Solicitation Summary
This is a Request for Proposal (RFP) for Chiller Equipment Preventive Maintenance Services at the United States Embassy in Abu Dhabi, United Arab Emirates. The solicitation number is 19TC1026R0001, issued by the Procurement and Contracting Office on January 13, 2026, with proposals due February 11, 2026, at 4:00 pm UAE time. The contract is for firm fixed-price annual maintenance services on three chiller units (two York Screw Chillers and one Trane Screw Chiller) covering a base year plus four optional one-year periods. All prices must be submitted in Arab Emirate Dirhams (AED) and include labor, materials, tools, insurance (including Defense Base Act coverage), DBA, police clearance certificates, overhead, profit, and VAT as a separate line item. The contractor must perform all work directly with its own employees; subcontracting is prohibited. Services include annual preventive maintenance, oil analysis, system diagnostics, component replacement, cleaning, and inspection per manufacturer specifications, with work performed during normal business hours (07:30-17:00 Monday-Thursday, 07:30-11:30 Friday, excluding local holidays).
The contractor must provide trained chiller maintenance specialists, appropriate tools and testing equipment, and maintain an onsite inventory of consumable parts and supplies. Key deliverables include submission of personnel names with training certificates within 10 days of award, valid insurance certificates, formal service reports within 15 calendar days of each maintenance visit, and signed maintenance checklists. The Government will evaluate proposals on technical acceptability (including past performance and experience with York/Trane chillers for at least five contracts completed in the past three years) and price, awarding to the lowest priced acceptable offeror. Mandatory requirements include active SAM registration, proof of authorized service provider certification from the manufacturer, valid commercial license, valid Workmen Compensation Insurance, audited financial statements for the past three years, and confirmation that no portion of services will be subcontracted. The contract will commence within six months of solicitation, and the contractor assumes absolute liability for personal injuries and property damage resulting from negligence.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
DOCUMENT
United States Embassy Abu Dhabi, United Arab Emirates
Chiller Equipment Preventive Maintenance Services
Solicitation No.: 19TC1026R0001
Procurement and Contracting Office
P.O. Box 4009 Embassies District Area
Abu Dhabi, United Arab Emirates
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 1 of 63
19TC1026R0001
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 1449 cover sheet
• Continuation To SF-1449, RFP Number 19TC1026R0001, Prices, Block 23
• Continuation To SF-1449, RFP Number 19TC1026R0001, Schedule of Supplies/Services, Block 20 Description/Specifications/Work Statement
• Attachment 1 – Government-Furnished Property
• Exhibit A – Statement of Work
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not
Prescribed in Part 12
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 2 of 63
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR15790092
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
January 13, 2026
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Gregory Stoneberg
b. TELEPHONE NUMBER (No collect calls)
+971-2-414-2443
8. OFFER DUE DATE/ LOCAL
TIME
February 11, 2026, 4:00 pm (UAE time)
9. ISSUED BY CODE 19TC10 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: ____ % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
Contracting Office
U.S. Embassy Abu Dhabi
United Arab Emirates
HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
NAICS:
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8 (A) SIZE STANDARD:
11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 19TC10 16. ADMINISTERED BY CODE 19TC10
Contracting Office
U.S. Embassy Abu Dhabi
United Arab Emirates
Contracting Office
U.S. Embassy Abu Dhabi
United Arab Emirates
17a. CONTRACTOR/
OFFERER
TELEPHONE NO.
CODE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY
Financial Management Center
U.S. Embassy Abu Dhabi
United Arab Emirates
CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
1.
2.
3.
4.
5.
Preventive Maintenance services for Chiller Equipment systems - see attached.
Base Year
Option Year 1
Option Year 2
Option Year 3
Option Year 4
LS
LS
AED
AED
AED
AED
AED
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN A SOFT_
COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL
ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _________________ OFFER DATED
____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO
ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
Gregory Stoneberg
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 3 of 63
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT 37. CHECK NUMBER
PARTIAL FINAL
COMPLETE PARTIAL
FINAL
38. S/R ACCOUNT NO.
39. S/R VOUCHER NO. 40. PAID BY
41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41C. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 4 of 63
SECTION 1 - THE SCHEDULE
Continuation/Addendum to SF-1449
RFP Number 19TC1026R0001
PRICES, BLOCK 23
1.0 DESCRIPTION
The U.S. Embassy in Abu Dhabi requires services from a competent contractor to maintain
Chillers equipment in safe, reliable and efficient operating condition. The contract type is a firm fixed price contract for scheduled annual maintenance services paid at the annual rate below.
