO for receptacle circuit / dish washer for
10mA trip rating
Each 100
003.d Install a new 32Amp
/ 240Volt RCBO for receptacle circuit for
10mA trip rating
Each 100
003.e Install a new 45Amp
/ 240Volt power
Each 50
19TC1026R0003 Page 8 of 137 connector for clothes dryer
003.f Install a new 45Amp
/ 240Volt RCBO for clothes dryer for
10mA trip rating
Each 50
003.g Install a new 13Amp
/ 240Volt three pin fused plug for appliances and table lamps
Each 500
003.h Install a new 45Amp
/ 240Volt cooker switch with indication light
Each 75
003.i Install a new 45Amp
/ 240Volt cooker outlet plate with terminal block
Each 50
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor / PVC insulated / 600 Volts rated, to be interconnected in series with dryer switch
Each 30
003.k Provide wiring of
240volts, AC operated single phase cooker / dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to cooker / dryer outlet
003.l Provide wiring of
415volts, AC operated three phase cooker / dryer appliance with new 4 sq mm copper
Each
19TC1026R0003 Page 9 of 137 conductor, PVC insulated, 600volts rated building wire from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit breaker and a
32-40A isolator.
004 Provide electrical services, Type-2, including supply and installation of materials, per specification section
C.2.6.2 and as defined in below
CLINs 014.2.a to
014.2.b
004.a Install a new 13Amp outdoor type RCD receptacle for 10mA trip rating
Each 100
004.b Install a new 13Amp outdoor type RCD duplex receptacle for
10mA trip rating
Each 100
005 Estimated DBA
Insurance cost
NAICS Code: 524126
Casualty insurance carriers, direct
Lot 1
006 5% VAT Lot 1
CLIN
Total of all Sub CLINS (Line items) Prices in
AED
Total of all line-item prices: AED__________________
Base Year Total: AED___________________
19TC1026R0003 Page 10 of 137
B.3.4 Option year 1 Prices (starting on the date stated in the contract award and continuing for a period of 12 months)
Sub-
Description of
Service
NAICS Code:
236118 Addition, alteration and renovation of multifamily and residential building
Unit in AED
Total
Estimated
Price in AED
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per Plumbing
Standard section C.2.1 washer including SS body water filter washer including SS body water filter but excluding water heater drain connection for clothes washer with stand pipe to nearest connection from vent port of clothes dryer to back-draft damper in wall damper in wall for flexible aluminum duct connection for
19TC1026R0003 Page 11 of 137
001.f Provide cold water supply and drain connection for dish washer
001.g Install kitchen sink for drinking water including long neck faucet and water connection from angle valve under sink
001.h Install kitchen wall for drinking water including water connection from angle valve under sink washer excluding SS body water filter
Each 15
001.j Install hot water supply to clothes washer excluding SS body water filter and water heater
Each 15
001.k Provide only SS body water filter
Each 25
001.l Install duct-in fan for laundry exhaust duct, 4inch diameter connection, single speed, Tempest or approved equal
Each 25
002 Provide electrical maintenance service per Electrical
Standard section C.2.2
002.a Replace the existing single phase MCB of size range 10Amp to new 40Amp / 240Volt
MCB
Each 40
002.b Replace the existing three phase MCB of size range 32Amp to
19TC1026R0003 Page 12 of 137 new 100Amp /
415Volt MCB
002.c Replace the existing single phase RCBO of size range 16Amp to
45Amp / 240Volt
RCBO
Each 35
002.d Replace the existing three phase RCCB of size range 40Amp to
100Amp / 415Volt
RCCB
Each 25
002.e Replace the existing
13Amp / 240Volt duplex receptacle & switch with new one
Each 50
002.f Replace the existing two-way light switch
& cover plate with new one
Each 15
002.g Replace the existing outdoor type 13Amp /
240Volt receptacle & switch with new one
Each 30
002.h Replace the existing outdoor type 13Amp /
240Volt duplex receptacle & switch with new one
Each 30
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.k Replace 18W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.l Replace 23W
CFL/LED energy saver bulb with a new one, as needed
Each 500
19TC1026R0003 Page 13 of 137
002.m Replace 40W to
100W incandescent bulb, as needed
Each 75
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of KDK make or approved equal
Each 15
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 200
003 Provide electrical services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per Electrical
Standard section C.2.2
003.a Install a new 13Amp /
240Volt RCD receptacle for 10mA trip rating
Each 75
003.b Install a new 13Amp /
240Volt RCD duplex receptacle for 10mA trip rating
Each 75
003.c Install a new 20Amp /
240Volt RCBO for receptacle circuit / dish washer for 10mA trip rating
Each 100
003.d Install a new 32Amp /
240Volt RCBO for receptacle circuit for
10mA trip rating
Each 100
003.e Install a new 45Amp /
240Volt power connector for clothes dryer
Each 50
003.f Install a new 45Amp /
240Volt RCBO for
19TC1026R0003 Page 14 of 137 clothes dryer for
10mA trip rating
003.g Install a new 13Amp /
240Volt three pin fused plug for appliances and table lamps
Each 500
003.h Install a new 45Amp /
240Volt cooker switch with indication light
Each 75
003.i Install a new 45Amp /
240Volt cooker outlet plate with terminal block
Each 50
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor /
PVC insulated / 600
Volts rated, to be interconnected in series with dryer switch
Each 30
003.k Provide wiring of
240volts, AC operated single phase cooker / dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to cooker / dryer outlet
415volts, AC operated three phase cooker / dryer appliance with new 4 sq mm copper conductor, PVC insulated, 600volts rated building wire from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit breaker and a
32-40A isolator.
