19TC1026R0001_Document Submission Checklist_Ref. Section 3.pdf
PDF 132 KB Posted
- Solicitation number
- 19TC1026R0001
- Issued by
-
Department of State US Embassy Abu Dhabi
About this file
This is a Document Submission Checklist for RFP #19TC1026R0001 for York/Trane Chiller Preventive Maintenance (PM) services. Offerors must submit eighteen distinct document categories across pricing and technical proposals, which must be submitted separately. Required submissions include the SF-1449 cover page, a pricing table, and proof of SAM registration with UEI number and CAGE code. Technical qualifications must demonstrate a Project Manager with minimum five years of experience managing York/Trane Chiller PM services and expertise in troubleshooting chillers, supported by a detailed resume. Offerors must provide evidence of an established business with permanent address and telephone listing, along with a valid commercial license issued by local government.
Past performance documentation requires information for at least five chiller preventive maintenance contracts completed between 2023 and 2025, including contract award and completion dates, place of performance, contract value, client contact information, and detailed descriptions of services performed. Additional technical requirements include submission of training certificates for maintenance service personnel, a list of proposed tools and equipment, valid authorized service provider certification from Johnson Controls or Trane Chiller Manufacturer, a detailed work plan addressing all work elements, and a quality assurance plan. Offerors must confirm ability to supply new and original consumables and spare parts, provide valid Workmen Compensation Insurance certificates, submit audited financial statements for the past three years (2022-2024), and certify that all work will be performed directly without subcontracting. The final submission must include Section 5 Representations and Certifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Submission Checklist for RFP # 19TC1026R0001
For each item below, please confirm submission by selecting "Yes" or "No."
Srl. # Document Yes No
1. SF-1449 Cover page (Blocks 12, 17, 19-24, and 30 as appropriate)
2. Section 1 – Pricing Table
3. Section 3. A.2 (a)
Name of the Project Manager (PM) and confirmation whether PM understands written and spoken English.
4. Section 3. A.2 (b)
At a minimum, the Project Manager must have five years of professional experience in managing
York/Trane Chiller PM Service team and expertise in troubleshooting the Chillers. Submit resume of the
Project Manager that details his/her professional experience.
5. Section 3. A.2 (c)
Evidence that the offeror operates an established business with a permanent address, and telephone listing.
6. Section 3. A.2 (d)
Proof of active SAM registration including the SAM
Unique Entity Identification (UEI) number and CAGE code.
7. Section 3. A.2 (3)
Provide following information for at-least five of the
Chiller Preventive maintenance services completed in the past three years (year 2023 to 2025), demonstrating prior experience with relevant past performance information and references.
Following information must be submitted for each contract:
(a) Date of contract awarded.
(b) Date of completion of contract:
(c) Place of performance:
(d) Value of contract:
(e) Contact name of the client:
(f) Contact Telephone or cell numbers:
(g) Contact email addresses:
(h) Brief the type of service/work performed.
Provide details on the capacity/type of the chiller service and service work that your company performed.
8. Section 3. A.2 (4)
Provide a list of Chiller maintenance service personnel in your company who are trained to perform the requested service. Attach a copy of their training certificate.
9. Section 3. A.2 (5)
Provide a list of the following on proposed Chiller maintenance service:
a. Tools
b. Equipment.
10. Section 3. A.2 (6)
Provide a copy of valid authorized service provider certification of the offeror that authorizes the offeror to perform the requested York/Trane Chiller PM service. The authorized certification must be obtained either from Johnson Controls or Trane Chiller
Manufacturer.
11. Section 3. A.2 (7)
Submit a copy of valid commercial license of your company issued by the local government.
12. Section 3. A.2 (8)
Submit a detailed work plan (methodology) taking into account all work elements in Section 1, Performance Work Statement.
13. Section 3. A.2 (9)
Submit a quality plan of ensuring quality of services including but not limited to contract administration and oversight.
14. Section 3. A.2 (10)
Provide a confirmation that offeror has ability to supply the required new and original consumables and spare parts (when requested by Embassy through a separate PO) to perform all necessary inspection, specialized tests/diagnostic/programming and servicing of Chillers equipment as required by the contract.
15. Section 3. A.2 (11)
Submit a copy of valid Workmen Compensation
Certificate of Insurance(s).
16. Section 3. A.2 (12)
Submit a copy of past three years (year 2022 to 2024) audited financial statement of the offeror.
17. Section 3. A.2 (13)
Provide confirmation that the requested Chiller PM service will be performed by the offeror and no portion of the contract will be sub-contracted out.
18. Section 3. B.
Proposal Submission: Pricing and Technical Proposals must be submitted separately, as per the instructions listed in paragraphs A(1)-(13) above.
34. Section 5 – Representations and Certifications
File details come from the government source that posted it. Updated .