These rates include all costs associated with providing Chiller maintenance services in accordance with manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-
5) including DBA, police clearance certificate, overhead, profit and VAT (if applicable). The contract will be for a one-year period, with four one-year optional periods of performance. These services shall result in all systems being serviced under this agreement being in good operational condition when activated.
The works required under this contract shall be performed directly by the Contractor’s employees and shall not be subcontracted.
1.1. Type of Contract
This is a firm fixed price contract payable entirely in Arab Emirate Dirham (AED). Prices for all
Contract Line Item Numbers (CLIN) shall include proper disposal of toxic substances as per Item
6.5 where applicable. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
1.2. Period of Performance
The contract will be for a period of one-year, with a maximum of four one-year optional periods of performance and will be expected to commence within six months period from the date of solicitation.
2.0 PRICING
2.1 VALUE ADDED TAX
VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 5 of 63
2.2 Base Year - The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:
2.3 Option Year 1 - The Contractor shall provide the services shown below for Option Year 1, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months.
CLIN Description
Quantity of
Equipment
Type of services No. of service
Unit price
/ service
(AED)
Total per year (AED)
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
Trane Screw Chiller, Model: RTAC 300-
D UZOHHAGR
H4WY 2COB RA5T
N11A, 300ton
Annual
PM
Total Base Year
CLIN Description
Quantity of
Equipment
Type of services No. of service
Unit price
/ service
(AED)
Total per year (AED)
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
Trane Screw Chiller, Model: RTAC 300-
D UZOHHAGR
H4WY 2COB RA5T
N11A, 300ton
Annual
PM
Total Option Year 1
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 6 of 63
2.4 Option Year 2 - The Contractor shall provide the services shown below for Option
Year 2, starting two years after the date stated in the Notice to Proceed and continuing for a period of 12 months.
2.5 Option Year 3 - The Contractor shall provide the services shown below for Option
Year 3, starting three years after the date stated in the Notice to Proceed and continuing for a period of 12 months.
CLIN Description
Quantity of
Equipment
Type of services No. of service
Unit price
/ service
(AED)
Total per year (AED)
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
Trane Screw Chiller, Model: RTAC 300-
D UZOHHAGR
H4WY 2COB RA5T
N11A, 300ton
Annual
PM
Total Option Year 2
CLIN Description
Quantity of
Equipment
Type of services No. of service
Unit price
/ service
(AED)
Total per year (AED)
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
Trane Screw Chiller, Model: RTAC 300-
D UZOHHAGR
H4WY 2COB RA5T
N11A, 300ton
Annual
PM
Total Option Year 3
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 7 of 63
2.6 Option Year 4 - The Contractor shall provide the services shown below for Option
Year 4, starting four years after the date stated in the Notice to Proceed and continuing for a period of 12 months.
Total for Base and all Option Years:
Base Year Total AED
Option Year 1 Total AED
Option Year 2 Total AED
Option Year 3 Total AED
Option Year 4 Total AED
GRAND TOTAL OF BASE YEAR PLUS ALL OPTION YEARS AED
Note: The above CLIN pricing includes DBA insurance. DBA insurance shall not be priced as a separate line item.
3.0 NOTICE TO PROCEED
After contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.
CLIN Description
Quantity of
Equipment
Type of services No. of service
Unit price
/ service
(AED)
Total per year (AED)
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
York Chiller, Model:
YVAA0273DUG51
BA, 240ton
Annual
PM
Trane Screw Chiller, Model: RTAC 300-
D UZOHHAGR
H4WY 2COB RA5T
N11A, 300ton
Annual
PM
Total Option Year 4
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 8 of 63
CONTINUATION/ADDENDUM TO SF-1449
RFP NUMBER 19TC1026R0001
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATION/WORK STATEMENT
1.0 SCOPE OF WORK
The U.S. Embassy in Abu Dhabi requires the Contractor to maintain the Chiller equipment in safe, reliable and efficient operating condition. The Contractor shall provide all necessary managerial, administrative and direct labor personnel, and as well as all necessary transportation, equipment, tools, consumable parts, supplies and materials required to perform inspection, maintenance and adjustment as required to maintain the Chiller equipment in accordance with the manufacturer's specifications. The works required under this contract shall be performed directly by the
Contractor’s employees and shall not be subcontracted.