19TC1026R0003 Page 15 of 137
004 Provide electrical services, Type-2, including supply and installation of materials, per specification section
C.2.6.2 and as defined in below CLINs
014.2.a to 014.2.b
004.a Install a new 13Amp outdoor type RCD receptacle for 10mA trip rating
Each 100
004.b Install a new 13Amp outdoor type RCD duplex receptacle for
10mA trip rating
Each 100
NAICS Code: 524126
Casualty insurance carriers, direct
Lot 1
006 5% VAT Lot 1
CLIN
Total of all Sub CLINS (Line items) Prices in AED
Option Year 1 Total: AED___________________
19TC1026R0003 Page 16 of 137
B.3.5 Option year 2 Prices (starting on the date stated in the contract award and continuing
NAICS Code:
236118 Addition, alteration and renovation of multifamily and residential building
AED
Total
Estimated
Price in AED
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Plumbing
C.2.1 washer including
SS body water filter washer including
SS body water filter but excluding water drain connection for clothes washer with stand pipe to nearest connection from vent port of
19TC1026R0003 Page 17 of 137 clothes dryer to back-draft damper in wall
001.e Install back draft damper in wall for flexible aluminum duct connection for
001.f Provide cold water supply and drain connection for dish washer
001.g Install kitchen sink mounted water filter for drinking water including long neck faucet and water connection from angle valve under sink
001.h Install kitchen wall mounted water filter for drinking water including water connection from angle valve under washer excluding
SS body water filter
Each 15
001.j Install hot water supply to clothes washer excluding
SS body water filter and water heater
Each 15
001.k Provide only SS body water filter
Each 25
001.l Install duct-in fan for laundry exhaust duct, 19TC1026R0003 Page 18 of 137
4inch diameter connection, single speed, Tempest or approved equal
002 Provide electrical maintenance service per
Electrical
002.a Replace the existing single phase MCB of size range 10Amp to new 40Amp /
240Volt MCB
Each 40
002.b Replace the existing three phase MCB of size range 32Amp to new 100Amp /
415Volt MCB
Each 25
002.c Replace the existing single phase RCBO of size range 16Amp to 45Amp /
240Volt RCBO
Each 35
002.d Replace the existing three phase RCCB of size range 40Amp to 100Amp /
415Volt RCCB
Each 25
002.e Replace the existing 13Amp /
240Volt duplex receptacle & switch with new one
Each 50
002.f Replace the existing two-way light switch & cover plate with new one
19TC1026R0003 Page 19 of 137
002.g Replace the existing outdoor type 13Amp /
240Volt receptacle & switch with new one
Each 30
002.h Replace the existing outdoor type 13Amp /
240Volt duplex receptacle & switch with new one
Each 30
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.k Replace 18W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.l Replace 23W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.m Replace 40W to
100W incandescent bulb, as needed
Each 75
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of
KDK make or approved equal
19TC1026R0003 Page 20 of 137
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 200
003 Provide electrical services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Electrical
003.a Install a new
13Amp / 240Volt
RCD receptacle for 10mA trip rating
Each 75
003.b Install a new
13Amp / 240Volt
RCD duplex receptacle for
10mA trip rating
Each 75
003.c Install a new
20Amp / 240Volt
RCBO for receptacle circuit
/ dish washer for
10mA trip rating
Each 100
003.d Install a new
32Amp / 240Volt
RCBO for receptacle circuit for 10mA trip rating
Each 100
003.e Install a new
45Amp / 240Volt power connector for clothes dryer
Each 50
003.f Install a new
45Amp / 240Volt
RCBO for clothes
19TC1026R0003 Page 21 of 137 dryer for 10mA trip rating
003.g Install a new
13Amp / 240Volt three pin fused plug for appliances and table lamps
Each 500
003.h Install a new
45Amp / 240Volt cooker switch with indication light
Each 75
003.i Install a new
45Amp / 240Volt cooker outlet plate with terminal block
Each 50
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor
/ PVC insulated /
600 Volts rated, to be interconnected in series with dryer switch
Each 30
003.k Provide wiring of
240volts, AC operated single phase cooker / dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to cooker / dryer outlet
19TC1026R0003 Page 22 of 137
003.l Provide wiring of
415volts, AC operated three phase cooker / dryer appliance with new 4 sq mm copper conductor, PVC insulated, 600volts rated building wire from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit breaker and a 32-
40A isolator.
