Amendment of Solicitation for Electrical Power Supply Services
This is an Amendment to Solicitation No. 19GT5026R0001 issued by the American Embassy Guatemala City's General Services Office, effective March 17, 2026. The amendment extends the proposal due date from February 23, 2026 to March 31, 2026 at 17:00 hours local Guatemala time. The amendment incorporates three key changes: (1) adds the Economic Price Adjustment (EPA) clause FAR 52.216-4 to Section 2, Contract Clauses, with corresponding updates to Section 1 pricing requirements; (2) incorporates the Pre-Proposal Conference Minutes and Questions and Answers as official attachments; and (3) updates all solicitation references to the new due date. Offerors must acknowledge receipt of this amendment prior to the submission deadline using one of the specified methods or risk rejection.
The underlying solicitation is a firm fixed-price contract with economic price adjustment for supplying electricity and equipment to the U.S. Embassy compound with a maximum demand requirement of 750 kW. The contract includes a one-year base period plus four optional one-year periods, with an optional six-month extension. Offerors must submit comprehensive pricing narratives, detailed pricing tables for each contract year, cost projections based on historical consumption data, separate line items for fixed and variable components and rental/installation services, and installation/insurance fees. Pricing may employ innovative methodologies including time-of-use, demand-based, tiered, indexed, or algorithmic models. The EPA clause permits energy rate adjustments annually after the first twelve months and premium adjustments based on host government legislation, subject to mutual agreement and independent third-party review. Value Added Tax (12%) applies but is not included in CLIN rates. Proposals must be submitted exclusively to GuatemalaBids@state.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Metering Per Hour.xlsx | XLSX spreadsheet | |
| RFP 19GT5026R0001 - Electrical Power Supply for the NEC.pdf | ||
| RFP 19GT5026R0001 - Electrical Power Supply for the NEC - Pre Solicitation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE OF PAGESAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
1 11
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
03/17/2026
4. REQUISITION/PURCHASE REQ. NO.
PR11974881-0001
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE GT500 7. ADMINISTERED BY (If other than Item 6) CODE
AMERICAN EMBASSY GUATEMALA CITY
Boulevard Austriaco 11-51, Zona 16, ATTN: GSO - PROCUREMENT SECTION Guatemala
GUATEMALA
AMERICAN EMBASSY GUATEMALA CITY
Boulevard Austriaco 11-51, Zona 16, ATTN: GSO - PROCUREMENT SECTION Guatemala
GUATEMALA
(X) 9A. AMENDMENT OF SOLICITATION
NO.
19GT5026R0001
x
9B. DATED (SEE ITEM 11)
02/23/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers x is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to modify Solicitation No. 19GT5026R0001 as follows:
1) Extend the due date for receipt of proposals to March 31, 2026, 17:00 hours (local Guatemala time). All references to the proposal due date within the solicitation are hereby updated accordingly.
2) Add the Economic Price Adjustment (EPA) clause to the solicitation. The clause FAR 52.216-4, Economic Price Adjustment - Labor and Material, is incorporated into Section 2, Contract Clauses. Section 1 - The Schedule, I. Pricing. is updated to reflect EPA applicability. Offerors shall prepare pricing in accordance with the revised Section 1 and instruction in Section 3.
3) Incorporate the Pre-Proposal Conference Minutes and the Questions and Answers as official attachments to the solicitation. These documents are hereby added as:
*Attachment 1: Pre-Proposal Conference Minutes and *Attachment 2: Questions and Answers.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SBU - CONTRACTING AND ACQUISITIONS
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFP NUMBER 19GT5026R0001
PRICES, BLOCK 23
The purpose of this firm fixed price with economic price adjustment (EPA) contract is for the supply of electricity and equipment for its new Embassy compound in accordance with Statement of Work in Section II.
The contract will be for a one-year period from the date of the contract award, with four (4) one-year options.