Following are the details of the Chiller equipment that requires Preventive Maintenance Service from the Contractor:
1. York Screw Chiller, Model: YVAA0273DUG51BAVNXXXSAXLAXXX5044XB
FXXV210X1DXSA2BCXG5R1XQXXXBXXEXW, Specification: Air cooled Screw
Chiller (Refrigerant 134A) Sl. No. 11552M14003863
2. York Screw Chiller, Model: YVAA0273DUG51BAVNXXXSAXLAXXX5044XB
Chiller (Refrigerant 134A) Sl. No. 11552M14003862
3. Trane Screw Chiller, Model: RTAC 300-D UZOHHAGR H4WY 2COB RA5T N11A, Specification: Trane Air cooled Screw Chiller (Refrigerant 134A) Sl. No. U15CO1293
Under this contract, the Contractor shall provide services of trained Chiller maintenance specialist/s on a yearly basis to check equipment, its operation and perform scheduled preventive maintenance.
The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown, and deterioration when units are activated/running.
2.0 HOURS OF PERFORMANCE
The Contractor shall perform all scheduled maintenance work during normal business hours which are defined as 07:30. to 17:00 from Monday through Thursday and 07:30 to 11:30 on Fridays, excluding local/ public holidays. If the work is required to be performed outside of these standard normal work hours to allow for uninterrupted operations of the Embassy Compound, then it requires approval in advance by the Contracting Officer's Representative (COR).
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 9 of 63
3.0 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
3.1 General. The Contractor shall designate a representative who shall supervise the
Contractor's fully trained specialists/technicians and be the Contractor's liaison with the U.S.
Embassy. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Contractor employees will be given access to the equipment and its associated areas and will be escorted by Embassy personnel.
3.2 Personnel Security. The Government reserves the right to deny access to U.S owned and
U.S.-operated facilities to any individual. When requested, the Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this contract prior to their utilization. The Government will issue access badges to approved Contractor personnel, each of whom shall display his/her card(s) on the uniform at all times while on
Government property serviced under this contract. These access badges are the property of the
Government. The Contractor shall return all access badges when the contract is completed, when a Contractor’s employee leaves this contract, or at the request of the Government. No technician will be allowed on site without prior authorization. Note: This may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.
3.3 The Contractor shall work closely with the COR or his representative while at the Compound.
3.4 Standards of Conduct
3.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States
Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
3.4.2 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. All employees shall wear uniforms approved by the Contracting
Officer's Representative (COR). The Contractor shall provide, to each employee and supervisor, uniforms and personal equipment. The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.
3.4.3 Neglect of duties is unacceptable. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
3.4.4 The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 10 of 63
3.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
3.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct;
unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.
3.4.7 Key Control. Embassy Facility Management staff will provide access to the Contractor’s
PM Service personnel to the required maintenance areas. The Contractor will not be issued to use any keys.
4.0 SCHEDULED PREVENTIVE MAINTENANCE REQUIREMENTS
4.1 General. The Contractor shall provide the requested service to meet the scheduled preventive maintenance requirements. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.
4.2 Qualified Contractor - The Contractor must provide appropriate numbers of qualified and trained technicians/Specialist at a minimum to provide the requested service on Chiller equipment annually as requested in this contract. Sub-contracting the requested Chiller Preventive
Maintenance Service on its entirety or partial is not authorized.
4.3 Safety: Safety is the highest priority on this and all OBO/CFSM/FAC projects/operations.
OBO SHEM policy is to work de-energized! The team leader shall direct all of those under his/her charge to work safely. The Contactor is required to provide all required PPE for the technicians to work safely at site. Lock Out Tag Out (LOTO) is to be strictly enforced.
4.4 Consumables/inventory: The Contractor shall inventory, supply and replace expendable parts
(example filters, hoses, O-rings / gaskets) that have become worn due to wear and tear. The
Contractor shall advise the COR to maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, oil, coolant, filters, grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits.