004 Provide electrical services, Type-2, including supply and installation of materials, per specification section C.2.6.2 and as defined in below CLINs
004.a Install a new
13Amp outdoor type RCD receptacle for
10mA trip rating
Each 100
004.b Install a new
13Amp outdoor type RCD duplex receptacle for
10mA trip rating
Each 100
005 DBA Insurance
NAICS Code:
524126 Casualty insurance carriers, direct
Lot 1
006 5% VAT Lot 1
19TC1026R0003 Page 23 of 137
CLIN
Option Year 2 Total: AED___________________
B.3.6 Option year 3 Prices (starting on the date stated in the contract award and continuing
NAICS Code:
236118 Addition, alteration and renovation of multifamily and
AED
Total
Estimated
Price in AED
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Plumbing washer including
SS body water washer including
SS body water filter but excluding water
001.c Provide PVC pipe drain
19TC1026R0003 Page 24 of 137 connection for clothes washer with stand pipe to nearest drain
001.d Provide flexible aluminum duct connection from vent port of clothes dryer to back-draft damper in wall for flexible aluminum duct connection for drain connection water filter for drinking water including long neck faucet and water connection from angle valve water filter for drinking water including water connection from angle valve under washer excluding
SS body water filter
Each 15
001.j Install hot water supply to clothes washer excluding
19TC1026R0003 Page 25 of 137
SS body water filter and water heater
001.k Provide only SS body water filter
Each 25
001.l Install duct-in fan for laundry exhaust duct, 4inch diameter connection, single speed, Tempest or approved equal
Each 25
002 Provide electrical maintenance service per
Electrical phase MCB of size range
10Amp to new
40Amp / 240Volt
MCB
Each 40
002.b Replace the existing three phase MCB of size range
32Amp to new
100Amp /
415Volt MCB
Each 25
002.c Replace the existing single phase RCBO of size range
16Amp to
45Amp / 240Volt
RCBO
Each 35
002.d Replace the existing three phase RCCB of size range
40Amp to
19TC1026R0003 Page 26 of 137
100Amp /
415Volt RCCB
002.e Replace the existing 13Amp /
240Volt duplex receptacle & switch with new one
Each 50
002.f Replace the existing two-way light switch & cover plate with new one
Each 15
002.g Replace the existing outdoor type 13Amp /
240Volt receptacle & switch with new one
Each 30
002.h Replace the existing outdoor type 13Amp /
240Volt duplex receptacle & switch with new one
Each 30
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.k Replace 18W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.l Replace 23W
CFL/LED energy saver bulb with a
Each 500
19TC1026R0003 Page 27 of 137 new one, as needed
002.m Replace 40W to
100W incandescent bulb, as needed
Each 75
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of
KDK make or approved equal
Each 15
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 200
003 Provide electrical services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Electrical
RCD receptacle for 10mA trip rating
Each 75
003.b Install a new
13Amp / 240Volt
RCD duplex receptacle for
10mA trip rating
Each 75
003.c Install a new
20Amp / 240Volt
RCBO for receptacle circuit
/ dish washer for
10mA trip rating
19TC1026R0003 Page 28 of 137
003.d Install a new
32Amp / 240Volt
RCBO for receptacle circuit for 10mA trip rating
Each 100
003.e Install a new
45Amp / 240Volt power connector for clothes dryer
Each 50
003.f Install a new
45Amp / 240Volt
RCBO for clothes dryer for 10mA trip rating
Each 50
003.g Install a new
13Amp / 240Volt three pin fused plug for appliances and table lamps
Each 500
003.h Install a new
45Amp / 240Volt cooker switch with indication light
Each 75
003.i Install a new
45Amp / 240Volt cooker outlet plate with terminal block
Each 50
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor
/ PVC insulated /
600 Volts rated, to be interconnected in series with dryer switch
Each 30
003.k Provide wiring of
240volts, AC operated single phase cooker /
19TC1026R0003 Page 29 of 137 dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to cooker / dryer outlet
003.l Provide wiring of
415volts, AC operated three phase cooker / dryer appliance with new 4 sq mm copper conductor, PVC insulated, 600volts rated building wire from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit including supply and installation of materials, per specification section C.2.6.2 and as defined in type RCD receptacle for
10mA trip rating
Each 100
004.b Install a new
13Amp outdoor type RCD duplex