I. PRICING
The Government is soliciting proposals for the supply of electricity and equipment to the U.S. Embassy compound with a maximum demand requirement of 750 kW. The contract will include:
• A Base Year of service from the date of award
• Four (4) Option Years that may be exercised at the discretion of the Government
The Contractor is required to provide the energy supply, equipment, and all labor and materials for removal, installation and maintenance of equipment as required in the Statement of Work. Rather than prescribing a fixed rate structure, the Government encourages offerors to propose their most competitive and innovative pricing methodologies. Offerors may propose pricing models such as:
• Time-of-use pricing
• Demand-based or peak/off-peak pricing
• Tiered, block, or banded pricing
• Indexed rates tied to fuel or market indices
• Mathematical or algorithmic models based on consumption trends
Offerors must clearly define their pricing model(s), including all underlying assumptions, formulas, variables, and escalation factors. Pricing must be submitted for each of the following periods:
I.1 Base Year
No. Description Quantity Per Unit Price Months Total
1. Power demand, fixed rate 750 kW 12
2. Energy (variable) 450,000
(estimate) kWh 12
3. Measurement equipment 1 EA 12
* Total for Base Year
I.2 Option Year 1
1. Power demand, fixed rate 750 kW 12
2. Energy (variable) 450,000
(estimate) kWh 12
* Total for Option Year 1
I.3 Option Year 2
1. Power demand, fixed rate 750 kW 12
2. Energy (variable) 450,000
(estimate) kWh 12
* Total for Option Year 2
I.4 Option Year 3
1. Power demand, fixed rate 750 kW 12
2. Energy (variable) 450,000
(estimate) kWh 12
* Total for Option Year 3
I.5 Option Year 4
1. Power demand, fixed rate 750 kW 12
2. Energy (variable) 450,000
(estimate) kWh 12
* Total for Option Year 4
I.6 Option to Extend Services (6-months)
1. Power demand, fixed rate 750 kW 6
2. Energy (variable) 450,000
(estimate) kWh 6
3. Measurement equipment 1 EA 6
* Total for Option to Extend
Services
I.7 Summary
Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4 Option to Extend Services
GRAND TOTAL FOR BASE PLUS ALL
OPTION YEARS AND OPTION TO
EXTEND SERVICES
Submission Requirements:
Each proposal shall include the following:
1. A comprehensive pricing narrative explaining the methodology and rationale.
2. Pricing tables for each contract year (Base + 4 Option Years), showing cost breakdowns.
3. Projections using the historical consumption data provided in Annex I as a baseline.
4. A summary cost projection for each year and a grand total for all five years.
5. Any installation fees, insurance costs, or other applicable charges.
6. Separate line items for fixed and variable components, if applicable.
7. Separate line items for rental equipment and installation/removal services.
The Government may evaluate pricing based on overall cost-effectiveness, transparency, risk management, and the realistic applicability of the proposed model to the Embassy’s energy profile.
VALUE ADDED TAX
VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Prices provided are NET. However, VAT shall be included on Invoices submitted for payment. A VAT exemption form will be provided for the 12% tax.
I.8 ECONOMIC PRICE ADJUSTMENT-ELECTRICITY FEES
I.8.1 Energy Rate Adjustment Based on Experience - For energy services, prices may be adjusted upward or downward based on the market value. To exercise an economic price adjustment, it is required that the contractor presents cost experience data that includes the market fluctuation to support any price adjustment requirement. Prices may be adjusted upward or downward based on the experience. No adjustment will be allowed during the first twelve months. After such time, the Contractor or the Government may request an adjustment in energy rates on an annual basis. Adjustments are not retroactive to previous contract terms. Before any such adjustment is made, the Contractor agrees to provide the Government with a report showing the components that support the adjustment request. The Government reserves the right to have an independent third party review the data provided and make recommendations regarding the appropriateness of the requested adjustment.
Any adjustment shall be subject to the mutual agreement of the parties and shall result in a written modification to the contract. Mutually agreed to adjustments shall be effective thirty days after complete information is received by the Government. Any failure to reach agreement under this clause shall be subject to the procedures in the Disputes clause.
I.8.2 Premium Adjustment Based on Laws - The rates may also be adjusted during the performance period of the contract as a result of laws enacted by the host Government, if such change in the laws has a direct impact on the cost to the Contractor to perform this contract at the contracted rate. In that event, the Contracting Officer may enter into negotiations with the Contractor to modify the contract to adjust the premium rate. The Contractor agrees to provide all documentation necessary to support any requested adjustment.