4.5 Refrigerants, parts and maintenance materials delivered to the post are to be new and unused.
Parts shall be OEM (Original Equipment Manufacturer) approved. Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type. Refrigerants shall meet the AHRI Standard 700-2015 or most recent
AHRI Standards.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 11 of 63
4.6 Contractor shall provide supervision, labor, tools, and equipment to perform preventive maintenance work. All personnel working in the vicinity should wear and /or use appropriate safety protection while all work is performed.
4.7 Exclusion. This contract does NOT include repair of equipment and replacement of hardware
(example: control circuitry board, mechanical and electrical parts etc.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance.
The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the
Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work.
Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor’s negligence.
4.8 Replacement/repair of any electronic or electrical parts shall be approved by the COR prior to procurement/installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the
Government.
4.9 Stocking of recommended repair parts is at the discretion of the Embassy and is dependent upon the nearest location of the Equipment manufacturer, distributor or dealer. A recommended spare parts list shall be obtained by the Contractor from the manufacturer or distributor and provided to the COR to review/procure.
4.10 Any questions or injuries shall be brought to the attention of the Post COR and Occupation
Safety and Health Officer (POSHO) immediately. Material Safety Data Sheets (MSDS) for all
HAZMAT (Hazardous Materials) shall be provided by the Contractor. Copies shall be provided to the COR for approval.
4.11 Checklist Approval
4.11.1 The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to perform. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement. The Contractor shall perform the tasks at a minimum as mentioned in the reference Check list for Chiller 1, 2 and 3 PM Services. Once the scheduled PM Service is complete, the Contractor is required to submit a formal service report including laboratory test results, if any (that may include oil, glycol sample test reports etc.) within 15calendar days from the date of PM Service completion to COR.
4.11.2 The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after each maintenance visit.
4.11.3 It is the responsibility of the Contractor to perform all manufacturers’ recommended preventive maintenance work including preventive maintenance recommended by the manufacturers’ technical manuals for the respective equipment.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 12 of 63
4.11.4 Additionally, the maintenance Contractor shall refer and keep at the post O&M binders provided by the manufacturers. These binders shall be placed in a location accessible to post personnel to review as needed.
4.11.5 Once the necessary PM Service is complete, the Chiller Maintenance Specialists shall leave a copy of this signed checklist with the COR or the COR's designated personnel.
5.0 TROUBLE CALL RESPONSE SERVICE
5.1 Callback Service - When Chiller equipment which was previously worked on by the
Contractor's service personnel, has a repeated malfunction within one month period, the Contractor shall be obligated to provide, at no extra cost, a return visit by a trained Chiller service specialist to correct the problem, even if the problem is minor in nature. The Chiller service specialist shall contact COR to schedule the repair work.
6.0 PERSONNEL, TOOLS, REPAIR PARTS, MATERIALS AND SUPPLIES
6.1 The Contractor shall provide trained Chiller maintenance specialists with the appropriate tools and testing equipment for scheduled preventive maintenance, safety inspection, and safety testing, emergency repairs/assistance, as required by this contract. The Contractor shall provide all of the necessary service materials, consumables to perform the quality maintenance service and to maintain the system.
6.2 The Contractor must have their own maintenance service personnel to perform all requested service as required by the contract, as sub-contracting of the contract service on its entirety or partial is not authorized.
6.3 Contractor furnished materials include but are not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing and eye protection, MSDS, cleaning material and oil/coolant spill containment kit. Expendable/consumable items (example hoses, oil, chemicals, coolant, filters, O-rings/sealant, thermostat, fuse) shall be maintained in the onsite inventory.
6.4 Supplying of required repair parts, materials and supplies to troubleshoot the Chiller equipment is not covered by this contract.
6.5 Disposal of used oil and other toxic substances: The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the Contractor must show proof of authorized disposal of these toxic/hazardous substances.
7.0 SOFTWARE, LICENSES AND PASSWORDS
Copies of any and all software and licenses needed to control or to adjust the communications module/program shall be given to the post upon completion of the work.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 13 of 63
8.0 EXCLUSIONS
The Contractor shall not assume responsibility for the following items of Chiller equipment service, which are not included in this contract:
a. Supplying of required repair parts without an approved purchase order from
Embassy Contracting Officer.
b. Emergency repair call service
c. Servicing of any other equipment which is not included in this SOW - Pricing table
2.2 to 2.6.
