RFQ 19PK4026Q5005 - POST Site Visit Notes

This Request for Quote document outlines technical, administrative, security, and safety requirements for the installation of a non-metal plate boundary wall with razor wire at a POST (federal facility) compound. The project scope includes installing a 15-foot-high non-metal plate boundary wall spanning 110 meters, with five non-metal plate gates measuring 11 feet high by 42 meters running length. Razor wire must be installed with 3-4 inch pitch spacing to prevent climbing and finger gripping, with holes in anti-vision plates covered. Contractors must submit a detailed technical execution plan addressing materials, fasteners, metal supports, project completion duration, and cost. The site supervisor must possess technical expertise and fluent English proficiency, while all laborers must demonstrate skills in working at heights, cutting, and welding tasks as required.

Administrative requirements mandate daily staff accountability tracking, work hours from 0800-1630, constant escort supervision, and compliance with all guard instructions during drills and emergencies. Comprehensive safety protocols address work at height (safety harnesses, lifelines, fall protection inspection, sun protection, and hydration), hot work operations (fire watch, fire extinguishers, fire-resistant blankets, hot work permits), electrical equipment (proper grounding, 3-prong plugs, damage inspection), material handling, and required PPE including safety harness, hard hat, goggles, heavy-duty gloves, long sleeves/pants, and safety boots. An Emergency Response Plan must be established with briefing on the post's Emergency Action Plan, emergency contact numbers, evacuation assembly points, on-site first aid kits, and pre-work coordination with the Contracting Officer Representative (COR), Technical Security Officer (TSO), and Facility Administrator (FAC). Award will be based on technically acceptable lowest-cost methodology. Offerors must submit prices per unit of measure "Meter" for supplies and services separately with a grand total in PKR currency, a detailed project chart with timeline, project team organogram with professional backgrounds, and a comprehensive safety plan. All bids must be submitted electronically, and the contract awardee must furnish all materials and tools for FAC inspection and acceptance prior to service execution.

View the file

Other files

File Type Posted
SF30_RFQ - 19PK4026Q5005.pdf PDF
Updated RFQ 001 - 19PK4026Q5005.pdf PDF
Cancellation Notice Signed_260519_163908.pdf PDF
Q and A.pdf PDF
RFQ-19PK4026Q5005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ - 19PK4026Q5005 - POST Site visit notes

1. TECHNICAL REQUIREMENTS:

• Non-Metal plate Boundary Wall Area: 15 ft (Height) x 110 meter (Running length)

• Razor wire should be installed to ensure Anti-vision plate holes must be covered with Razor wire to prevent persons fingers gripping and climb able opportunity.

• Gate: 05 non-metal plate area: 11 ft (H) x 42 meter ( Running length)

• To complete the lifesaving objectives . The Contractor must submit best technical execution plan (methodology) as per existing boundary wall location shown them during site visit. (The proposal involved best material as per life Sustainably , Required Fasteners/metal supports / Clamp ( Razor wire proper stiffness), Cost, and Project Completion Duration).

• Site supervisor should have technical expertise (Job technical knowledge) and well-spoken English.

• All labors and workers should have sufficient skills to work at height , cutting and welding task (If required).

• The contractor must focus also that required supports should be such like they should not be an opportunity of climb over the wall.

• The Razor wire pitch (Each coil wire difference) about 3 to 4 inches to avoided persons hand through the coil to reach climb up supports or holes.

• The FAC will provide the main electrical connection point to connect with only. The Contractor has responsibility to arrange sufficient extension cords (3- wire with properly grounded) to feed their electrical equipment/ tools.

2. ADMINISTRATIVE & SECURITY REQUIREMENTS:

• Daily Staff Accountability tracking sheet on Compound.

• Time punctuality 0800 to 1630.

• Work at site will be under Escorted person , no one can move/walk without escort person.

• Follow Escort person / Guard instructions during any Drill and Emergency

Alert.

3. SAFETY PROTOCOL FOR RAZOR WIRE INSTALLATION ON

COMPOUND PERIMETER WALL

1. Work at Height

• Use safety harnesses and lifelines for all elevated work

• Inspect fall protection equipment before use

• Provide sun protection (hats) and hydration breaks (use of oral rehydration recommended especially during the summers)

• FAC will inspect all equipment and scaffolding before work begins and periodically during installation

2. Hot Work (Welding, Grinding, Cutting)

• Assign fire watch during and after hot work

• Keep fire extinguishers readily available

• Use fire-resistant blankets to protect surrounding areas

• Maintain clear access to electrical panels for emergency shutoff

• Hot Work protocol must be in place and during the Hot Work, the permit has to be in place

3. Electrical Equipment

• All electrical equipment (welding plant, grinder, cutter etc) must be properly grounded and have 3 prong plugs

• Inspect all electrical cords and equipment for damage before use

• Use appropriate voltage equipment compatible with post electrical systems

• Keep electrical equipment away from water and wet conditions

• FAC will inspect all electrical equipment before use

4. Material Handling

• Use mechanical aids or team lifting for razor wire rolls

• Keep work area clear of obstructions

• Handle materials with appropriate PPE for razor wire handling

5. Required PPE

• Safety harness and lifeline

• Hard hat, safety goggles/face shield

• Heavy-duty gloves, long sleeves, long pants

• Safety boots with puncture-resistant soles

• High-visibility vest (if near traffic)

6. Daily Toolbox Talks

• Review daily tasks and hazards

• Confirm PPE and fall protection use

• Review emergency procedures

• Discuss heat stress prevention and hydration

• Confirm hot work permits and fire watch assignments

7. Emergency Response Plan

• Ensure vendor is briefed on post's Emergency Action Plan (EAP)

• Establish emergency contact numbers (fire department and medical aid/nearby hospital)

• Designate assembly points for evacuation

• Ensure first aid kit and trained first aid personnel are on-site

• Plan for immediate fire department notification considering language differences, response distance, and traffic congestion

• Coordinate emergency response procedures with COR/TSO/FAC before work begins

FAC will inspect all equipment and scaffolding before work begins and periodically during installation. The contractor must acknowledge receipt and understanding of these requirements before commencing work. Please confirm the contractor's compliance.

4. COMMERCIAL ASPECTS OF CONTRACT

Technical Evaluations shall be based upon technical methodology/plan submitted by the offerors. Award will be based upon technically acceptable lowest cost methodology determined by POST

For supplies: Offers are required to submit technical specifications mentioning physical specs, product life & cost. Products offered under more than 1 specs should be clearly define under proposal A, B ,C etc

For services: Offers need to submit

• Project chart with timeline listed against each activity

• Detailed project execution methodology

• Project team organogram (project manager, site supervisor, fabricator/welder, skilled workforce) explain their roles in the project with professional background/experiences

• Safety plan to address the safety protocols listed above

Offerors need to submit Prices per UoM “Meter” for both supplies and services separately and grand total PKR cost in section “Section A Pricing Table”

Offerors are required to submit breakdown of pricing as per “ATTACHMENT 2”

Page 30 of RFQ

Offerors are required to submit all documentation as per SECTION J Page 35 including workers proof of health/accidental insurance

All bids must be submitted electronically (hard copy submissions are not encouraged as per Post green initiative policy)

Contract awardee will be required to furnish all materials & tools for inspection and acceptance in accordance to the acceptable technical literature and POST

PoC acceptance prior to execution of services