ATTACHMENT 1 - Pre-proposal Conference - Minutes
RFP 19GT5026R0001 – Electrical Power Supply Services
Date: March 10, 2026
Time: 09:00 hours
Solicitation Number: 19GT5026R0001
Attendees: Ronaldo Prado – Electrical Engineer
Lorena Galdamez - Contracting Specialist Zayda Serech – Contracting Agent
Prospective Contractors:
1. Gerardo René Ceballos Muñoz - Comercializadora Guatemalteca Mayorista de Electricidad, S.
A. - GUATEMEL –
2. Juan Armando Orozco Rodas - Comercializadora Guatemalteca Mayorista de Electricidad, S. A.
- GUATEMEL –
3. Allan Estuardo H - Ingeniería Global Wes
4. Gerber – TOTALTEC
5. Dalia Veras - ECONOENERGIA, S.A.
6. Paula Daniela Ortiz Naranjo - ELECTRONOVA/Progreso
7. Wendy Renee River – GUATEMEL
Introduction:
The Contracting Specialist, Aura Lorena Galdamez, welcomed all attendees and introduced Electrical Engineer and Contacting Agent representing the U.S. Embassy in Guatemala.
Agenda:
• Welcome to attendees
• Review of solicitation package
• Questions and answers
• Reminder of offer submission due date/time
• Wrap up and dismissal
Discussion of the solicitation package:
The Contracting Specialist projected the solicitation package to the attendees and went section by section explaining the requirements and pointing out important data or requirements of the solicitation.
Conference attendees were notified that these questions and answers along with the meeting minutes and any amendment would be posted in SAM.gov site so that other vendors are not disadvantaged for being unable to attend the pre-proposal conference.
Conclusion:
Prospective offerors were reminded that doing business with the U.S. Government differs from commercial practice because the solicitation and award processes are regulated under FAR regulations.
The conference concluded and attendees were thanked for their presence and expression of interest in serving the U.S. Government and the meeting was adjourned.
ATTACHMENT 2 - Pre-proposal Conference – Questions and Answers
RFP 19GT5026R0001 – Electrical Power Supply Services
Q1. Is the measurement equipment to be purchased or rented?
R1. The U.S. Embassy in Guatemala needs the measurement equipment to be rented.
Q2. Can you provide photographs of the location where the measure equipment has to be installed?
R2. Below you can find the photographs of the existing equipment and the location where the rented equipment needs to be installed.
Q3. Are you already operating at High Voltage?
R3. We are currently operating at Medium Voltage with EEGSA 13.8kV, with redundant supply, La Paz and San Isidro sub-stations.
Q4. Do you have metering?
R4. USG recommends that all requirements necessary to process metering be included in the proposal, renting equipment in compliance with AMM/NCC14. The Contractor shall ensure that all documentation and technical specifications for metering are provided. So far, we still don’t know who the owner of the current measurement transformers CTs and PTs is. Until further instruction, please keep as part of your offers the metering system rental fee.
Q5. For primary metering, do you have hourly load profile readings?
R5. Attached is the metering per hour, from 03/11/2025 to 03/11/2026 as requested.
Q6. Is Embassy already registered as a large user or is registration required?
R6. The U.S. Embassy in Guatemala was registered as a large user with the following data:
ID of large user: GUSEEUMS0000001 Company mame in AMM: EMBAJADA DE LOS ESTADOS UNIDOS
Your offer shall include any cost that will be incurred to verify the large user ID and any necessary updates to our new location in Zone 16. This can be included as an additional task in the solicitation package.
Q7. Are the Clauses required for the proposal submission?
R7. The offerors shall include the Contract Clauses in their offers as confirmation of revision and acceptance of them.
Q8. Price tables: Are the projections estimates based on consumption?