9.0 INSURANCE REQUIREMENTS
9.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor's personnel in the performance of this contract.
The Contractor's assumption of absolute liability is independent of any insurance policies.
Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:
Comprehensive General Liability
(1) BODILY INJURY, ON OR OFF THE SITE, IN UAE DIRHAMS
Cumulative 1,000,000.00
(2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN UAE DIRHAMS
Cumulative 1,000,000.00
9.2 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required by the laws of either the country in which the employees are working or the employee's native country, whichever offers greater benefits, following FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”.
10.0 PERMITS
The Contractor shall maintain in full force and affect all permits, licenses, and appointments required for the prosecution of work under this contract at no additional cost to the Government.
The Contractor shall obtain these permits, licenses, and appointments in compliance with host country laws.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 14 of 63
11.0 LOCAL LAW REGISTRATION
If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the contract shall be payable by the Contractor without Government reimbursement.
12.0 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT
The Contractor shall physically inventory all Government furnished property in its possession.
Physical inventories consist of sighting, tagging or marking, describing, recording, reporting, and reconciling the property with written records. The Contractor shall conduct these physical inventories annually during the contract and at the completion or termination of the contract, as directed by the COR. Unless approved in advance by the Contracting Officer, personnel other than those who maintain the property records or who have custody of the property shall conduct the inventory.
13.0 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
13.1 This plan provides an effective method to promote satisfactory Contractor performance.
The QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Para Performance Threshold
Services.
Perform all required scheduled
Preventive maintenance services for
Chiller equipment set forth in the scope of work.
1. through 12. All required services are performed and no more than one
(1) customer complaint is received per yearly PM Service visit.
13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the
Contractor for corrective action.
13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR
52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 15 of 63
13.4. Procedures.
13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
13.4.2 The COR will complete appropriate documentation to record the complaint.
13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The
COR will retain the annotated copy of the written complaint for his/her files.
13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.
13.4.8 Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the
Contracting Officer for appropriate action under the Inspection clause.
14.0 DELIVERABLES
The following items shall be delivered under this contract:
Description Clause
Reference
Delivery Date Deliver To
Names, biographic data, police clearance on Contractor personnel
3.2 of SOW 10 days after contract award.
COR
Copy of Insurance Certificates -
Comprehensive/General
Liability/WCP
9.2 of SOW 10 days after contract award.
CO
Copy of Defense Base Act (DBA)
Insurance Policy/Certificate
Section 3, A.1 10 days after contract award.
CO
Submission of formal PM Service report
4.11.1 of SOW Within 15 calendar days after completion of each maintenance service.
COR
Invoice – for all work required, performed, and accepted
2.0 of Section 1 After completion of each maintenance service.
FMO
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 16 of 63
ATTACHMENT 1
GOVERNMENT FURNISHED PROPERTY
Chiller (Refrigerant R143A) Sl. No. 11552M14003863
Chiller (Refrigerant R143A) Sl. No. 11552M14003862
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 17 of 63
EXHIBIT A
STATEMENT OF WORK
I. GENERAL INFORMATION:
The United States Embassy in Abu Dhabi requires professional services and contractor cost proposals to perform preventive maintenance services of the Embassy Compound Air-cooled
Chillers.
II. PROJECT REQUIREMENTS:
DESCRIPTION OF EQUIPMENT:
Chiller (Refrigerant R143A) Sl. No. 11552M14003863
Chiller (Refrigerant R143A) Sl. No. 11552M14003862
III. GENERAL REQUIREMENTS:
The Contractor under this SOW shall be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. The technician shall sign off on every task specified in the Statement of Work and will provide a typewritten copy of their report to the COR or the COR's designate within fifteen (15) business days of each maintenance visit.
The Government has the following manuals:
a. Operation & Maintenance manual of Chiller 1 & 2.
b. Operation & Maintenance manual of Chiller 3.
IV. SCOPE OF WORK - - CHILLERS ANNUAL MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO) immediately. Material Safety Data
Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 18 of 63
The Contractor shall inventory, supply and replace expendable parts (e.g., filters, hoses, O-rings/gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, oil, chemicals, coolant, filters, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personnel protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be new and are to be industry standard and intended for the task to be performed. Parts are to be OEM approved.
Refrigerants are to meet the AHRI_Standard_700-2015 or most recent AHRI Standards.