19TC1026R0003 Page 30 of 137 receptacle for
10mA trip rating
Insurance Cost insurance carriers, direct
Lot 1
006 5% VAT Lot 1
CLIN
Option Year 3 Total: AED___________________
B.3.7 Option year 4 Prices (starting on the date stated in the contract award and continuing
NAICS Code:
236118 Addition, alteration and renovation of multifamily and
AED
Total
Estimated
Price in AED
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Plumbing washer including
19TC1026R0003 Page 31 of 137
SS body water filter
001.b Install hot water supply to clothes washer including
SS body water filter but excluding water drain connection for clothes washer with stand pipe to nearest connection from vent port of clothes dryer to back-draft for flexible aluminum duct connection for drain connection water filter for drinking water including long neck faucet and water connection from angle valve water filter for drinking water including water
19TC1026R0003 Page 32 of 137 connection from angle valve under sink
001.i Install cold water supply to clothes washer excluding
SS body water filter
Each 15
001.j Install hot water supply to clothes washer excluding
SS body water filter and water heater
Each 15
001.k Provide only SS body water filter
Each 25
001.l Install duct-in fan for laundry exhaust duct, 4inch diameter connection, single speed, Tempest or approved equal
Each 25
002 Provide electrical maintenance service per
Electrical phase MCB of size range 10Amp to new 40Amp /
240Volt MCB
Each 40
002.b Replace the existing three phase MCB of size range 32Amp to new 100Amp /
415Volt MCB
Each 25
002.c Replace the existing single phase RCBO of size range 16Amp
Each 35
19TC1026R0003 Page 33 of 137 to 45Amp /
240Volt RCBO
002.d Replace the existing three phase RCCB of size range 40Amp to 100Amp /
415Volt RCCB
Each 25
002.e Replace the existing 13Amp /
240Volt duplex receptacle & switch with new one
Each 50
002.f Replace the existing two-way light switch & cover plate with new one
Each 15
002.g Replace the existing outdoor type 13Amp /
240Volt receptacle & switch with new one
Each 30
002.h Replace the existing outdoor type 13Amp /
240Volt duplex receptacle & switch with new one
Each 30
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 1,000
002.k Replace 18W
CFL/LED energy saver bulb with a
Each 1,000
19TC1026R0003 Page 34 of 137 new one, as needed
002.l Replace 23W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.m Replace 40W to
100W incandescent bulb, as needed
Each 75
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of
KDK make or approved equal
Each 15
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 200
003 Provide electrical services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Electrical
RCD receptacle for 10mA trip rating
Each 75
003.b Install a new
13Amp / 240Volt
RCD duplex receptacle for
10mA trip rating
Each 75
003.c Install a new
20Amp / 240Volt
19TC1026R0003 Page 35 of 137
RCBO for receptacle circuit
/ dish washer for
10mA trip rating
003.d Install a new
32Amp / 240Volt
RCBO for receptacle circuit for 10mA trip rating
Each 100
003.e Install a new
45Amp / 240Volt power connector for clothes dryer
Each 50
003.f Install a new
45Amp / 240Volt
RCBO for clothes dryer for 10mA trip rating
Each 50
003.g Install a new
13Amp / 240Volt three pin fused plug for appliances and table lamps
Each 500
003.h Install a new
45Amp / 240Volt cooker switch with indication light
Each 75
003.i Install a new
45Amp / 240Volt cooker outlet plate with terminal block
Each 50
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor
/ PVC insulated /
600 Volts rated, to be interconnected in series with dryer switch
19TC1026R0003 Page 36 of 137
003.k Provide wiring of
240volts, AC operated single phase cooker / dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to operated three phase cooker / dryer appliance with new 4 sq mm copper conductor, PVC insulated, 600volts rated building wire from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit including supply and installation of materials, per specification section C.2.6.2 and as defined in type RCD
19TC1026R0003 Page 37 of 137 receptacle for
10mA trip rating
004.b Install a new
13Amp outdoor type RCD duplex receptacle for
10mA trip rating
Each 100 insurance carriers, direct
Lot 1
006 5% VAT Lot 1
CLIN
Option Year 4 Total: AED___________________
B.3.8 52.217-8 – OPTION TO EXTEND SERVICES (6 MONTHS)
NOTE to Offerors: Offerors are encouraged to complete the following pricing table for price evaluation purposes and FAR Clause 52.217-8 Option to Extend Services for 6 months.