R8. USG seeks detailed, non-variable tariff information. In regards of volatility USG understands that some suppliers may provide projections/estimates but not fixed prices. Projections are encouraged; once the Economic Price Adjustment (EPA) is included, any adjustments must be justified. The Contractor shall provide detailed price tables, clearly indicating which rates are fixed and which are estimates, and justify any projected adjustments in accordance with the EPA clause. EPA clause FAR 52.216-4, Economic Price Adjustment – Labor and Material, is incorporated into Section 2, Contract Clauses.
Q9. Will you accept reference prices for option years? As the market fluctuates, is not possible to provide fixed rates for 5-years.
R9. An amendment is being issued to change the type of contract from fixed price to fixed price with economic price adjustment type contract. To exercise an economic price adjustment it is required that the contractor presents cost experience data that includes the market fluctuation to support any price adjustment requirement. Prices may be adjusted upward or downward based on the experience. No adjustments will be allowed during the first twelve months. After such time, the Contractor or the Government may request an adjustment in the rates. Adjustments are not retroactive to previous contract terms. Before any such adjustment is made, the Contractor agrees to provide the Government with a report showing the components that support the adjustment request. The Government reserves the right to have an independent third party review the data provided and make recommendations regarding the appropriateness of the requested adjustment. Any adjustment shall be subject to the mutual agreement of the parties and shall result in a written modification to the contract. Mutually agreed to adjustments shall be effective thirty days after complete information is received by the Government. Any failure to reach agreement under this clause shall be subject to the procedures in the Disputes clause.
Premium Adjustment Based on Laws - The rates may also be adjusted during the performance period of the contract as a result of laws enacted by the host Government, if such change in the laws has a direct impact on the cost to the Contractor to perform this contract at the contracted rate. In that event, the Contracting Officer may enter into negotiations with the Contractor to modify the contract to adjust the premium rate. The Contractor agrees to provide all documentation necessary to support any requested adjustment.
Q10. Is the UGS looking for a specific energy supply?
R10. The Contractor is free to propose energy supply from any qualified source, provided all technical and regulatory requirements are met.
Broker contractor can also include more than one offer including different primary sources of energy, such as renewable energy and non-renewable energy.
Q11. Is the supply point new or already existing?
If it is new:
• Does the scope only include the management of the commercial metering equipment rental and the official meter, or is the installation of the Medium Voltage (MV) feeder line also required?
• Is the installation of the oil-filled transformer also included, or will this item be handled separately?
We ask this because, in order to process the fee agreement with the Empresa Eléctrica de Guatemala (EEGSA), it is necessary to submit photographs of the primary drop and the oil-filled transformer properly installed.
If it is an existing point:
• Is the service currently in Low Voltage (LV) or Medium Voltage (MV)?
• The request for primary metering leads us to think that it may be either a new point or an existing point currently in LV. Generally, when metering is in LV, hourly readings are not available, but if such data exists, it would be very helpful for preparing the consumption projections.
R.11 Supply point already exists in 13.8kVAC, point of connection is a Demarcation Room inside of the Embassy Compound. Regarding historical data, please find attached a .csv file with the consumptions of a year ago by hour, as per your request.
Q12. The project scope also includes the management of?
• Registration as a Large Electricity User before the Ministerio de Energía y Minas de Guatemala.
• Management of the fee agreement with Empresa Eléctrica de Guatemala.
• Commercial enablement with the Administrador del Mercado Mayorista de Guatemala.
R12. Offers should include updating or registration of a great user at MEM and AMM or just an update of the supply point of the current GUS number. As well as all necessary agreements with EEGSA in order to have a smooth transition, without interruption as possible in the service.
Q13. Deadline for offers and submission.
R13. Please note that submission of offers has been extended to Tuesday, March 31, 2026 by COB 17:00 hours. Offer submission shall be made ONLY through the following email address:
GuatemalaBids@state.gov
End of Questions and Answers
SBU - CONTRACTING AND ACQUISITIONS
mailto:GuatemalaBids@state.gov
| SF30 Cover page Amendment 1 |
| RFP 19GT5026R0001 - Questions and Answers - Amendment 1 approved by AGA 17Mar2026 |
| I. PRICING |
File details come from the government source that posted it. Updated .