Refrigerants, parts and maintenance materials delivered to the post are to be new and unused.
Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type.
Water Treatment Considerations
A proper water treatment program, administered under the supervision of a competent water treatment specialist, is an essential part of routine maintenance to ensure the safe operation and longevity of chilled water system equipment, as well as other system components.
Embassy has a separate contract with a third-party Contractor to have the water sampling/quality checked on quarterly basis. The water treatment program is to monitor/control the following situations:
- Corrosion
- Scale Formation
- Biological Fouling
The Chiller PM Service Contractor shall verify the condition of the Chilled water pipelines and record the condition of the pipes/its associated equipment in the report, as a part of the PM Service checks.
SAFETY AND SPECIAL INSTRUCTIONS:
1. Follow site safety procedures and supervisor’s instructions.
2. Schedule outage with operating personnel.
3. Use extreme caution when climbing access ladders.
4. Perform applicable lockout/tag out steps of site safety procedures.
5. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.
6. Record and report equipment damage or deficiencies.
7. Review and follow the manufacturer’s O&M instructions.
8. Record results in the equipment history log.
9. Allow only qualified personnel to do maintenance work on this equipment.
10. Record results in the equipment history log.
11. Check manufacturer’s specifications for the maximum number of plugged tubes.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 19 of 63
12. Allow only qualified personnel to do maintenance work on this equipment.
At a minimum, the following work must be done:
1. Use appropriate personal protective equipment (PPE) when preforming work.
2. Check all work areas, tools and equipment to ensure unsafe conditions are eliminated or guarded against.
3. Follow site safety procedures.
4. Schedule maintenance with facilities.
5. Before de-energizing equipment, verify operation of back-up power before shutdown.
Return to normal after verification and proceed with shut down for maintenance.
6. Follow LOTO procedures.
7. Lock out and disconnect/open all sources of power before preforming any work/cleaning inside equipment that has exposed live parts or present an electrical hazard.
8. Review and follow the manufacturer’s instructions for the service/cleaning requirements of equipment.
9. Remove LOTO in accordance with appropriate procedures.
10. Record results of control work/testing in history log, if applicable.
11. Simulate utility outage after maintenance is completed to verify back up power preforms as required.
12. Report all incidents and near miss incidents to COR and assist as requested in the investigation and corrective action.
At a minimum the Contractor shall comply with the following:
1. Contractor shall submit worksheet/checklist that will be used for preforming maintenance/cleaning service to the COR for review,
2. A discrepancy report shall be submitted to the COR immediately upon discovery of any conditions that could result in equipment failure.
3. Inspection report shall be submitted to the COR within seven days of completing work.
4. All lab analysis and reports shall be in English.
MAINTENANCE PROCEDURES:
Check List – For performing Chiller 1, 2 & 3 equipment Annual PM Service
Mechanical:
Note: Prior carrying out the Chiller annual PM Service, run test the equipment and log the initial chiller data to assess the condition of the chiller.
1. Check for visual and audible operation of the chiller unit for proper operation, excessive noise, or vibration.
2. Physically check the chiller for oil traces for refrigerant leaks.
3. Run system diagnostics test.
4. Check oil level in oil separator sight glass.
5. Replace the oil filter and gaskets.
6. Check liquid line sight glass/moisture indicator, oil, and refrigerant pressures.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 20 of 63
