SF - 30 signed.pdf
PDF 1 MB Posted
- Attached to
- Electrical Subpanel Replacement
- Solicitation number
- 19PE5026R0001
- Issued by
-
Department of State US Embassy Lima
About this file
This is Amendment 0001 to Solicitation 19PE5026R0001 issued by the American Embassy Lima's General Services Office (GSO) Procurement office. The amendment extends the proposal submission deadline to Wednesday, June 10, 2026, at 12:00 pm Lima time and implements comprehensive renumbering of solicitation sections from Section C to Section B throughout the document.
The solicitation pertains to civil and electrical works at FAP Base in Callao, Peru, with three primary contract line items (CLINs): CLIN 0003 for civil works including wall/floor preparation, conduit installation, repair, grouting, and painting; CLIN 0004 for electrical subpanel supply and installation with specified technical requirements (32-pole panel, copper busbar, RAL 7035 finish, salt-fog rated); and CLIN 0005 for circuit breakers and protection devices including thermal-magnetic breakers, RCCBs, LED indicators, and fuse holders. All CLINs are priced on a Fixed Price (FFP) basis. The amendment modifies invoicing requirements to align VAT with Peruvian tax regulations and changes VAT evaluation from a separate assessment to inclusion in the base price comparison. The period of performance is 60 calendar days from Notice to Proceed with incorporation of FAR 52.242-17 Government Delay of Work clause. Insurance requirements are now mandatory, requiring contractor compliance with Peruvian law including SCTR, EsSalud, and General Liability insurance, as the Defense Base Act does not apply to host government facilities. The performance bond guaranty amount has been increased from 20% to 50% of the contract price in U.S. dollars. Technical evaluation criteria emphasize clear understanding of work requirements in Section B and consideration of past performance per Section J.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 19PE5026R0001 - Qand A sheet.pdf | ||
| RFP-ConstrOverseas_SAF - 19PE5026R0001 signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
PR15952524-0001
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE PE500 7. ADMINISTERED BY (If other than Item 6) CODE
AMERICAN EMBASSY LIMA
Av. Lima Polo cdra 2 s/n, Monterrico, Surco, ATTN: GSO/Procurement Lima
PERU
AMERICAN EMBASSY LIMA
Av. Lima Polo cdra 2 s/n, Monterrico, Surco, ATTN: GSO/Procurement Lima
PERU
(X) 9A. AMENDMENT OF SOLICITATION
NO.
19PE5026R0001
x
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
By completing items 8 and 15, and returning(a) 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The proposal submission deadline has been extended to Wednesday, June 10th, at 12:00 pm (Lima time). Additionally, the internally referenced content and sector numbering within Sections A through J of the solicitation have been renumbered in accordance with the continuation sheets issued under this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
Chris Burney x
PAGE OF PAGES
1 6
06/05/2026
06/05/2026
06/05/2026 16:35 GMT
Burney, Christopher (BurneyC@state.gov)
Continuation sheet for 19PE5026R0001- 0001
Amendment is hereby made to reflect the following changes;
I. CLIN’s 0003, 0004 and 0005 of Section A, (page 05 of 84)
CLIN Description Type Price
Civil Works (wall/floor preparation, conduit installation, repair, grouting, painting per Section C.4.1) FFP $_______
Electrical Works - New Subpanel Supply and Installation (32-pole panel, copper busbar, RAL 7035 finish, salt-fog rated per Section C.4.2)
FFP $_______
Electrical Works - Circuit Breakers and Protection Devices (thermal-magnetic breakers, RCCBs, LED indicators, fuse holders per Section C.4.2.3)
FFP $_______
Is replaced with the following
CLIN Description Type Price
Civil Works (wall/floor preparation, conduit installation, repair, grouting, painting per Section B.4.1)
FFP $_______
0004 Electrical Works - New Subpanel Supply and Installation (32-pole panel, copper busbar, RAL 7035 finish, salt-fog rated per Section B.4.2)
FFP $_______
Electrical Works - Circuit Breakers and Protection Devices (thermal-magnetic breakers, RCCBs, LED indicators, fuse holders per Section B.4.2.3)
FFP $_______
II. Section A, NOTES, (page 06 of 84)
4. CLIN Breakdown Rationale:
o CLIN 0003: Covers all civil works detailed in Section C.4.1 (chipping, conduit installation, repair, painting) o CLIN 0005: Covers all circuit protection devices specified in Section C.4.2.3
5. Invoicing: Invoices shall reference specific CLIN numbers and demonstrate progress/completion for each line item. VAT shall be invoiced separately under CLIN 0009 with supporting tax documentation.
6. Evaluation: Price evaluation under Section M will consider the reasonableness and balance of pricing across all CLINs 0001-0008. CLIN 0009 (VAT) will be evaluated for accuracy and compliance with Peruvian tax law but is not part of the base price comparison.
Is replaced with
4. CLIN Breakdown Rationale:
o CLIN 0003: Covers all civil works detailed in Section B.4.1 (chipping, conduit installation, repair, painting) o CLIN 0005: Covers all circuit protection devices specified in Section B.4.2.3
5. Invoicing: Invoices shall reference specific CLIN numbers and demonstrate progress or completion for each line item. VAT shall be invoiced in accordance with Peruvian tax regulations and included on the same invoice as the associated line items.
6. Evaluation: Price evaluation under Section K will consider the Total Evaluated Price across all CLINs. Pricing will be assessed for reasonableness and balance, and VAT will be reviewed for accuracy and compliance with Peruvian tax law as part of the total price comparison.
III. Section B3, B.5 and B.6 — References "Section C.4" and "Section C.13" (Page 9 thru 23)
Is replaced with the following:
All references to "Section C.4," "Section C.4.1," "Section C.4.2," "Section C.4.2.4," and "Section C.13" within the SOW are replaced to reference the appropriate section as follows:
• "Section C.4.1" → Section B.4.1
• "Section C.4.2" → Section B.4.2
• "Section C.4.2.4" → Section B.4.2.4
• "Section C.6(e)" → Section B.6.(e)
• "Section C.13" → Section B.13 (Safety and Security)
IV. Section B.27.2 Period of performance (page 23 of 84) 60 from Notice to Proceed (NTP)
Is replaced with
60 calendar days from Notice to Proceed (NTP) and the incorporation of FAR 52.242‑17
– Government Delay of Work (APR 1984).
V. Section B.16: INSURANCE "Not applicable for this contract." (page 18 of 84)
Is replaced with:
Insurance is required for this contract. The Defense Base Act (DBA) is NOT applicable, as work will be performed at a host government facility (FAP Base – Callao), not owned, leased, or rented by the U.S. Government. The Contractor shall maintain, at its own expense, all insurance required by Peruvian law, including but not limited to SCTR, EsSalud, and General Liability, consistent with Section G.18 of this solicitation.
VI. Section I List of attachments (page 70 of 84) Attachment 2 Sample Bank Letter of Guaranty states the guarantee amount as "20% of the contract price in U.S. dollars during the period ending with the date of final acceptance."
Is replaced with:
Amount as "50% of the contract price in U.S. dollars during the period ending with the date of final acceptance."
VII. Section E.11.4 (page 33 of 84) States: "All deliverables listed in Section C and Section J are submitted and approved."
Is replaced with:
4. All deliverables listed in Section B and Section E are submitted and approved."
VIII. Section F.3.2 — Withholding (page 36 of 84) Bullet (4) states: "The Contractor fails to comply with Section C or H requirements."
Is replaced with:
The Contractor fails to comply with Section B, E or G requirements."
IX. Section G.16 — Closeout Requirements (page 43 of 84)
States: "The Contractor shall submit all close-out deliverables listed in Section C."
Is replaced with:
The Contractor shall submit all close-out deliverables listed in Section B.30.
X. Section K.3 Factor 1 – Technical Approach & Compliance (page 79 of 84)
* Bullet (1st) states: "Understanding of Scope: Clear understanding of the work required in Section C."
Is replaced with:
Understanding of Scope: Clear understanding of the work required in Section B.
* Bullet (7th) states: "Past performance; as required in section L.” (page 79 of 84) Is replaced with:
Past performance; as required in section J.
XI. Section J.1 — Volume II Price (page 76 of 84) Bullet (4th) States: "Material Compliance Statement confirming pricing is based on specifications in Section C.4."
Is replaced with:
Material Compliance Statement confirming pricing is based on specifications in Section B.4
XII. Section K.4.3 Value Added Tax (VAT) (page 80 of 84)
States; The VAT evaluation clause reads: CLIN [X] (VAT) will be evaluated separately and is not included in the base price comparison.
o Accuracy; VAT calculation must be based on current [country] tax law o Compliance: offeror must demonstrate understanding of VAT documentation o Documentation Offeror must commit to providing proper tax documentation.
Is replaced with:
CLIN 0009 (VAT) will be part of the base price comparison.
o Accuracy; VAT calculation must be based on current Peruvian tax law o Documentation: VAT shall be charged and reflected in the vendor's corresponding invoice issued in Peru under the local tax authority (SUNAT).
XIII. The proposal submission deadline has been extended to Wednesday, June 10, 2026, at 12:00 pm (Lima time)