The cost/price information provided will be used to evaluate the total price of the award for all options in 52.217-9 Option to Extend the Term of the Contract and 52.217-8 Option to
Extend Services plus the total price for the basic requirement ONLY. The price offered in the table below will not be included in the total contract award amount; however, if you choose not to provide any cost/price information for each line item below, your Price Proposal will be considered incomplete, labeled as failure to follow instructions, and no further consideration will be given.
NAICS Code:
236118 Addition, alteration and renovation of multifamily and
AED
Total
Price in AED
19TC1026R0003 Page 38 of 137
001 Provide plumbing services, Type-1, including supply and installation of materials, for laundry and kitchen appliances per
Plumbing washer including
SS body water
Each 13 washer including
SS body water filter but excluding water
001.c Provide PVC pipe drain connection for clothes washer with stand pipe to nearest drain
Each 8 connection from vent port of clothes dryer to back-draft for flexible aluminum duct connection for
Each 5
19TC1026R0003 Page 39 of 137 drain connection for dish washer
001.g Install kitchen sink mounted water filter for drinking water including long neck faucet and water connection from angle valve water filter for drinking water including water connection from angle valve under
Each 8 washer excluding
SS body water filter
Each 8
001.j Install hot water supply to clothes washer excluding
SS body water filter and water heater
Each 8
001.k Provide only SS body water filter
Each 13
001.l Install duct-in fan for laundry exhaust duct, 4inch diameter connection, single speed, Tempest or approved equal
Each 13
002 Provide electrical maintenance service per
Electrical
19TC1026R0003 Page 40 of 137
002.a Replace the existing single phase MCB of size range
10Amp to new
40Amp / 240Volt
MCB
Each 20
002.b Replace the existing three phase MCB of size range
32Amp to new
100Amp /
415Volt MCB
Each 13
002.c Replace the existing single phase RCBO of size range
16Amp to
45Amp / 240Volt
RCBO
Each 18
002.d Replace the existing three phase RCCB of size range
40Amp to
100Amp /
415Volt RCCB
Each 13
002.e Replace the existing 13Amp /
240Volt duplex receptacle & switch with new one
Each 25
002.f Replace the existing two-way light switch & cover plate with new one
Each 8
002.g Replace the existing outdoor type 13Amp /
240Volt receptacle & switch with new one
19TC1026R0003 Page 41 of 137
002.h Replace the existing outdoor type 13Amp /
240Volt duplex receptacle & switch with new one
Each 15
002.i Replace 9W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.j Replace 11W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.k Replace 18W
CFL/LED energy saver bulb with a new one, as needed
Each 500
002.l Replace 23W
CFL/LED energy saver bulb with a new one, as needed
Each 250
002.m Replace 40W to
100W incandescent bulb, as needed
Each 38
002.n Replace 150mm diameter window mounted exhaust fan with louvers with a new one of
KDK make or approved equal
Each 8
002.o Install 255mm dia flexible metal conduits for existing exposed wiring
Meter 100
003 Provide electrical services, Type-1, including supply
19TC1026R0003 Page 42 of 137 and installation of materials, for laundry and kitchen appliances per
Electrical
Standard section
C.2.2
003.a Install a new
13Amp / 240Volt
RCD receptacle for 10mA trip rating
Each 38
003.b Install a new
13Amp / 240Volt
RCD duplex receptacle for
10mA trip rating
Each 38
003.c Install a new
20Amp / 240Volt
RCBO for receptacle circuit
/ dish washer for
10mA trip rating
Each 50
003.d Install a new
32Amp / 240Volt
RCBO for receptacle circuit for 10mA trip rating
Each 50
003.e Install a new
45Amp / 240Volt power connector for clothes dryer
Each 25
003.f Install a new
45Amp / 240Volt
RCBO for clothes dryer for
10mA trip rating
Each 25
003.g Install a new
13Amp / 240Volt three pin fused plug for appliances and table lamps
Each 250
19TC1026R0003 Page 43 of 137
003.h Install a new
45Amp / 240Volt cooker switch with indication light
Each 38
003.i Install a new
45Amp / 240Volt cooker outlet plate with terminal block
Each 25
003.j Provide new wiring for duct-in fan for dryer exhaust, 6sq mm copper conductor
/ PVC insulated /
600 Volts rated, to be interconnected in series with dryer switch
Each 15
003.k Provide wiring of
240volts, AC operated single phase cooker / dryer appliance with new 6 sq mm copper conductor, PVC insulated, 600 volts rated building wire from DB to operated three phase cooker / dryer appliance with new 4 sq mm copper conductor, PVC insulated, 600volts rated building wire
19TC1026R0003 Page 44 of 137 from DB to cooker / dryer outlet Install a new 32-40A 3-phase circuit breaker and a 32-
40A isolator.
004 Provide electrical services, Type-2, including supply and installation of materials, per specification section C.2.6.2 and as defined in below CLINs
014.2.a to
014.2.b type RCD receptacle for
10mA trip rating
Each 50
004.b Install a new
13Amp outdoor type RCD duplex receptacle for
10mA trip rating
Each 50 insurance carriers, direct
Lot 1
006 5% VAT Lot 1
CLIN
19TC1026R0003 Page 45 of 137
B.3.8 GRAND TOTAL PRICE FOR BASE YEAR PLUS FOUR OPTION YEARS
Base Year Total CLIN 0001: AED
First Option Year Total CLIN 1001: AED
Second Option Year Total CLIN 2001: AED
Third Option Year Total CLIN 3001: AED
Fourth Option Year Total CLIN 4001: AED
52.217-8 Option to Extend Services CLIN 5001: AED
Grand Total Price for all Options: AED
MINIMUM AND MAXIMUM AMOUNTS
During the Base Year of the contract, and during the option year that might be exercised, the
United States Government (USG) shall place orders totaling a minimum of USD 10,000. This reflects the contract minimum guarantee for each period of performance. The amount of all orders, for base and all option years shall not exceed To Be Determined (TBD). This reflects the contract maximum.
B.4 ORDERING - The Government shall issue task orders for ordering all services under the contract. Task orders may be issued from the effective date of the contract until the end of the "Period of Performance." All task orders are subject to the terms and conditions of the solicitation. The solicitation shall take precedence in the event of conflict with any task order.
B.4.1 ORDERING PROCEDURES
At or Below Micro-Purchase Threshold. The Contracting Officer will issue a task order directly to a Contractor in the multiple award IDIQ contract that will meet the requirements of the requesting office. In emergency situations. the Contracting Officer may or may not issue a request for task order proposal. In the case of issuing a verbal request for a proposal with specified requirements, a written request for task order proposal will follow within three (3) days in which work may be required to start immediately. With approval of the Contracting
Officer, the Contracting Officer’s Representative may issue a verbal request for proposal.
The following information will be provided in verbal and written request for task order proposal (See the sample task order at Section J, Exhibit 2):
(a) Date of order
(b) Contract number
(c) Order number
(d) Location of property
(e) Amount of work (square meters or linear meters)
19TC1026R0003 Page 46 of 137
(f) Point of contact for questions
Above the Micro-Purchase Threshold and Below the Simplified Acquisition Threshold.
Unless a J/A is issued to a specific Contractor under the multiple award IDIQ contract, the
Contracting Officer will issue a Request for Task Order Proposal (RFTOP) to the IDIQ contract awardees. Selection will be based on lowest price. In some cases, and with approval from the Contracting Officer, the Contracting Officer’s Representative will verbally request for task order proposal. Verbal request will be followed by a written request for task order proposal within 3 days. Awardees are required to submit a proposal or otherwise acknowledging receipt of the written request for proposal. IDIQ contract awardees must provide a proposal or submitting an email confirming the inability to fulfill the requirements in the written request for task order proposal.
(g) Date of order
(h) Contract number
(i) Order number
(j) Location of property
(k) Amount of work (square meters or linear meters
(l) Point of contact for questions
B.4.2 SURVEY OF PROPERTY - Before performing work, the Contractor shall survey the property and verify the work required against the task, to determine if any discrepancies exist.
The Contractor shall be responsible for any errors that might have been avoided by such a survey/review. The Contractor shall immediately report any discrepancies to the COR or the
Contracting Officer and shall not begin work until such matters are resolved.
B.4.3 TASK ORDER COMPLETION DATE – The Contractor shall complete all services on individual housing units within ten (10) days of receipt of a written task order depending on the level of work required to complete the task order requirements. The time period specified above shall not begin until the Contractor is afforded reasonable access to the work site.
The time period specified above may be shortened if mutually agreed to by the contractor and the Government.
The completion date is fixed and may be extended only by a written modification signed by the Contracting Officer.
19TC1026R0003 Page 47 of 137
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 INTRODUCTION
C.1.1 GENERAL - U.S. Embassy Abu Dhabi requires the services of a contractor to perform make-ready services (preparation of residential units for occupancy, including all contract line items in this contract) tasks for U.S. Government-owned and leased properties.
The works required under contract shall be performed directly by the Prime contractor employees. Work shall not be subcontracted out.
The Embassy currently maintains 158 Short-Term Lease (STL) residences that require make-ready services for incoming or on-station personnel; this number may vary. The Government is contemplating awarding one or more IDIQ contract(s). The Contracting Officer will issue task orders as prescribed by FAR 16.507-2 Fair Opportunity Procedures.
The Contractor is required to assign a trained and experienced Project Coordinator to oversee the requested work within the approved schedule.
C.1.2 ENGLISH SPEAKING PROJECT COORDINATOR - The assigned Project
Coordinator shall be coversant in English who shall be available at the assigned residences while performing the requested services designated by the Contracting Officer during normal
Embassy working hours (see Section F.7) and shall have supervision as his/her sole function during the times s/he is on duty and be the Contractor's liaison with the Government.
C.1.3. PERSONNEL - The Contractor shall be responsible for providing qualified technicians for each trade with relevant experience to perform make-ready services for task orders issued under this contract. Helper positions do not need to meet the experience requirement. The
Contractor's employees shall be at the assigned residences only for contractual duties and not for any other business or purposes.
C.2 STANDARDS
C.2.1 PLUMBING SERVICES
The Contractor shall perform the following plumbing repairs and use the checklist in
Section J, Exhibit 4.
(a) The Contractor shall furnish all supplies and equipment needed for the repairs.
(b) All plumbing and drainage work shall be carried out in accordance with the latest
International Plumbing Code (IPC) and applicable local standard.
(c) The contractor shall use approved, new, and good-quality materials suitable for potable water supply and sanitary drainage systems.
19TC1026R0003 Page 48 of 137
(d) Water supply piping shall be of approved Cpvc, Ppr, copper, or equivalent material, rated for the required pressure and temperature (16 bar or higher), with proper support, isolation valves, and insulation for hot water lines.
(e) Drainage and vent piping shall be of Upvc or equivalent Embassy FAC-approved material, installed with correct slopes, traps, cleanouts, and venting as per code to ensure smooth flow and prevent odor or backflow.
(f) All fittings, angle valves, traps, flexible hoses, pumps, and accessories shall be of high standard and installed in a neat and good manner.
(g) Water heaters shall be connected using rigid copper piping with pressure relief valves and all safety provisions as per code.
(h) Laundry water supply and drainage connections shall be properly sized and trapped, and laundry exhaust ducting, fan, and draft valve connections shall be securely installed, properly supported, and sealed, and vented to the outside in compliance with
IPC and HVAC -mechanical ventilation standards.
(i) All systems shall be tested, flushed, and commissioned, once the repair work is completed.
C.2.2 ELECTRICAL SERVICES
The Contractor shall perform the following electrical services and use the checklist in
Section J, Exhibit 4.
(a) The Contractor will provide all materials necessary to complete the quality work.
(b) Use appropriate PPEs prior performing any electrical related repair work.
(c) Use lock-out & tag-out prior commencing any electrical repair work.
(d) Use commercial graded materials, wiring supplies to perform the electrical wiring work. The Contractor proposed new wiring conductors shall be Ducab brand or
Embassy approved equivalent barnd 600volts rated residential/building wires.
(e) Perform megger test when a new wiring work is done and complete prior energizing the circuit.
(f) The Contractor shall ensure that the replacement wall receptacles, plugs and outlets shall match with the existing residence’s type/style and the voltage rating.
(g) When any wall receptacles, plugs and outlets replaced, it is the responsibility of the
Contractor to ensure that the polarity of the terminals are not compromised.
19TC1026R0003 Page 49 of 137
(h) When replacing new RCDs/RCBOs, it is the responsibility of the Contractor to ensure that the sensitivity of the RCD/RCBO is remain same as the existing. Test the
RCD/RCB once the work is complete.
(i) Turn off the light circuit when replace bulb/s. The replacement bulb/s shall be with the same type and temperature (kelvin) – color and voltage rating.
C.3 MAJOR REPAIRS
RESERVED
C.4 CONTRACTOR PERSONNEL
All personnel assigned by the Contractor for the performance of the respective services shall be regular employees of the Contractor, and shall be supervised by the Contractor. There shall be no employer-employee relationship between the Government and the personnel.
Subcontractors may only be employed with the express written consent of the Contracting
Officer.
C.4.1 QUALIFICATION
The Contractor/personnel shall have the following criterion for their experiences at a minimum:
(a) Shall have an established business continuously operating with a permanent address and telephone listing in UAE for the past seven (7) years at a minimum in providing maintenance services for residential buildings.
(b) Shall have successfully completed at least ten (10) residential building maintenance services in the last five (5) years at a minimum in providing maintenance services for residential buildings to demonstrate their prior continuous building maintenance experience.
(c) At least two (2) numbers of residential building maintenance service contract/order services rendered each year since year 2020 and continuing to provide building maintenance contract/order services till present.
(d) Residential building maintenance contract/order with at least 12-month service period shall be considered as one number of experience and required to provide at least ten (10) numbers of building maintenance contracts in total.
(e) The Project Coordinator shall have five (5) years of continuous supervisory experience in residential building maintenance in managing maintenance crew with the tasks involved similar to the pricing table tasks of this solicitation at a minimum is required to perform make-ready services for task orders issued under this contract.
19TC1026R0003 Page 50 of 137
(f) The Contractor’s technician/s shall have minimum of three (3) years of continuous experience in their respective trade in residential building maintenance at a minimum is required to perform make-ready services for task orders issued under this contract.
C.4.2. RESPONSIBILTIES OF THE CONTRACTOR
(a) The Contractor shall bear complete responsibility for management of work at site.
(b) The Embassy COR will coordinate and notify the Contractor for the exact date of make ready services to be performed at the assigned STL properties.
(c) It is the Contractor’s responsibility to estimate the volume of work and supply the necessary materials, use the required number/s of appropriate tools/equipment to complete the task order work with-in approved number of days.
(d) The Contractor is required to submit Material Safety Data Sheet (MSDS) for the proposed liquid/materials (if to be used) and its application of the work.
(e) The Contractor shall assign a Project Coordinator to represent the Contractor and to manage the performance of work at site.
(f) The Project Coordinator shall have adequate English language skills to be able to communicate with CO and Property office.
(g) The Contractor shall carry out all requested activities described in the SOW and in case
Contractor deputes portion of the activities to a sub-contractor; then this should be done by prior approval from the Contracting Officer.
(h) The Contractor shall bear complete responsibility and management control for the sub-contracted services and shall not depute the sub-contractor to represent the Contractor in dealings with the Embassy.
(i) The Contractor shall bear complete responsibility for safe performance of cleaning work at site and comply with all local laws pertaining to construction labor and safety. In addition, the safety requirements relating to this SOW as contained in the
USACE Manual EM 385-1-1 shall apply. In case of a conflict between the local laws and the requirements of EM 385-1-1, the stringent of the two shall apply. A soft copy of the USACE Manual EM 385-1-1 is available in the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/E
M_385-1-1_English_2003.pdf
(j) The Contractor shall prepare and implement a safety and quality management plan specific to the SOW based on hazards analyses of the activities. A copy of the safety management plan shall be provided to the COR for reference. The Contractor shall promptly report all mishaps / accidents at site to the Contracting Officer and COR.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf
19TC1026R0003 Page 51 of 137
(k) The Contractor shall comply with security requirements and be responsible for conduct of employees and subcontractor at work site.
(l) The Contractor can use the Water and Electricity available at the assigned…