7. Check refrigerant level in the evaporator sight glass while running full load for 10 to 15 minutes.
8. Record system operating temperatures and pressures in the checklist.
9. Replace the oil annually.
10. Inspect plumbing and valves for leaks, adjust as necessary.
11. Check compressor and evaporator heater operation.
12. Check superheat on the evaporator and the economizer feed to the compressor.
13. Check condenser sub-cooling. Check for dirt in the panel. Check door gasket for sealing integrity.
14. Replace filter core drier.
15. Replace oil cooler filter drier.
16. Fill out maintenance checklist and report deficiencies.
17. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
18. Check all strainers, valves, etc.
19. Check heater mounting screws for tightness.
20. Thoroughly clean evaporator and condenser tubes.
21. Check the oil level and refrigerant charge.
22. Conduct vibration analysis of motor & assembly: Check all alignments to specifications.
23. Check all seals.
24. Lubricate shaft bearings and motor bearings as required.
25. Check superheat and sub-cooling temperatures.
26. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
27. Exercise the butterfly valves and valves.
28. Check the chiller for leaks. Add refrigerant if low. Record amounts and address leakage problems.
29. Thoroughly clean intake side condenser coils, fans, and intake screens.
30. Fill out maintenance checklist and report deficiencies.
31. Have a qualified laboratory perform a compressor oil analysis to determine system moisture content and acid level.
32. Check glycol concentration on low temp. or other applications where freezing may be a problem.
33. Check the glycol hoses and clamps.
34. VSD glycol condition and change every 3 years or as per manufacturer recommendation.
35. Inspect all piping components for leaks and damage. Clean all water strainers.
36. Clean and repaint any components that show corrosion.
37. Check condenser coils for dirt/debris and clean as necessary.
38. Clean the condenser fans. Check the fan assemblies for proper clearance in the fan shroud openings and for motor shaft misalignment or abnormal endplay, vibration, and noise.
39. Check the fan blades wear and tear.
40. Vacuum dust and dirt from heat sink fins
41. Check ventilation fans for proper operation and clean as needed.
42. Lubricate all moving parts with proper lubricant.
43. Clean interior of cabinet.
44. Clean exterior of cabinet.
45. Energize circuit and check operation of starter and any pilot lights. Replace as required.
46. Remove debris from worksite.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 21 of 63
47. Perform operational test and return to service.
Electrical & Controls:
1. Check programmable operating setpoints and safety cutouts. assure they are correct for the application.
2. Verify motor amperage load limit.
3. Check contactors, sensors, transducers, and mechanical safety limits.
4. Check oil heater and thermostat.
5. Check the flow switch operation and valves.
6. Check line voltage, motor & output phase balance.
7. Leak test the chiller, check operating and safety controls, and inspect electrical components for proper operation.
8. Visually inspect for broken parts, contact arcing, or any evidence of overheating.
9. Check motor nameplate for current rating and controller manufacturer’s recommended heater size (report discrepancy to supervisor).
10. Check line and load connections for tightness (check manufacturer’s instructions for torque specifications).
11. Check all control wiring connections for tightness.
12. Complete RCM Procedure CM-0002 (Qualitative Infrared Testing).
13. On units equipped with motor reversing capacity, check mechanical interlock.
14. On units equipped with two-stage starting, check dash pots and timing controls for proper operation. Adjust as required.
15. On units equipped with variable speed starters:
a. Record the VFD parameter settings using MCT-10
b. Confirm the VFD doors and covers are in
c. Check tightness of connections to resistor bank.
d. Check resistor coils and plates for cracking, broken wires, mounting and signs of overheating. Clean as required.
e. Check tightness of connections to drum controller.
16. Check starters contact connections by applying a thin film of black contact grease to line and load stabs, operate contacts and check surface contact.
Panel, Electronic Controls:
1. Check for dirt in the panel. check door gasket sealing integrity.
2. Clean panel interior.
3. Verify functionality of supported devices.
4. Clean ventilation filter and fan (if applicable).
5. Record and report equipment damage or deficiencies.
6. Record results in the equipment history log
7. Replace battery where applicable.
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 22 of 63
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,
BLOCK 27A)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL RODUCTS AND COMMERCIAL
SERVICES (JAN 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar
2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun
2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov
2021) (41 U.S.C. 3509)).
__(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the
American Recovery and Reinvestment Act of 2009.)
__(4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
_X_(5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun
2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__(6) [Reserved].
__(7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section
743 of Div. C).
https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_233_3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 https://www.acquisition.gov/far/part-52#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_203_13 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14
Solicitation – Preventive Maintenance for Chiller Equipment Systems Page 23 of 63
__(8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__(9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of
Division R of Pub. L. 117-328).
__(10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply
Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec
2023) ( Pub. L. 115–390, title II).
__(11)
(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec
2023) ( Pub. L. 115–390, title II).
__(ii) Alternate I (Dec 2023) of 52.204-30.
_X_ (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (Nov 2021) ( 31 U.S.C. 6101 note).
__(13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility
Matters (Oct 2018) ( 41 U.S.C. 2313).
__(14) [Reserved].
__(15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022)
( 15 U.S.C. 657a).
__(16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
(Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)
(15 U.S.C. 657a).
__(1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .